PREPARING ROW
|
STA
|
25.150
|
$4,200.000
|
$732.560
|
$1,000.000
|
$4,400.000
|
$2,000.000
|
$1,248.130
|
$2,600.000
|
$3,500.000
|
|
|
PREP ROW (TREE REMOVE) (0"-12" DIA)
|
EA
|
4.000
|
$396.000
|
$2,750.000
|
$150.000
|
$1,500.000
|
$1,220.000
|
$1,424.270
|
$1,150.000
|
$1,200.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
2.000
|
$10.000
|
$108.900
|
$50.000
|
$350.000
|
$32.800
|
$20.910
|
$219.000
|
$10.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
345.000
|
$12.500
|
$16.500
|
$40.000
|
$30.000
|
$22.100
|
$18.280
|
$33.000
|
$5.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
389.000
|
$9.000
|
$16.500
|
$40.000
|
$22.000
|
$19.600
|
$5.650
|
$32.000
|
$5.000
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
508.000
|
$10.000
|
$9.900
|
$5.000
|
$6.000
|
$9.000
|
$5.740
|
$12.000
|
$1.000
|
|
|
REMOV CONC (MISC)
|
SY
|
21.000
|
$26.000
|
$29.700
|
$40.000
|
$150.000
|
$87.200
|
$28.630
|
$85.000
|
$8.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
14,205.000
|
$19.000
|
$18.700
|
$20.000
|
$18.000
|
$18.200
|
$23.140
|
$25.000
|
$19.000
|
|
|
EMBANK (FNL)(DC)(TY C1)
|
CY
|
282.000
|
$15.000
|
$22.000
|
$30.000
|
$50.000
|
$14.000
|
$47.380
|
$85.000
|
$22.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
6,572.000
|
$1.000
|
$2.260
|
$1.000
|
$8.000
|
$4.000
|
$1.840
|
$3.800
|
$5.250
|
|
|
BLOCK SODDING
|
SY
|
677.000
|
$5.800
|
$9.880
|
$10.000
|
$10.000
|
$8.500
|
$10.390
|
$7.000
|
$8.500
|
|
|
BROADCAST SEED (PERM_URBAN_CLAY)
|
SY
|
5,895.000
|
$1.000
|
$0.270
|
$0.500
|
$0.500
|
$0.370
|
$0.280
|
$0.400
|
$0.510
|
|
|
BROADCAST SEED (TEMP_WARM_COOL)
|
SY
|
5,895.000
|
$0.130
|
$0.160
|
$0.500
|
$0.250
|
$0.370
|
$0.170
|
$0.350
|
$0.510
|
|
|
VEGETATIVE WATERING
|
TGL
|
105.000
|
$24.200
|
$29.700
|
$8.500
|
$60.000
|
$61.300
|
$75.630
|
$48.000
|
$90.000
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_LONG_ROLL)
|
SY
|
6,572.000
|
$3.000
|
$1.360
|
$1.500
|
$2.500
|
$2.900
|
$1.420
|
$2.600
|
$1.000
|
|
|
FL BS(CIP)(TY D, GR 1-2 OR 5)(FNAL POS)
|
CY
|
2,315.000
|
$60.000
|
$53.130
|
$20.000
|
$60.000
|
$80.000
|
$60.140
|
$90.000
|
$80.000
|
|
|
GEOGRID BASE REINFORCEMENT (TYPE 2)
|
SY
|
10,785.000
|
$2.000
|
$1.760
|
$1.000
|
$2.500
|
$3.000
|
$3.350
|
$2.200
|
$6.000
|
|
|
LIME (COM OR QK)(SLURRY)
|
TON
|
263.000
|
$300.000
|
$385.000
|
$300.000
|
$300.000
|
$457.000
|
$352.510
|
$330.000
|
$350.000
|
|
|
LIME TRT (SUBGRADE) (8")
|
SY
|
10,785.000
|
$2.000
|
$4.400
|
$4.000
|
$6.500
|
$3.350
|
$3.820
|
$6.150
|
$16.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
1,888.000
|
$3.200
|
$5.060
|
$5.000
|
$3.500
|
$3.700
|
$4.150
|
$5.000
|
$3.560
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
1,533.000
|
$75.040
|
$89.100
|
$190.000
|
$100.000
|
$100.000
|
$112.750
|
$100.000
|
$120.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
1,086.000
|
$96.880
|
$97.900
|
$190.000
|
$120.000
|
$124.000
|
$138.870
|
$115.000
|
$125.000
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
118.000
|
$96.880
|
$110.000
|
$200.000
|
$140.000
|
$111.000
|
$124.620
|
$137.000
|
$125.000
|
|
|
