LAVACA FM 531 (0269-10-028)

Items: 115

County: LAVACA
Length: 3.0290 MILES
Highway: FM 531
District: YOAKUM
Control Number: 0269-10-028
DBE Goal: 0.0%
Project: STP 2026(495)HES
Guaranty: $44,000.00
Time: 105 WORKING DAYS
Engineer's Estimate: $2,177,687.55
Date: 04/07/2026 (2 months ago)
Contract Number: 4263015
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00206489
Contract Type: Federal
Project Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH - HSIP
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
COVEY MORROW
CHASE HERMES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,177,687.55
$2,566,088.85
Over/Under Est: 17.84% $388,401.30
Over/Under Est: 35.67% $776,724.50
Amt Left: 15.13% $388,323.20
Over/Under Est: 57.82% $1,259,045.71
Amt Left: 33.93% $870,644.41
Delta: -16.33% -$482,321.21

Bid Items & Bid Tabulations

115 Total 0 of 115
LAVACA  |  FM 531  |  YOAKUM  |  0269-10-028  |  04/07/2026  |  $2,177,687.55  |  STP 2026(495)HES  |  HAZARD ELIM & SAFETY  |  105 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
E-Z BEL CONSTRUCTION, LLC
ACME BRIDGE COMPANY, INC.
PREPARING ROW
STA 9.900 $1,100.000 $1,587.440 $6,900.000 $1,580.000
EXCAV (ROADWAY)
CY 366.000 $11.000 $23.100 $22.000 $56.700
SUBGR WIDEN (OC)
STA 157.980 $185.000 $440.000 $200.000 $445.000
EMBANK (VEH)(OC)(TY C)
CY 343.000 $30.000 $30.800 $13.500 $78.600
BACKFILL (TY A)
STA 152.280 $180.000 $121.000 $180.000 $254.000
BLADING
HR 25.000 $86.000 $110.000 $158.000 $85.800
BROADCAST SEED (TEMP_WARM)
SY 230.000 $0.300 $0.200 $4.000 $4.300
BROADCAST SEED (TEMP_COOL)
SY 230.000 $0.300 $0.200 $4.000 $4.300
DRILL SEED (PERM_RURAL_CLAY)
SY 52,660.000 $0.300 $0.310 $0.200 $0.170
DRILL SEED (TEMP_WARM)
SY 13,165.000 $0.300 $0.260 $0.250 $0.230
DRILL SEED (TEMP_COOL)
SY 13,165.000 $0.300 $0.260 $0.250 $0.230
VEGETATIVE WATERING
TGL 443.260 $26.000 $23.100 $60.000 $49.800
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 78.000 $75.000 $93.500 $120.000 $211.000
AGGR (TY-PE, GR-4)(SAC-B)
CY 383.000 $120.000 $121.420 $300.000 $383.000
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 16,910.000 $2.750 $4.560 $4.000 $9.000
D-GR HMA TY-B SAC-B PG64-22
TON 3,862.000 $83.000 $94.600 $144.000 $131.000
D-GR HMA TY-B PG64-22 (LEVEL-UP)
TON 500.000 $100.000 $94.600 $135.000 $131.000
D-GR HMA TY-D SAC-B PG70-22
TON 6,062.000 $93.500 $102.430 $115.000 $124.000
TACK COAT
GAL 1,170.000 $4.500 $3.520 $3.500 $3.750
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,000.000 $40.000 $62.920 $70.000 $75.300
CUT & RESTORING PAV
SY 14.000 $350.000 $252.000 $280.000 $105.000
CUT AND RESTORE PAV (FLEX BASE)
SY 15.000 $200.000 $56.000 $45.000 $105.000
CEM STABIL BKFL
CY 113.000 $168.000 $224.000 $280.000 $171.000
TEMPORARY SPL SHORING
SF 256.000 $15.000 $56.000 $30.000 $25.500
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 20.000 $275.000 $158.900 $275.000 $302.000
RIPRAP (CONC)(5 IN)
CY 9.000 $620.000 $952.010 $600.000 $571.000
RIPRAP (CONC)(CL B)
CY 0.700 $1,260.000 $1,064.010 $600.000 $612.790
RIPRAP (STONE PROTECTION)(12 IN)
CY 48.000 $200.000 $200.770 $270.000 $158.000
RETROFIT RAIL (TY T131RC)
LF 440.000 $185.000 $218.000 $205.000 $226.000
CMP (GAL STL 12 IN)
LF 8.000 $165.000 $50.400 $60.000 $95.900
CMP (GAL STL 18 IN)
LF 28.000 $120.000 $61.600 $65.000 $123.000
CMP (GAL STL 24 IN)
LF 24.000 $160.000 $145.600 $70.000 $148.000
CMP (GAL STL 30 IN)
LF 8.000 $125.000 $218.400 $85.000 $158.000
CMP (GAL STL 42 IN)
LF 16.000 $125.000 $280.000 $95.000 $184.000
CMP AR (GAL STL DES 1)
