PREPARING ROW
|
STA
|
217.560
|
$1,000.000
|
$749.250
|
$2,820.000
|
$10,024.130
|
$6,640.000
|
$17,701.760
|
$900.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
3,547.000
|
$8.750
|
$7.800
|
$8.400
|
$6.970
|
$7.000
|
$6.170
|
$8.500
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
1,848.000
|
$10.000
|
$6.660
|
$10.000
|
$8.230
|
$7.000
|
$18.820
|
$9.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,163.000
|
$11.500
|
$8.940
|
$16.500
|
$8.480
|
$10.000
|
$16.200
|
$17.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
3,097.000
|
$2.800
|
$5.610
|
$4.600
|
$4.140
|
$5.000
|
$3.800
|
$10.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
1,089.000
|
$6.300
|
$5.610
|
$9.600
|
$5.320
|
$6.000
|
$8.250
|
$8.000
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
141.000
|
$15.000
|
$29.970
|
$13.000
|
$18.620
|
$9.000
|
$8.070
|
$15.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
19.000
|
$13.800
|
$73.260
|
$16.000
|
$23.860
|
$21.000
|
$41.940
|
$40.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,670.000
|
$6.900
|
$6.660
|
$8.450
|
$6.440
|
$9.000
|
$4.060
|
$13.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
71,614.000
|
$8.000
|
$12.090
|
$14.000
|
$17.000
|
$15.000
|
$25.000
|
$11.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
29,330.300
|
$20.000
|
$14.190
|
$20.000
|
$30.000
|
$10.500
|
$32.610
|
$32.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
68,010.000
|
$1.250
|
$0.600
|
$2.450
|
$1.540
|
$2.000
|
$1.230
|
$1.000
|
|
|
BLOCK SODDING
|
SY
|
68,010.000
|
$3.150
|
$2.930
|
$4.300
|
$2.930
|
$4.050
|
$2.930
|
$3.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
38,657.000
|
$0.130
|
$0.170
|
$0.200
|
$0.170
|
$0.500
|
$0.170
|
$0.180
|
|
|
VEGETATIVE WATERING
|
MG
|
1,639.000
|
$15.000
|
$16.650
|
$39.000
|
$23.850
|
$18.000
|
$18.250
|
$22.000
|
|
|
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
|
CY
|
26,004.000
|
$43.500
|
$36.410
|
$39.000
|
$42.000
|
$38.200
|
$44.970
|
$41.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
4,233.000
|
$130.000
|
$152.250
|
$160.000
|
$165.080
|
$166.000
|
$162.680
|
$215.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
160,637.000
|
$3.500
|
$2.280
|
$2.250
|
$5.000
|
$5.300
|
$4.550
|
$4.460
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
31,205.000
|
$3.750
|
$3.950
|
$2.800
|
$2.700
|
$2.710
|
$2.700
|
$4.460
|
|
|
ASPH (AC-15P)
|
GAL
|
34,291.000
|
$3.750
|
$3.630
|
$3.100
|
$3.000
|
$3.010
|
$3.000
|
$4.360
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
1,039.000
|
$80.000
|
$68.920
|
$145.000
|
$140.000
|
$140.320
|
$140.000
|
$135.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
46,807.000
|
$3.750
|
$3.570
|
$3.100
|
$3.000
|
$3.010
|
$3.000
|
$4.360
|
|
|
AGGR (TY-PB GR-4)
|
CY
|
1,301.000
|
$51.000
|
$68.950
|
$114.000
|
$110.000
|
$110.250
|
$110.000
|
$136.000
|
|
|
TACK COAT
|
GAL
|
28,653.000
|
$3.750
|
$3.170
|
$2.600
|
$2.500
|
$2.510
|
$2.500
|
$3.000
|
|
|
CEM STABIL BKFL
|
CY
|
45.000
|
$55.000
|
$121.480
|
$150.000
|
$175.220
|
$150.000
|
$93.640
|
$190.000
|
|
|
CUT & RESTORING PAV
|
SY
|
4,309.000
|
$76.000
|
$175.000
|
$68.000
|
$111.160
|
$120.000
|
$68.040
|
$185.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
2.000
|
$375.000
|
$1,973.220
|
$300.000
|
$476.970
|
$350.000
|
$163.310
|
$1,111.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
21,569.000
|
$3.000
|
$5.280
|
$2.100
|
$8.000
|
$1.000
|
$6.240
|
$1.050
|
|
|
TEMPORARY SPL SHORING
|
SF
|
24,965.000
|
$13.250
|
$5.000
|
$21.000
|
$19.440
|
$19.620
|
$19.000
|
$30.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
11,670.000
|
$115.000
|
$93.840
|
$115.000
|
$77.580
|
$70.500
|
$85.570
|
$91.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
130.000
|
$285.000
|
$316.570
|
$320.000
|
$240.000
|
$315.000
|
$315.790
|
$280.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
396.000
|
$385.000
|
$477.370
|
$480.000
|
$385.000
|
$475.000
|
$476.190
|
$410.000
|
|
|
CL A CONC (FLUME)
|
CY
|
4.500
|
$380.000
|
$700.000
|
$1,380.000
|
$1,231.660
|
$1,400.000
|
$500.000
|
$920.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
1,257.200
|
$390.000
|
$600.000
|
$375.000
|
$414.180
|
$560.000
|
$510.850
|
$500.000
|
|
|
CL C CONC (MISC)
|
CY
|
252.400
|
$375.000
|
$800.000
|
$525.000
|
$823.980
|
$900.000
|
$273.080
|
$520.000
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
29,574.000
|
$65.000
|
$58.000
|
$51.000
|
$91.000
|
$57.300
|
$53.980
|
$107.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
20,057.000
|
$0.300
|
$0.290
|
$0.290
|
$0.290
|
$0.290
|
$0.290
|
$0.300
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
982.500
|
$365.000
|
$353.670
|
$420.000
|
$374.270
|
$400.000
|
$337.590
|
$335.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
975.000
|
$380.000
|
$416.780
|
$430.000
|
$394.770
|
$408.000
|
$41.160
|
$368.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
13.000
|
$375.000
|
$369.720
|
$380.000
|
$417.820
|
$520.000
|
$500.000
|
$368.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
84.000
|
$375.000
|
$369.720
|
$440.000
|
$417.830
|
$450.000
|
$373.780
|
$368.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
396.000
|
$400.000
|
$369.720
|
$450.000
|
$417.840
|
$475.000
|
$450.000
|
$368.000
|
|
|
RIPRAP (CONC) (CL B) (6")
|
CY
|
82.000
|
$450.000
|
$369.720
|
$430.000
|
$394.770
|
$450.000
|
$450.000
|
$368.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
149.000
|
$375.000
|
$442.090
|
$500.000
|
$467.860
|
$429.650
|
$421.650
|
$420.000
|
|
|
RAIL (TY C221)
|
LF
|
4,347.000
|