TOM-C PG76-22 SAC-A
|
TON
|
537.000
|
$144.170
|
$124.300
|
$200.000
|
$165.000
|
$173.000
|
$194.650
|
$225.000
|
$167.000
|
|
|
PLANE ASPH CONC PAV (2.5")
|
SY
|
1,364.000
|
$2.570
|
$7.700
|
$9.000
|
$8.000
|
$7.400
|
$2.610
|
$2.500
|
$8.000
|
|
|
CONC PVMT (CRCP) (7")
|
SY
|
518.000
|
$108.200
|
$97.150
|
$125.000
|
$120.000
|
$125.000
|
$114.820
|
$105.000
|
$160.000
|
|
|
CUT & RESTORING PAV
|
SY
|
444.000
|
$211.680
|
$82.800
|
$35.000
|
$100.000
|
$185.000
|
$123.640
|
$46.000
|
$116.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
563.000
|
$416.000
|
$231.830
|
$140.000
|
$180.000
|
$255.000
|
$199.370
|
$220.000
|
$160.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,123.000
|
$7.000
|
$27.600
|
$1.000
|
$10.000
|
$9.500
|
$5.240
|
$25.000
|
$5.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
6.000
|
$310.000
|
$209.990
|
$200.000
|
$300.000
|
$423.000
|
$474.760
|
$350.000
|
$1,100.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
104.000
|
$240.000
|
$241.490
|
$300.000
|
$350.000
|
$243.000
|
$332.330
|
$230.000
|
$250.000
|
|
|
CL A CONC (CHANNEL LINING)
|
CY
|
98.000
|
$1,050.000
|
$674.080
|
$750.000
|
$550.000
|
$746.000
|
$998.370
|
$642.000
|
$550.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
31.200
|
$575.000
|
$787.430
|
$900.000
|
$750.000
|
$571.000
|
$603.060
|
$750.000
|
$600.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
42.000
|
$82.000
|
$152.340
|
$120.000
|
$180.000
|
$95.200
|
$67.260
|
$200.000
|
$160.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,095.000
|
$170.000
|
$229.620
|
$220.000
|
$200.000
|
$150.000
|
$153.970
|
$280.000
|
$199.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
2.000
|
$6,031.000
|
$6,816.880
|
$4,000.000
|
$7,000.000
|
$9,930.000
|
$10,375.450
|
$8,800.000
|
$16,000.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
1.000
|
$10,234.000
|
$9,642.990
|
$5,000.000
|
$8,500.000
|
$10,400.000
|
$9,908.120
|
$13,000.000
|
$17,500.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
1.000
|
$11,565.000
|
$11,383.240
|
$6,200.000
|
$10,500.000
|
$13,100.000
|
$11,768.580
|
$14,000.000
|
$19,000.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
$6,601.000
|
$8,847.880
|
$4,000.000
|
$10,000.000
|
$10,400.000
|
$10,885.350
|
$12,750.000
|
$25,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
1.000
|
$6,933.000
|
$7,217.460
|
$5,000.000
|
$10,000.000
|
$7,610.000
|
$9,160.020
|
$8,200.000
|
$17,000.000
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
4.000
|
$5,286.000
|
$11,260.280
|
$7,000.000
|
$10,500.000
|
$10,400.000
|
$10,545.040
|
$8,900.000
|
$19,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$5,413.000
|
$6,229.580
|
$4,000.000
|
$7,000.000
|
$6,550.000
|
$8,973.270
|
$7,700.000
|
$15,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
3.000
|
$5,922.000
|
$8,058.830
|
$5,500.000
|
$8,000.000
|
$8,210.000
|
$9,288.350
|
$8,600.000
|
$17,000.000
|
|
|
INLET (COMPL)(ARMOR CURB SLOT)
|
EA
|
4.000
|
$6,817.250
|
$4,414.690
|
$2,500.000
|
$7,500.000
|
$7,500.000
|
$6,471.470
|
$9,150.000
|
$8,500.000
|
|
|
INLET (COMP)(TY SIDEWALK BRIDGE)
