CALHOUN US 87 (0144-03-036)

Items: 108

County: CALHOUN
Length: N/A
Highway: US 87
District: YOAKUM
Control Number: 0144-03-036
DBE Goal: N/A
Project: STP 2B20(120)HES
Guaranty: N/A
Time: 181 WORKING DAYS
Engineer's Estimate: $8,296,315.20
Date: 11/05/2020 (5 years ago)
Contract Number: N/A
Type: GRADE SEPARATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$8,296,315.20
$8,660,295.31
Over/Under Est: 4.39% $363,980.11
Over/Under Est: 24.04% $1,994,500.78
Amt Left: 18.83% $1,630,520.67
Over/Under Est: 33.08% $2,744,274.76
Amt Left: 27.49% $2,380,294.65
Delta: -7.29% -$749,773.98
Over/Under Est: 37.06% $3,074,217.43
Amt Left: 31.29% $2,710,237.32
Delta: -2.99% -$329,942.67
Subcontractor Percentage Amount
JB PINNACLE GROUP, LLC 4.99% $433,101.62
VOGES DRILLING CO. 2.14% $185,738.97
KELLER NORTH AMERICA, INC. 1.59% $138,002.32
DEPENDABLE FENCE 0.70% $60,755.74
THIRD COAST SERVICES LLC 0.66% $57,283.98
LONE STAR EROSION CONTROL 0.64% $55,548.10
HIGHWAY BARRICADES AND SERVICES, LLC 0.63% $54,680.16
MURRAY CONSTRUCTION 0.16% $13,887.03
TORO BRAVO CONSTRUCTION, LLC 0.14% $12,151.15
SK CONCRETE SERVICES LLC 0.09% $7,811.45
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.07% $6,075.57
Total: 11.81% $1,025,036.09

Bid Items & Bid Tabulations

108 Total 0 of 108
CALHOUN  |  US 87  |  YOAKUM  |  0144-03-036  |  11/05/2020  |  $8,296,315.20  |  STP 2B20(120)HES  |  GRADE SEPARATION  |  181 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANGEL BROTHERS HOLDINGS CORP.
TIERRA LEASE SERVICE, LLC
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 17.000 $5,000.000 $1,661.160 $52,000.000 $381.540 $33,250.000
REMOVING STAB BASE & ASPH PAV (12")
SY 16,186.000 $6.500 $5.060 $3.500 $4.300 $4.500
EXCAVATION (ROADWAY)
CY 3,137.000 $14.000 $29.970 $11.000 $16.650 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 51,913.000 $19.500 $39.390 $43.000 $16.500 $5.000
BLADING
HR 50.000 $150.000 $91.200 $92.000 $132.320 $140.000
FURNISHING AND PLACING TOPSOIL (4")
STA 52.000 $260.000 $1,419.000 $515.000 $477.920 $20.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 127,955.000 $0.500 $0.150 $0.280 $0.120 $0.010
DRILL SEEDING (TEMP) (WARM)
SY 31,989.000 $0.500 $0.100 $0.280 $0.120 $0.100
DRILL SEEDING (TEMP) (COOL)
SY 31,989.000 $0.500 $0.100 $0.280 $0.120 $0.100
VEGETATIVE WATERING
MG 4,326.000 $20.000 $19.980 $11.500 $25.360 $1.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 8,465.000 $75.000 $73.990 $91.000 $91.600 $100.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 467.000 $200.000 $152.250 $159.000 $228.510 $210.000
LIME TRT (SUBGRADE)(8")
SY 28,922.000 $4.600 $2.280 $2.900 $1.850 $0.010
PRIME COAT (MC-30)
GAL 4,984.000 $5.000 $3.850 $4.800 $3.990 $4.350
AGGR(TY-PE GR-3 SAC-B)
CY 322.000 $150.000 $99.350 $194.000 $128.690 $100.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 10,932.000 $4.000 $3.310 $3.600 $3.340 $3.750
CEM STABIL BKFL
CY 43.800 $150.000 $130.000 $93.800 $150.630 $75.000
DRILL SHAFT (36 IN)
LF 600.000 $300.000 $304.810 $205.000 $294.800 $200.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 38.000 $250.000 $200.000 $380.000 $379.500 $125.000
CL C CONC (ABUT)
CY 36.000 $1,500.000 $1,000.000 $1,008.000 $963.050 $850.000
REINF CONC SLAB
SF 3,400.000 $25.000 $20.000 $20.500 $34.200 $22.000
APPROACH SLAB
CY 106.200 $470.000 $200.000 $544.000 $523.920 $0.010
RETAINING WALL (MSE)
SF 64,005.000 $34.750 $34.000 $37.000 $72.390 $86.750
PRESTR CONC GIRDER (TX34)
LF 422.500 $140.000 $130.000 $187.000 $193.600 $195.000
RIPRAP (CONC)(4 IN)
CY 135.000 $550.000 $500.000 $525.000 $480.530 $525.000
RIPRAP (CONC)(5 IN)
CY 8.700 $500.000 $350.000 $550.000 $453.650 $500.000
RAIL (TY T223)