$85.000
|
$68.000
|
$100.000
|
$70.150
|
$96.000
|
$70.740
|
$140.000
|
|
|
RAIL (TY C223)
|
LF
|
661.000
|
$95.000
|
$140.000
|
$210.000
|
$38.590
|
$135.000
|
$192.900
|
$195.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
4,732.000
|
$75.000
|
$131.510
|
$112.000
|
$125.250
|
$126.000
|
$88.840
|
$168.000
|
|
|
GABION MATTRESSES (GALV)(6 IN)
|
SY
|
15,442.000
|
$60.000
|
$56.390
|
$54.000
|
$57.910
|
$53.000
|
$53.000
|
$56.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
584.000
|
$60.000
|
$71.620
|
$79.000
|
$54.430
|
$95.000
|
$79.000
|
$98.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
100.000
|
$70.000
|
$96.470
|
$116.000
|
$73.760
|
$100.000
|
$74.210
|
$115.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
30.000
|
$75.000
|
$89.790
|
$162.000
|
$167.340
|
$125.000
|
$103.110
|
$120.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
17.000
|
$175.000
|
$237.680
|
$400.000
|
$208.860
|
$280.000
|
$258.070
|
$1,140.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
298.000
|
$225.000
|
$254.030
|
$250.000
|
$219.300
|
$305.000
|
$221.430
|
$340.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
375.000
|
$225.000
|
$258.800
|
$250.000
|
$233.920
|
$310.000
|
$200.880
|
$320.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
116.000
|
$250.000
|
$274.650
|
$290.000
|
$261.070
|
$320.000
|
$212.050
|
$360.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
133.000
|
$235.000
|
$316.900
|
$340.000
|
$287.180
|
$350.000
|
$302.200
|
$400.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
92.000
|
$300.000
|
$348.590
|
$380.000
|
$365.500
|
$400.000
|
$445.000
|
$420.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
125.000
|
$325.000
|
$431.050
|
$370.000
|
$386.390
|
$405.000
|
$312.510
|
$500.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
92.000
|
$475.000
|
$441.280
|
$420.000
|
$386.390
|
$550.000
|
$338.170
|
$500.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
170.000
|
$325.000
|
$438.380
|
$600.000
|
$386.390
|
$425.000
|
$373.030
|
$540.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
83.000
|
$340.000
|
$475.350
|
$560.000
|
$391.610
|
$600.000
|
$409.880
|
$600.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
656.000
|
$400.000
|
$517.610
|
$400.000
|
$469.930
|
$525.000
|
$436.410
|
$666.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
410.000
|
$450.000
|
$565.140
|
$560.000
|
$548.250
|
$575.000
|
$464.860
|
$480.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
165.000
|
$65.000
|
$68.660
|
$60.000
|
$78.320
|
$72.000
|
$71.840
|
$75.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
13,966.000
|
$75.000
|
$79.230
|
$65.000
|
$82.710
|
$71.500
|
$68.250
|
$90.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
2,228.000
|
$85.000
|
$100.350
|
$90.000
|
$101.820
|
$90.000
|
$98.110
|
$113.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
3,265.000
|
$110.000
|
$126.760
|
$120.000
|
$133.670
|
$114.000
|
$173.000
|
$150.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
1,467.000
|
$140.000
|
$169.010
|
$130.000
|
$146.200
|
$200.000
|
$164.420
|
$195.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
214.000
|
$175.000
|
$195.420
|
$160.000
|
$172.310
|
$235.000
|
$177.100
|
$240.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
4.000
|
$4,500.000
|
$4,753.540
|
$6,900.000
|
$5,646.060
|
$5,500.000
|
$4,861.680
|
$4,880.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
$6,000.000
|
$6,338.050
|
$7,800.000
|
$6,455.390
|
$6,000.000
|
$7,500.000
|
$5,900.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
2.000
|
$7,000.000
|
$8,978.910
|
$11,300.000
|
$9,724.000
|
$9,500.000
|
$8,256.380
|
$7,750.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
4.000
|
$10,000.000
|
$15,845.130
|
$16,700.000
|
$14,887.970
|
$17,000.000
|
$14,635.890
|
$19,100.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
9.000
|
$4,500.000
|
$4,753.540
|
$6,900.000
|
$5,562.510
|
$5,500.000
|
$4,786.700
|
$3,880.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
19.000
|
$5,000.000
|
$5,281.710
|
$7,800.000
|
$6,424.050
|
$6,500.000
|
$5,483.380
|
$5,200.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
12.000
|
$5,000.000
|
$4,753.540
|
$7,300.000
|
$5,912.350
|
$6,000.000
|
$5,071.700
|
$5,500.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
54.000
|
$5,500.000
|
$5,809.880
|
$8,600.000
|
$6,951.410
|
$6,800.000
|
$5,913.380
|
$6,920.000
|
|
|
INLET (COMPL)(PCO)(4FT)(NONE)
|
EA
|
2.000
|
$4,750.000
|
$4,753.540
|
$7,300.000
|
$5,964.580
|
$7,000.000
|
$5,136.620
|
$4,500.000
|
|
|
INLET (COMPL)(PCO)(4FT)(LEFT)
|
EA
|
3.000
|
$5,250.000
|
$6,338.050
|
$9,100.000
|
$7,651.090
|
$8,500.000
|
$6,506.620
|
$7,000.000
|
|
|
INLET (COMPL)(PCO)(4FT)(RIGHT)
|
EA
|
3.000
|
$5,250.000
|
$5,809.880
|
$8,100.000
|
$6,679.910
|
$9,000.000
|
$5,716.620
|
$6,450.000
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
9.000
|
$5,750.000
|
$6,338.050
|
$9,500.000
|
$7,828.610
|
$9,000.000
|
$6,651.620
|
$8,000.000
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
2.000
|
$5,750.000
|
$8,450.730
|
$11,100.000
|
$9,509.920
|
$10,000.000
|
$8,021.620
|
$9,320.000
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
7.000
|
$6,250.000
|
$6,866.220
|
$10,100.000
|
$8,429.070
|
$10,000.000
|
$10,000.000
|
$8,500.000
|
|
|
INLET (COMPL)(PCO)(6FT)(BOTH)
|
EA
|
5.000
|
$7,250.000
|
$9,507.080
|
$12,200.000
|
$8,852.020
|
$10,000.000
|
$7,498.570
|
$8,860.000
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
3.000
|
$5,000.000
|
$3,697.200
|
$8,100.000
|
$5,009.050
|
$5,500.000
|
