PREPARING ROW
|
STA
|
557.000
|
$2,200.000
|
$2,125.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
2,145.000
|
$30.000
|
$31.500
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
3,861.600
|
$22.000
|
$21.010
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
832.000
|
$25.000
|
$24.500
|
|
|
REMOVING CONC (CURB)
|
LF
|
574.000
|
$10.000
|
$14.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
850.000
|
$30.000
|
$31.500
|
|
|
REMOVE STAB BASE & ASPH PAV (13"-18")
|
SY
|
4,339.000
|
$15.000
|
$13.140
|
|
|
REMOVING STAB BASE & ASPH PAV (4" - 6")
|
SY
|
3,452.000
|
$7.000
|
$6.930
|
|
|
REMOVE TRT BASE & ASPH PAV (20"-30")
|
SY
|
59,175.000
|
$10.000
|
$21.040
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
178,500.000
|
$11.000
|
$11.800
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
413,803.000
|
$14.500
|
$12.150
|
|
|
BACKFILL (TY A OR B)
|
STA
|
40.000
|
$250.000
|
$184.000
|
|
|
BLADING
|
HR
|
278.000
|
$130.000
|
$168.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
45,041.000
|
$1.150
|
$1.990
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
1,100.000
|
$2.000
|
$0.420
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
686,025.000
|
$0.200
|
$0.230
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
171,512.000
|
$0.200
|
$0.150
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
171,512.000
|
$0.200
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
6,329.000
|
$50.000
|
$24.500
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
13,336.000
|
$3.000
|
$1.430
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
52,182.000
|
$88.000
|
$104.140
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
1,597.000
|
$270.000
|
$275.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
100,337.000
|
$3.750
|
$3.000
|
|
|
CEMENT
|
TON
|
959.000
|
$280.000
|
$275.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
100,337.000
|
$4.500
|
$3.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
34,879.000
|
$5.000
|
$6.460
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
1,341.000
|
$115.000
|
$172.410
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
59,297.000
|
$5.000
|
$5.360
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
4,157.000
|
$3.000
|
$3.660
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
3,402.000
|
$4.000
|
$3.660
|
|
|
CEM STABIL BKFL
|
CY
|
10,544.000
|
$210.000
|
$200.000
|
|
|
CUT & RESTORING PAV
|
SY
|
1,815.000
|
$170.000
|
$280.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
545.000
|
$105.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
4,053.000
|
$15.000
|
$15.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,500.000
|
$40.000
|
$70.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
380.000
|
$230.000
|
$215.200
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,210.000
|
$400.000
|
$245.140
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
1,015.000
|
$430.000
|
$339.680
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
309.000
|
$185.000
|
$150.140
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
336.000
|
$300.000
|
$225.220
|
|
|
CL C CONC (ABUT)
|
CY
|
150.900
|
$1,750.000
|
$1,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
146.400
|
$1,650.000
|
$1,200.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
128.800
|
$1,800.000
|
$1,200.000
|
|
|
REINF CONC SLAB
|
SF
|
38,796.000
|
$25.000
|
$28.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,876.130
|
$200.000
|
$170.000
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
2,937.420
|
$210.000
|
$200.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
491.000
|
$500.000
|
$600.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
357.000
|
$550.000
|
$650.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
295.000
|
$175.000
|
$180.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
448.000
|
$500.000
|
$500.000
|
|
|
RAIL (TY T551)
|
LF
|
480.000
|
$120.000
|
$160.000
|
|
|
RAIL (TY T552)
|
LF
|
360.000
|
$120.000
|
$160.000
|
|
|
RAIL (TY SSTR)
|
LF
|
2,274.100
|
$100.000
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
237.000
|
$190.000
|
$250.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
134.000
|
$500.000
|
$400.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
408.000
|
$600.000
|
$525.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
1,425.000
|
$675.000
|
$675.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
2,931.000
|
$800.000
|
$775.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
220.000
|
$850.000
|
$800.000
|
|
|
CONC BOX CULV (9 FT X 7 FT)(EXTEND)
|
LF
|
486.000
|
$1,100.000
|
$1,100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
48.000
|
$200.000
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
6,196.000
|
$120.000
|
$120.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
2.000
|
$6,500.000
|
$8,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
11.000
|
$7,000.000
|
$8,250.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
7.000
|
$8,750.000
|
$9,000.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
58.000
|
$6,500.000
|
$10,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$9,000.000
|
$5,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
2.000
|
$13,000.000
|
$8,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1) (C)
|
EA
|
4.000
|
$15,000.000
|
$7,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
10.000
|
$16,000.000
|
$6,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
15.000
|
