Show Job Controls
Bid Cobra

GOLIAD SH 239 (0516-02-029)

Items: 108

County: GOLIAD
Length: N/A
Highway: SH 239
District: CORPUS CHRISTI
Control Number: 0516-02-029
DBE Goal: N/A
Project: STP 2021(377)
Guaranty: N/A
Time: 246 WORKING DAYS
Engineer's Estimate: $7,795,714.50
Date: 02/04/2021 (5 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (7)
E
Engineer's Estimate
$7,795,714.50
$7,455,639.89
Over/Under Est: -4.36% -$340,074.61
Over/Under Est: -1.64% -$128,066.20
Amt Left: 2.84% $212,008.41
$8,013,424.34
Over/Under Est: 2.79% $217,709.84
Amt Left: 7.48% $557,784.45
Delta: -4.51% -$345,776.04
Over/Under Est: 7.15% $557,239.24
Amt Left: 12.04% $897,313.85
Delta: -4.24% -$339,529.40
Over/Under Est: 10.41% $811,909.80
Amt Left: 15.45% $1,151,984.41
Delta: -3.05% -$254,670.56
Over/Under Est: 12.61% $982,962.31
Amt Left: 17.75% $1,323,036.92
Delta: -1.99% -$171,052.51
Over/Under Est: 19.75% $1,539,282.95
Amt Left: 25.21% $1,879,357.56
Delta: -6.34% -$556,320.64
Subcontractor Percentage Amount
LISKA CONSTRUCTION COMPANY, INC. 25.77% $1,921,318.40
INTERSTATE CONCRETE & STEEL SERVICES INCORPORATED 3.03% $225,905.89
LONE STAR EROSION CONTROL 2.06% $153,586.18
HIGHWAY BARRICADES AND SERVICES, LLC 1.48% $110,343.47
COLD CREEK CONSTRUCTION, LTD 0.95% $70,828.58
FLASHER EQUIPMENT COMPANY 0.76% $56,662.86
TRP CONSTRUCTION GROUP, LLC 0.35% $26,094.74
TORO BRAVO CONSTRUCTION, LLC 0.17% $12,674.59
M & D FOUNDATION DRILLING INDUSTRIES, INC. 0.00% $0.00
MCL CONTRACTING, LLC 0.00% $0.00
JB PINNACLE GROUP, LLC 0.00% $0.00
HERMANOS STEEL, LLC 0.00% $0.00
Total: 34.57% $2,577,414.71

Bid Items & Bid Tabulations

108 Total 0 of 108
GOLIAD  |  SH 239  |  CORPUS CHRISTI  |  0516-02-029  |  02/04/2021  |  $7,795,714.50  |  STP 2021(377)  |  REHAB EXIST ROADWAY  |  246 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
TIERRA LEASE SERVICE, LLC
FARIS INDUSTRIES, INC.
J. CARROLL WEAVER, INC.
ANDERSON COLUMBIA CO., INC.
ANGEL BROTHERS HOLDINGS CORP.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 150.000 $3,000.000 $515.580 $250.000 $284.780 $416.250 $1,750.000 $2,300.000 $410.320
REMOVING STAB BASE AND ASPH PAV(4"-16")
SY 3,058.000 $4.000 $4.560 $6.500 $6.920 $9.220 $5.000 $18.000 $9.460
OBLITERATING ABANDONED ROAD
SY 2,685.000 $6.000 $4.560 $2.000 $5.510 $9.220 $6.000 $2.000 $6.460
EXCAVATION (ROADWAY)
CY 31,764.000 $9.000 $7.890 $10.000 $10.180 $12.030 $12.000 $10.000 $12.250
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 22,328.000 $8.000 $7.890 $8.000 $9.860 $21.520 $10.000 $8.000 $6.910
BLADING
HR 48.000 $100.000 $91.200 $75.000 $97.250 $83.250 $125.000 $100.000 $140.650
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 151,600.000 $0.400 $0.320 $0.350 $0.320 $0.340 $0.320 $0.280 $0.340
CELL FBR MLCH SEED(TEMP)(WARM)
SY 75,800.000 $0.300 $0.270 $0.250 $0.270 $0.300 $0.270 $0.270 $0.290
CELL FBR MLCH SEED(TEMP)(COOL)
SY 75,800.000 $0.300 $0.270 $0.250 $0.270 $0.300 $0.270 $0.270 $0.290
VEGETATIVE WATERING
MG 3,764.000 $15.000 $16.650 $12.000 $7.480 $13.320 $28.000 $10.000 $11.800
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 29,126.000 $1.500 $0.750 $0.800 $0.750 $2.080 $0.750 $1.600 $0.810
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
CY 13,835.000 $42.000 $57.170 $59.500 $65.600 $57.530 $76.000 $65.000 $69.680
CEMENT
TON 829.000 $150.000 $147.000 $145.000 $140.000 $158.730 $154.000 $150.000 $164.790
CEMENT TREAT (MX EXST MTL & NW BS)(9")
SY 77,181.000 $1.600 $1.480 $1.200 $2.610 $1.530 $3.000 $2.700 $1.390
CEMENT TREAT(NEW BASE)(9")
SY 13,599.000 $4.000 $1.480 $1.200 $1.790 $1.530 $3.400 $2.500 $2.340
ASPH (RC-250)