$4,356.620
|
$4,600.000
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
3.000
|
$5,500.000
|
$5,281.710
|
$9,600.000
|
$6,366.620
|
$6,800.000
|
$5,441.700
|
$6,500.000
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
2.000
|
$5,500.000
|
$5,281.710
|
$9,600.000
|
$6,366.630
|
$6,800.000
|
$5,461.620
|
$6,150.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
13.000
|
$6,000.000
|
$6,338.050
|
$10,500.000
|
$7,348.240
|
$7,500.000
|
$6,241.700
|
$8,080.000
|
|
|
INLET (COMPL)(PCU)(4FT)(NONE)
|
EA
|
2.000
|
$5,500.000
|
$4,225.370
|
$8,000.000
|
$4,951.620
|
$6,500.000
|
$4,186.060
|
$5,510.000
|
|
|
INLET (COMPL)(PCU)(4FT)(BOTH)
|
EA
|
1.000
|
$6,500.000
|
$5,809.880
|
$9,900.000
|
$6,753.010
|
$8,000.000
|
$8,000.000
|
$8,160.000
|
|
|
INLET (COMPL)(PCU)(5FT)(LEFT)
|
EA
|
1.000
|
$6,250.000
|
$7,394.390
|
$11,600.000
|
$8,314.210
|
$9,000.000
|
$7,046.620
|
$8,260.000
|
|
|
INLET (COMPL)(PCU)(5FT)(RIGHT)
|
EA
|
3.000
|
$6,250.000
|
$7,394.390
|
$11,600.000
|
$8,314.210
|
$9,000.000
|
$7,046.620
|
$8,080.000
|
|
|
INLET (COMPL)(PCU)(5FT)(BOTH)
|
EA
|
6.000
|
$6,750.000
|
$7,922.560
|
$12,200.000
|
$8,899.000
|
$9,500.000
|
$7,521.620
|
$9,160.000
|
|
|
INLET (COMPL)(PCU)(6FT)(NONE)
|
EA
|
1.000
|
$6,250.000
|
$6,866.220
|
$10,900.000
|
$7,671.980
|
$9,000.000
|
$6,538.570
|
$6,830.000
|
|
|
INLET (COMPL)(PCU)(6FT)(BOTH)
|
EA
|
2.000
|
$7,250.000
|
$10,035.250
|
$12,500.000
|
$9,196.640
|
$10,000.000
|
$7,778.570
|
$9,900.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$4,000.000
|
$4,753.540
|
$6,700.000
|
$5,499.870
|
$7,000.000
|
$4,726.740
|
$3,900.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$5,000.000
|
$4,753.540
|
$7,000.000
|
$5,703.500
|
$6,800.000
|
$4,897.710
|
$4,800.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
2.000
|
$5,500.000
|
$5,281.710
|
$7,300.000
|
$6,032.460
|
$7,000.000
|
$5,167.710
|
$4,040.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$5,500.000
|
$5,809.880
|
$8,000.000
|
$6,706.020
|
$8,000.000
|
$5,712.710
|
$5,800.000
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$6,750.000
|
$12,676.100
|
$16,300.000
|
$14,517.260
|
$15,000.000
|
$12,096.620
|
$6,240.000
|
|
|
INLET (COMPL)(DROP)(TY Y-1)
|
EA
|
5.000
|
$5,000.000
|
$6,338.050
|
$9,200.000
|
$7,739.860
|
$9,000.000
|
$6,557.710
|
$4,350.000
|
|
|
INLET (COMP)(DROP)(TY W-3)
|
EA
|
1.000
|
$8,000.000
|
$17,957.810
|
$23,000.000
|
$20,354.810
|
$35,000.000
|
$17,466.840
|
$17,800.000
|
|
|
INLET (COMPL)(DROP)(TY W-1)
|
EA
|
20.000
|
$5,750.000
|
$7,922.560
|
$11,100.000
|
$9,562.120
|
$10,000.000
|
$8,071.050
|
$6,000.000
|
|
|
INLET (COMP) (TY SIDEWALK BRIDGE)
|
EA
|
17.000
|
$8,000.000
|
$9,401.440
|
$11,000.000
|
$8,900.000
|
$18,500.000
|
$15,519.130
|
$8,200.000
|
|
|
INLET(COMPL)(DROP)(TY W-2)
|
EA
|
2.000
|
$7,000.000
|
$12,676.100
|
$17,100.000
|
$15,237.820
|
$15,000.000
|
$16,000.000
|
$10,700.000
|
|
|
INLET (COMPL) (TRAFFIC) (TY W-5)
|
EA
|
3.000
|
$12,000.000
|
$33,802.940
|
$43,000.000
|
$40,091.780
|
$43,000.000
|
$33,717.160
|
$41,500.000
|
|
|
INLET (COMPL)(ARMOR CURB SLOT)
|
EA
|
5.000
|
$3,150.000
|
$4,288.810
|
$6,900.000
|
$4,435.100
|
$4,500.000
|
$5,000.000
|
$3,700.000
|
|
|
INLET (COMPL) (TRAFFIC) (TY W - 2)
|
EA
|
1.000
|
$7,500.000
|
$15,845.130
|
$21,000.000
|
$18,741.390
|
$18,000.000
|
$16,097.080
|
$10,700.000
|
|
|
JCT BOX (STAGE I) (PJB) (5 FT X 5 FT)
|
EA
|
2.000
|
$3,500.000
|
$4,225.370
|
$5,700.000
|
$4,445.140
|
$5,000.000
|
$5,000.000
|
$4,060.000
|
|
|
JCT BOX (STAGE II) (PJB) (5 FT X 5 FT)
|
EA
|
2.000
|
$3,500.000
|
$4,225.370
|
$3,300.000
|
$4,193.720
|
$5,000.000
|
$5,000.000
|
$2,820.000
|
|
|
JCT BOX (STAGE I) (PJB) (8 FT X 8 FT)
|
EA
|
4.000
|
$5,500.000
|
$10,563.420
|
$12,300.000
|
$10,695.170
|
$10,000.000
|
$11,225.890
|
$9,980.000
|
|
|
JCT BOX (STAGE II) (PJB) (8 FT X 8 FT)
|
EA
|
5.000
|
$5,500.000
|
$6,866.220
|
$5,600.000
|
$6,376.270
|
$6,500.000
|
$7,475.810
|
$5,230.000
|
|
|
INLET(COMP)(ARMOR CURB SLOT)(MOD)(TY A)
|
EA
|
47.000
|
$3,000.000
|
$7,335.490
|
$9,900.000
|
$1,566.430
|
$6,200.000
|
$7,500.000
|
$6,820.000
|
|
|
INLET(COMP)(ARMOR CURB SLOT)(MOD)(TY B)
|
EA
|
20.000
|
$2,250.000
|
$4,834.270
|
$7,800.000
|
$1,566.430
|
$5,000.000
|
$3,335.520
|
$6,820.000
|
|
|
INLET (STAGE I) (PCO) (3 FT) (NONE)
|
EA
|
1.000
|
$2,750.000
|
$3,697.200
|
$5,200.000
|
$3,870.780
|
$4,000.000
|
$3,431.620
|
$2,940.000
|
|
|
INLET (STAGE II) (PCO) (3 FT) (NONE)
|
EA
|
2.000
|
$2,750.000
|
$3,697.200
|
$3,000.000
|
$3,875.220
|
$3,500.000
|
$3,316.060
|
$2,720.000
|
|
|
INLET (STAGE I) (PCO) (3 FT) (RIGHT)
|
EA
|
2.000
|
$3,000.000
|
$3,697.200
|
$4,700.000
|
$3,505.290
|
$3,500.000
|
$3,131.620
|
$2,940.000
|
|
|
INLET (STAGE II) (PCO) (3 FT) (RIGHT)
|
EA
|
2.000
|
$3,000.000
|
$4,225.370
|
$3,700.000
|
$3,546.270
|
$3,200.000
|
$3,901.060
|
$3,690.000
|
|
|
INLET (STAGE I) (PCO) (6 FT) (RIGHT)
|
EA
|
1.000
|
$3,875.000
|
$5,281.710
|
$6,800.000
|
$5,421.550
|
$5,500.000
|
$4,703.570
|
$5,460.000
|
|
|
INLET (STAGE II) (PCO) (6 FT) (RIGHT)
|
EA
|
1.000
|
$3,875.000
|
$4,753.540
|
$3,700.000
|
$4,590.550
|
$3,500.000
|
$3,901.060
|
$3,700.000
|
|
|
INLET (STAGE I) (PCO) (3 FT) (BOTH)
|
EA
|
1.000
|
$3,250.000
|
$3,697.200
|
$5,300.000
|
$3,980.430
|
$4,000.000
|
$3,497.710
|
$2,900.000
|
|
|
INLET (STAGE II) (PCO) (3 FT) (BOTH)
|
EA
|
1.000
|
$3,250.000
|
$4,753.540
|
$4,300.000
|
$5,154.460
|
$3,500.000
|
$4,361.060
|
$5,200.000
|
|
|
INLET (STAGE I) (PCO) (4 FT) (BOTH)
|
EA
|
3.000
|
$3,375.000
|
$4,753.540
|
$6,100.000
|
$4,857.630
|
$5,000.000
|
$4,236.620
|
$3,500.000
|
|
|
INLET (STAGE II) (PCO) (4 FT) (BOTH)