LF 8.000 $120.000 $224.000 $68.000 $129.000
CMP AR (GAL STL DES 3)
LF 12.000 $105.000 $392.000 $78.000 $139.000
CONC BOX CULV (4 FT X 2 FT)
LF 33.000 $270.000 $672.000 $530.000 $758.000
CONC BOX CULV (6 FT X 2 FT)
LF 19.000 $370.000 $840.010 $860.000 $825.000
CONC BOX CULV (7 FT X 3 FT)
LF 21.000 $975.000 $952.010 $1,500.000 $1,080.000
CONC BOX CULV (10 FT X 4 FT)
LF 11.000 $950.000 $1,344.010 $1,650.000 $1,390.000
CONC BOX CULV (10 FT X 6 FT)
LF 11.000 $1,150.000 $1,568.010 $2,050.000 $1,530.000
RC PIPE (CL III)(24 IN)
LF 53.000 $140.000 $156.800 $82.000 $131.000
RC PIPE (CL III)(30 IN)
LF 84.000 $225.000 $224.000 $110.000 $179.000
RC PIPE (CL III)(42 IN)
LF 10.000 $280.000 $392.000 $200.000 $267.000
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $17,000.000 $15,680.100 $26,500.000 $19,600.000
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $17,500.000 $33,600.220 $32,000.000 $26,400.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1)(C)
EA 2.000 $9,800.000 $10,080.070 $9,000.000 $9,800.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1)(C)
EA 2.000 $8,000.000 $10,640.070 $9,750.000 $9,830.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1)(C)
EA 1.000 $7,000.000 $14,560.100 $10,500.000 $9,990.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1)(C)
EA 1.000 $11,120.000 $16,800.110 $11,500.000 $10,500.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1)(C)
EA 1.000 $7,900.000 $19,040.120 $14,200.000 $10,900.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $10,000.000 $21,280.140 $15,700.000 $13,800.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1)(P)
EA 4.000 $12,000.000 $2,464.020 $11,700.000 $20,400.000
SET (TY II) (12 IN) (CMP) (6: 1) (P)
EA 2.000 $1,500.000 $952.010 $1,100.000 $1,450.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 8.000 $1,200.000 $1,120.010 $1,200.000 $1,790.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000 $1,300.000 $2,800.020 $1,350.000 $2,070.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 3.000 $1,700.000 $2,240.010 $1,950.000 $2,270.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $2,000.000 $2,240.010 $1,950.000 $2,420.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 2.000 $2,000.000 $3,920.030 $1,500.000 $2,750.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $3,000.000 $3,920.030 $3,350.000 $3,820.000
SET (TY II) (42 IN) (CMP) (6: 1) (P)
EA 2.000 $4,000.000 $5,040.030 $3,750.000 $5,380.000
SET (TY II) (42 IN) (RCP) (3: 1) (C)
EA 2.000 $5,000.000 $4,480.030 $4,400.000 $6,060.000
SET (TY II) (DES 1) (CMP) (6: 1) (P)
EA 2.000 $1,600.000 $1,120.010 $1,175.000 $2,380.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 2.000 $1,800.000 $2,800.020 $1,250.000 $2,380.000
REMOV STR (SMALL)
EA 3.000 $1,200.000 $1,120.010 $861.000 $936.000
MOBILIZATION
LS 1.000 $175,000.000 $189,215.940 $285,000.000 $304,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $2,500.000 $9,972.130 $2,050.000 $32,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,000.000 $3,603.650 $7,500.000 $17,000.000
TMA (STATIONARY)
DAY 20.000 $300.000 $128.700 $255.000 $248.000
TMA (MOBILE OPERATION)
DAY 20.000 $320.000 $308.880 $500.000 $399.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 160.000 $30.000 $56.730 $55.000 $59.400
ROCK FILTER DAMS (REMOVE)
LF 160.000 $6.000 $21.820 $12.000 $13.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,350.000 $4.000 $4.310 $4.000 $4.050
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,350.000 $1.500 $1.360 $1.250 $1.300
DRIVEWAYS (ACP)
