0216-03-034
|
GUADALUPE
|
SAN ANTONIO
|
$2,982,000
|
FM 466
|
C 216-3-34
|
06/02/2026
|
04/01/2026
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($2,728,902)
|
|
|
6495-94-001
|
WHARTON
|
YOAKUM
|
$839,069
|
US0059
|
RMC - A00219004
|
05/11/2026
|
02/23/2026
|
ADD TURN LANE
|
HUNTER INDUSTRIES, LTD.
($933,297)
|
|
|
0018-01-102
|
LA SALLE
|
LAREDO
|
$27,692,721
|
IH 35
|
F 2026(635)
|
05/07/2026
|
03/02/2026
|
PREVENT MAINT
|
HUNTER INDUSTRIES, LTD.
($24,814,865)
|
|
|
1269-01-023
|
GUADALUPE
|
SAN ANTONIO
|
$19,746,679
|
FM 1150
|
F 2026(628)
|
05/07/2026
|
03/02/2026
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($14,244,558)
|
|
|
0073-08-183
|
BEXAR
|
SAN ANTONIO
|
$34,315,721
|
IH 37
|
CM 2026(627)
|
05/06/2026
|
03/02/2026
|
CONSTRUCT FRONTAGE RD, RAMPS & INTRS...
|
HUNTER INDUSTRIES, LTD.
($33,122,615)
|
|
|
1186-02-028
|
BASTROP
|
AUSTIN
|
$3,339,794
|
FM 969
|
STP 2026(607)VRU
|
05/06/2026
|
03/02/2026
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($3,189,429)
|
|
|
0269-10-028
|
LAVACA
|
YOAKUM
|
$2,177,688
|
FM 531
|
STP 2026(495)HES
|
04/07/2026
|
02/02/2026
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($2,566,089)
|
|
|
0299-14-010
|
MAVERICK
|
LAREDO
|
$131,978,368
|
SL 480
|
F 2026(307)
|
04/07/2026
|
12/01/2025
|
CONSTRUCT NEW ROAD
|
HUNTER INDUSTRIES, LTD.
($93,685,507)
|
|
|
6498-26-001
|
CALHOUN
|
YOAKUM
|
$599,961
|
FM1090
|
RMC - A00219974
|
04/06/2026
|
03/06/2026
|
ASPH PAVMT REPAIR
|
HUNTER INDUSTRIES, LTD.
($648,273)
|
|
|
0237-05-047
|
DUVAL
|
LAREDO
|
$21,994,703
|
SH 44
|
F 2026(420)
|
03/04/2026
|
01/09/2026
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($18,216,991)
|
|
|
0542-06-053
|
LIVE OAK
|
CORPUS CHRISTI
|
$5,608,038
|
US 59
|
F 2026(421)
|
03/04/2026
|
01/09/2026
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($5,311,274)
|
|
|
6484-29-001
|
TRAVIS
|
AUSTIN
|
$991,480
|
FM0812
|
RMC - A00215427
|
02/11/2026
|
12/01/2025
|
ASPH PAVMT REPAIR
|
HUNTER INDUSTRIES, LTD.
($717,000)
|
|
|
0180-02-048
|
REFUGIO
|
CORPUS CHRISTI
|
$1,500,213
|
SH 35
|
F 2026(306)
|
02/05/2026
|
12/01/2025
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($1,219,239)
|
|
|
0445-02-068
|
LAVACA
|
YOAKUM
|
$2,279,413
|
UA 90
|
STP 2026(340)HES
|
02/04/2026
|
12/01/2025
|
INTERS IMPRVS WITH RIGHT AND/OR LEFT...
|
HUNTER INDUSTRIES, LTD.
($2,212,469)
|
|
|
0527-03-025
|
AUSTIN
|
YOAKUM
|
$723,278
|
FM 1458
|
BR 2026(254)
|
01/07/2026
|
11/01/2025
|
BRIDGE REPL
|
HUNTER INDUSTRIES, LTD.
($936,878)
|
|
|
0211-06-068
|
FAYETTE
|
YOAKUM
|
$4,163,925
|
US 77
|
C 211-6-68
|
01/06/2026
|
11/01/2025
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($4,335,114)
|
|
|
0100-03-094
|
WILSON
|
SAN ANTONIO
|
$163,512
|
US 181
|
STP 2B25(170)HES
|
12/03/2025
|
10/01/2025
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($184,258)
|
|
|
0716-03-012
|
COLORADO
|
YOAKUM
|
$1,583,330
|
FM 806
|
BR 2026(192)
|
12/03/2025
|
10/01/2025
|
BRIDGE REPL
|
HUNTER INDUSTRIES, LTD.
($1,598,214)
|
|
|
1262-01-016
|
FAYETTE
|
YOAKUM
|
$1,442,458
|
FM 1115
|
BR 2026(191)
|
12/03/2025
|
10/01/2025
|
BRIDGE REPL
|
HUNTER INDUSTRIES, LTD.
($1,375,081)
|
|
|
0089-05-047
|
JACKSON
|
YOAKUM
|
$8,850,915
|
US 59
|
C 89-5-47
|
12/02/2025
|
10/01/2025
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($9,131,386)
|
|
|
0408-05-032
|
AUSTIN
|
YOAKUM
|
$10,709,547
|
FM 331
|
C 408-5-32
|
12/02/2025
|
10/01/2025
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($10,744,493)
|
|
|
1122-04-017
|
WILSON
|
SAN ANTONIO
|
$11,652,395
|
FM 1344
|
C 1122-4-17
|
12/02/2025
|
10/01/2025
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($9,689,291)
|
|
|
1500-01-028
|
FRIO
|
SAN ANTONIO
|
$3,688,493
|
FM 1582
|
C 1500-1-28
|
09/05/2025
|
07/01/2025
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($2,460,101)
|
|
|
1534-01-021
|
BLANCO
|
AUSTIN
|
$742,494
|
RM 1623
|
F 2B25(131)
|
09/05/2025
|
07/01/2025
|
SEAL COAT
|
HUNTER INDUSTRIES, LTD.
($507,633)
|
|
|
6477-48-001
|
GONZALES
|
YOAKUM
|
$3,471,250
|
IH0010
|
RMC - A00213057
|
09/04/2025
|
07/01/2025
|
FLEXIBLE PAVMT STRUCT REPAIR
|
HUNTER INDUSTRIES, LTD.
($2,922,697)
|
|
|
6483-27-001
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$1,888,980
|
IH0037
|
RMC - A00215070
|
09/04/2025
|
04/01/2025
|
REHAB OF EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($1,459,019)
|
|
|
6481-33-001
|
JIM WELLS
|
CORPUS CHRISTI
|
$857,486
|
FM3376
|
RMC - A00214369
|
08/19/2025
|
02/13/2025
|
MILL AND INLAY
|
HUNTER INDUSTRIES, LTD.