|
EA
|
3.000
|
$3,375.000
|
$4,753.540
|
$4,300.000
|
$5,154.460
|
$3,800.000
|
$4,361.060
|
$5,600.000
|
|
|
INLET (STAGE I) (PCO) (5 FT) (BOTH)
|
EA
|
3.000
|
$3,625.000
|
$5,281.710
|
$6,800.000
|
$5,458.100
|
$5,500.000
|
$4,721.620
|
$4,580.000
|
|
|
INLET (STAGE II) (PCO) (5 FT) (BOTH)
|
EA
|
3.000
|
$3,625.000
|
$5,281.710
|
$4,300.000
|
$5,154.460
|
$3,900.000
|
$4,361.050
|
$5,770.000
|
|
|
INLET (STAGE I) (PCU) (5 FT) (NONE)
|
EA
|
2.000
|
$3,125.000
|
$4,225.370
|
$5,700.000
|
$4,455.590
|
$4,500.000
|
$3,906.620
|
$4,600.000
|
|
|
INLET (STAGE II) (PCU) (5 FT) (NONE)
|
EA
|
2.000
|
$3,125.000
|
$5,281.710
|
$6,600.000
|
$5,608.730
|
$4,500.000
|
$4,731.060
|
$4,040.000
|
|
|
INLET (STAGE I) (PCU) (3 FT) (LEFT)
|
EA
|
1.000
|
$3,250.000
|
$3,169.030
|
$4,800.000
|
$3,510.510
|
$4,500.000
|
$3,136.620
|
$3,000.000
|
|
|
INLET (STAGE II) (PCU) (3 FT) (LEFT)
|
EA
|
2.000
|
$3,250.000
|
$4,753.540
|
$6,000.000
|
$5,039.590
|
$3,500.000
|
$4,266.060
|
$4,440.000
|
|
|
INLET (COMPL)(DROP)(TY W-5)
|
EA
|
2.000
|
$13,000.000
|
$36,971.960
|
$33,000.000
|
$30,207.630
|
$36,000.000
|
$28,714.820
|
$35,200.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$7,000.000
|
$8,440.170
|
$23,000.000
|
$7,500.000
|
$13,000.000
|
$16,426.160
|
$15,500.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
4.000
|
$14,000.000
|
$36,961.400
|
$31,000.000
|
$16,000.000
|
$25,000.000
|
$30,062.440
|
$36,600.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
4.000
|
$12,200.000
|
$23,228.960
|
$29,000.000
|
$24,000.000
|
$22,000.000
|
$26,550.370
|
$24,950.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$10,000.000
|
$24,285.300
|
$46,000.000
|
$35,750.000
|
$35,000.000
|
$50,000.000
|
$55,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
1.000
|
$4,250.000
|
$7,172.560
|
$9,900.000
|
$4,050.640
|
$14,000.000
|
$9,121.220
|
$11,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
24.000
|
$750.000
|
$1,795.780
|
$2,400.000
|
$1,116.910
|
$2,000.000
|
$2,454.950
|
$1,515.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
9.000
|
$1,000.000
|
$1,795.780
|
$2,500.000
|
$2,062.950
|
$2,000.000
|
$2,427.230
|
$1,660.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,000.000
|
$1,901.420
|
$2,600.000
|
$1,705.250
|
$2,500.000
|
$2,850.240
|
$1,660.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,250.000
|
$1,901.420
|
$3,000.000
|
$2,470.240
|
$2,500.000
|
$2,850.240
|
$1,750.000
|
|
|
SLOT DRAIN (GAL STL) (18 IN)
|
LF
|
20.000
|
$125.000
|
$232.400
|
$320.000
|
$322.310
|
$125.000
|
$342.880
|
$5,660.000
|
|
|
REMOV STR (INLET)
|
EA
|
6.000
|
$670.000
|
$1,161.980
|
$780.000
|
$372.310
|
$1,850.000
|
$1,687.720
|
$980.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$600.000
|
$1,161.980
|
$780.000
|
$489.550
|
$1,900.000
|
$1,800.210
|
$950.000
|
|
|
REMOV STR (SET)
|
EA
|
112.000
|
$375.000
|
$475.350
|
$159.000
|
$197.270
|
$800.000
|
$343.170
|
$310.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
18.000
|
$1,150.000
|
$2,323.950
|
$1,660.000
|
$1,627.610
|
$2,500.000
|
$887.610
|
$415.000
|
|
|
REMOV STR (PIPE)
|
LF
|
4,201.000
|
$16.000
|
$19.540
|
$13.500
|
$13.820
|
$18.000
|
$12.480
|
$15.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
222.000
|
$45.000
|
$73.940
|
$27.000
|
$61.440
|
$85.000
|
$47.360
|
$85.000
|
|
|
REMOV STR (ROCKWALL)
|
EA
|
1.000
|
$2,000.000
|
$500.000
|
$1,210.000
|
$712.080
|
$1,500.000
|
$263.680
|
$525.000
|
|
|
REMOV STR (SMALL)
|
EA
|
1.000
|
$1,200.000
|
$500.000
|
$1,020.000
|
$1,282.170
|
$1,500.000
|
$263.680
|
$2,100.000
|
|
|
REMOVING ROCK RIPRAP
|
LF
|
156.000
|
$10.000
|
$5.000
|
$14.000
|
$9.130
|
$10.000
|
$5.790
|
$16.000
|
|
|
REMOV STR (MASONARY)
|
LF
|
35.000
|
$50.000
|
$10.000
|
$58.000
|
$40.690
|
$45.000
|
$30.130
|
$53.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,034,600.000
|
$2,891,546.980
|
$3,650,000.000
|
$4,318,084.210
|
$3,585,000.000
|
$4,600,000.000
|
$4,880,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
44.000
|
$6,000.000
|
$2,548.000
|
$11,000.000
|
$20,959.860
|
$5,800.000
|
$6,765.540
|
$1,380.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,940.000
|
$22.000
|
$26.120
|
$27.000
|
$26.120
|
$22.000
|
$22.000
|
$27.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 5)
|
LF
|
749.000
|
$28.000
|
$16.360
|
$30.000
|
$16.360
|
$30.000
|
$30.000
|
$17.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
4,689.000
|
$7.500
|
$9.110
|
$5.050
|
$9.110
|
$7.000
|
$7.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
278.000
|
$13.500
|
$18.200
|
$14.500
|
$18.200
|
$11.000
|
$11.000
|
$19.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
278.000
|
$4.000
|
$6.830
|
$4.950
|
$6.830
|
$2.000
|
$2.000
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
22,340.000
|
$2.000
|
$2.020
|
$2.400
|
$2.020
|
$1.700
|
$1.700
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
22,340.000
|
$0.450
|
$0.400
|
$0.250
|
$0.400
|
$0.600
|
$0.600
|
$0.420
|
|
|
CONSTRUCTING DETOURS
|
SY
|
26,315.000
|
$45.000
|
$43.450
|
$52.000
|
$43.310
|
$50.000
|
$75.000
|
$53.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
12,300.000
|
$22.000
|
$30.000
|
$15.000
|
$20.600
|
$33.000
|
$23.880
|
$33.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
1,040.000
|
$20.000
|
$36.000
|
$104.000
|
$22.240
|
$50.000
|
$53.860
|
$33.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
71,980.000
|
$5.250
|
$10.000
|
$2.400
|
$3.590
|
$4.800
|
$2.610
|
$8.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
5,460.000
|
$7.250
|
$15.000
|
$14.500
|
$5.150
|
$22.000
|