|
EA
|
1.000
|
$13,993.000
|
$15,466.330
|
$2,500.000
|
$18,000.000
|
$21,700.000
|
$16,879.010
|
$26,500.000
|
$16,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,494.000
|
$2,539.080
|
$2,500.000
|
$3,600.000
|
$2,110.000
|
$2,102.320
|
$2,640.000
|
$2,800.000
|
|
|
REMOV STR (INLET)
|
EA
|
3.000
|
$466.000
|
$1,324.740
|
$300.000
|
$2,000.000
|
$625.000
|
$1,398.370
|
$1,100.000
|
$400.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$534.000
|
$717.570
|
$250.000
|
$1,200.000
|
$547.000
|
$307.450
|
$350.000
|
$400.000
|
|
|
REMOV STR (PIPE)
|
LF
|
781.000
|
$20.000
|
$33.120
|
$5.000
|
$32.000
|
$18.600
|
$24.860
|
$50.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$271,090.970
|
$109,131.490
|
$200,000.000
|
$275,000.000
|
$284,000.000
|
$253,890.840
|
$334,000.000
|
$250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$9,440.000
|
$6,597.360
|
$2,000.000
|
$6,500.000
|
$5,000.000
|
$3,263.410
|
$5,000.000
|
$2,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$2,285.000
|
$3,831.030
|
$5,000.000
|
$3,000.000
|
$7,500.000
|
$7,945.210
|
$13,000.000
|
$3,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
64.000
|
$139.000
|
$136.820
|
$100.000
|
$140.000
|
$2.500
|
$165.030
|
$50.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$144.000
|
$328.370
|
$200.000
|
$1,000.000
|
$21.300
|
$200.040
|
$300.000
|
$300.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
22.000
|
$40.270
|
$53.090
|
$50.000
|
$50.000
|
$68.700
|
$55.780
|
$95.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
22.000
|
$11.000
|
$36.710
|
$20.000
|
$40.000
|
$31.700
|
$38.570
|
$25.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$25.000
|
$44.750
|
$40.000
|
$25.000
|
$26.400
|
$47.020
|
$25.000
|
$14.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$10.860
|
$11.010
|
$1.000
|
$15.000
|
$15.900
|
$11.570
|
$5.000
|
$6.000
|
|
|
FRNT END LOADER WORK (ERSN & SEDM CONT)
|
HR
|
80.000
|
$100.000
|
$110.000
|
$20.000
|
$120.000
|
$121.000
|
$65.020
|
$126.000
|
$85.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,565.000
|
$3.500
|
$3.390
|
$5.000
|
$4.000
|
$5.300
|
$3.560
|
$5.000
|
$2.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,565.000
|
$0.920
|
$1.130
|
$0.500
|
$1.500
|
$1.300
|
$1.190
|
$1.250
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
363.000
|
$5.520
|
$4.180
|
$3.000
|
$4.000
|
$6.300
|
$4.390
|
$8.000
|
$2.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
363.000
|
$1.150
|
$1.020
|
$2.000
|
$1.500
|
$2.100
|
$1.070
|
$1.250
|
$2.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
540.000
|
$84.000
|
$77.000
|
$20.000
|
$40.000
|
$186.000
|
$143.300
|
$66.000
|
$25.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
762.000
|
$128.740
|
$94.500
|
$112.000
|
$95.000
|
$125.000
|
$59.340
|
$90.000
|
$99.000
|
|
|
CONC CURB (TY I)
|
LF
|
3,966.000
|
$14.000
|
$14.700
|
$25.000
|
$16.000
|
$15.900
|
$47.480
|
$14.000
|
$21.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
331.000
|
$25.060
|
$46.200
|
$25.000
|
$28.000
|
$31.700
|
$47.480
|
$44.000
|
$40.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
