DUVAL SH 44 (0237-05-047)

Items: 126

County: DUVAL
Length: 4.0020 MILES
Highway: SH 44
District: LAREDO
Control Number: 0237-05-047
DBE Goal: 0.0%
Project: F 2026(420)
Guaranty: $100,000.00
Time: 345 WORKING DAYS
Engineer's Estimate: $21,994,703.43
Date: 03/04/2026 (3 months ago)
Contract Number: 3263004
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00127306
Contract Type: Federal
Project Description: REHABILITATION OF EXISTING ROADWAY TREAT EXIST SUBGRADE, NEW FLEXBASE, HMA DENSE GRADE TYC, MBGF, & PAVEMENT MARKINGS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JOSE VARGAS
LUIS URBINA
ANGEL MARTINEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$21,994,703.43
$18,216,990.60
Over/Under Est: -17.18% -$3,777,712.83
Over/Under Est: -15.51% -$3,412,287.36
Amt Left: 2.01% $365,425.47
$19,019,467.25
Over/Under Est: -13.53% -$2,975,236.18
Amt Left: 4.41% $802,476.65
Delta: -2.35% -$437,051.18
Over/Under Est: 8.24% $1,811,430.88
Amt Left: 30.68% $5,589,143.71
Delta: -25.17% -$4,786,667.06
$27,009,857.24
Over/Under Est: 22.8% $5,015,153.81
Amt Left: 48.27% $8,792,866.64
Delta: -13.46% -$3,203,722.93

Bid Items & Bid Tabulations

126 Total 0 of 126
DUVAL  |  SH 44  |  LAREDO  |  0237-05-047  |  03/04/2026  |  $21,994,703.43  |  F 2026(420)  |  REHAB EXIST ROADWAY  |  345 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANDERSON COLUMBIA CO., INC.
CK NEWBERRY, LLC
TEXAS MATERIALS GROUP, INC.
MAKO CONTRACTING, LLC
PREPARING ROW
STA 230.000 $3,000.000 $673.510 $500.000 $500.000 $268.000 $1,100.000
REMOV CONC (RIPRAP)
SY 1,622.000 $8.000 $14.180 $25.000 $20.000 $19.000 $55.000
RMV (10") TRT/UNTRT BASE & ASPH PAV
SY 120,504.000 $10.000 $4.770 $2.400 $4.750 $10.000 $7.000
EXCAV (ROADWAY)
CY 13,707.000 $14.000 $16.350 $10.000 $15.000 $19.000 $14.000
SUBGR WIDEN (DC)
STA 230.000 $1,000.000 $488.400 $2,200.000 $350.000 $940.000 $3,750.000
EMBANK (FNL)(DC)(TY D)
CY 2,195.000 $6.500 $14.210 $10.000 $20.000 $14.200 $7.000
DRILL SEED (PERM_RURAL_CLAY)
AC 42.200 $800.000 $1,250.000 $1,350.000 $1,250.000 $1,250.000 $5,500.000
DRILL SEED (TEMP_WARM)
AC 42.200 $500.000 $500.000 $540.000 $500.000 $500.000 $2,500.000
PROOF ROLLING
HR 42.000 $80.000 $88.000 $140.000 $70.000 $182.000 $125.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 40,261.000 $85.000 $88.730 $88.000 $85.000 $114.500 $110.000
LIME (QUICKLIME (SLURRY))
TON 1,938.000 $350.000 $326.350 $375.000 $315.000 $398.000 $492.490
LIME TRT (EXIST MATL)(6")
SY 130,461.000 $3.500 $3.020 $3.500 $1.650 $4.220 $3.220
PRIME COAT (RC-250)
GAL 25,133.000 $5.000 $4.410 $5.000 $4.500 $4.600 $6.130
D-GR HMA TY-B SAC-B PG70-22
TON 31,404.000 $105.000 $95.310 $98.000 $96.500 $107.500 $159.850
D-GR HMA TY-C SAC-A PG76-22
TON 14,972.000 $120.000 $116.220 $108.000 $112.500 $138.000 $204.700
D-GR HMA TY-D SAC-B PG64-22
TON 2,293.000 $140.000 $98.560 $110.000 $105.000 $128.000 $194.350
PLANE ASPH CONC PAV(4")
SY 107,026.000 $2.600 $2.810 $1.000 $1.500 $3.140 $4.260
STRUCT EXCAV (BOX)
CY 2,549.000 $50.000 $9.430 $10.000 $10.000 $9.500 $104.500
CEM STABIL BKFL
CY 641.000 $250.000 $90.570 $150.000 $140.000 $138.000 $280.000
TRENCH EXCAVATION PROTECTION
LF 644.000 $20.000 $9.080 $12.000 $12.000 $11.850 $60.000
TEMPORARY SPL SHORING
SF 27,002.000 $25.000 $0.950 $12.000 $10.750 $31.000 $14.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 72.000 $350.000 $383.240 $210.000 $300.000 $250.000 $224.250
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 27.000 $380.000 $540.740 $320.000 $400.000 $350.000 $339.250
RIPRAP (CONC)(5 IN)