$3.010
|
$10.710
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
11,600.000
|
$7.000
|
$10.000
|
$6.700
|
$7.480
|
$4.000
|
$4.080
|
$14.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
980.000
|
$8.500
|
$10.000
|
$26.000
|
$8.580
|
$10.000
|
$4.150
|
$11.000
|
|
|
CONC CURB (TY I)
|
LF
|
41,869.000
|
$10.000
|
$9.270
|
$12.500
|
$9.750
|
$12.500
|
$11.480
|
$12.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
154.000
|
$40.000
|
$23.710
|
$24.000
|
$19.850
|
$30.000
|
$22.500
|
$24.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
2,739.000
|
$20.000
|
$8.960
|
$9.150
|
$20.000
|
$15.000
|
$8.500
|
$9.000
|
|
|
CONC CURB (TY C1)
|
LF
|
537.000
|
$100.000
|
$113.760
|
$102.000
|
$71.610
|
$100.000
|
$96.570
|
$95.000
|
|
|
CONC CURB (TY F1)
|
LF
|
450.000
|
$85.000
|
$95.720
|
$142.000
|
$90.520
|
$100.000
|
$83.280
|
$82.000
|
|
|
CONC CURB (TY F2)
|
LF
|
531.000
|
$120.000
|
$116.880
|
$173.000
|
$123.060
|
$100.000
|
$94.610
|
$92.000
|
|
|
CONC CURB (TY F3)
|
LF
|
3,590.000
|
$135.000
|
$150.220
|
$150.000
|
$131.570
|
$120.000
|
$121.040
|
$110.000
|
|
|
CONC CURB (TY C2)
|
LF
|
630.000
|
$95.000
|
$103.100
|
$113.000
|
$91.220
|
$95.000
|
$86.480
|
$86.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,825.000
|
$65.000
|
$70.890
|
$90.000
|
$67.220
|
$80.000
|
$73.940
|
$61.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,045.000
|
$50.000
|
$33.990
|
$37.000
|
$32.000
|
$53.000
|
$43.670
|
$55.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
21,819.000
|
$45.000
|
$44.220
|
$41.000
|
$42.830
|
$46.000
|
$51.560
|
$55.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
773.000
|
$50.000
|
$50.590
|
$65.000
|
$51.010
|
$65.000
|
$57.290
|
$63.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
32.000
|
$2,500.000
|
$1,989.400
|
$2,500.000
|
$1,971.950
|
$2,500.000
|
$2,144.140
|
$1,900.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
14.000
|
$1,800.000
|
$2,099.920
|
$1,940.000
|
$1,993.800
|
$2,500.000
|
$1,955.620
|
$2,000.000
|
|
|
CONC SIDEWALKS (10")
|
SY
|
19.000
|
$55.000
|
$99.470
|
$193.000
|
$97.310
|
$185.000
|
$98.570
|
$115.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
350.000
|
$21.000
|
$23.430
|
$29.000
|
$22.500
|
$29.000
|
$25.200
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$2,302.000
|
$2,000.000
|
$1,850.000
|
$2,015.000
|
$1,765.000
|
$2,420.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,869.000
|
$2.000
|
$2.000
|
$1.800
|
$2.500
|
$1.750
|
$2.000
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,650.000
|
$2,531.000
|
$2,800.000
|
$2,695.000
|
$2,800.000
|
$2,700.000
|
$2,660.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
18.000
|
$210.000
|
$215.000
|
$220.000
|
$275.000
|
$215.000
|
$225.000
|
$225.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
15.000
|
$20,000.000
|
$20,750.000
|
$20,000.000
|
$20,750.000
|
$19,900.000
|
$8,950.000
|
$23,900.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
4,307.000
|
$17.000
|
$21.300
|
$5.500
|
$40.520
|
$24.000
|
$26.430
|
$10.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
23.000
|
$230.000
|
$187.350
|
$230.000
|
$187.350
|
$187.350
|
$268.000
|
$200.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$290.000
|
$222.500
|
$240.000
|
$222.500
|
$222.500
|
$312.000
|
$233.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$575.000
|
$575.760
|
$510.000
|
$575.760
|
$575.760
|
$556.000
|
$605.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
895.000
|
$7.500
|
$16.080
|
$16.000
|
$15.000
|
$16.000
|
$16.040
|
$22.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,820.000
|
$19.000
|
$23.110
|
$23.000
|
$23.500
|
$23.000
|
$23.060
|
$33.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
805.000
|
$11.500
|
$21.100
|
$21.000
|
$17.350
|
$21.000
|
$21.050
|
$27.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
6,375.000
|
$22.000
|
$30.150
|
$30.000
|
$27.000
|
$30.000
|
$30.070
|
$38.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
10,310.000
|
$1.450
|
$1.260
|
$1.250
|
$1.550
|
$1.250
|
$1.250
|
$1.630
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
225.000
|
$1.600
|
$1.510
|
$1.500
|
$1.700
|
$1.500
|
$1.500
|
$1.730
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
2,900.000
|
$2.100
|
$1.760
|
$1.750
|
$2.200
|
$1.750
|
$1.750
|
$2.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
1.000
|
$1,000.000
|
$753.750
|
$760.000
|
$800.000
|
$750.000
|
$751.880
|
$810.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
27.000
|
$1,100.000
|
$1,105.500
|
$1,110.000
|
$1,000.000
|
$1,100.000
|
$1,102.750
|
$1,070.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
|
EA
|
7.000
|
$6,000.000
|
$6,030.000
|
$6,100.000
|
$4,965.000
|
$6,000.000
|
$6,015.000
|
$5,880.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
123.250
|
$25.000
|
$28.000
|
$27.000
|
$30.000
|
$29.000
|
$30.000
|
$31.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
70.000
|
$475.000
|
$565.110
|
$580.000
|
$565.110
|
$566.000
|
$576.000
|
$595.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$490.000
|
$669.000
|
$730.000
|
$669.000
|
$669.000
|
$718.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$575.000
|
$858.000
|
$820.000
|
$858.000
|
$858.000
|
$803.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
6.000
|
$600.000
|
$790.000
|
$830.000
|
$790.000
|
$790.000
|
$817.000
|
$830.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$655.000
|
$817.610
|
$900.000
|
$817.610
|
$818.000
|
$883.000
|
$860.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$675.000
|
$1,058.320
|
$960.000
|