450.000
|
$29.460
|
$46.200
|
$25.000
|
$32.000
|
$33.800
|
$53.410
|
$44.000
|
$35.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
21.000
|
$153.510
|
$205.790
|
$110.000
|
$250.000
|
$95.100
|
$166.160
|
$196.000
|
$250.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
668.000
|
$101.000
|
$120.750
|
$100.000
|
$90.000
|
$95.100
|
$77.150
|
$115.000
|
$135.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
505.000
|
$65.000
|
$82.950
|
$100.000
|
$60.000
|
$84.500
|
$77.740
|
$79.000
|
$150.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
704.000
|
$44.110
|
$95.550
|
$110.000
|
$70.000
|
$105.000
|
$91.980
|
$91.000
|
$160.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
3.000
|
$2,500.000
|
$2,263.740
|
$1,200.000
|
$1,500.000
|
$2,320.000
|
$2,789.200
|
$2,156.000
|
$3,400.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
2.000
|
$3,100.000
|
$2,263.740
|
$1,200.000
|
$1,500.000
|
$2,320.000
|
$4,450.840
|
$2,156.000
|
$3,300.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
2.000
|
$3,098.000
|
$2,551.430
|
$1,200.000
|
$1,800.000
|
$2,320.000
|
$4,462.710
|
$2,430.000
|
$3,300.000
|
|
|
CURB RAMPS (TY 7) (SUP)
|
EA
|
1.000
|
$3,100.000
|
$2,673.230
|
$1,200.000
|
$1,500.000
|
$2,430.000
|
$4,617.010
|
$2,546.000
|
$3,400.000
|
|
|
CURB RAMPS (TY 1) (SUP)
|
EA
|
2.000
|
$2,500.000
|
$2,468.480
|
$1,200.000
|
$1,500.000
|
$2,430.000
|
$2,967.230
|
$2,351.000
|
$3,300.000
|
|
|
CURB RAMPS (TY 2) (SUP)
|
EA
|
1.000
|
$3,100.000
|
$2,673.230
|
$1,200.000
|
$1,500.000
|
$2,430.000
|
$3,323.280
|
$2,546.000
|
$3,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
256.000
|
$2.300
|
$1.730
|
$5.000
|
$5.000
|
$1.600
|
$4.450
|
$6.840
|
$10.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
8.000
|
$305.120
|
$288.740
|
$200.000
|
$400.000
|
$370.000
|
$415.410
|
$290.000
|
$255.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
10.000
|
$4,500.000
|
$5,249.860
|
$5,100.000
|
$5,500.000
|
$5,280.000
|
$6,171.830
|
$5,000.000
|
$7,000.000
|
|
|
IN RD IL (TY SA) 40T-8-8 (250W EQ) LED
|
EA
|
3.000
|
$6,600.000
|
$6,824.810
|
$5,800.000
|
$7,000.000
|
$6,870.000
|
$7,358.720
|
$6,500.000
|
$7,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,370.000
|
$9.000
|
$13.650
|
$10.500
|
$25.000
|
$13.700
|
$13.060
|
$13.000
|
$36.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
445.000
|
$25.900
|
$21.000
|
$34.000
|
$35.000
|
$21.100
|
$37.980
|
$20.000
|
$25.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,930.000
|
$2.000
|
$1.680
|
$2.000
|
$2.500
|
$1.700
|
$2.370
|
$1.600
|
$2.200
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
4,160.000
|
$2.000
|
$1.840
|
$1.800
|
$2.500
|
$1.850
|
$2.370
|
$1.750
|
$2.400
|
|
|
GROUND BOX TY A (122311)
|
EA
|
1.000
|
$1,178.000
|
$944.970
|
$1,000.000
|
$1,100.000
|
$951.000
|
$1,175.030
|
$900.000
|
$1,490.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
5.000
|
$1,442.000
|
$1,023.720
|
$1,250.000
|
$1,400.000
|
$1,030.000
|
$1,542.960
|
$975.000
|
$2,030.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$9,700.000
|
$7,349.800
|