LF 4,945.000 $120.000 $100.000 $92.000 $165.000 $100.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 78.330 $100.000 $100.000 $145.000 $158.400 $105.000
CONC BOX CULV (5 FT X 4 FT)
LF 97.500 $350.000 $700.000 $455.000 $792.000 $500.000
RC PIPE (CL III)(24 IN)
LF 35.000 $80.000 $90.000 $85.000 $181.500 $75.000
RC PIPE (CL IV)(30 IN)
LF 101.000 $100.000 $120.000 $87.000 $192.500 $115.000
INLET (COMPL)(POD)(FG)(3FTX3FT)
EA 1.000 $3,800.000 $4,000.000 $4,750.000 $8,250.000 $6,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $5,000.000 $3,000.000 $4,235.000 $7,480.000 $9,000.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
EA 3.000 $5,600.000 $6,500.000 $9,840.000 $8,580.000 $0.010
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $2,200.000 $2,200.000 $2,010.450 $3,437.500 $2,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $3,400.000 $2,240.000 $2,530.000 $2,800.000
REMOV STR (SMALL)
EA 1.000 $1,100.000 $1,000.000 $1,980.000 $550.000 $1,500.000
MOBILIZATION
LS 1.000 $700,000.000 $859,550.790 $1,000,000.000 $675,000.000 $1,130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $14,000.000 $3,182.650 $1,260.000 $2,200.000 $8,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $40.000 $30.000 $31.000 $27.500 $30.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $10.000 $10.000 $10.000 $11.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $25.000 $15.000 $27.500 $22.000 $15.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $6.000 $2.000 $13.250 $5.500 $2.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,424.000 $4.000 $1.850 $3.000 $2.200 $1.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,424.000 $1.000 $0.800 $1.100 $1.100 $0.800
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 90.000 $10.000 $8.000 $11.000 $6.600 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 90.000 $1.000 $3.000 $1.100 $2.200 $3.000
CONSTRUCTING DETOURS
SY 2,986.000 $60.000 $51.330 $44.500 $56.490 $50.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 4,600.000 $60.000 $26.000 $32.000 $46.010 $25.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 3,520.000 $5.000 $8.000 $3.000 $11.110 $2.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 4,600.000 $7.000 $12.000 $18.900 $5.080 $10.000
CONC CURB & GUTTER (TY II)
LF 130.000 $30.000 $32.000 $60.000 $40.700 $22.000
MTL W-BEAM GD FEN (TIM POST)
LF 120.000 $22.000 $26.300 $22.000 $22.000 $34.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $2,460.000 $1,540.000 $1,540.000 $1,825.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,300.000 $3,050.000 $2,640.000 $2,640.000 $2,430.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,500.000 $755.000 $2,420.000 $2,420.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $1,000.000 $755.000 $770.000 $770.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $11,000.000 $21,755.000 $26,950.000 $26,950.000 $8,175.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 3.000 $11,000.000 $6,735.000 $8,580.000 $8,580.000 $8,175.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 4.000 $1,600.000 $1,400.000 $1,479.000 $275.000 $1,344.000
CONDT (PVC) (SCH 40) (2")
LF 150.000 $6.000 $7.000 $7.600 $3.300 $6.900
CONDT (PVC) (SCH 40) (2") (BORE)
LF 95.000 $13.000 $22.000 $23.750 $27.500 $21.600
CONDT (RM) (1")
LF 350.000 $20.000 $20.000 $20.000 $3.300 $18.230
CONDT (RM) (2")
LF 60.000 $30.000 $20.000 $21.500 $4.400 $19.520
ELEC CONDR (NO.12) BARE
LF 900.000 $1.250 $1.500 $1.150 $3.300 $1.030
ELEC CONDR (NO.12) INSULATED
LF 585.000 $1.250 $1.500 $1.150 $2.200 $1.050
ELEC CONDR (NO.8) BARE
LF 1,170.000 $1.400 $1.250 $1.250 $2.200 $1.140
ELEC CONDR (NO.8) INSULATED
LF 80.000 $1.500 $1.300 $1.400 $4.400 $1.280
GROUND BOX TY A (122311)