$16,500.000
|
$10,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$16,500.000
|
$10,000.000
|
|
|
SET (TY I)(S= 9 FT)(HW= 8 FT)(4:1) (C)
|
EA
|
4.000
|
$19,500.000
|
$28,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,900.000
|
$2,800.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,850.000
|
$2,800.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,000.000
|
$3,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
7.000
|
$3,200.000
|
$4,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
76.000
|
$3,150.000
|
$4,000.000
|
|
|
JACK BOR OR TUN PIPE(12 IN)(STL CASING)
|
LF
|
680.000
|
$775.000
|
$232.290
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
12.000
|
$3,000.000
|
$2,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
5.000
|
$1,300.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
3,511.000
|
$25.000
|
$20.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
1,104.000
|
$150.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,233,438.000
|
$5,591,617.330
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$7,000.000
|
$12,550.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
878.000
|
$50.000
|
$49.250
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
878.000
|
$15.000
|
$14.520
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
440.000
|
$30.000
|
$48.130
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
440.000
|
$12.000
|
$14.120
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,586.000
|
$4.200
|
$8.150
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,586.000
|
$1.500
|
$1.470
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,628.000
|
$5.500
|
$5.330
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,628.000
|
$2.000
|
$1.470
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,920.000
|
$110.000
|
$72.800
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
7,090.000
|
$50.000
|
$90.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
140.000
|
$75.000
|
$125.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$75.000
|
$75.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
4,200.000
|
$12.000
|
$12.500
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
7,090.000
|
$18.000
|
$12.500
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
140.000
|
$16.000
|
$75.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$22.000
|
$100.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
7,866.000
|
$110.000
|
$125.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
794.000
|
$100.000
|
$115.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,647.000
|
$95.000
|
$55.200
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
6,297.000
|
$50.000
|
$41.400
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
79,705.000
|
$0.250
|
$0.200
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$3.000
|
$4.010
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$250.000
|
$275.610
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
8,806.000
|
$18.000
|
$19.750
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
5.000
|
$4,400.000
|
$3,375.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$275.610
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$2,000.000
|
$1,152.550
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
14.000
|
$1,300.000
|
$927.050
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
11.000
|
$27,000.000
|
$26,909.590
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
13.000
|
$9,000.000
|
$8,669.200
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
208.000
|
$50.000
|
$83.180
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$750.000
|
$406.010
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
8.000
|
$350.000
|
$126.880
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$250.000
|
$152.250
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
34.000
|
$500.000
|
$450.430
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
4.000
|
$1,600.000
|
$1,000.960
|
|
|
IN RD IL (TY SA) 50T-4 (400W EQ) LED
|
EA
|
42.000
|
$2,000.000
|
$5,205.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
12,225.000
|
$20.000
|
$8.510
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,840.000
|
$31.000
|
$15.010
|
|
|
CONDT (RM) (1")
|
LF
|
120.000
|
$36.000
|
$20.020
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
15,065.000
|
$3.000
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
30,310.000
|
$3.000
|
$2.100
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
36.000
|
$1,200.000
|
$1,101.060
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
5.000
|
$9,500.000
|
$8,007.690
|
|
|
ELC SRV TY T 120/240 000(NS)GS(N)SP(O)
|
EA
|
2.000
|
$8,000.000
|
$4,504.330
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
24.000
|
$90.000
|
$25.020
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
2,242.500
|
$35.000
|
$28.030
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$850.000
|
$558.270
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
5.000
|
$900.000
|
$598.870
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
17.000
|
$1,000.000
|
$685.140
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
3.000
|
$1,050.000
|
$761.270
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
11.000
|
$1,150.000
|
$812.020
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
22.000
|
$1,050.000
|
$989.650
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
8.000
|
$1,300.000
|
$1,015.030
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
43.000