$5,500.000
|
$11,000.000
|
$7,400.000
|
$10,325.940
|
$7,000.000
|
$9,900.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
11.000
|
$48.000
|
$26.250
|
$25.000
|
$110.000
|
$103.000
|
$59.350
|
$50.000
|
$51.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
24.000
|
$597.000
|
$701.120
|
$130.000
|
$840.000
|
$793.000
|
$890.170
|
$675.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
11.000
|
$790.000
|
$787.480
|
$130.000
|
$1,100.000
|
$1,010.000
|
$1,139.420
|
$740.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
1.000
|
$800.000
|
$892.480
|
$750.000
|
$1,000.000
|
$916.000
|
$1,029.040
|
$765.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
28.000
|
$132.000
|
$52.500
|
$50.000
|
$50.000
|
$79.300
|
$89.020
|
$100.000
|
$250.000
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
2.000
|
$130.000
|
$26.250
|
$25.000
|
$25.000
|
$40.200
|
$45.110
|
$50.000
|
$250.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
10.000
|
$25.000
|
$5.250
|
$25.000
|
$5.000
|
$23.300
|
$21.020
|
$15.000
|
$250.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GNDLL
|
EA
|
5.000
|
$130.000
|
$94.500
|
$110.000
|
$90.000
|
$116.000
|
$130.560
|
$45.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRFLL
|
EA
|
5.000
|
$130.000
|
$94.500
|
$97.000
|
$90.000
|
$100.000
|
$112.750
|
$50.000
|
$100.000
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)Y
|
EA
|
30.000
|
$11.000
|
$52.500
|
$400.000
|
$50.000
|
$33.800
|
$37.980
|
$15.000
|
$200.000
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)R
|
EA
|
7.000
|
$11.000
|
$52.500
|
$400.000
|
$50.000
|
$33.800
|
$37.980
|
$15.000
|
$150.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
506.000
|
$0.820
|
$1.720
|
$4.620
|
$3.000
|
$1.900
|
$0.900
|
$1.750
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
282.000
|
$0.530
|
$1.720
|
$4.630
|
$3.000
|
$1.900
|
$0.900
|
$1.750
|
$1.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
117.000
|
$1.270
|
$0.890
|
$2.000
|
$3.600
|
$0.900
|
$1.010
|
$2.200
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
58.000
|
$1.330
|
$1.260
|
$3.000
|
$3.800
|
$1.250
|
$1.420
|
$3.500
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
594.000
|
$1.000
|
$1.260
|
$1.000
|
$1.500
|
$1.250
|
$1.420
|
$2.100
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
724.000
|
$7.700
|
$9.450
|
$6.750
|
$8.350
|
$9.500
|
$10.680
|
$7.750
|
$15.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$140.000
|
$208.940
|
$200.000
|
$165.000
|
$210.000
|
$236.190
|
$115.000
|
$275.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
6.000
|
$250.000
|
$288.740
|
$300.000
|
$205.000
|
$291.000
|
$326.400
|
$140.000
|
$275.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$175.000
|
$225.740
|
$200.000
|
$205.000
|
$227.000
|
$255.180
|
$130.000
|
$275.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
25.000
|
$40.000
|
$52.500
|
$35.000
|
$62.000
|
$52.800
|
$59.340
|
$35.000
|
$15.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
436.000
|
$7.650
|
$9.450
|
$12.000
|
$8.350
|
$9.500
|
$10.680
|
$11.400
|