CY 11.000 $600.000 $783.230 $600.000 $575.000 $550.000 $750.000
RIPRAP (CONC) (CL B) (4 IN)
CY 203.000 $550.000 $726.060 $550.000 $525.000 $505.000 $700.000
RIPRAP (CONC)(DISSIPATER)
CY 7.000 $1,200.000 $1,301.550 $700.000 $650.000 $632.000 $5,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 182.000 $825.000 $743.210 $550.000 $550.000 $510.000 $600.000
CONC BOX CULV (3 FT X 2 FT)
LF 108.000 $410.000 $292.720 $380.000 $375.000 $350.000 $467.500
CONC BOX CULV (4 FT X 3 FT)
LF 60.000 $450.000 $346.900 $460.000 $450.000 $426.000 $555.500
CONC BOX CULV (5 FT X 2 FT)
LF 224.000 $530.000 $400.560 $540.000 $525.000 $501.000 $641.300
CONC BOX CULV (5 FT X 4 FT)
LF 152.000 $550.000 $453.150 $620.000 $625.000 $575.000 $716.100
CONC BOX CULV (6 FT X 2 FT)
LF 53.000 $650.000 $453.150 $640.000 $625.000 $577.000 $807.400
CONC BOX CULV (6 FT X 3 FT)
LF 249.000 $785.000 $504.150 $700.000 $675.000 $652.000 $880.000
CONC BOX CULV (6 FT X 5 FT)
LF 69.000 $950.000 $583.310 $840.000 $800.000 $771.000 $935.000
CONC BOX CULV (9 FT X 8 FT)
LF 92.000 $1,550.000 $1,027.960 $1,700.000 $1,600.000 $1,575.000 $3,600.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $15,000.000 $22,790.410 $11,000.000 $10,000.000 $9,461.000 $18,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $17,780.000 $28,203.800 $20,000.000 $20,000.000 $18,405.000 $25,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $33,000.000 $39,912.440 $24,000.000 $22,000.000 $21,891.000 $30,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $45,000.000 $50,951.710 $38,000.000 $36,000.000 $35,000.000 $40,000.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $50,000.000 $55,647.920 $45,000.000 $42,000.000 $41,250.000 $50,000.000
SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C)
EA 6.000 $8,000.000 $2,217.740 $7,000.000 $7,000.000 $6,550.000 $12,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1)(C)
EA 2.000 $14,000.000 $16,431.410 $9,000.000 $9,000.000 $8,339.000 $15,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C)
EA 4.000 $14,000.000 $2,806.040 $11,000.000 $10,000.000 $9,739.000 $15,000.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1)(C)
EA 2.000 $15,000.000 $3,478.380 $10,000.000 $9,500.000 $8,750.000 $15,000.000
REMOV STR (BOX CULVERT)
EA 14.000 $9,000.000 $132.810 $1,800.000 $2,500.000 $1,609.000 $32,450.000
REMOV STR (SET)
EA 16.000 $800.000 $531.250 $1,500.000 $1,500.000 $1,375.000 $3,850.000
REMOV STR (WINGWALL)
EA 4.000 $2,300.000 $1,301.550 $1,400.000 $1,500.000 $1,250.000 $4,800.000
MOBILIZATION
LS 1.000 $1,434,612.620 $1,440,058.610 $1,640,000.000 $1,800,000.000 $1,699,450.000 $665,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $5,000.000 $8,288.300 $3,500.000 $5,000.000 $3,275.000 $4,350.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,000.000 $2,500.000 $20,000.000 $20,000.000 $15,000.000 $5,000.000
TMA (STATIONARY)
DAY 698.000 $250.000 $150.000 $300.000 $200.000 $175.000 $200.000
TMA (MOBILE OPERATION)
DAY 500.000 $250.000 $250.000 $20.000 $25.000 $400.000 $250.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 273.000 $73.000 $90.000 $100.000 $90.000 $90.000 $25.000
ROCK FILTER DAMS (REMOVE)
LF 273.000 $14.500 $18.000 $20.000 $18.000 $18.000 $5.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 56.000 $40.000 $55.000 $60.000 $25.000 $55.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 56.000 $10.000 $20.000 $22.000 $20.000 $20.000 $18.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 20.000 $150.000 $150.000 $100.000 $85.000 $140.000 $125.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 800.000 $6.000 $6.000 $6.500 $6.000 $6.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 800.000 $1.000 $2.000 $2.100 $2.000 $2.000 $1.000
