Show Job Controls
Bid Cobra

LAVACA UA 90 (0445-02-072)

Items: 130

County: LAVACA
Length: 0.5570 MILES
Highway: UA 90
District: YOAKUM
Control Number: 0445-02-072
DBE Goal: 4.0%
Project: F 2025(924)
Guaranty: $100,000.00
Time: WORKING DAYS
Engineer's Estimate: $6,336,208.10
Date: 08/07/2025 (10 months ago)
Contract Number: 8253006
Type: EMISSIONS REDUCTION
Project ID: A00207004
Contract Type: Federal
Project Description: CONSTRUCT ROUNDABOUT
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
COVEY MORROW
CHASE HERMES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$6,336,208.10
$6,702,218.10
Over/Under Est: 5.78% $366,010.00
Over/Under Est: 7.3% $462,320.30
Amt Left: 1.44% $96,310.30
Subcontractor Percentage Amount
THIRD COAST SERVICES LLC 4.97% $333,100.24
HIGHWAY BARRICADES AND SERVICES, LLC 2.22% $148,789.24
TORO BRAVO CONSTRUCTION, LLC 0.71% $47,585.75
MURRAY CONSTRUCTION 0.51% $34,181.31
LONE STAR EROSION CONTROL 0.50% $33,511.09
DEPENDABLE FENCE 0.28% $18,766.21
4E TREE WORX LLC 0.20% $13,404.44
SK CONCRETE SERVICES LLC 0.20% $13,404.44
Total: 9.59% $642,742.72