($764,826)
|
|
|
0384-01-024
|
CALDWELL
|
AUSTIN
|
$2,154,843
|
SH 142
|
F 2025(950)
|
08/07/2025
|
06/02/2025
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($1,719,623)
|
|
|
0445-02-072
|
LAVACA
|
YOAKUM
|
$6,336,208
|
UA 90
|
F 2025(924)
|
08/07/2025
|
06/02/2025
|
EMISSIONS REDUCTION
|
HUNTER INDUSTRIES, LTD.
($6,702,218)
|
|
|
3388-01-005
|
LLANO
|
AUSTIN
|
$1,337,472
|
RM 3404
|
SSW 3388-1-5
|
07/01/2025
|
05/01/2025
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($1,179,800)
|
|
|
0573-03-022
|
GONZALES
|
YOAKUM
|
$13,648,816
|
SH 304
|
C 573-3-22
|
06/05/2025
|
04/01/2025
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($10,569,339)
|
|
|
2485-02-013
|
DIMMIT
|
LAREDO
|
$1,691,050
|
SL 517
|
STP 2025(813)HES
|
06/05/2025
|
04/01/2025
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($1,400,125)
|
|
|
3486-01-010
|
WILLIAMSON
|
AUSTIN
|
$5,189,368
|
FM 3349
|
F 2025(756)
|
06/05/2025
|
04/01/2025
|
WIDEN ROAD - ADD SHOULDERS
|
HUNTER INDUSTRIES, LTD.
($4,662,191)
|
|
|
6484-96-001
|
LAVACA
|
YOAKUM
|
$981,505
|
SH0095
|
RMC - A00215731
|
05/29/2025
|
04/30/2025
|
ASPHIC CONC PAVMT REPAIRS
|
HUNTER INDUSTRIES, LTD.
($791,562)
|
|
|
0029-03-055
|
CALDWELL
|
AUSTIN
|
$5,525,420
|
US 90
|
C 29-3-55
|
04/04/2025
|
02/02/2025
|
PREVENT MAINT
|
HUNTER INDUSTRIES, LTD.
($4,315,552)
|
|
|
6480-88-001
|
KARNES
|
CORPUS CHRISTI
|
$1,452,855
|
FM0626
|
RMC - A00214289
|
04/03/2025
|
02/20/2025
|
REHAB OF EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($1,289,866)
|
|
|
0515-04-034
|
LAVACA
|
YOAKUM
|
$7,562,794
|
FM 530
|
C 515-4-34
|
03/05/2025
|
01/05/2025
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($5,948,468)
|
|
|
0511-02-028
|
COMAL
|
SAN ANTONIO
|
$4,922,856
|
RM 32
|
STP 2025(607)HES
|
03/04/2025
|
01/05/2025
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($3,391,550)
|
|
|
7774-01-006
|
BEXAR
|
SAN ANTONIO
|
$2,571,026
|
PA 1502
|
C 7774-1-6
|
03/04/2025
|
01/05/2025
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($1,579,728)
|
|
|
1499-01-032
|
FRIO
|
SAN ANTONIO
|
$704,587
|
FM 1581
|
STP 2025(509)HRR
|
02/07/2025
|
01/05/2025
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($614,054)
|
|
|
0700-01-049
|
BURNET
|
AUSTIN
|
$6,847,445
|
SH 71
|
STP 2025(431)HES
|
02/06/2025
|
01/05/2025
|
WIDEN ROAD - ADD SHOULDERS
|
HUNTER INDUSTRIES, LTD.
($7,072,728)
|
|
|
0748-04-042
|
FRIO
|
SAN ANTONIO
|
$20,954,835
|
FM 140
|
C 748-4-42
|
02/06/2025
|
01/05/2025
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($14,824,127)
|
|
|
0989-01-043
|
JIM WELLS
|
CORPUS CHRISTI
|
$2,235,251
|
FM 624
|
STP 2025(467)HES
|
02/06/2025
|
01/05/2025
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($1,711,943)
|
|
|
6477-47-001
|
VICTORIA
|
YOAKUM
|
$999,500
|
US0077
|
RMC - A00213056
|
01/15/2025
|
01/05/2025
|
SPOT BASE REPAIR
|
HUNTER INDUSTRIES, LTD.
($998,424)
|
|
|
1434-02-005
|
GUADALUPE
|
SAN ANTONIO
|
$1,929,704
|
FM 1977
|
C 1434-2-5
|
01/08/2025
|
11/27/2024
|
WIDEN ROAD - ADD SHOULDERS
|
HUNTER INDUSTRIES, LTD.
($1,001,033)
|
|
|
3136-01-190
|
TRAVIS
|
AUSTIN
|
$4,018,785
|
SL 1
|
C 3136-1-190
|
11/07/2024
|
09/26/2024
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($3,314,600)
|
|
|
0535-07-053
|
FAYETTE
|
YOAKUM
|
$10,408,947
|
IH 10
|
C 535-7-53
|
11/06/2024
|
09/25/2024
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($10,827,270)
|
|
|
0088-02-062
|
GOLIAD
|
CORPUS CHRISTI
|
$24,425,868
|
US 59
|
BR 2025(159)
|
10/01/2024
|
08/20/2024
|
BRIDGE REPL
|
HUNTER INDUSTRIES, LTD.
($31,574,353)
|
|
|
0287-03-036
|
GONZALES
|
YOAKUM
|
$17,978,198
|
SH 80
|
F 2B24(283)
|
07/10/2024
|
05/29/2024
|
WIDEN ROAD - ADD LANES
|
HUNTER INDUSTRIES, LTD.
($14,520,546)
|
|
|
0037-08-042
|
DIMMIT
|
LAREDO
|
$55,196,345
|
US 83
|
C 37-8-42
|
07/09/2024
|
05/28/2024
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($46,859,660)
|
|
|
0074-02-082
|
LIVE OAK
|
CORPUS CHRISTI
|
$15,649,346
|
IH 37
|
C 74-2-82
|
05/02/2024
|
03/21/2024
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($13,060,729)
|
|
|
6401-54-001
|
COLORADO
|
YOAKUM
|
$409,782
|
SS0052
|
RMC - 640154001
|
05/02/2024
|
03/28/2024
|
ASPH PAVMT REPAIR
|
HUNTER INDUSTRIES, LTD.
($468,903)
|
|
|
6415-22-001
|
VICTORIA
|
YOAKUM
|
$1,813,038
|
US0087
|
RMC - 641522001
|
04/04/2024
|
02/27/2024
|
ASPH PAVMT REPAIR
|
HUNTER INDUSTRIES, LTD.