GAL 18,156.000 $4.500 $3.730 $3.250 $4.000 $3.310 $3.500 $3.500 $4.870
AGGR(TY-B GR-5 SAC-B)
CY 672.000 $72.000 $58.460 $95.000 $78.900 $130.520 $75.000 $100.000 $129.550
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 34,497.000 $3.000 $3.200 $2.750 $3.200 $2.910 $2.900 $3.500 $4.300
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
CY 1,067.000 $150.000 $74.780 $79.000 $87.160 $98.900 $100.000 $100.000 $140.380
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,100.000 $35.000 $29.640 $51.500 $35.790 $49.950 $36.000 $41.000 $63.070
CEM STABIL BKFL
CY 242.000 $115.000 $150.000 $90.000 $150.000 $166.500 $140.000 $150.000 $151.410
FLOWABLE BACKFILL
CY 6.000 $300.000 $162.750 $285.000 $150.000 $249.750 $155.000 $350.000 $250.110
TEMPORARY SPL SHORING
SF 1,780.000 $15.000 $12.550 $10.500 $25.000 $5.550 $25.000 $25.000 $39.800
DRILL SHAFT (18 IN)
LF 232.000 $110.000 $74.650 $95.000 $75.000 $66.600 $75.000 $68.000 $116.840
DRILL SHAFT (36 IN)
LF 1,264.000 $185.000 $299.670 $225.000 $235.000 $234.210 $235.000 $220.000 $300.290
CL C CONC (ABUT)
CY 77.200 $800.000 $850.000 $900.000 $732.200 $943.500 $735.000 $900.000 $1,039.130
CL C CONC (CAP)
CY 81.600 $1,000.000 $850.000 $1,275.000 $907.760 $943.500 $920.000 $1,000.000 $1,064.610
CL C CONC (COLUMN)
CY 76.300 $1,000.000 $850.000 $1,375.000 $784.000 $943.500 $790.000 $900.000 $999.540
REINF CONC SLAB
SF 21,850.000 $16.000 $18.500 $21.000 $14.250 $20.650 $14.500 $20.000 $22.240
PRESTR CONC GIRDER (TX54)
LF 2,835.000 $140.000 $140.000 $150.000 $135.000 $158.730 $140.000 $160.000 $161.780
RIPRAP (CONC)(5 IN)
CY 88.000 $425.000 $456.760 $500.000 $425.000 $543.900 $490.000 $550.000 $473.740
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 116.000 $400.000 $450.000 $500.000 $425.000 $527.250 $490.000 $500.000 $540.930
RIPRAP (STONE PROTECTION)(12 IN)
CY 134.000 $150.000 $113.620 $110.000 $135.000 $222.000 $180.000 $200.000 $244.650
RIPRAP (MOW STRIP)(4 IN)
CY 100.000 $500.000 $504.010 $525.000 $435.000 $543.900 $430.000 $450.000 $580.110
RAIL (TY T223)
LF 1,022.000 $75.000 $100.000 $90.000 $78.400 $116.550 $82.000 $90.000 $135.840
ARMOR JOINT (SEALED)
LF 126.000 $100.000 $90.000 $95.000 $82.600 $99.900 $84.000 $120.000 $144.310
RC PIPE (CL III)(18 IN)
LF 584.000 $65.000 $63.000 $60.000 $54.000 $83.250 $60.000 $90.000 $65.930
RC PIPE (CL III)(24 IN)
LF 166.000 $75.000 $78.750 $75.000 $74.550 $94.350 $75.000 $105.000 $91.970
RC PIPE (CL III)(36 IN)
LF 42.000 $125.000 $126.000 $150.000 $133.700 $177.600 $120.000 $200.000 $177.280
RC PIPE (CL IV)(30 IN)
LF 16.000 $150.000 $241.510 $170.000 $2,250.000 $133.200 $230.000 $480.000 $192.640
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 30.000 $1,200.000 $1,083.630 $1,350.000 $975.000 $1,748.250 $1,100.000 $1,600.000 $1,029.490
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,500.000 $1,417.540 $1,600.000 $1,100.000 $1,998.000 $1,400.000 $1,900.000 $1,288.240
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $1,500.000 $2,095.850 $1,900.000 $1,750.000 $2,553.000 $2,000.000 $2,600.000 $1,653.240
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $3,750.000 $3,927.100 $2,700.000 $2,250.000 $4,884.000 $3,800.000 $4,200.000 $2,380.920
CLEAN EXIST CULVERTS
EA 4.000 $2,000.000 $1,890.050 $800.000 $1,200.000 $1,221.000 $1,800.000 $1,200.000 $2,056.560
REMOV STR (HEADWALL)
EA 2.000 $1,500.000 $997.530 $500.000 $900.000 $971.250 $950.000 $2,500.000 $1,694.290
REMOV STR (PIPE)
LF 189.000 $20.000 $12.600 $6.000 $20.000 $14.430 $12.000 $100.000 $20.240
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $78,000.000 $200,000.000 $130,000.000 $135,000.000 $213,120.000 $135,000.000 $150,000.000 $242,970.000
