VICTORIA US 77 (0370-04-033)

Items: 33

County: VICTORIA
Length: N/A
Highway: US 77
District: YOAKUM
Control Number: 0370-04-033
DBE Goal: N/A
Project: STP 2020(435)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $10,285,894.20
Date: 01/09/2020 (6 years ago)
Contract Number: N/A
Type: ACP OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$10,285,894.20
$9,370,793.23
Over/Under Est: -8.9% -$915,100.97
Over/Under Est: 0.73% $74,687.91
Amt Left: 10.56% $989,788.88
Over/Under Est: 1.9% $195,320.85
Amt Left: 11.85% $1,110,421.82
Delta: -1.16% -$120,632.94
Over/Under Est: 9.47% $974,536.66
Amt Left: 20.17% $1,889,637.63
Delta: -7.43% -$779,215.81

Bid Items & Bid Tabulations

33 Total 0 of 33
VICTORIA  |  US 77  |  YOAKUM  |  0370-04-033  |  01/09/2020  |  $10,285,894.20  |  STP 2020(435)  |  ACP OVERLAY  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
JAMES CONSTRUCTION GROUP, L.L.C.
ANGEL BROTHERS HOLDINGS CORP.
SMITH & COMPANY (VULCAN CONSTRUCTION)
BACKFILL (TY A OR B)
STA 1,438.240 $150.000 $133.650 $114.000 $70.000 $270.000
BLADING
HR 40.000 $150.000 $91.200 $91.970 $100.000 $150.000
AGGR(TY-PE GR-4 SAC-B)
CY 5,390.000 $100.000 $98.520 $102.000 $95.000 $100.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 238,244.000 $3.500 $3.360 $3.000 $3.500 $3.500
D-GR HMA TY-D SAC-B PG70-22
TON 84,592.000 $80.000 $72.660 $89.000 $89.500 $89.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,200.000 $75.000 $42.780 $56.000 $56.000 $65.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 300.000 $50.000 $32.750 $56.000 $83.000 $55.000
PLANE ASPH CONC PAV(0" TO 2")
SY 133,750.000 $3.500 $1.210 $1.350 $2.400 $1.500
CLEANING AND SEALING EXISTING JOINTS
LF 329.600 $25.000 $44.550 $19.070 $45.000 $45.000
MOBILIZATION
LS 1.000 $840,000.000 $816,115.220 $516,000.000 $453,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $4,500.000 $2,150.430 $11,600.000 $8,000.000 $20,000.000
RUMBLE STRIPS (SHOULDER)
LF 280,524.000 $0.200 $0.110 $0.150 $0.150 $0.150
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 81,074.000 $0.200 $0.350 $0.250 $0.200 $0.200
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 310,472.000 $0.200 $0.350 $0.180 $0.200 $0.200
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 7,208.000 $0.200 $0.350 $0.250 $0.250 $0.220
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 315,912.000 $0.200 $0.350 $0.220 $0.200 $0.200
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 25,092.000 $1.250 $1.780 $0.440 $1.300 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,724.000 $1.250 $1.780 $0.440 $1.300 $1.150
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 9,640.000 $1.250 $0.900 $0.820 $1.050 $1.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 132.000 $25.000 $14.000 $14.000 $22.200 $20.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $350.000 $185.000 $200.000 $277.750 $250.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 464.000 $30.000 $12.000 $12.000 $16.650 $15.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 496.000 $25.000 $14.250 $15.000 $22.200 $20.000
REFL PAV MRKR TY I-C
EA 274.000 $3.500 $3.750 $10.000 $5.550 $5.000
REFL PAV MRKR TY II-A-A
EA 420.000 $3.500 $3.750 $8.000 $5.550 $5.000
REFL PAV MRKR TY II-C-R
EA 2,234.000 $1.500 $3.250 $4.000 $5.550 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $7,580.680 $7,000.000 $6,500.000 $4,000.000
HPPM W/RET REQ TY I(W)4"(BRK)(100MIL)
LF 40,537.000 $0.400 $0.460 $0.480 $0.550 $0.500
HPPM W/RET REQ TY I(W)4"(SLD)(100MIL)
LF 155,276.000 $0.400 $0.460 $0.480 $0.550 $0.500
HPPM W/RET REQ TY I(Y)4"(BRK)(100MIL)
LF 3,604.000 $0.400 $0.480 $0.480 $0.550 $0.500
HPPM W/RET REQ TY I(Y)4"(SLD)(100MIL)
LF 157,636.000 $0.400 $0.460 $0.480 $0.550 $0.500
TMA (STATIONARY)
DAY 14.000 $350.000 $303.230 $250.000 $200.000 $500.000
TMA (MOBILE OPERATION)
DAY 150.000 $95.000 $505.380 $600.000 $200.000 $275.000
Totals: $10,285,894.200 $9,370,793.236 $10,360,582.112 $10,481,215.050 $11,260,430.860