($2,036,481)
|
|
|
0179-09-034
|
JACKSON
|
YOAKUM
|
$16,160,769
|
SH 35
|
C 179-9-34
|
03/06/2024
|
01/24/2024
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($17,748,210)
|
|
|
0941-04-019
|
VICTORIA
|
YOAKUM
|
$12,106,203
|
FM 237
|
C 941-4-19
|
03/05/2024
|
01/23/2024
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($9,911,169)
|
|
|
6422-12-001
|
DEWITT
|
YOAKUM
|
$1,931,346
|
UA0077
|
RMC - 642212001
|
02/01/2024
|
12/21/2023
|
ASPH PAVMT REPAIR
|
HUNTER INDUSTRIES, LTD.
($1,882,668)
|
|
|
0211-06-059
|
FAYETTE
|
YOAKUM
|
$128,168,588
|
US 77
|
F 2024(576)
|
01/05/2024
|
11/24/2023
|
WIDEN ROAD - ADD LANES
|
HUNTER INDUSTRIES, LTD.
($112,692,666)
|
|
|
0366-04-027
|
WILSON
|
SAN ANTONIO
|
$42,571,905
|
SH 123
|
F 2024(696)
|
01/05/2024
|
11/24/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($39,483,858)
|
|
|
0287-03-034
|
GONZALES
|
YOAKUM
|
$47,110,387
|
SH 80
|
C 287-3-34
|
01/04/2024
|
11/23/2023
|
WIDEN ROAD - ADD LANES
|
HUNTER INDUSTRIES, LTD.
($39,193,545)
|
|
|
0371-01-090
|
VICTORIA
|
YOAKUM
|
$10,129,259
|
US 77
|
F 2024(643)
|
01/04/2024
|
11/23/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($11,515,798)
|
|
|
0015-11-074
|
TRAVIS
|
AUSTIN
|
$2,915,066
|
SL 275
|
F 2024(472)
|
12/05/2023
|
11/15/2023
|
PREVENT MAINT
|
HUNTER INDUSTRIES, LTD.
($3,285,366)
|
|
|
0267-02-038
|
FAYETTE
|
YOAKUM
|
$21,052,065
|
SH 159
|
C 267-2-38
|
12/05/2023
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($21,356,225)
|
|
|
0432-02-097
|
VICTORIA
|
YOAKUM
|
$18,073,713
|
SH 185
|
F 2024(438)
|
12/05/2023
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($17,374,126)
|
|
|
0420-01-047
|
JACKSON
|
YOAKUM
|
$11,854,606
|
SH 172
|
F 2024(117)
|
10/06/2023
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($12,691,411)
|
|
|
2293-01-032
|
HAYS
|
AUSTIN
|
$1,164,581
|
FM 2439
|
F 2024(151)
|
10/06/2023
|
11/15/2023
|
PREVENT MAINT
|
HUNTER INDUSTRIES, LTD.
($958,354)
|
|
|
0270-01-051
|
DEWITT
|
YOAKUM
|
$63,364,496
|
SH 72
|
F 2B23(121)
|
08/03/2023
|
11/15/2023
|
WIDEN ROAD - ADD LANES
|
HUNTER INDUSTRIES, LTD.
($74,026,222)
|
|
|
0483-01-052
|
LA SALLE
|
LAREDO
|
$6,853,144
|
SH 97
|
F 2B23(147)
|
08/03/2023
|
11/15/2023
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($7,207,235)
|
|
|
0535-06-049
|
FAYETTE
|
YOAKUM
|
$10,245,886
|
IH 10
|
F 2B23(083)
|
08/03/2023
|
11/15/2023
|
CONSTRUCT REST AREA
|
HUNTER INDUSTRIES, LTD.
($9,282,087)
|
|
|
0088-05-096
|
VICTORIA
|
YOAKUM
|
$51,222,552
|
US 59
|
F 2B23(079)
|
08/02/2023
|
11/15/2023
|
WIDEN ROAD - ADD LANES
|
HUNTER INDUSTRIES, LTD.
($55,933,078)
|
|
|
1090-04-018
|
JACKSON
|
YOAKUM
|
$15,617,789
|
FM 1593
|
F 2B23(086)
|
08/02/2023
|
11/15/2023
|
WIDEN ROAD - ADD LANES
|
HUNTER INDUSTRIES, LTD.
($18,540,157)
|
|
|
0025-04-051
|
GUADALUPE
|
SAN ANTONIO
|
$2,435,888
|
UA 90
|
STP 2023(951)HES
|
06/28/2023
|
11/15/2023
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($2,221,434)
|
|
|
1899-02-021
|
KENDALL
|
SAN ANTONIO
|
$5,986,126
|
RM 1376
|
STP 2023(956)VRU
|
06/27/2023
|
11/15/2023
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($5,653,830)
|
|
|
0088-03-048
|
GOLIAD
|
CORPUS CHRISTI
|
$11,511,610
|
US 59
|
F 2023(931)
|
06/02/2023
|
11/28/2023
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($10,014,542)
|
|
|
0113-02-063
|
GILLESPIE
|
AUSTIN
|
$11,488,921
|
US 290
|
C 113-2-63
|
06/02/2023
|
11/28/2023
|
HWY IMPRV
|
HUNTER INDUSTRIES, LTD.
($12,041,546)
|
|
|
0016-03-124
|
HAYS
|
AUSTIN
|
$1,065,373
|
IH 35
|
F 2023(880)
|
06/01/2023
|
11/27/2023
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($1,002,855)
|
|
|
0015-13-417
|
TRAVIS
|
AUSTIN
|
$6,867,179
|
IH 35
|
F 2023(067)
|
05/04/2023
|
11/15/2023
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($7,604,085)
|
|
|
0022-09-055
|
VAL VERDE
|
LAREDO
|
$16,243,353
|
US 90
|
C 22-9-55
|
05/04/2023
|
11/15/2023
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD. / ANDERSON COLU
($17,895,331)
|
|
|
0016-16-028
|
HAYS
|
AUSTIN
|
$8,491,533
|
RM 967
|
F 2022(466)
|
04/04/2023
|
09/24/2024
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($8,474,686)
|
|
|
0025-09-083
|
BEXAR
|
SAN ANTONIO
|
$808,180
|
FM 78
|
STP 2023(545)HES
|
03/08/2023
|
08/21/2024
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($962,217)
|
|
|
0016-02-170
|
HAYS
|
AUSTIN
|
$5,219,590
|
IH 35
|
C 16-2-170
|
02/02/2023
|
11/15/2023
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($4,186,522)
|
|
|
0573-01-041
|
BASTROP
|
AUSTIN
|
$2,836,280
|
SH 304
|
C 573-1-41
|
02/02/2023
|
11/15/2023
|
WIDEN ROAD - ADD SHOULDERS
|
HUNTER INDUSTRIES, LTD.