$1,058.320
|
$1,060.000
|
$947.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$725.000
|
$909.000
|
$940.000
|
$909.000
|
$909.000
|
$921.000
|
$955.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
9.000
|
$900.000
|
$988.000
|
$1,000.000
|
$988.000
|
$988.000
|
$987.000
|
$1,040.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
15.000
|
$1,000.000
|
$2,844.960
|
$3,200.000
|
$2,844.960
|
$2,855.000
|
$3,185.000
|
$2,990.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
122.000
|
$80.000
|
$85.930
|
$84.000
|
$85.930
|
$86.000
|
$83.000
|
$90.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
8.000
|
$22.000
|
$17.830
|
$25.000
|
$17.830
|
$18.000
|
$25.000
|
$19.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
8.000
|
$20.000
|
$17.830
|
$25.000
|
$17.830
|
$18.000
|
$25.000
|
$19.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
349.000
|
$10.000
|
$24.210
|
$5.100
|
$24.210
|
$25.000
|
$5.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
4.000
|
$20.000
|
$24.730
|
$25.000
|
$24.730
|
$25.000
|
$25.000
|
$26.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
4.000
|
$18.000
|
$24.730
|
$25.000
|
$24.730
|
$25.000
|
$25.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
6.000
|
$50.000
|
$57.390
|
$73.000
|
$57.390
|
$58.000
|
$72.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
22.000
|
$40.000
|
$57.390
|
$73.000
|
$57.390
|
$58.000
|
$72.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)SRF
|
EA
|
7.000
|
$85.000
|
$67.420
|
$73.000
|
$67.420
|
$68.000
|
$72.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
19.000
|
$100.000
|
$47.650
|
$73.000
|
$47.650
|
$48.000
|
$72.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)SRF
|
EA
|
40.000
|
$85.000
|
$69.390
|
$73.000
|
$69.390
|
$70.000
|
$72.000
|
$73.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
44.000
|
$60.000
|
$60.020
|
$73.000
|
$60.020
|
$61.000
|
$72.000
|
$63.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)GND)GND
|
EA
|
1.000
|
$200.000
|
$422.300
|
$250.000
|
$422.300
|
$423.000
|
$250.000
|
$440.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
7,490.000
|
$0.350
|
$0.300
|
$0.240
|
$0.240
|
$0.200
|
$0.240
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
125,980.000
|
$0.230
|
$0.300
|
$0.220
|
$0.220
|
$0.200
|
$0.220
|
$0.310
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(LNDP)
|
LF
|
308.000
|
$0.750
|
$1.000
|
$0.810
|
$0.800
|
$0.400
|
$0.800
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
15,175.000
|
$0.560
|
$0.500
|
$0.670
|
$0.660
|
$0.400
|
$0.660
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
206.000
|
$60.000
|
$100.000
|
$127.000
|
$125.000
|
$65.000
|
$125.000
|
$105.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
98.000
|
$60.000
|
$125.000
|
$127.000
|
$125.000
|
$75.000
|
$125.000
|
$131.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
13,170.000
|
$0.240
|
$0.300
|
$0.240
|
$0.240
|
$0.200
|
$0.240
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
160,157.000
|
$0.250
|
$0.300
|
$0.220
|
$0.220
|
$0.200
|
$0.220
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)(MED NOSE)
|
EA
|
13.000
|
$300.000
|
$150.000
|
$250.000
|
$244.000
|
$100.000
|
$244.000
|
$158.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
1,340.000
|
$0.800
|
$0.650
|
$0.510
|
$0.500
|
$0.750
|
$0.500
|
$0.680
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
36,070.000
|
$0.600
|
$0.600
|
$0.480
|
$0.470
|
$0.750
|
$0.470
|
$0.630
|
|
|
WK ZN PAV MRK REMOV (W)8"(LNDP)
|
LF
|
181.000
|
$1.500
|
$1.250
|
$2.050
|
$2.000
|
$1.500
|
$2.000
|
$1.300
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
8,605.000
|
$1.250
|
$1.000
|
$1.200
|
$1.200
|
$1.500
|
$1.200
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
41.000
|
$155.000
|
$150.000
|
$152.000
|
$150.000
|
$95.000
|
$150.000
|
$158.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
41.000
|
$175.000
|
$175.000
|
$152.000
|
$150.000
|
$110.000
|
$150.000
|
$180.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
900.000
|
$1.000
|
$0.650
|
$0.510
|
$0.500
|
$0.750
|
$0.500
|
$0.680
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
39,479.000
|
$0.650
|
$0.600
|
$0.480
|
$0.470
|
$0.750
|
$0.470
|
$0.630
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
4,355.000
|
$1.100
|
$1.410
|
$2.050
|
$0.810
|
$0.800
|
$1.160
|
$1.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,006.000
|
$0.850
|
$1.410
|
$2.050
|
$0.510
|
$0.500
|
$1.070
|
$1.300
|
|
|
WK ZN PAV MRK NON-REMOV (W) (BIKE DOT)
|
EA
|
126.000
|
$1.500
|
$1.000
|
$1.500
|
$1.500
|
$2.500
|
$1.500
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W) (BIKE DOT)
|
EA
|
70.000
|
$5.000
|
$2.000
|
$5.100
|
$5.000
|
$5.000
|
$5.000
|
$2.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
32.000
|
$0.900
|
$1.000
|
$1.000
|
$1.000
|
$2.500
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,623.000
|
$0.820
|
$0.700
|
$0.680
|
$0.670
|
$0.850
|
$0.670
|
$0.740
|
|
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
|
LF
|
80.000
|
$4.000
|
$3.500
|
$4.050
|
$4.000
|
$4.500
|
$4.000
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
4,750.000
|
$6.500
|
$6.000
|
$5.700
|
$5.600
|
$5.000
|
$5.600
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
117.000
|
$125.000
|
$100.000
|
$136.000
|
$134.000
|
$95.000
|
$134.000
|
$105.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
4.000
|
$185.000
|
$150.000
|
$181.000
|
$178.000
|
$125.000
|
$178.000
|
$157.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
2.000
|
$275.000
|
$200.000
|
$240.000
|
$240.000