Bid Items & Bid Tabulations

130 Total 0 of 130
LAVACA  |  UA 90  |  YOAKUM  |  0445-02-072  |  08/07/2025  |  $6,336,208.10  |  F 2025(924)  |  EMISSIONS REDUCTION  |  WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
E-Z BEL CONSTRUCTION, LLC
PREPARING ROW
STA 8.000 $3,000.000 $1,835.600 $3,500.000
PREP ROW (TREE REMOVE) (24"-36" DIA)
EA 1.000 $1,500.000 $3,850.000 $3,500.000
PREP ROW (TREE REMOVE) (36"-48" DIA)
EA 1.000 $2,000.000 $4,950.000 $4,500.000
REMOV CONC (PAV)
SY 10,483.000 $10.000 $18.700 $10.500
OBLITERATING ABANDONED ROAD
SY 3,300.000 $8.000 $8.300 $20.000
EXCAV (ROADWAY)
CY 8,548.000 $16.000 $22.300 $23.000
EMBANK (FNL)(DC)(TY C)
CY 3,076.000 $17.000 $22.300 $17.000
BACKFILL (TY A)
STA 19.050 $275.000 $162.000 $221.000
BLADING
HR 50.000 $120.000 $120.000 $75.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 37,855.000 $0.500 $0.250 $0.250
BROADCAST SEED (TEMP_WARM)
SY 9,464.000 $0.500 $0.300 $0.300
BROADCAST SEED (TEMP_COOL)
SY 9,464.000 $0.750 $0.300 $0.300
VEGETATIVE WATERING
TGL 319.100 $25.000 $24.500 $25.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 2,688.000 $95.000 $75.520 $87.000
FL BS (RDWY DEL)(TY E GR 1-2)(FNL POS)
CY 2,406.000 $110.000 $75.640 $89.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 292.000 $250.000 $330.000 $350.000
LIME TRT (EXIST MATL)(6")
SY 14,436.000 $7.500 $3.120 $9.000
LIME TRT (EXIST MATL)(8")
SY 12,524.000 $8.000 $3.600 $9.000
CEMENT
TON 132.000 $250.000 $231.000 $300.000
CEMENT TRT (NEW BASE)(6")
SY 14,436.000 $3.000 $2.400 $8.500
PRIME COAT (MC-30)
GAL 5,222.000 $5.000 $6.800 $4.000
AGGR (TY-PE, GR-3)(SAC-B)
CY 307.000 $115.000 $142.220 $140.000
AGGR (TY-PE, GR-4)(SAC-B)
CY 221.000 $140.000 $142.370 $150.000
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 20,211.000 $4.000 $4.370 $4.500
D-GR HMA TY-B PG64-22
TON 2,593.000 $110.000 $103.600 $150.000
D-GR HMA TY-D SAC-B PG70-22
TON 4,428.000 $125.000 $114.600 $151.000
TACK COAT
GAL 1,240.000 $5.000 $3.780 $4.000
CONC PVMT (CRCP) (10")
SY 11,571.000 $110.000 $129.000 $120.000
CONC PVMT (CRCP) (13")
SY 1,192.000 $150.000 $200.000 $165.000
CONC PVMT(TRANSITION SLAB) (10")
SY 266.000 $200.000 $150.000 $110.000
CUT & RESTORING PAV
SY 286.000 $110.000 $115.560 $135.000
CEM STABIL BKFL
CY 71.000 $185.000 $199.800 $325.000
FLOWABLE BACKFILL
CY 15.000 $350.000 $210.600 $214.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 170.000 $300.000 $153.010 $260.000
RIPRAP (CONC)(5 IN)
CY 58.000 $600.000 $625.320 $800.000
RIPRAP (CONC)(CL B)
CY 6.000 $500.000 $681.480 $1,000.000
RIPRAP (MOW STRIP)(5 IN)
CY 21.000 $450.000 $631.800 $750.000
CONC BOX CULV (7 FT X 3 FT)
LF 20.000 $1,000.000 $1,728.000 $1,400.000
RC PIPE (CL III)(18 IN)
LF 162.000 $100.000 $183.600 $95.000
RC PIPE (CL III)(24 IN)
LF 32.000 $125.000 $259.200 $110.000
INLET (COMP)(TY C)
EA 1.000 $5,000.000 $9,719.990 $12,800.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1)(C)
EA 1.000 $13,500.000 $16,091.980 $7,000.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1)(C)
EA 1.000 $14,000.000 $30,401.970 $13,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $1,800.000 $1,404.000 $3,600.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $2,400.000 $1,404.000 $3,100.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,800.000 $1,782.000 $3,500.000
REMOV STR (SMALL)
EA 5.000 $1,200.000 $1,676.870 $500.000
MOBILIZATION
LS 1.000 $550,000.000 $751,124.360 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $4,000.000 $3,554.240 $3,200.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $10,000.000 $7,820.680 $5,800.000
TMA (STATIONARY)
DAY 20.000 $275.000 $364.960 $200.000
TMA (MOBILE OPERATION)
DAY 20.000 $400.000 $782.070 $150.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $50.000 $45.000 $45.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $10.000 $10.000 $10.000
SANDBAGS FOR EROSION CONTROL
EA 100.000 $12.000 $12.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,166.000 $5.000 $3.900 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,166.000 $2.000 $1.000 $1.000
CONSTRUCTING DETOURS
SY 6,294.000 $60.000 $58.340 $43.000
COLORED TEXTURED CONC (5")
SY 4,106.000 $65.000 $124.200 $100.000
CONC CURB (TY II)
LF 5,479.000 $60.000 $32.400 $20.000
CONC CURB (MONO) (TY I)
LF 1,477.000 $10.000 $22.520 $50.000
DRIVEWAYS (ACP)
SY 60.000 $75.000 $59.800 $149.000
DRIVEWAYS (SURF TREAT)
SY 746.000 $35.000 $36.800 $97.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $30.000 $27.090 $27.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,500.000 $2,737.000 $2,237.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $2.000 $4.000 $4.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $270.000 $250.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,200.000 $3,446.000 $3,446.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $275.000 $250.000 $250.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 5.000 $200.000 $175.000 $200.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $250.000 $200.000 $225.000