CONSTRUCTING DETOURS
SY 27,022.000 $44.000 $45.360 $51.000 $50.000 $66.000 $74.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 200.000 $75.000 $82.500 $80.000 $50.000 $75.000 $30.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 1,000.000 $40.000 $93.500 $185.000 $110.000 $150.000 $125.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 19,500.000 $50.000 $30.150 $22.000 $60.000 $56.000 $80.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 4,040.000 $20.000 $17.420 $16.000 $12.000 $30.000 $20.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 340.000 $20.000 $25.660 $16.000 $22.000 $35.000 $30.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 19,500.000 $10.000 $6.340 $1.700 $8.000 $7.000 $7.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 5,820.000 $15.000 $15.880 $4.000 $5.000 $7.000 $7.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 500.000 $16.000 $26.640 $4.000 $15.000 $7.000 $7.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 3,880.000 $12.000 $16.010 $12.000 $10.000 $24.000 $50.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 340.000 $20.000 $22.240 $12.000 $22.000 $24.000 $50.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 19,500.000 $20.000 $15.200 $12.000 $15.000 $32.000 $7.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 42,240.000 $0.270 $0.180 $0.170 $0.150 $0.180 $0.160
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 21,120.000 $0.270 $0.200 $0.170 $0.200 $0.200 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 2,975.000 $25.000 $27.250 $36.000 $28.000 $30.000 $38.530
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 4.000 $1,130.000 $1,455.000 $1,820.000 $1,925.000 $1,160.000 $1,941.200
REMOVE METAL BEAM GUARD FENCE
LF 1,975.000 $3.000 $5.000 $2.400 $3.000 $3.000 $2.590
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $265.000 $355.000 $215.000 $325.000 $220.000 $230.000
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $3,000.000 $2,985.000 $3,800.000 $4,500.000 $3,300.000 $4,054.900
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $1,415.000 $455.000 $215.000 $325.000 $330.000 $230.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 70.000 $1,300.000 $1,250.000 $975.000 $650.000 $1,180.000 $948.750
CRASH CUSH ATTEN (REMOVE)
EA 70.000 $1,000.000 $555.000 $740.000 $650.000 $825.000 $948.750
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 70.000 $10,000.000 $6,825.000 $6,250.000 $6,500.000 $8,000.000 $948.750
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 8.000 $250.000 $656.270 $600.000 $550.000 $550.000 $660.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $500.000 $880.630 $645.000 $600.000 $600.000 $900.000
RELOCATE EXISTING MAILBOX
EA 9.000 $250.000 $544.080 $270.000 $250.000 $250.000 $660.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 9.000 $11,913.540 $4,674.000 $5,270.000 $5,250.000 $4,500.000 $5,629.250
CONDT (PVC) (SCH 40) (2")
LF 2,075.000 $15.340 $13.300 $11.000 $20.000 $12.000 $11.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 93.000 $28.710 $35.750 $40.000 $51.000 $30.000 $42.550
ELEC CONDR (NO.8) BARE
LF 2,213.000 $2.240 $2.050 $1.600 $2.500 $1.500 $1.730
ELEC CONDR (NO.8) INSULATED
LF 4,371.000 $2.550 $2.300 $1.700 $2.750 $1.550 $1.840
ELEC CONDR (NO.6) BARE
LF 10.000 $3.620 $2.230 $3.400 $3.750 $1.750 $3.680
ELEC CONDR (NO.6) INSULATED