|
$275.000
|
$240.000
|
$210.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
60.000
|
$130.000
|
$125.000
|
$151.000
|
$149.000
|
$125.000
|
$149.000
|
$131.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
7.000
|
$35.000
|
$45.000
|
$38.000
|
$37.000
|
$25.000
|
$37.000
|
$47.000
|
|
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
|
EA
|
56.000
|
$127.000
|
$100.000
|
$102.000
|
$100.000
|
$75.000
|
$100.000
|
$105.000
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
|
EA
|
56.000
|
$200.000
|
$100.000
|
$250.000
|
$249.000
|
$125.000
|
$249.000
|
$105.000
|
|
REFL PAV MRK TY I (W)(BIKE DOT)(100MIL)
|
EA
|
367.000
|
$2.500
|
$1.000
|
$1.000
|
$1.000
|
$5.000
|
$1.000
|
$1.050
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
9.000
|
$275.000
|
$150.000
|
$290.000
|
$288.000
|
$250.000
|
$288.000
|
$157.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
68,628.000
|
$0.120
|
$0.120
|
$0.120
|
$0.120
|
$0.150
|
$0.120
|
$0.130
|
|
|
PAVEMENT SEALER 6"
|
LF
|
34,577.000
|
$0.170
|
$0.150
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.160
|
|
|
PAVEMENT SEALER 8"
|
LF
|
7,287.000
|
$0.370
|
$0.200
|
$0.380
|
$0.370
|
$0.300
|
$0.370
|
$0.210
|
|
|
PAVEMENT SEALER 18"
|
LF
|
80.000
|
$0.850
|
$0.500
|
$0.510
|
$0.500
|
$3.000
|
$0.500
|
$0.500
|
|
|
PAVEMENT SEALER 24"
|
LF
|
4,762.000
|
$2.250
|
$1.000
|
$1.900
|
$1.890
|
$4.000
|
$1.890
|
$1.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
117.000
|
$40.000
|
$20.000
|
$41.000
|
$40.000
|
$65.000
|
$40.000
|
$21.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
60.000
|
$45.000
|
$20.000
|
$41.000
|
$40.000
|
$75.000
|
$40.000
|
$21.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
9.000
|
$90.000
|
$50.000
|
$191.000
|
$188.000
|
$100.000
|
$188.000
|
$52.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
4.000
|
$65.000
|
$25.000
|
$61.000
|
$60.000
|
$85.000
|
$60.000
|
$26.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
2.000
|
$100.000
|
$25.000
|
$61.000
|
$60.000
|
$85.000
|
$60.000
|
$26.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
7.000
|
$16.500
|
$5.000
|
$20.000
|
$20.000
|
$10.000
|
$20.000
|
$5.250
|
|
|
PAVEMENT SEALER (BIKE ARROW)
|
EA
|
56.000
|
$55.000
|
$20.000
|
$20.000
|
$20.000
|
$5.000
|
$20.000
|
$21.000
|
|
|
PAVEMENT SEALER (BIKE SYMBOL)
|
EA
|
56.000
|
$85.000
|
$20.000
|
$51.000
|
$50.000
|
$5.000
|
$50.000
|
$21.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
10,030.000
|
$0.370
|
$0.350
|
$0.370
|
$0.360
|
$0.500
|
$0.360
|
$0.370
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
9,809.000
|
$0.300
|
$0.350
|
$0.350
|
$0.340
|
$0.500
|
$0.340
|
$0.370
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
34,523.000
|
$0.450
|
$0.450
|
$0.490
|
$0.480
|
$0.600
|
$0.480
|
$0.470
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
5,280.000
|
$0.350
|
$0.350
|
$0.410
|
$0.400
|
$0.500
|
$0.400
|
$0.370
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
43,421.000
|
$0.300
|
$0.350
|
$0.350
|
$0.340
|
$0.500
|
$0.340
|
$0.370
|
|
|
PAVMENENT SEALER (BIKE DOT)
|
LF
|
734.000
|
$10.000
|
$1.000
|
$0.510
|
$0.500
|
$5.000
|
$0.500
|
$1.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
871.000
|
$3.300
|
$3.500
|
$3.050
|
$3.000
|
$5.000
|
$3.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,536.000
|
$3.250
|
$3.500
|
$3.050
|
$3.000
|
$0.250
|
$3.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
70,836.000
|
$0.400
|
$0.250
|
$0.320
|
$0.320
|
$0.250
|
$0.320
|
$0.260
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
6,695.000
|
$0.850
|
$0.500
|
$0.860
|
$0.850
|
$0.500
|
$0.850
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
493.000
|
$3.250
|
$2.000
|
$3.050
|
$3.000
|
$5.000
|
$3.000
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
33.000
|
$60.000
|
$25.000
|
$25.000
|
$25.000
|
$45.000
|
$25.000
|
$26.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
21.000
|
$60.000
|
$25.000
|
$25.000
|
$25.000
|
$55.000
|
$25.000
|
$26.000
|
|
|
ELIM EXT PAV MRK & MRKS (MED NOSE)
|
EA
|
1.000
|
$190.000
|
$50.000
|
$102.000
|
$100.000
|
$100.000
|
$100.000
|
$53.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
7.000
|
$27,600.000
|
$19,095.000
|
$19,200.000
|
$27,360.000
|
$19,000.000
|
$19,047.500
|
$26,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
3.000
|
$7,000.000
|
$6,030.000
|
$6,100.000
|
$2,000.000
|
$6,000.000
|
$6,015.000
|
$4,820.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
3.000
|
$53,500.000
|
$44,220.000
|
$44,000.000
|
$32,200.000
|
$44,000.000
|
$44,110.000
|
$53,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
57.000
|
$234.000
|
$226.120
|
$230.000
|
$196.000
|
$225.000
|
$225.560
|
$250.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
19.000
|
$225.000
|
$226.120
|
$230.000
|
$196.000
|
$225.000
|
$225.560
|
$250.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
57.000
|
$225.000
|
$226.120
|
$230.000
|
$196.000
|
$225.000
|
$225.560
|
$250.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
35.000
|
$230.000
|
$226.120
|
$230.000
|
$196.000
|
$225.000
|
$225.560
|
$250.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
57.000
|
$225.000
|
$226.120
|
$230.000
|
$196.000
|
$225.000
|
$225.560
|
$250.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
19.000
|
$240.000
|
$226.120
|
$230.000
|
$196.000
|
$225.000
|
$225.560
|
$250.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
56.000
|
$525.000
|
$552.750
|
$560.000
|
$535.000
|
$550.000
|
$551.380
|
$630.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
16.000
|
$105.000
|
$105.520