SY 1,380.000 $46.000 $44.000 $20.000 $21.500
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 15,998.000 $0.400 $0.410 $0.500 $0.430
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $29.000 $24.820 $28.000 $28.400
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $1,975.660 $2,100.000 $1,620.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $2.000 $2.530 $3.500 $4.350
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,140.790 $3,100.000 $3,580.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $180.000 $253.290 $275.000 $272.000
WIRE FENCE (TY A)
LF 100.000 $5.000 $30.390 $30.000 $35.600
WIRE FENCE (WATER GAP)
LF 48.000 $40.000 $65.860 $65.000 $33.300
MAILBOX INSTALL-S (WC-POST) TY 3
EA 10.000 $165.000 $400.000 $231.000 $419.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 2.000 $5,000.000 $6,839.730 $8,855.000 $7,840.000
CONDT (PVC) (SCH 40) (2")
LF 260.000 $15.000 $17.210 $21.570 $18.100
CONDT (PVC) (SCH 80) (2") (BORE)
LF 110.000 $25.000 $25.980 $39.500 $20.500
ELEC CONDR (NO.10) BARE
LF 30.000 $2.000 $2.210 $1.100 $1.150
ELEC CONDR (NO.10) INSULATED
LF 90.000 $2.000 $2.450 $1.000 $1.650
ELEC CONDR (NO.8) BARE
LF 340.000 $2.000 $2.570 $1.300 $1.700
ELEC CONDR (NO.8) INSULATED
LF 680.000 $2.500 $2.760 $1.000 $1.850
GROUND BOX TY A (122311)W/APRON
EA 4.000 $1,300.000 $1,469.700 $1,250.000 $1,520.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $8,650.000 $12,438.330 $9,800.000 $7,000.000
ALUMINUM SIGNS (TY A)
SF 24.000 $35.000 $20.000 $23.000 $41.900
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $665.000 $675.000 $280.000 $708.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 3.000 $1,450.000 $800.000 $1,055.000 $839.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 48.000 $400.000 $400.000 $305.000 $419.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 2.000 $495.000 $475.000 $370.000 $498.000
REMOVE SM RD SN SUP&AM
EA 56.000 $90.000 $100.000 $75.000 $105.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
EA 10.000 $28.000 $25.000 $18.000 $26.200
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $38.000 $25.000 $22.000 $26.200
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 16.000 $75.000 $100.000 $108.000 $105.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 95,994.000 $0.190 $0.280 $0.250 $0.260
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 6,192.000 $0.190 $0.280 $0.250 $0.260
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 62,745.000 $0.190 $0.280 $0.250 $0.260
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,998.000 $1.100 $1.600 $1.500 $1.050
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
LF 31,998.000 $0.650 $0.860 $0.800 $0.820
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 2,064.000 $1.250 $0.860 $0.800 $0.820
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 20,915.000 $1.000 $0.860 $0.800 $0.820
PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE)
LF 80.000 $17.500 $38.540 $35.000 $36.700
PREFAB PM TY C (W)(24")(SLD)
LF 12.000 $15.000 $16.510 $15.000 $15.700
REFL PAV MRKR TY II-A-A
EA 366.000 $6.000 $6.060 $5.500 $5.800
VEH SIG SEC (12")LED(RED)
EA 2.000 $350.000 $515.620 $382.000 $434.000
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 1.000 $5,000.000 $6,184.960 $7,996.000 $7,240.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $6,000.000 $5,148.070 $8,481.000 $25,200.000
Totals: $2,177,687.550 $2,566,088.839 $2,954,412.050 $3,436,733.261
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,500.00
Total: $2,000.00