CALDWELL SH 142 (0384-01-024)

Items: 95

County: CALDWELL
Length: 1.9480 MILES
Highway: SH 142
District: AUSTIN
Control Number: 0384-01-024
DBE Goal: 5.0%
Project: F 2025(950)
Guaranty: $43,000.00
Time: 80 WORKING DAYS
Engineer's Estimate: $2,154,843.03
Date: 08/07/2025 (10 months ago)
Contract Number: 8253014
Type: RESURFACE ROADWAY
Project ID: A00135291
Contract Type: Federal
Project Description: FDR, MILL AND INLAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DIANA SCHULZE
SHANE SWIMM
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,154,843.03
$1,719,623.17
Over/Under Est: -20.2% -$435,219.86
Over/Under Est: -13.99% -$301,538.48
Amt Left: 7.77% $133,681.38
Over/Under Est: -10% -$215,530.65
Amt Left: 12.78% $219,689.21
Delta: -4.64% -$86,007.83

Bid Items & Bid Tabulations

95 Total 0 of 95
CALDWELL  |  SH 142  |  AUSTIN  |  0384-01-024  |  08/07/2025  |  $2,154,843.03  |  F 2025(950)  |  RESURF ROADWAY  |  80 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
DEAN WORD COMPANY, LTD.
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 16.000 $3,000.000 $1,148.850 $1,500.000 $2,650.000
REMOV CONC (DRIVEWAYS)
SY 100.000 $20.000 $27.600 $66.500 $30.000
REMOV CONC (CURB & GUTTER)
LF 210.000 $25.000 $13.800 $15.750 $10.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 332.000 $10.000 $13.800 $15.000 $14.500
EXCAV (ROADWAY)
CY 971.000 $31.270 $25.400 $25.500 $50.000
EMBANK (FNL)(OC)(TY B)
CY 75.000 $19.090 $27.600 $104.750 $100.000
BACKFILL (TY A)
STA 33.000 $125.000 $159.250 $53.000 $200.000
BROADCAST SEED (PERM_URBAN_CLAY)
SY 911.000 $4.000 $0.500 $0.500 $0.500
VEGETATIVE WATERING
TGL 5.000 $100.000 $31.050 $257.250 $100.000
SOIL RET BLKT(SL_MOD_CLAY_LONG)
SY 911.000 $4.390 $3.250 $3.750 $3.250
D-GR HMA TY-B PG64-22
TON 668.000 $172.000 $91.450 $120.750 $110.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 1,451.000 $145.000 $88.400 $115.750 $125.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 160.000 $325.000 $99.600 $194.250 $140.000
TOM-C PG76-22 SAC-B
TON 2,364.000 $160.000 $124.900 $128.750 $161.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 6,690.000 $57.500 $41.770 $40.500 $48.500
PLANE ASPH CONC PAV (0"- 1" EDGE MILL)
SY 8,933.000 $2.250 $1.880 $3.250 $1.000
CEM STABIL BKFL
CY 281.000 $270.000 $223.680 $163.250 $200.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 13.000 $370.000 $590.000 $913.250 $600.000
RC PIPE (ARCH)(CL III)(DES 2)
LF 300.000 $250.000 $251.640 $214.750 $225.000
SET (TY II) (DES 2) (RCP) (6: 1) (C)
EA 16.000 $2,500.000 $3,131.490 $2,226.000 $2,800.000
ADJUSTING MANHOLES
EA 1.000 $1,619.260 $8,947.110 $3,953.500 $8,000.000
REMOV STR (SET)
EA 16.000 $100.000 $648.670 $902.500 $150.000
REMOV STR (PIPE)
LF 300.000 $25.000 $42.500 $13.250 $38.000
MOBILIZATION
LS 1.000 $157,125.100 $105,308.370 $120,000.000 $90,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $7,500.000 $3,224.330 $13,131.750 $10,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,000.000 $9,201.250 $7,401.500 $7,500.000
TMA (STATIONARY)
DAY 80.000 $275.000 $216.500 $350.000 $50.000
TMA (MOBILE OPERATION)
DAY 3.000 $80.000 $324.750 $850.000 $100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $6.550 $3.750 $4.250 $3.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.300 $0.500 $0.500 $0.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,000.000 $6.440 $4.850 $5.500 $4.850
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $1.190 $1.000 $1.250 $1.000
CONC CURB & GUTTER (TY II)
LF 210.000 $37.560 $42.500 $57.000 $40.000
CONC CURB (SLOTTED)
LF 20.000 $50.000 $74.930 $68.500 $70.000
DRIVEWAYS (CONC)
SY 55.000 $135.810 $134.210 $153.250 $120.000
DRIVEWAYS (ACP) (TY 3)
SY 375.000 $165.000 $45.500 $88.250 $100.000
CONC SIDEWALKS (5")
SY 2,455.000 $72.500 $87.230 $80.750 $78.000
CURB RAMPS (TY 1)
EA 1.000 $2,958.750 $2,795.970 $2,700.250 $2,500.000
CURB RAMPS (TY 6)
EA 1.000 $3,184.000 $2,795.970 $3,156.750 $2,500.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 4.000 $310.000 $374.000 $393.750 $400.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $500.000 $473.000 $439.500 $500.000
CONDT (PVC) (SCH 40) (2")
LF 215.000 $16.000 $33.000 $16.000 $33.000
CONDT (PVC) (SCH 40) (3")
LF 105.000 $26.000 $37.000 $24.000 $37.000
ELEC CONDR (NO.8) BARE
LF 390.000 $2.000 $2.700 $1.750 $2.700
ELEC CONDR (NO.8) INSULATED
LF 960.000 $2.000 $2.700 $2.500 $2.700
ELEC CONDR (NO.6) BARE