($2,515,581)
|
|
|
0320-04-029
|
WILLIAMSON
|
AUSTIN
|
$5,910,823
|
US 79
|
C 320-4-29
|
02/01/2023
|
11/15/2023
|
PREVENT MAINT
|
HUNTER INDUSTRIES, LTD.
($5,596,125)
|
|
|
0366-02-094
|
GUADALUPE
|
SAN ANTONIO
|
$12,521,321
|
SH 123
|
C 366-2-94
|
02/01/2023
|
11/15/2023
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($7,325,978)
|
|
|
0535-05-037
|
GONZALES
|
YOAKUM
|
$12,180,001
|
IH 10
|
C 535-5-37
|
02/01/2023
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($12,470,411)
|
|
|
0286-01-061
|
HAYS
|
AUSTIN
|
$1,209,890
|
SH 21
|
C 286-1-61
|
01/06/2023
|
11/15/2023
|
PREVENT MAINT
|
HUNTER INDUSTRIES, LTD.
($1,208,196)
|
|
|
6405-26-001
|
TRAVIS
|
AUSTIN
|
$3,258,701
|
IH0035
|
RMC - 640526001
|
12/02/2022
|
11/15/2023
|
ASPH PAVMT REPAIR
|
HUNTER INDUSTRIES, LTD.
($5,562,208)
|
|
|
6427-49-001
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$606,014
|
US0181
|
RMC - 642749001
|
12/02/2022
|
11/15/2023
|
MILL AND INLAY
|
HUNTER INDUSTRIES, LTD.
($760,356)
|
|
|
0015-09-202
|
WILLIAMSON
|
AUSTIN
|
$1,245,854
|
IH 35
|
F 2023(336)
|
12/01/2022
|
09/24/2024
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($1,348,347)
|
|
|
0255-01-090
|
JIM WELLS
|
CORPUS CHRISTI
|
$5,229,054
|
US 281
|
C 255-1-90
|
11/02/2022
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($4,570,095)
|
|
|
1234-02-013
|
BASTROP
|
AUSTIN
|
$394,167
|
FM 1100
|
F 2023(069)
|
10/07/2022
|
11/15/2023
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($468,555)
|
|
|
3210-01-019
|
HAYS
|
AUSTIN
|
$1,540,031
|
FM 2770
|
STP 2023(068)HES
|
10/07/2022
|
11/15/2023
|
WIDEN ROAD - ADD LANES
|
HUNTER INDUSTRIES, LTD.
($1,394,024)
|
|
|
2350-01-060
|
VICTORIA
|
YOAKUM
|
$12,773,486
|
SL 463
|
F 2022(146)
|
10/06/2022
|
11/15/2023
|
ADD 2 LANES FOR 4-LANE DIVIDED
|
HUNTER INDUSTRIES, LTD.
($13,851,978)
|
|
|
0113-05-049
|
BLANCO
|
AUSTIN
|
$13,608,817
|
US 290
|
F 2023(014)
|
09/08/2022
|
11/15/2023
|
SEAL COAT
|
HUNTER INDUSTRIES, LTD.
($13,188,476)
|
|
|
0748-06-016
|
ATASCOSA
|
SAN ANTONIO
|
$14,058,120
|
FM 1099
|
F 2023(102)
|
09/08/2022
|
11/15/2023
|
RESPORE EXIST PAVMT
|
HUNTER INDUSTRIES, LTD.
($14,508,839)
|
|
|
0807-01-032
|
BASTROP
|
AUSTIN
|
$1,486,520
|
FM 535
|
F 2023(016)
|
09/08/2022
|
11/15/2023
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($1,577,805)
|
|
|
2660-01-012
|
DIMMIT
|
LAREDO
|
$18,754,771
|
FM 2688
|
C 2660-1-12
|
09/08/2022
|
11/15/2023
|
BASE, ACP, GRAD, STR, PAV MRKS, SIGN...
|
HUNTER INDUSTRIES, LTD.
($12,957,925)
|
|
|
0346-01-040
|
JACKSON
|
YOAKUM
|
$10,070,392
|
SH 111
|
F 2023(114)
|
09/07/2022
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($9,898,507)
|
|
|
3136-01-196
|
TRAVIS
|
AUSTIN
|
$1,258,140
|
SL 1
|
F 2023(110)
|
09/07/2022
|
11/15/2023
|
PREVENT MAINT
|
HUNTER INDUSTRIES, LTD.
($1,239,173)
|
|
|
0269-02-068
|
LAVACA
|
YOAKUM
|
$2,098,279
|
US 77
|
F 2022(703)
|
08/04/2022
|
11/15/2023
|
INTERS IMPRVS WITH RIGHT AND/OR LEFT...
|
HUNTER INDUSTRIES, LTD.
($2,786,917)
|
|
|
0017-13-012
|
ATASCOSA
|
SAN ANTONIO
|
$5,479,624
|
SH 132
|
F 2022(688)
|
06/30/2022
|
11/15/2023
|
WIDEN ROAD - ADD LANES
|
HUNTER INDUSTRIES, LTD.
($6,628,642)
|
|
|
0022-05-025
|
VAL VERDE
|
LAREDO
|
$12,119,655
|
US 90
|
F 2022(601)
|
06/02/2022
|
11/15/2023
|
PLANING, OVERLAYING, RAIL UPGRADE &...
|
HUNTER INDUSTRIES, LTD.
($16,723,941)
|
|
|
0371-02-074
|
REFUGIO
|
CORPUS CHRISTI
|
$8,855,103
|
US 77
|
C 371-2-74
|
06/02/2022
|
09/03/2024
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($9,300,600)
|
|
|
2519-01-007
|
KENDALL
|
SAN ANTONIO
|
$4,040,562
|
FM 1621
|
SSW 2519-1-7
|
06/01/2022
|
09/03/2024
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($7,314,033)
|
|
|
0715-03-014
|
DEWITT
|
YOAKUM
|
$10,643,950
|
FM 108
|
F 2022(491)
|
05/05/2022
|
08/31/2024
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($10,571,632)
|
|
|
0286-01-057
|
HAYS
|
AUSTIN
|
$6,473,164
|
SH 80
|
STP 2022(440)MM
|
04/06/2022
|
09/24/2024
|
WIDEN ROAD - ADD SHOULDERS
|
HUNTER INDUSTRIES, LTD.
($7,150,483)
|
|
|
6394-34-001
|
VICTORIA
|
YOAKUM
|
$1,526,814
|
SH0185
|
RMC - 639434001
|
03/04/2022
|
11/15/2023
|
ASPH PAVMT REPAIR
|
HUNTER INDUSTRIES, LTD.
($1,747,618)
|
|
|
0022-06-052
|
VAL VERDE
|
LAREDO
|
$6,196,225
|
US 90
|
F 2022(418)
|
03/03/2022
|
11/15/2023
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($6,003,080)
|
|
|
6394-32-001
|
GONZALES
|
YOAKUM
|
$699,707
|
BU0183V
|
RMC - 639432001
|
03/03/2022
|
11/15/2023
|
ASPH PAVMT REPAIR
|
HUNTER INDUSTRIES, LTD.