MOBILIZATION
LS 1.000 $550,000.000 $582,038.000 $525,000.000 $881,476.680 $500,000.000 $860,000.000 $830,000.000 $801,356.730
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $6,000.000 $3,411.170 $2,500.000 $3,394.700 $4,995.000 $1,200.000 $15,000.000 $3,282.170
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 380.000 $30.000 $25.500 $25.500 $25.500 $32.190 $26.000 $35.000 $27.030
ROCK FILTER DAMS (REMOVE)
LF 380.000 $10.000 $7.000 $7.000 $7.000 $16.650 $7.000 $12.500 $7.600
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $20.000 $15.000 $15.000 $15.000 $16.650 $15.000 $30.000 $16.050
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $5.000 $2.000 $2.000 $2.000 $9.710 $2.000 $8.000 $2.400
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,010.000 $4.000 $2.750 $2.750 $2.750 $2.390 $2.750 $3.500 $2.930
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,010.000 $1.000 $1.000 $1.000 $1.000 $0.560 $1.000 $0.500 $1.100
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 440.000 $5.000 $5.500 $5.500 $5.500 $5.210 $5.500 $7.000 $5.990
BIODEG EROSN CONT LOGS (REMOVE)
LF 440.000 $1.000 $1.500 $1.500 $1.500 $0.560 $1.500 $1.000 $1.790
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 20.000 $4,300.000 $3,500.000 $3,000.000 $3,000.000 $3,885.000 $4,400.000 $1,000.000 $4,583.910
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,080.000 $25.000 $25.000 $35.000 $18.000 $19.980 $18.000 $60.000 $25.660
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,080.000 $10.000 $10.000 $15.000 $18.000 $12.210 $18.000 $10.000 $17.020
DRIVEWAYS (ACP)
SY 1,786.000 $30.000 $30.660 $30.000 $39.550 $38.850 $46.000 $40.000 $45.220
RUMBLE STRIPS (SHOULDER)
LF 28,400.000 $0.150 $0.130 $0.150 $0.130 $0.280 $0.520 $1.750 $0.180
RUMBLE STRIPS (CENTERLINE)
LF 14,200.000 $0.150 $0.150 $0.200 $0.150 $0.280 $0.550 $1.950 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 1,175.000 $25.000 $19.000 $20.000 $19.250 $21.090 $20.000 $23.000 $20.030
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,650.000 $1,750.000 $1,800.000 $1,831.500 $2,300.000 $1,950.000 $1,993.590
REMOVE METAL BEAM GUARD FENCE
LF 1,175.000 $5.000 $1.750 $2.000 $1.350 $1.940 $1.400 $1.500 $1.920
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,000.000 $2,350.000 $2,500.000 $2,430.000 $2,608.500 $2,500.000 $2,500.000 $2,479.390
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $250.000 $275.000 $300.000 $115.000 $305.250 $115.000 $150.000 $300.640
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1,050.000 $1,100.000 $700.000 $1,165.500 $700.000 $500.000 $1,150.080
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $16,200.000 $6,800.000 $7,500.000 $7,500.000 $7,548.000 $7,500.000 $10,000.000 $7,187.580
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 5.000 $200.000 $195.000 $225.000 $217.500 $216.450 $200.000 $220.000 $214.270
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 28.000 $450.000 $575.000 $600.000 $561.130 $638.250 $575.000 $600.000 $613.950
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 4.000 $620.000 $750.000 $800.000 $727.480 $832.500 $750.000 $750.000 $797.020
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 23.000 $650.000 $625.000 $650.000 $626.120 $693.750 $625.000 $650.000 $664.520
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $650.000 $850.000 $900.000 $721.390 $832.500 $850.000 $800.000 $902.020
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 3.000 $900.000 $1,050.000 $1,100.000 $846.400 $1,165.500 $1,100.000 $900.000 $1,112.020
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $460.000 $350.000 $375.000 $564.000 $388.500 $350.000 $610.000 $377.020