EA 1.000 $600.000 $900.000 $944.000 $2,750.000 $858.000
GROUND BOX TY A (122311)W/APRON
EA 4.000 $800.000 $1,200.000 $1,138.000 $3,300.000 $1,034.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 1.000 $5,500.000 $6,000.000 $5,687.000 $16,500.000 $5,170.000
ALUMINUM SIGNS (TY G)
SF 256.000 $30.000 $30.000 $28.600 $28.600 $22.220
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 3.000 $400.000 $450.000 $660.000 $660.000 $480.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $650.000 $515.000 $687.500 $687.500 $526.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $650.000 $570.000 $770.000 $770.000 $560.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $800.000 $660.000 $935.000 $935.000 $673.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $923.000 $880.000 $1,210.000 $1,210.000 $935.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $1,500.000 $920.000 $1,265.000 $1,265.000 $1,065.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 23.000 $400.000 $335.000 $330.000 $330.000 $300.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $1,900.000 $3,000.000 $2,420.000 $2,420.000 $2,200.000
REMOVE SM RD SN SUP&AM
EA 16.000 $100.000 $75.000 $77.000 $77.000 $55.000
INSTALL LRSS (STRUCT STEEL)
LB 1,703.000 $7.000 $7.500 $4.250 $4.240 $4.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 2,585.000 $2.000 $0.750 $0.750 $0.720 $0.650
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 1,024.000 $0.550 $0.750 $0.750 $0.720 $0.650
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 4,270.000 $0.600 $0.650 $0.750 $0.720 $0.650
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 6,800.000 $0.600 $0.650 $0.750 $0.720 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 40.000 $2.000 $1.410 $1.000 $1.100 $1.110
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 200.000 $2.000 $1.410 $1.000 $1.100 $0.810
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 250.000 $1.250 $1.000 $1.650 $1.650 $1.500
REFL PAV MRK TY II (W) 8" (SLD)
LF 2,120.000 $0.300 $0.500 $0.650 $0.660 $0.600
REFL PAV MRK TY II (W) 12" (SLD)
LF 300.000 $1.200 $1.500 $1.300 $1.320 $1.200
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 1,940.000 $0.350 $0.700 $0.650 $0.660 $0.600
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 11,102.000 $0.350 $0.500 $0.600 $0.610 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 12,347.000 $0.300 $0.500 $0.600 $0.610 $0.550
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 72.000 $15.000 $15.000 $17.600 $17.600 $16.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 10.000 $37.000 $55.000 $38.500 $38.500 $35.000
REFL PAV MRKR TY II-A-A
EA 60.000 $4.000 $10.000 $5.500 $5.500 $5.000
REFL PAV MRKR TY II-C-R
EA 185.000 $4.000 $7.000 $5.500 $5.500 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,640.000 $0.500 $0.700 $0.850 $0.830 $0.750
ELIM EXT PAV MRK & MRKS (8")
LF 620.000 $1.000 $1.500 $1.650 $1.650 $1.500
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $4,000.000 $1,500.000 $990.000 $990.000 $6,500.000
D-GR HMA TY-B PG70-22
TON 5,535.000 $90.000 $68.710 $91.000 $139.160 $95.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 68.000 $100.000 $131.010 $125.000 $226.110 $125.000
D-GR HMA TY-D SAC-B PG76-22
TON 3,001.000 $90.000 $76.240 $104.000 $150.160 $145.000
TACK COAT
GAL 2,439.000 $3.500 $2.960 $4.100 $5.500 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $7,900.000 $7,689.040 $7,500.000 $12,751.100 $15,000.000
TMA (STATIONARY)
DAY 30.000 $400.000 $358.820 $225.000 $275.000 $300.000
TMA (MOBILE OPERATION)
DAY 3.000 $200.000 $973.940 $550.000 $385.000 $500.000
Totals: $8,296,315.200 $8,660,295.310 $10,290,815.980 $11,040,589.975 $11,370,532.632