($704,757)
|
|
|
0516-02-031
|
GOLIAD
|
CORPUS CHRISTI
|
$10,169,973
|
SH 239
|
F 2022(257)
|
01/07/2022
|
11/15/2023
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($10,110,263)
|
|
|
0700-03-145
|
TRAVIS
|
AUSTIN
|
$12,843,171
|
SH 71
|
C 700-3-145
|
01/06/2022
|
11/15/2023
|
HWY IMPRV
|
HUNTER INDUSTRIES, LTD.
($13,908,751)
|
|
|
0348-07-018
|
ATASCOSA
|
SAN ANTONIO
|
$15,639,090
|
FM 99
|
C 348-7-18
|
12/02/2021
|
11/15/2023
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($15,357,877)
|
|
|
0535-08-089
|
COLORADO
|
YOAKUM
|
$4,432,188
|
IH 10
|
F 2022(187)
|
12/02/2021
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($4,831,460)
|
|
|
0143-08-099
|
DEWITT
|
YOAKUM
|
$1,784,581
|
US 87
|
F 2022(144)
|
12/01/2021
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($1,692,979)
|
|
|
6393-17-001
|
GOLIAD
|
CORPUS CHRISTI
|
$299,125
|
US0059
|
RMC - 639317001
|
11/16/2021
|
11/15/2023
|
SPOT BASE REPAIR
|
HUNTER INDUSTRIES, LTD.
($383,420)
|
|
|
0155-02-029
|
GOLIAD
|
CORPUS CHRISTI
|
$22,746,370
|
US 183
|
C 155-2-29
|
11/04/2021
|
11/15/2023
|
REHAB ROADWAY AND ADD PASSING LANES
|
HUNTER INDUSTRIES, LTD.
($22,867,693)
|
|
|
0432-01-067
|
CALHOUN
|
YOAKUM
|
$3,025,893
|
SH 185
|
F 2022(081)
|
10/07/2021
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($3,450,815)
|
|
|
1122-04-012
|
WILSON
|
SAN ANTONIO
|
$5,354,351
|
FM 1344
|
SSW 1122-4-12
|
09/01/2021
|
11/15/2023
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($6,200,914)
|
|
|
2975-01-009
|
ATASCOSA
|
SAN ANTONIO
|
$7,418,473
|
FM 2924
|
F 2022(047)
|
09/01/2021
|
11/15/2023
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($7,308,203)
|
|
|
0088-05-098
|
VICTORIA
|
YOAKUM
|
$11,687,239
|
US 59
|
C 88-5-98
|
08/05/2021
|
11/15/2023
|
CONSTRUCT ONE WAY FRONTAGE ROADS
|
HUNTER INDUSTRIES, LTD.
($13,531,313)
|
|
|
0236-04-029
|
FRIO
|
SAN ANTONIO
|
$25,996,381
|
FM 117
|
C 236-4-29
|
08/05/2021
|
11/15/2023
|
REHAB AND WIDEN NARROW ROADWAY TO AD...
|
HUNTER INDUSTRIES, LTD.
($23,587,273)
|
|
|
1090-04-016
|
JACKSON
|
YOAKUM
|
$3,880,529
|
FM 1593
|
F 2021(773)
|
08/05/2021
|
11/15/2023
|
ACP OVERLAY, WIDEN/ADD TURN LANES, I...
|
HUNTER INDUSTRIES, LTD.
($4,530,159)
|
|
|
1776-01-036
|
HAYS
|
AUSTIN
|
$6,740,121
|
RM 967
|
STP 2021(808)HES
|
08/05/2021
|
11/15/2023
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($6,598,036)
|
|
|
0150-04-046
|
LLANO
|
AUSTIN
|
$7,172,733
|
SH 29
|
C 150-4-46
|
08/04/2021
|
11/15/2023
|
HWY IMPRV
|
HUNTER INDUSTRIES, LTD.
($7,398,989)
|
|
|
0241-03-029
|
MATAGORDA
|
YOAKUM
|
$2,898,350
|
SH 60
|
F 2021(721)
|
08/04/2021
|
11/15/2023
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($4,538,993)
|
|
|
0987-03-012
|
HAYS
|
AUSTIN
|
$3,558,837
|
FM 621
|
STP 2021(806)MM
|
08/04/2021
|
11/15/2023
|
WIDEN ROAD - ADD LANES
|
HUNTER INDUSTRIES, LTD.
($2,961,992)
|
|
|
0215-09-035
|
GUADALUPE
|
SAN ANTONIO
|
$12,891,468
|
FM 725
|
F 2021(675)
|
07/01/2021
|
11/15/2023
|
WIDEN ROAD - ADD SHOULDERS
|
HUNTER INDUSTRIES, LTD.
($10,378,166)
|
|
|
1133-02-032
|
GONZALES
|
YOAKUM
|
$6,350,418
|
FM 794
|
F 2021(596)
|
06/04/2021
|
11/15/2023
|
WIDEN ROADWAY AND INSTL CENTERLINE...
|
HUNTER INDUSTRIES, LTD.
($5,212,301)
|
|
|
1268-01-013
|
COMAL
|
SAN ANTONIO
|
$40,975,029
|
FM 1103
|
C 1268-1-13
|
06/04/2021
|
11/15/2023
|
EXPAND 2 TO 4 LN W/MEDIANS, TRN LNS,...
|
HUNTER INDUSTRIES, LTD.
($39,295,624)
|
|
|
0026-02-034
|
FAYETTE
|
YOAKUM
|
$2,999,043
|
US 90
|
STP 2021(586)
|
06/03/2021
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($2,724,322)
|
|
|
0683-04-022
|
TRAVIS
|
AUSTIN
|
$14,520,825
|
RM 3238
|
F 2021(619)
|
06/03/2021
|
11/15/2023
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($15,859,607)
|
|
|
6369-60-001
|
VICTORIA
|
YOAKUM
|
$2,790,447
|
BU0059T
|
RMC - 636960001
|
06/03/2021
|
11/15/2023
|
ACP
|
HUNTER INDUSTRIES, LTD.
($2,780,095)
|
|
|
6381-05-001
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$1,057,136
|
FM0893
|
RMC - 638105001
|
06/03/2021
|
11/15/2023
|
MILL AND INLAY
|
HUNTER INDUSTRIES, LTD.
($899,918)
|
|
|
1776-02-019
|
HAYS
|
AUSTIN
|
$6,720,271
|
FM 2001
|
C 1776-2-19
|
03/05/2021
|
11/15/2023
|
CONSTRUCT NEW ROADWAY LANES
|
HUNTER INDUSTRIES, LTD.