|
$106.000
|
$130.000
|
$105.000
|
$105.260
|
$126.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
60.000
|
$95.000
|
$95.470
|
$96.000
|
$110.000
|
$95.000
|
$95.240
|
$97.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
10,185.000
|
$2.300
|
$1.660
|
$1.650
|
$1.800
|
$1.650
|
$1.650
|
$1.600
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
11,505.000
|
$2.600
|
$2.460
|
$2.450
|
$2.800
|
$2.450
|
$2.460
|
$3.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
9,870.000
|
$1.300
|
$0.900
|
$0.910
|
$1.400
|
$0.900
|
$0.900
|
$1.000
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
3.000
|
$850.000
|
$1,809.000
|
$1,820.000
|
$3,120.000
|
$4,980.000
|
$1,804.500
|
$2,100.000
|
|
|
INS TRF SIG PL AM (S)1 ARM(28')
|
EA
|
1.000
|
$6,650.000
|
$6,030.000
|
$6,100.000
|
$5,840.000
|
$6,000.000
|
$6,015.000
|
$5,560.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
4.000
|
$8,200.000
|
$8,040.000
|
$8,100.000
|
$7,720.000
|
$8,000.000
|
$8,020.000
|
$7,350.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')
|
EA
|
1.000
|
$8,700.000
|
$9,045.000
|
$9,100.000
|
$8,022.000
|
$9,000.000
|
$9,022.500
|
$8,300.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
3.000
|
$9,600.000
|
$10,050.000
|
$10,100.000
|
$8,500.000
|
$10,000.000
|
$10,025.000
|
$8,700.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')
|
EA
|
1.000
|
$10,500.000
|
$11,055.000
|
$11,100.000
|
$9,145.000
|
$11,000.000
|
$11,027.500
|
$9,450.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')
|
EA
|
1.000
|
$16,500.000
|
$23,115.000
|
$23,000.000
|
$24,305.000
|
$23,000.000
|
$23,057.500
|
$24,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
7.000
|
$16,800.000
|
$25,125.000
|
$25,000.000
|
$26,825.000
|
$25,000.000
|
$25,062.500
|
$27,300.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')
|
EA
|
1.000
|
$19,000.000
|
$24,120.000
|
$24,000.000
|
$24,557.000
|
$24,000.000
|
$24,060.000
|
$24,700.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$22,000.000
|
$26,130.000
|
$26,000.000
|
$27,125.000
|
$26,000.000
|
$26,065.000
|
$27,600.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')
|
EA
|
2.000
|
$23,000.000
|
$24,120.000
|
$24,000.000
|
$24,845.000
|
$24,000.000
|
$24,060.000
|
$25,200.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
3.000
|
$23,300.000
|
$26,130.000
|
$26,000.000
|
$27,425.000
|
$26,000.000
|
$26,065.000
|
$28,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
4.000
|
$23,000.000
|
$27,135.000
|
$27,000.000
|
$27,785.000
|
$27,000.000
|
$27,067.500
|
$28,350.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
28.000
|
$1,800.000
|
$1,909.500
|
$1,920.000
|
$1,742.000
|
$1,900.000
|
$1,904.750
|
$2,100.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
56.000
|
$700.000
|
$804.000
|
$810.000
|
$857.000
|
$800.000
|
$802.000
|
$780.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
7.000
|
$3,000.000
|
$2,814.000
|
$2,800.000
|
$4,445.000
|
$2,800.000
|
$2,807.000
|
$3,150.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
16.000
|
$2,000.000
|
$4,000.000
|
$1,590.000
|
$2,471.150
|
$2,300.000
|
$1,388.010
|
$5,700.000
|
|
|
LITTER REMOVAL
|
CYC
|
16.000
|
$2,000.000
|
$1,000.000
|
$1,600.000
|
$670.630
|
$1,000.000
|
$1,527.250
|
$3,750.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
64.000
|
$2,000.000
|
$175.000
|
$630.000
|
$386.080
|
$550.000
|
$2,000.000
|
$1,170.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
293,000.000
|
$0.800
|
$0.680
|
$0.680
|
$0.680
|
$0.700
|
$0.770
|
$0.710
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
19,636.000
|
$70.000
|
$63.910
|
$57.000
|
$55.000
|
$55.620
|
$55.000
|
$86.000
|
|
|
D-GR HMA TY-C PG70-22
|
TON
|
41,174.000
|
$75.000
|
$71.160
|
$57.000
|
$55.000
|
$55.590
|
$55.000
|
$86.000
|
|
|
SP MIXES SP-D SAC-B PG70-22
|
TON
|
20,766.000
|
$85.000
|
$79.790
|
$68.000
|
$65.000
|
$66.000
|
$65.000
|
$86.000
|
|
|
SOUND WALL
|
SF
|
85,480.000
|
$70.000
|
$36.930
|
$38.500
|
$36.500
|
$70.230
|
$51.600
|
$52.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
4.000
|
$250.000
|
$150.000
|
$440.000
|
$263.350
|
$450.000
|
$500.000
|
$1,100.000
|
|
|
FIBERGLASS SOUND WALL
|
SF
|
3,850.000
|
$50.000
|
$36.930
|
$100.000
|
$73.120
|
$49.160
|
$125.000
|
$90.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
164,637.000
|
$1.700
|
$1.260
|
$1.050
|
$1.360
|
$1.500
|
$1.440
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,008.000
|
$100.000
|
$80.000
|
$63.000
|
$63.580
|
$75.000
|
$42.960
|
$66.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
925.000
|
$2.250
|
$2.010
|
$2.000
|
$1.750
|
$2.000
|
$2.010
|
$1.500
|
|
|
CCTV FIELD EQUIP (ANALOG) (INSTL ONLY)
|
EA
|
7.000
|
$4,025.000
|
$854.250
|
$860.000
|
$1,700.000
|
$850.000
|
$852.130
|
$790.000
|
|
|
TMA (STATIONARY)
|
DAY
|
236.000
|
$150.000
|
$350.000
|
$350.000
|
$232.500
|
$175.000
|
$272.400
|
$160.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
54.000
|
$175.000
|
$500.000
|
$650.000
|
$546.940
|
$350.000
|
$535.600
|
$570.000
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
28.000
|
$6,500.000
|
$7,035.000
|
$7,100.000
|
$6,345.000
|
$7,000.000
|
$7,017.500
|
$5,770.000
|
|
|
RVDS(ADVANCE DETECTION ONLY)
|
EA
|
16.000
|
$7,000.000
|
$7,035.000
|
$7,100.000
|
$7,743.000
|
$7,000.000
|
$7,017.500
|
$7,140.000
|
|
|
VIVDS TEMPORARY
|
EA
|
3.000
|
$11,100.000
|
$14,070.000
|
$14,100.000
|
$11,000.000
|
$14,000.000
|
$14,035.000
|
$11,200.000
|
|
Totals: |
$40,975,028.510
|
$39,295,624.252
|
$40,895,597.160
|
$43,617,011.376
|
$44,339,243.710
|
$46,436,722.026
|
$48,888,891.650
|