Show Job Controls
Bid Cobra

FAYETTE US 90 (0026-02-034)

Items: 81

County: FAYETTE
Length: N/A
Highway: US 90
District: YOAKUM
Control Number: 0026-02-034
DBE Goal: N/A
Project: STP 2021(586)
Guaranty: N/A
Time: 175 WORKING DAYS
Engineer's Estimate: $2,999,043.24
Date: 06/03/2021 (5 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$2,999,043.24
$2,724,321.52
Over/Under Est: -9.16% -$274,721.72
Over/Under Est: 11.64% $349,106.20
Amt Left: 22.9% $623,827.92
Over/Under Est: 16.92% $507,350.71
Amt Left: 28.71% $782,072.43
Delta: -4.73% -$158,244.51

Bid Items & Bid Tabulations

81 Total 0 of 81
FAYETTE  |  US 90  |  YOAKUM  |  0026-02-034  |  06/03/2021  |  $2,999,043.24  |  STP 2021(586)  |  SURF/ROADWAY RESTOR  |  175 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
DEAN WORD COMPANY, LTD.
ANGEL BROTHERS HOLDINGS CORP.
REMOVING CONC (PAV)
SY 10,662.000 $5.750 $7.800 $11.088 $10.000
REMOVING CONC (MEDIANS)
SY 1,407.000 $15.000 $13.410 $11.788 $10.000
REMOVING CONC (CURB AND GUTTER)
LF 3,328.000 $8.000 $7.710 $6.723 $5.000
REMOVING CONC (FLUME)
SY 15.000 $3.500 $29.970 $47.191 $18.000
EXCAVATION (ROADWAY)
CY 7,373.000 $10.000 $15.600 $25.716 $24.000
BLADING
HR 25.000 $100.000 $114.000 $88.758 $75.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 5,512.000 $65.000 $52.940 $63.922 $98.000
LIME TRT (EXST MATL)(8")
SY 14,962.000 $3.000 $2.280 $2.224 $5.000
LIME (HYD, COM OR QK)(SLURRY)
TON 143.000 $180.000 $147.000 $196.105 $160.000
CEMENT
TON 220.000 $150.000 $159.600 $181.560 $170.000
CEMENT TREAT(EXIST MATL)(8")
SY 18,112.000 $3.000 $2.280 $1.777 $3.000
PRIME COAT (MC-30)
GAL 6,615.000 $5.000 $3.950 $6.050 $5.000
AGGR(TY-PE GR-3 SAC-B)
CY 389.000 $85.000 $75.490 $131.191 $215.000
AGGR(TY-PE GR-4 SAC-B)
CY 273.000 $85.000 $75.470 $109.451 $150.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 25,283.000 $3.500 $3.410 $3.829 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 500.000 $65.000 $57.640 $55.587 $48.000
PLANE ASPH CONC PAV (2")
SY 3,035.000 $1.400 $2.330 $2.536 $5.000
PLANE ASPH CONC PAV (3" TO 6")
SY 31,763.000 $2.000 $2.490 $3.418 $3.000
RIPRAP (CONC)(5 IN)
CY 4.000 $450.000 $600.000 $1,068.150 $660.000
RC PIPE (CL III)(15 IN)
LF 4.000 $60.000 $250.000 $181.190 $270.000
SET (TY II) (15 IN) (RCP) (4: 1) (C)
EA 2.000 $1,100.000 $1,500.000 $2,649.900 $1,600.000
ADJUSTING MANHOLES
EA 2.000 $500.000 $1,000.000 $1,095.000 $1,000.000
MOBILIZATION
LS 1.000 $250,000.000 $245,740.270 $341,879.752 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,000.000 $2,978.160 $6,541.174 $7,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 105.000 $3.050 $4.000 $10.300 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 105.000 $1.200 $2.000 $5.150 $0.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 350.000 $1.600 $2.000 $3.090 $1.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 350.000 $3.850 $6.000 $6.180 $2.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,180.000 $30.000 $30.000 $38.437 $45.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 200.000 $30.000 $34.000 $50.200 $45.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 4,360.000 $6.000 $8.000 $12.580 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 760.000 $6.000 $9.000 $14.820 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,180.000 $15.000 $12.000 $16.360 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 200.000 $15.000 $15.000 $18.600 $20.000
CONC CURB & GUTTER (TY II)
LF 100.000 $45.000 $29.500 $55.055 $32.000
CONC MEDIAN