($5,959,526)
|
|
|
6369-58-001
|
GONZALES
|
YOAKUM
|
$3,570,192
|
US0090
|
RMC - 636958001
|
03/04/2021
|
11/15/2023
|
ON CALL PAVMT REPAIRS
|
HUNTER INDUSTRIES, LTD.
($3,203,924)
|
|
|
0180-02-041
|
REFUGIO
|
CORPUS CHRISTI
|
$5,718,658
|
SH 35
|
C 180-2-41
|
02/05/2021
|
11/15/2023
|
WIDEN ROAD - ADD LANES
|
HUNTER INDUSTRIES, LTD.
($4,992,798)
|
|
|
1375-01-011
|
CALDWELL
|
AUSTIN
|
$4,737,143
|
FM 1322
|
STP 2021(364)
|
02/05/2021
|
11/15/2023
|
SEAL COAT
|
HUNTER INDUSTRIES, LTD.
($4,094,875)
|
|
|
0022-07-031
|
VAL VERDE
|
LAREDO
|
$9,284,312
|
US 90
|
C 22-7-31
|
02/04/2021
|
11/15/2023
|
SPOT BASE REPAIR, OVERLAY, RAIL UPGR...
|
HUNTER INDUSTRIES, LTD.
($7,511,304)
|
|
|
0267-03-030
|
FAYETTE
|
YOAKUM
|
$4,114,215
|
FM 609
|
STP 2021(348)
|
02/04/2021
|
11/15/2023
|
PAVMT REPAIR AND SURF
|
HUNTER INDUSTRIES, LTD.
($3,404,044)
|
|
|
0516-02-029
|
GOLIAD
|
CORPUS CHRISTI
|
$7,795,715
|
SH 239
|
STP 2021(377)
|
02/04/2021
|
11/15/2023
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($7,455,640)
|
|
|
1937-02-032
|
ZAVALA
|
LAREDO
|
$9,587,229
|
FM 393
|
BR 2021(297)
|
01/07/2021
|
11/15/2023
|
BRIDGE REPL
|
HUNTER INDUSTRIES, LTD.
($8,978,776)
|
|
|
0144-03-036
|
CALHOUN
|
YOAKUM
|
$8,296,315
|
US 87
|
STP 2B20(120)HES
|
11/05/2020
|
11/15/2023
|
GRADE SEPARATION
|
HUNTER INDUSTRIES, LTD.
($8,660,295)
|
|
|
0511-03-012
|
HAYS
|
AUSTIN
|
$1,892,370
|
RM 32
|
STP 2021(110)
|
11/04/2020
|
11/15/2023
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($1,671,960)
|
|
|
0535-07-050
|
FAYETTE
|
YOAKUM
|
$13,026,398
|
IH 10
|
NH 2021(119)
|
11/04/2020
|
11/15/2023
|
ACP OVERLAY
|
HUNTER INDUSTRIES, LTD.
($10,399,532)
|
|
|
1123-02-016
|
KARNES
|
CORPUS CHRISTI
|
$9,901,543
|
FM 81
|
C 1123-2-16
|
11/04/2020
|
11/15/2023
|
REHAB ROADWAY AND WIDEN
|
HUNTER INDUSTRIES, LTD.
($8,531,764)
|
|
|
6364-54-001
|
REFUGIO
|
CORPUS CHRISTI
|
$672,022
|
US0077
|
RMC - 636454001
|
09/03/2020
|
11/15/2023
|
SPOT BASE REPAIR
|
HUNTER INDUSTRIES, LTD.
($601,217)
|
|
|
0269-06-059
|
DEWITT
|
YOAKUM
|
$4,378,216
|
US 183
|
C 269-6-59
|
08/06/2020
|
11/15/2023
|
ADD 3 LANES FOR A 4-LANE UNDIVIDED H...
|
HUNTER INDUSTRIES, LTD.
($3,564,628)
|
|
|
0359-02-005
|
GOLIAD
|
CORPUS CHRISTI
|
$12,356,350
|
SH 119
|
C 359-2-5
|
08/06/2020
|
11/15/2023
|
REHAB AND WIDENING OF SHOULDERS
|
HUNTER INDUSTRIES, LTD.
($9,793,593)
|
|
|
0269-04-039
|
LAVACA
|
YOAKUM
|
$955,597
|
UA 77
|
STP 2B20(112)HES
|
08/05/2020
|
11/15/2023
|
ADD LEFT TURN LANES
|
HUNTER INDUSTRIES, LTD.
($1,216,445)
|
|
|
0088-05-104
|
VICTORIA
|
YOAKUM
|
$6,402,470
|
US 59
|
NH 2020(988)
|
07/09/2020
|
11/15/2023
|
INSTL MEDIAN BARRIER AND WIDEN ROADW...
|
HUNTER INDUSTRIES, LTD.
($6,878,588)
|
|
|
0216-01-057
|
COMAL
|
SAN ANTONIO
|
$14,258,767
|
SL 337
|
STP 2B20(029)MM
|
07/09/2020
|
11/15/2023
|
CONSTRUCT GRADE SEPARATION
|
HUNTER INDUSTRIES, LTD.
($14,284,639)
|
|
|
0016-02-149
|
HAYS
|
AUSTIN
|
$14,192,050
|
IH 35
|
NH 2020(853)
|
07/08/2020
|
11/15/2023
|
FREEWAY OPERATIONAL IMPRVS
|
HUNTER INDUSTRIES, LTD.
($14,020,542)
|
|
|
0100-08-095
|
BEE
|
CORPUS CHRISTI
|
$17,136,769
|
US 181
|
C 100-8-95
|
07/08/2020
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($14,739,738)
|
|
|
3545-02-010
|
HAYS
|
AUSTIN
|
$7,098,810
|
FM 110
|
STP 2020(761)
|
04/09/2020
|
11/15/2023
|
CONSTRUCT OVERPASS
|
HUNTER INDUSTRIES, LTD.
($5,882,254)
|
|
|
0016-02-152
|
HAYS
|
AUSTIN
|
$23,384,139
|
IH 35
|
NH 2020(463)
|
04/08/2020
|
11/15/2023
|
FREEWAY OPERATIONAL IMPRVS
|
HUNTER INDUSTRIES, LTD.
($21,992,737)
|
|
|
0573-04-017
|
GONZALES
|
YOAKUM
|
$3,864,100
|
FM 1116
|
STP 2020(710)
|
04/08/2020
|
11/15/2023
|
REHAB OF EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($3,364,665)
|
|
|
0471-02-070
|
HAYS
|
AUSTIN
|
$17,722,518
|
SH 21
|
NH 1902(251)
|
03/05/2020
|
11/15/2023
|
PROVIDE SUPER 2 PASSING LANES
|
HUNTER INDUSTRIES, LTD.