|
$500.000
|
$340.030
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
18.000
|
$500.000
|
$431.390
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
134.000
|
$150.000
|
$50.750
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
1.000
|
$110.000
|
$40.600
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
11,144.730
|
$6.000
|
$5.000
|
|
|
REMOVE LRSA
|
EA
|
11.000
|
$1,200.000
|
$1,501.440
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
29.000
|
$25.000
|
$25.380
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
101.000
|
$21.000
|
$25.380
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
66.000
|
$22.000
|
$26.390
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
30.000
|
$90.000
|
$58.870
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
31.000
|
$90.000
|
$58.870
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
35.000
|
$110.000
|
$58.870
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
69,300.000
|
$0.650
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
|
LF
|
1,000.000
|
$0.650
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
98,000.000
|
$0.500
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
22.000
|
$9.500
|
$16.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
85,600.000
|
$0.400
|
$0.320
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
1,035.000
|
$9.000
|
$3.850
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
13,500.000
|
$1.000
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
21,500.000
|
$1.000
|
$0.320
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
13,100.000
|
$2.000
|
$0.320
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,000.000
|
$2.000
|
$1.630
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,000.000
|
$2.000
|
$1.630
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,790.000
|
$1.500
|
$0.660
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
343.000
|
$1.000
|
$0.840
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
13,550.000
|
$1.400
|
$0.840
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
3,620.000
|
$2.250
|
$0.840
|
|
|
PAVEMENT SEALER 6"
|
LF
|
4,220.000
|
$0.500
|
$0.260
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
1.000
|
$65.000
|
$135.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
1,000.000
|
$2.000
|
$0.880
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
2,306.000
|
$7.000
|
$8.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
555.000
|
$28.000
|
$16.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
18.000
|
$250.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
4.000
|
$360.000
|
$325.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
4.000
|
$375.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
10.000
|
$474.000
|
$475.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
22.000
|
$315.000
|
$275.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
4.000
|
$65.000
|
$18.000
|
|
PREFAB PAV MRK TY C (Y) (12") (SLD)
|
LF
|
6,270.000
|
$9.000
|
$7.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
376.000
|
$5.000
|
$3.850
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
681.000
|
$6.000
|
$3.850
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,442.000
|
$6.000
|
$3.850
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
22,440.000
|
$1.000
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
15,900.000
|
$0.750
|
$0.550
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
80.000
|
$2.000
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
30.000
|
$6.000
|
$25.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$80.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
1.000
|
$90.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,220.000
|
$0.200
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
1.000
|
$26.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
28.000
|
$1.500
|
$10.000
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$3,600.000
|
$5,963.680
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$600.000
|
$850.520
|
|
|
FULL - WIDTH MOWING
|
CYC
|
12.000
|
$3,500.000
|
$3,600.000
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
38,204.000
|
$88.000
|
$121.200
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
9,279.000
|
$92.000
|
$128.900
|
|
|
D-GR HMA TY-D SAC-B PG76-22
|
TON
|
48,645.000
|
$95.000
|
$132.200
|
|
|
TACK COAT
|
GAL
|
89,050.000
|
$5.000
|
$4.760
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$9,000.000
|
$10,000.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$11,000.000
|
$8,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
50.000
|
$250.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
50.000
|
$350.000
|
$900.000
|
|
|
HPPM-RIB W/RET REQ TYI(W)6"(BRK)100MIL
|
LF
|
17,975.000
|
$0.900
|
$0.660
|
|
|
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL
|
LF
|
86,895.000
|
$0.900
|
$0.660
|
|
|
HPPM-RIB W/RET REQ TYI(Y)6"(SLD)100MIL
|
LF
|
86,230.000
|
$0.900
|
$0.660
|
|
|
CASING STEEL (12IN)
|
LF
|
425.000
|
$425.000
|
$475.000
|
|
|
JCK TUN BOR OR AUG WTR MAIN (PVC) (6IN)
|
LF
|
730.000
|
$65.000
|
$160.270
|
|
|
REMOVE WATER METER AND VAULT
|
EA
|
1.000
|
$1,500.000
|
$25,000.000
|
|
|
WET CONNECTION (6IN)
|
EA
|
1.000
|
$2,500.000
|
$15,000.000
|
|
|
WATER METER BOX
|
EA
|
1.000
|
$10,000.000
|
$9,500.000
|
|
|
ABAND/FILL EXIST 6" WATER PIPE
|
LF
|
539.000
|
$110.000
|
$183.330
|
|
|
GATE VALVE (6")
|
EA
|
1.000
|
$3,500.000
|
$6,000.000
|
|
Totals: |
$51,222,552.430
|
$55,933,077.821
|