LF 10.000 $2,015.590 $2.550 $3.700 $4.250 $1.950 $3.680
TRAY CABLE (3 CONDR) (12 AWG)
LF 286.000 $3.620 $3.350 $3.000 $2.750 $3.000 $3.220
GROUND BOX TY C (162911)W/APRON
EA 2.000 $2,015.590 $1,241.000 $1,360.000 $2,000.000 $1,000.000 $1,449.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 165.000 $3.120 $4.900 $3.000 $3.250 $3.050 $3.220
REMOVE ELECTRICAL SERVICES
EA 1.000 $812.940 $1,890.000 $400.000 $4,000.000 $365.000 $419.750
ELC SRV TY T 120/240 000(NS)GS(L)SP(O)
EA 1.000 $4,000.000 $7,227.000 $6,330.000 $5,500.000 $5,500.000 $6,762.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 39.000 $1,000.000 $768.450 $740.000 $700.000 $690.000 $930.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $1,100.000 $824.540 $1,030.000 $800.000 $790.000 $1,380.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 11.000 $1,700.000 $992.810 $1,034.920 $1,000.000 $960.000 $1,680.000
REMOVE SM RD SN SUP&AM
EA 57.000 $135.000 $95.350 $107.000 $100.000 $100.000 $102.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 27.000 $31.000 $68.650 $48.000 $100.000 $45.000 $62.400
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI)
EA 12.000 $35.000 $75.000 $54.000 $100.000 $45.000 $62.400
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 580.000 $1.000 $7.500 $8.000 $8.000 $7.500 $9.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 18,957.000 $1.000 $1.100 $1.200 $1.250 $1.100 $1.320
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 18,957.000 $1.000 $1.100 $1.200 $1.250 $1.100 $1.320
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 8.000 $250.000 $275.000 $300.000 $300.000 $275.000 $330.000
PAVEMENT SLER 6"
LF 87,601.000 $0.300 $0.280 $0.300 $0.300 $0.280 $0.340
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 3,501.000 $1.000 $0.780 $0.850 $0.800 $0.780 $0.940
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 42,050.000 $1.000 $0.620 $0.650 $0.650 $0.620 $0.740
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 42,050.000 $0.750 $0.620 $0.650 $0.650 $0.620 $0.740
REFL PAV MRKR TY I-C
EA 176.000 $5.500 $7.500 $8.000 $8.000 $7.500 $9.000
REFL PAV MRKR TY II-A-A
EA 528.000 $5.000 $7.500 $8.000 $8.000 $7.500 $9.000
ELIM EXT PM & MRKS (4")
LF 68,814.000 $1.000 $0.250 $0.300 $0.500 $0.250 $0.300
ELIM EXT PM & MRKS (ARROW)
EA 6.000 $110.000 $70.000 $75.000 $75.000 $70.000 $84.000
ELIM EXT PM & MRKS (WORD)
EA 6.000 $110.000 $70.000 $75.000 $75.000 $70.000 $84.000
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $3,559.790 $20,758.000 $3,500.000 $10,000.000 $3,600.000 $3,737.500
TEMP TRAF SIGNALS
EA 3.000 $5,000.000 $12,459.000 $7,000.000 $10,000.000 $7,000.000 $7,475.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $316.370 $105.000 $485.000 $375.000 $345.000 $517.500
VEH SIG SEC (12")LED(RED)
EA 2.000 $317.870 $105.000 $485.000 $375.000 $345.000 $517.500
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
LF 221.000 $2.690 $2.400 $3.000 $2.750 $2.450 $3.220
REMOVAL OF CONDUIT
LF 10.000 $4.560 $6.350 $35.000 $4.500 $2.000 $36.800
REMOVE TRAFFIC SIGNAL
EA 1.000 $7,285.710 $6,458.000 $3,450.000 $7,000.000 $2,500.000 $3,680.000
BONDING COURSE
GAL 23,679.000 $5.000 $2.790 $1.000 $3.250 $3.560 $4.030
BIRD EXCLUSION METHOD
SF 1,324.000 $10.000 $1.500 $23.000 $25.000 $7.600 $10.000
TRAIL MNT SOL PRD RAD SPEED CNT MONITOR
EA 4.000 $10,000.000 $5,000.000 $13,400.000 $10,000.000 $11,850.000 $10,000.000
Totals: $21,994,703.430 $18,216,990.600 $18,582,416.070 $19,019,467.250 $23,806,134.310 $27,009,857.240
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
Total: $150,000.00