($17,392,024)
|
|
|
0370-04-033
|
VICTORIA
|
YOAKUM
|
$10,285,894
|
US 77
|
STP 2020(435)
|
01/09/2020
|
09/26/2024
|
ACP OVERLAY
|
HUNTER INDUSTRIES, LTD.
($9,370,793)
|
|
|
0370-05-052
|
VICTORIA
|
YOAKUM
|
$7,588,465
|
BU 77-S
|
NH 2019(731)
|
12/03/2019
|
11/15/2023
|
CNST MEDIAN, ACP OV;LIGHTING,PEDSTN
|
HUNTER INDUSTRIES, LTD.
($8,004,183)
|
|
|
0483-01-056
|
LA SALLE
|
LAREDO
|
$67,581,993
|
SH 97
|
STP 1802(439)
|
12/03/2019
|
11/15/2023
|
BASE,ACP,GRAD,STR,PAV MRK
|
HUNTER INDUSTRIES, LTD.
($67,316,512)
|
|
|
0073-07-064
|
LIVE OAK
|
CORPUS CHRISTI
|
$6,900,252
|
IH 37
|
NH 2020(208)
|
11/06/2019
|
11/15/2023
|
REHAB AND OVERLAY WEST AND EAST FRON...
|
HUNTER INDUSTRIES, LTD.
($6,699,673)
|
|
|
0266-01-083
|
FAYETTE
|
YOAKUM
|
$16,067,131
|
SH 71
|
NH 2020(197)
|
11/06/2019
|
11/15/2023
|
OVERLAY
|
HUNTER INDUSTRIES, LTD.
($15,790,738)
|
|
|
0016-02-163
|
HAYS
|
AUSTIN
|
$4,489,346
|
IH 35
|
NH 2020(306)
|
11/05/2019
|
11/15/2023
|
OVERLAY
|
HUNTER INDUSTRIES, LTD.
($3,960,590)
|
|
|
0515-03-051
|
CALHOUN
|
YOAKUM
|
$1,378,429
|
FM 1090
|
STP 2019(637)
|
10/03/2019
|
11/15/2023
|
PAVMT REPAIR AND RESURF
|
HUNTER INDUSTRIES, LTD.
($1,439,982)
|
|
|
0089-03-091
|
JACKSON
|
YOAKUM
|
$13,609,496
|
US 59
|
NH 2020(114)
|
10/02/2019
|
11/15/2023
|
PLANING AND ACP OVERLAY
|
HUNTER INDUSTRIES, LTD.
($12,833,114)
|
|
|
0027-04-041
|
WHARTON
|
YOAKUM
|
$1,726,963
|
UA 90
|
STP 1902(164)HES
|
09/06/2019
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
HUNTER INDUSTRIES, LTD.
($2,611,509)
|
|
|
0089-19-011
|
VICTORIA
|
YOAKUM
|
$3,570,485
|
BU 59-T
|
NH 2020(043)
|
09/06/2019
|
11/15/2023
|
MILL AND INLAY
|
HUNTER INDUSTRIES, LTD.
($3,807,959)
|
|
|
0144-04-043
|
CALHOUN
|
YOAKUM
|
$4,603,230
|
SH 238
|
STP 1902(293)
|
08/07/2019
|
11/15/2023
|
PAVMT REPAIR AND RESURF
|
HUNTER INDUSTRIES, LTD.
($4,717,939)
|
|
|
0715-01-022
|
GONZALES
|
YOAKUM
|
$13,561,435
|
FM 108
|
STP 1902(298)HES
|
08/07/2019
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS,ETC.
|
HUNTER INDUSTRIES, LTD.
($12,569,350)
|
|
|
0323-02-034
|
FAYETTE
|
YOAKUM
|
$16,938,585
|
SH 95
|
STP 1902(163)
|
07/10/2019
|
09/27/2024
|
REHAB OF EXIST ROAD
|
HUNTER INDUSTRIES, LTD.
($15,550,417)
|
|
|
0371-03-123
|
REFUGIO
|
CORPUS CHRISTI
|
$3,155,745
|
US 77
|
NH 1902(108)
|
07/10/2019
|
09/27/2024
|
MILL AND OVERLAY ROADWAY
|
HUNTER INDUSTRIES, LTD.
($3,620,226)
|
|
|
1090-05-018
|
CALHOUN
|
YOAKUM
|
$4,403,927
|
FM 1593
|
STP 1902(171)
|
07/10/2019
|
09/27/2024
|
RESTORE EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($4,811,548)
|
|
|
2820-01-012
|
FAYETTE
|
YOAKUM
|
$6,542,148
|
FM 2762
|
C 2820-1-12
|
07/10/2019
|
09/27/2024
|
RESTORE EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($6,090,094)
|
|
|
3545-02-007
|
HAYS
|
AUSTIN
|
$16,636,059
|
FM 110
|
CC 3545-2-7
|
07/10/2019
|
09/27/2024
|
CONSTRUCT NEW ROAD
|
HUNTER INDUSTRIES, LTD.
($16,235,482)
|
|
|
0142-15-026
|
KENDALL
|
SAN ANTONIO
|
$11,445,737
|
IH 10
|
NH 2019(788)
|
07/09/2019
|
09/27/2024
|
GRAD, BASE, SURF, STR, PAV'T MRKMT
|
HUNTER INDUSTRIES, LTD.
($12,602,402)
|
|
|
0155-04-055
|
GOLIAD
|
CORPUS CHRISTI
|
$29,312,416
|
US 183
|
STP 1902(107)
|
07/09/2019
|
09/27/2024
|
REHAB ROADWAY AND ADD PASSING LANES
|
HUNTER INDUSTRIES, LTD.
($31,126,365)
|
|
|
0255-01-084
|
JIM WELLS
|
CORPUS CHRISTI
|
$5,227,164
|
US 281
|
C 255-1-84
|
07/09/2019
|
09/27/2024
|
OVERLAY ROADWAY
|
HUNTER INDUSTRIES, LTD.
($5,930,379)
|
|
|
0291-07-034
|
BANDERA
|
SAN ANTONIO
|
$5,081,810
|
SH 16
|
STP 1902(064)HES
|
06/05/2019
|
11/15/2023
|
INST PROTECTION, WIDEN SHLDRS & PAV...
|
HUNTER INDUSTRIES, LTD.
($4,979,184)
|
|
|
0346-02-016
|
JACKSON
|
YOAKUM
|
$1,212,241
|
SH 111
|
STP 1902(023)HES
|
06/05/2019
|
11/15/2023
|
INCREASE SUPERELEVATION
|
HUNTER INDUSTRIES, LTD.
($1,235,556)
|
|
|
0016-04-116
|
COMAL
|
SAN ANTONIO
|
$18,176,785
|
IH 35
|
NH 2019(775)
|
06/04/2019
|
11/15/2023
|
GRADE, STR, BASE & SURF, ETC.
|
HUNTER INDUSTRIES, LTD.