LF 65.000 $2.300 $3.400 $2.250 $3.400
ELEC CONDR (NO.6) INSULATED
LF 130.000 $2.300 $3.400 $3.000 $3.400
ALUMINUM SIGNS (TY A)
SF 10.500 $33.000 $86.000 $32.500 $75.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 8.000 $1,125.000 $1,060.000 $1,318.500 $1,100.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 11,222.000 $0.170 $0.250 $0.250 $0.250
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 778.000 $0.320 $0.520 $0.350 $0.520
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,385.000 $0.340 $0.520 $0.350 $0.520
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,182.000 $5.000 $3.740 $2.000 $3.740
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 25.000 $75.000 $70.000 $28.500 $70.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 17.000 $226.140 $70.000 $28.500 $70.000
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
EA 112.000 $25.000 $16.000 $11.500 $16.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 800.000 $0.330 $0.250 $0.250 $0.250
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 18,304.000 $0.350 $0.250 $0.250 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 45.000 $2.270 $1.630 $3.500 $1.200
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,703.000 $1.500 $1.630 $2.000 $1.200
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 708.000 $1.660 $0.770 $1.250 $0.770
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,986.000 $1.250 $0.770 $1.000 $0.770
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,074.000 $9.000 $7.770 $7.500 $7.770
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 25.000 $150.000 $176.000 $165.500 $176.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 17.000 $175.000 $250.000 $177.000 $250.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 112.000 $50.000 $34.000 $34.250 $34.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 10,202.000 $0.650 $0.520 $0.750 $0.530
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 800.000 $0.650 $0.520 $0.750 $0.530
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 16,639.000 $0.600 $0.520 $0.750 $0.530
REFL PAV MRKR TY I-C
EA 200.000 $5.000 $4.300 $4.500 $4.500
REFL PAV MRKR TY II-A-A
EA 2,032.000 $5.000 $4.300 $3.750 $4.500
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $485.000 $23,000.000 $21,186.250 $23,500.000
VEH SIG SEC (12")LED(GRN)
EA 2.000 $269.000 $480.000 $411.000 $500.000
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $270.000 $480.000 $411.000 $500.000
VEH SIG SEC (12")LED(YEL)
EA 2.000 $270.000 $480.000 $411.000 $500.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $270.000 $480.000 $411.000 $500.000
VEH SIG SEC (12")LED(RED)
EA 2.000 $270.000 $480.000 $411.000 $500.000
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $270.000 $480.000 $411.000 $500.000
PED SIG SEC (LED)(COUNTDOWN)
EA 4.000 $675.000 $1,100.000 $896.000 $1,200.000
BACKPLATE W/REFL BRDR(4 SEC)
EA 2.000 $211.000 $310.000 $822.000 $310.000
RETROFIT REFL BRDR SHEETING (3 SEC)
EA 6.000 $168.000 $25.000 $502.250 $25.000
BACKPLATE W/REFL BRDR(3 SEC)
EA 2.000 $168.000 $220.000 $730.500 $220.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 640.000 $3.000 $2.200 $2.000 $2.200
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 2,405.000 $2.500 $3.200 $2.750 $3.200
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 430.000 $4.000 $3.800 $3.500 $3.800
INS TRF SIG PL AM (S)STR(TY B)
EA 1.000 $3,391.330 $9,700.000 $15,490.000 $9,700.000
REMOVE TRF SIG PL
EA 1.000 $3,391.330 $570.000 $3,676.750 $1,200.000
PED POLE ASSEMBLY
EA 2.000 $2,400.000 $4,600.000 $5,091.000 $4,600.000
PEDESTRIAN PUSH BUTTON POLE
EA 1.000 $2,646.640 $4,300.000 $3,276.000 $4,300.000
PED DETECT PUSH BUTTON (APS)
EA 4.000 $850.000 $1,300.000 $1,061.500 $1,300.000
BONDING COURSE
GAL 4,029.000 $4.500 $3.540 $3.750 $4.000
ITS COM CBL (ETHERNET)
LF 210.000 $2.000 $2.050 $4.000 $2.050
VIVDS CAM ASSY FXD LNS
EA 1.000 $6,760.000 $4,700.000 $2,494.250 $4,700.000
VIVDS MULTI CON COM CAX CBL(3COND16AWG)
LF 770.000 $2.000 $3.750 $2.500 $3.750
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 1.000 $7,684.000 $10,900.000 $10,016.750 $11,000.000
Totals: $2,154,843.030 $1,719,623.170 $1,853,304.550 $1,939,312.380
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,500.00
TRAFFIC SIGNAL CONTROLLER (PART) $15,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,500.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,500.00
Total: $22,500.00