$20.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
8,722.000
|
$0.200
|
$0.370
|
$0.500
|
$0.330
|
$0.370
|
$0.420
|
$0.610
|
$1.000
|
|
|
PAVEMENT SLER 8"
|
LF
|
652.000
|
$0.400
|
$0.500
|
$0.500
|
$0.750
|
$0.510
|
$0.570
|
$1.400
|
$1.000
|
|
|
PAVEMENT SLER 24"
|
LF
|
1,160.000
|
$2.000
|
$1.260
|
$3.000
|
$5.220
|
$1.250
|
$1.420
|
$1.600
|
$2.000
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
6.000
|
$80.000
|
$26.250
|
$100.000
|
$90.000
|
$26.400
|
$29.670
|
$50.000
|
$12.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
4.000
|
$76.000
|
$26.250
|
$100.000
|
$105.000
|
$26.400
|
$29.670
|
$60.000
|
$275.000
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
6.000
|
$74.000
|
$26.250
|
$150.000
|
$105.000
|
$26.400
|
$29.670
|
$65.000
|
$325.000
|
|
|
PAVEMENT SLER (YLD TRI)
|
EA
|
25.000
|
$32.000
|
$26.250
|
$25.000
|
$40.000
|
$26.400
|
$29.670
|
$15.000
|
$250.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
3,981.000
|
$0.500
|
$0.840
|
$1.000
|
$0.850
|
$0.850
|
$0.950
|
$1.000
|
$1.500
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
4,624.000
|
$0.550
|
$0.840
|
$1.000
|
$0.850
|
$0.850
|
$0.950
|
$1.000
|
$1.500
|
|
PREFAB PM TY B (W)(LN RDCT ARROW)
|
EA
|
2.000
|
$350.000
|
$367.490
|
$1,000.000
|
$460.000
|
$370.000
|
$415.420
|
$450.000
|
$325.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
144.000
|
$3.800
|
$6.300
|
$5.500
|
$6.500
|
$6.300
|
$7.120
|
$5.850
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
163.000
|
$3.800
|
$6.300
|
$5.500
|
$6.500
|
$6.300
|
$7.120
|
$5.850
|
$6.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
2.000
|
$320.000
|
$278.240
|
$225.000
|
$500.000
|
$280.000
|
$166.170
|
$265.000
|
$450.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
1.000
|
$7,900.000
|
$7,349.800
|
$4,900.000
|
$7,500.000
|
$7,400.000
|
$9,020.360
|
$7,000.000
|
$7,200.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$1,400.000
|
$524.990
|
$300.000
|
$750.000
|
$528.000
|
$379.800
|
$500.000
|
$810.000
|
|
|
STRIP MOWING
|
CYC
|
4.000
|
$4,350.000
|
$850.000
|
$200.000
|
$1,250.000
|
$1,740.000
|
$4,226.740
|
$1,500.000
|
$1,200.000
|
|
|
LITTER REMOVAL
|
CYC
|
11.000
|
$3,000.000
|
$1,250.000
|
$50.000
|
$1,700.000
|
$1,910.000
|
$2,206.740
|
$500.000
|
$1,100.000
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
4.910
|
$50.000
|
$450.000
|
$75.000
|
$1,500.000
|
$446.000
|
$11.040
|
$500.000
|
$850.000
|
|
|
DEBRIS REMOV-CNTR MED/MN LNS/RAMPS
|
CYC
|
11.000
|
$2,000.000
|
$850.000
|
$100.000
|
$1,700.000
|
$1,910.000
|
$5,664.270
|
$500.000
|
$1,050.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
0.148
|
$1,387.300
|
$5,000.000
|
$3,000.000
|
$5,000.000
|
$14,800.950
|
$155.870
|
$5,000.000
|
$7,100.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
273.000
|
$3.200
|
$4.620
|
$4.000
|
$4.000
|
$4.250
|
$4.750
|
$4.000
|
$5.500
|
|
|
BONDING COURSE
|
GAL
|
3,647.000
|
$3.200
|
$3.300
|
$3.000
|
$5.000
|
$3.150
|
$3.560
|
$4.000
|
$5.500
|
|
Totals: |
$2,981,999.700
|
$2,728,901.520
|
$2,760,043.130
|
$3,089,270.060
|
$3,149,441.661
|
$3,240,841.797
|
$3,362,927.210
|
$3,492,121.480
|