($19,093,979)
|
|
|
0100-06-065
|
KARNES
|
CORPUS CHRISTI
|
$15,175,932
|
US 181
|
NH 2019(989)
|
06/04/2019
|
11/15/2023
|
PAVMT REPAIR AND STRUCTURAL OVERLAY
|
HUNTER INDUSTRIES, LTD.
($15,738,942)
|
|
|
0366-03-068
|
GUADALUPE
|
SAN ANTONIO
|
$24,136,511
|
SH 123
|
NH 1902(063)
|
06/04/2019
|
11/15/2023
|
REHAB AND WIDEN TO ADD SHOULDERS
|
HUNTER INDUSTRIES, LTD.
($24,608,309)
|
|
|
0266-05-048
|
WHARTON
|
YOAKUM
|
$10,961,080
|
SH 71
|
STP 2019(730)
|
05/08/2019
|
11/15/2023
|
ADD 2 LANES FOR 4-LANE UNDIVIDED
|
HUNTER INDUSTRIES, LTD.
($9,682,167)
|
|
|
0348-03-030
|
KARNES
|
CORPUS CHRISTI
|
$14,368,033
|
SH 80
|
C 348-3-30
|
04/03/2019
|
11/15/2023
|
REHAB ROADWAY AND ADD PASSING LANES
|
HUNTER INDUSTRIES, LTD.
($13,738,005)
|
|
|
6343-65-001
|
DEWITT
|
YOAKUM
|
$2,834,232
|
US0183
|
RMC - 634365001
|
04/03/2019
|
11/15/2023
|
CALL OUT ASPHIC CONC PAVMT OVERLAY
|
HUNTER INDUSTRIES, LTD.
($3,029,377)
|
|
|
0088-01-068
|
BEE
|
CORPUS CHRISTI
|
$5,109,247
|
US 59
|
C 88-1-68
|
04/02/2019
|
11/15/2023
|
SPOT BASE REPAIR AND NOVACHIP ROADWA...
|
HUNTER INDUSTRIES, LTD.
($4,366,328)
|
|
|
6333-66-001
|
VAL VERDE
|
LAREDO
|
$534,981
|
RM2523
|
RMC - 633366001
|
04/02/2019
|
11/15/2023
|
THIN OVERLAY AND PAVMT MRK
|
HUNTER INDUSTRIES, LTD.
($520,034)
|
|
|
6343-64-001
|
VICTORIA
|
YOAKUM
|
$2,834,232
|
US0059
|
RMC - 634364001
|
04/02/2019
|
11/15/2023
|
CALL OUT ASPHIC CONC PAVMT OVERLAY
|
HUNTER INDUSTRIES, LTD.
($2,842,868)
|
|
|
0074-01-055
|
LIVE OAK
|
CORPUS CHRISTI
|
$1,927,013
|
IH 37
|
C 74-1-55
|
03/06/2019
|
11/15/2023
|
REHAB AND WIDEN-WEST FRTG LANES ONLY
|
HUNTER INDUSTRIES, LTD.
($1,839,972)
|
|
|
0180-02-040
|
REFUGIO
|
CORPUS CHRISTI
|
$12,352,440
|
SH 35
|
STP 2019(579)HES
|
02/06/2019
|
11/15/2023
|
SAFETY TRT FIXED OBJECTS, INSTL PASS...
|
HUNTER INDUSTRIES, LTD.
($12,619,232)
|
|
|
0024-01-101
|
UVALDE
|
SAN ANTONIO
|
$273,463
|
US 90
|
NH 2019(272)
|
12/05/2018
|
11/15/2023
|
INTERS IMPRVS
|
HUNTER INDUSTRIES, LTD.
($361,123)
|
|
|
0025-10-092
|
GUADALUPE
|
SAN ANTONIO
|
$7,755,982
|
FM 78
|
STP 2019(171)
|
11/07/2018
|
11/15/2023
|
SURF & PAVMT MRK
|
HUNTER INDUSTRIES, LTD.
($7,321,503)
|
|
|
0037-01-042
|
UVALDE
|
SAN ANTONIO
|
$11,761,070
|
US 83
|
STP 2019(170)
|
11/07/2018
|
11/15/2023
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($10,197,041)
|
|
|
0445-02-066
|
LAVACA
|
YOAKUM
|
$778,903
|
US 90A
|
STP 2019(174)
|
11/07/2018
|
11/15/2023
|
MILL AND INLAY
|
HUNTER INDUSTRIES, LTD.
($745,425)
|
|
|
6340-80-001
|
KINNEY
|
LAREDO
|
$255,500
|
RM0334
|
EMC - 634080001
|
10/25/2018
|
11/15/2023
|
REPAIR OF LOW WATER CROSSING WASHOUT
|
HUNTER INDUSTRIES, LTD.
($277,300)
|
|
|
0748-05-040
|
ATASCOSA
|
SAN ANTONIO
|
$5,263,546
|
FM 140
|
STP 2019(110)
|
10/02/2018
|
11/15/2023
|
GRADE, BASE, SC, SURF, PAVMT MRK
|
HUNTER INDUSTRIES, LTD.
($4,730,331)
|
|
|
0913-00-103
|
DEWITT
|
YOAKUM
|
$3,021,981
|
VA
|
STP 2019(098)
|
10/02/2018
|
11/15/2023
|
MILL AND INLAY
|
HUNTER INDUSTRIES, LTD.
($3,289,679)
|
|
|
0483-02-021
|
MCMULLEN
|
SAN ANTONIO
|
$29,289,402
|
SH 72
|
STP 2018(077)
|
09/06/2018
|
11/15/2023
|
GRADE, BASE, SURF, PAVMT MRK
|
HUNTER INDUSTRIES, LTD.
($30,553,965)
|
|
|
0153-02-040
|
GONZALES
|
YOAKUM
|
$7,207,873
|
US 183
|
NH 1802(495)
|
08/08/2018
|
11/15/2023
|
PAVMT REPAIR AND RESURF; MILLED R. S...
|
HUNTER INDUSTRIES, LTD.
($6,756,349)
|
|
|
0270-03-075
|
KARNES
|
CORPUS CHRISTI
|
$19,433,999
|
SH 72
|
STP 1802(559)
|
08/08/2018
|
11/15/2023
|
REHAB ROADWAY AND ADD PASSING LANES
|
HUNTER INDUSTRIES, LTD.
($18,309,294)
|
|
|
3621-01-014
|
VAL VERDE
|
LAREDO
|
$14,331,589
|
SL 79
|
STP 1802(541)
|
08/08/2018
|
11/15/2023
|
BASE,GRADE,ACP,PAVMRK,ILLUM
|
HUNTER INDUSTRIES, LTD.
($11,318,353)
|