REMOVE RD IL ASM (TRANS-BASE)
EA 8.000 $800.000 $148.630 $614.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 17.000 $5,600.000 $4,831.310 $6,000.000
TEMP RD IL SETUP AND REMOVE
EA 12.000 $8,900.000 $4,474.340 $7,200.000
TEMP RD IL MAINTAIN SYSTEM
MO 12.000 $5,500.000 $1,486.270 $83.000
CONDT (PVC) (SCH 80) (2")
LF 2,970.000 $21.000 $17.050 $13.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 787.000 $25.000 $24.210 $26.000
ELEC CONDR (NO.8) BARE
LF 3,757.000 $2.000 $2.400 $2.000
ELEC CONDR (NO.8) INSULATED
LF 7,636.000 $2.000 $2.830 $3.000
GROUND BOX TY A (122311)W/APRON
EA 5.000 $1,500.000 $1,246.550 $1,500.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $500.000 $148.610 $1,000.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $8,000.000 $7,581.260 $11,500.000
ELC SRV TY T 120/240 000(NS)GS(N)SP(O)
EA 3.000 $5,500.000 $4,961.100 $6,500.000
ALUMINUM SIGNS (TY A)
SF 48.000 $40.000 $35.000 $47.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $800.000 $775.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $800.000 $800.000 $895.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $850.000 $850.000 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $900.000 $900.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,000.000 $1,100.000 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $900.000 $1,200.000 $995.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $1,250.000 $1,250.000 $1,050.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 4.000 $1,000.000 $1,300.000 $1,025.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 12.000 $825.000 $500.000 $375.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 6.000 $600.000 $620.000 $450.000
REMOVE SM RD SN SUP&AM
EA 32.000 $75.000 $100.000 $90.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 7.000 $45.000 $35.000 $25.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 3.000 $65.000 $65.000 $80.000
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 436.000 $1.000 $0.780 $3.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 18,826.000 $0.300 $0.580 $1.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,734.000 $0.750 $0.880 $1.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 23,632.000 $0.350 $0.580 $1.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 21,725.000 $0.300 $0.420 $1.250
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 24,765.000 $0.300 $0.420 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 382.000 $1.000 $1.630 $1.500
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 9,413.000 $0.850 $1.100 $1.250
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 11,816.000 $0.850 $2.000 $1.250
TY I HIGH PERF PM (W)6"(DOT)(100 MIL)
LF 218.000 $2.500 $3.500 $1.250
TY I HIGH PERF PM (W)8"(DOT)(100 MIL)
LF 75.000 $2.500 $6.000 $2.000
TY I HIGH PERF PM(W)8"(SLD)(100 MIL)
LF 867.000 $2.500 $4.000 $1.500
PREFAB PM TY C (W)(DBL ARROW)
EA 3.000 $350.000 $375.000 $400.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 2.000 $450.000 $550.000 $550.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 21.000 $50.000 $35.000 $35.000
PREFAB PM TY C (Y)(24")(SLD)
LF 484.000 $15.000 $18.000 $12.000
REFL PAV MRKR TY II-A-A
EA 328.000 $7.000 $7.500 $6.250
REFL PAV MRKR TY II-C-R
EA 38.000 $8.000 $15.000 $6.500
ELIM EXT PM & MRKS (6")
LF 5,050.000 $0.500 $2.000 $2.000
PAV SURF PREP FOR MRK (4")
LF 120.000 $1.000 $0.100 $0.100
PAV SURF PREP FOR MRK (6")
LF 8,943.000 $0.150 $0.200 $0.150
PAV SURF PREP FOR MRK (8")
LF 941.000 $0.250 $0.300 $0.250
PAV SURF PREP FOR MRK (24")
LF 187.000 $1.500 $0.900 $2.000
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $30.000 $80.000 $25.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 3.000 $30.000 $160.000 $25.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 21.000 $10.000 $95.000 $10.000
PAV SURF PREP FOR MRK (RPM)
EA 110.000 $2.000 $25.000 $2.000
VEH SIG SEC (12")LED(YEL)
EA 6.000 $300.000 $244.020 $142.000
TRF SIG CBL (TY A)(10 AWG)(4 CONDR)
LF 229.000 $4.000 $9.170 $3.000
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 3.000 $5,600.000 $6,055.140 $6,200.000
NO. OF DAYS MILESTONE 1
$/D 13,995.000 $13,995.000 $65.000 $65.000
PREFORMED IN-LANE (TRANS) RUMBLE STRIP
LF 360.000 $30.000 $20.000 $16.000
TMSP RADAR SPEED CONTROL MONITOR
EA 3.000 $10,000.000 $8,863.440 $500.000
Totals: $202,196,233.100 $7,611,893.100 $7,708,203.400
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $51,500.00