REMOVE SM RD SN SUP&AM
EA 55.000 $50.000 $75.000 $80.000 $85.930 $83.250 $75.000 $93.000 $87.400
RELOCATE SM RD SN SUP & AM TY TEMP
EA 46.000 $200.000 $110.000 $125.000 $80.000 $122.100 $110.000 $320.000 $123.770
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 18.000 $15.000 $16.000 $20.000 $11.990 $17.760 $16.000 $13.000 $22.090
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 8.000 $75.000 $65.000 $70.000 $42.500 $72.150 $65.000 $45.000 $80.140
REMOVE DELIN & OBJECT MARKER ASSMS
EA 8.000 $15.000 $15.000 $15.000 $20.000 $16.650 $15.000 $21.000 $27.640
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 38.000 $25.000 $28.000 $30.000 $18.250 $31.080 $28.000 $20.000 $36.910
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 29,400.000 $0.250 $0.240 $0.350 $0.320 $0.270 $0.330 $0.270 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 30,300.000 $0.250 $0.240 $0.350 $0.320 $0.270 $0.330 $0.270 $0.260
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,800.000 $0.600 $0.670 $0.500 $0.480 $0.740 $0.500 $1.330 $0.740
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $7.000 $8.000 $15.500 $15.000 $8.880 $15.000 $10.500 $12.360
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 4,800.000 $0.750 $0.670 $0.500 $0.480 $0.740 $0.500 $1.330 $0.720
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,210.000 $1.000 $0.690 $0.850 $0.800 $0.770 $0.800 $1.010 $0.770
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 30,170.000 $0.300 $0.360 $0.450 $0.400 $0.400 $0.400 $0.370 $0.380
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,070.000 $0.300 $0.400 $0.450 $0.420 $0.440 $0.400 $0.380 $0.470
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 25,548.000 $0.300 $0.360 $0.450 $0.400 $0.400 $0.400 $0.370 $0.390
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 232.000 $10.000 $12.000 $13.000 $12.000 $13.320 $12.000 $10.000 $13.010
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $100.000 $193.000 $200.000 $190.000 $214.230 $195.000 $215.000 $210.580
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $200.000 $211.000 $250.000 $255.000 $234.210 $260.000 $241.000 $229.480
REFL PAV MRKR TY I-C
EA 112.000 $3.000 $4.000 $4.500 $4.000 $4.440 $4.000 $5.000 $5.050
REFL PAV MRKR TY II-A-A
EA 1,112.000 $3.000 $3.370 $4.000 $3.500 $3.740 $3.600 $5.000 $16.350
ELIM EXT PAV MRK & MRKS (4")
LF 6,200.000 $1.000 $0.470 $0.750 $0.600 $0.520 $0.600 $0.550 $0.510
PAV SURF PREP FOR MRK (4")
LF 475.000 $0.100 $0.500 $0.250 $0.200 $0.560 $0.200 $0.270 $0.730
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 2.290 $48,000.000 $5,250.000 $5,500.000 $6,000.000 $16,650.000 $6,000.000 $5,500.000 $13,379.250
D-GR HMA TY-B SAC-B PG64-22
TON 24,037.000 $70.000 $63.650 $70.000 $69.180 $67.560 $68.000 $65.000 $81.770
D-GR HMA TY-D SAC-B PG70-22
TON 9,246.000 $70.000 $74.090 $81.000 $76.480 $78.120 $81.000 $77.000 $89.810
TACK COAT
GAL 13,984.000 $3.000 $2.960 $2.350 $2.220 $4.240 $3.000 $2.600 $4.320
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $400.000 $188.870 $2,000.000 $800.000 $1,665.000 $1,020.000 $300.000 $1,735.780
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,600.000 $7,741.640 $20,000.000 $40,092.430 $7,215.000 $33,200.000 $10,000.000 $31,001.240
TMA (STATIONARY)
DAY 40.000 $220.000 $309.670 $200.000 $235.000 $333.000 $186.000 $250.000 $368.600
TMA (MOBILE OPERATION)
HR 120.000 $75.000 $77.420 $20.000 $50.000 $166.500 $64.000 $32.000 $174.760
Totals: $7,795,714.500 $7,455,639.890 $7,667,648.300 $8,013,424.336 $8,352,953.740 $8,607,624.300 $8,778,676.810 $9,334,997.466