SY 1,084.000 $150.000 $119.500 $123.050 $130.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $400.000 $540.000 $626.034 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $550.000 $660.000 $738.510 $1,300.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $350.000 $280.000 $412.824 $740.000
REMOVE SM RD SN SUP&AM
EA 6.000 $95.000 $80.000 $218.875 $120.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 2.000 $150.000 $40.000 $142.758 $110.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 6,168.000 $0.280 $0.200 $0.515 $0.200
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 30,514.000 $0.250 $0.200 $0.515 $0.200
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 450.000 $0.650 $0.400 $1.030 $0.400
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,440.000 $0.650 $0.400 $0.721 $0.400
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 287.000 $2.000 $3.000 $6.180 $3.000
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
EA 10.000 $5.000 $20.000 $6.180 $20.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 630.000 $0.250 $0.200 $0.515 $0.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 22,642.000 $0.250 $0.200 $0.515 $0.200
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 32,427.000 $0.700 $0.650 $0.587 $0.650
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 97.000 $4.000 $3.000 $4.120 $3.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 497.000 $8.000 $6.000 $6.180 $6.000
WK ZN PAV MRK REMOV (W)18"(YLD TRI)
EA 5.000 $40.000 $25.000 $51.500 $25.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 34,488.000 $0.700 $0.650 $0.587 $0.650
WK ZN PAV MRK REMOV (Y)12"(SLD)
LF 73.000 $4.000 $3.000 $4.120 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,995.000 $1.500 $1.410 $1.470 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,521.000 $1.250 $1.410 $1.470 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 150.000 $1.250 $1.200 $1.030 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 480.000 $1.000 $1.200 $1.030 $1.200
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,056.000 $0.350 $0.450 $0.515 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 13,122.000 $0.350 $0.450 $0.474 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 210.000 $0.350 $0.450 $0.536 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 12,210.000 $0.350 $0.450 $0.474 $0.450
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 97.000 $8.000 $4.000 $8.240 $4.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 127.000 $12.500 $8.000 $15.450 $8.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $550.000 $650.000 $662.290 $650.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 5.000 $20.000 $20.000 $51.500 $20.000
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 73.000 $8.000 $4.000 $8.240 $4.000
PRE PM TY C (ACC PRK)(BLU)(SYMBL ONLY)
EA 1.000 $250.000 $250.000 $515.000 $250.000
REFL PAV MRKR TY I-C
EA 105.000 $3.500 $3.000 $8.240 $3.000
REFL PAV MRKR TY II-A-A
EA 231.000 $3.500 $3.000 $6.180 $3.000
ELIM EXT PAV MRK & MRKS (4")
LF 23,840.000 $0.500 $0.250 $0.515 $0.250
ELIM EXT PAV MRK & MRKS (8")
LF 330.000 $0.600 $0.500 $1.236 $0.500
ELIM EXT PAV MRK & MRKS (12")
LF 100.000 $1.000 $1.000 $5.150 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 92.000 $3.000 $2.000 $5.150 $2.000
D-GR HMA TY-B PG64-22
TON 8,364.000 $80.000 $68.640 $76.051 $75.000
D-GR HMA TY-D SAC-B PG70-22
TON 6,677.000 $80.000 $77.040 $87.914 $85.000
TACK COAT
GAL 3,348.000 $3.300 $2.960 $3.281 $2.350
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $10,000.000 $9,093.000 $12,840.000 $9,000.000
TMA (STATIONARY)
DAY 30.000 $500.000 $300.000 $192.600 $125.000
TMA (MOBILE OPERATION)
DAY 33.000 $500.000 $300.000 $452.610 $150.000
Totals: $2,999,043.240 $2,724,321.520 $3,348,149.574 $3,506,393.950