CALHOUN FM 1090 (0515-03-051)

Items: 34

County: CALHOUN
Length: N/A
Highway: FM 1090
District: YOAKUM
Control Number: 0515-03-051
DBE Goal: N/A
Project: STP 2019(637)
Guaranty: N/A
Time: 45 WORKING DAYS
Engineer's Estimate: $1,378,429.00
Date: 10/03/2019 (6 years ago)
Contract Number: N/A
Type: PAVEMENT REPAIR AND RESURFACING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,378,429.00
$1,439,982.02
Over/Under Est: 4.47% $61,553.02
Over/Under Est: 6.01% $82,852.04
Amt Left: 1.48% $21,299.02
Over/Under Est: 29.14% $401,735.95
Amt Left: 23.62% $340,182.93
Delta: -21.82% -$318,883.91

Bid Items & Bid Tabulations

34 Total 0 of 34
CALHOUN  |  FM 1090  |  YOAKUM  |  0515-03-051  |  10/03/2019  |  $1,378,429.00  |  STP 2019(637)  |  PAVMT REPAIR AND RESURF  |  45 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
REXCO CONSTRUCTION SERVICES, INC.
ANGEL BROTHERS HOLDINGS CORP.
REMOVING CONC (DRIVEWAYS)
SY 125.800 $15.000 $19.990 $45.000 $27.000
REMOVING CONC (CURB AND GUTTER)
LF 200.000 $3.500 $7.800 $10.000 $15.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 261.900 $25.000 $25.590 $45.000 $22.000
REMOV STAB BASE & ASPH PAV (8"-20")
SY 19,900.000 $7.500 $7.710 $7.720 $14.650
BLOCK SODDING
SY 417.000 $5.000 $8.000 $17.090 $7.000
VEGETATIVE WATERING
MG 3.510 $100.000 $73.260 $20.000 $1,100.000
LIME TRT (EXST MATL) (6")
SY 3,600.000 $3.250 $4.560 $4.000 $8.500
LIME (HYD, COM OR QK)(SLURRY)
TON 25.800 $250.000 $183.750 $220.500 $213.000
AGGR(TY-PE GR-3 SAC-B)
CY 234.000 $110.000 $154.340 $124.370 $130.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 7,960.000 $3.750 $5.430 $4.200 $4.000
D-GR HMA TY-B PG70-22
TON 6,567.000 $95.000 $88.260 $101.080 $120.000
D-GR HMA TY-D SAC-B PG76-22
TON 2,189.000 $95.000 $92.460 $101.120 $121.000
TACK COAT
GAL 3,980.000 $2.500 $4.520 $3.690 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,000.000 $60.000 $65.510 $46.000 $81.000
ADJUSTING MANHOLES
EA 9.000 $1,200.000 $3,960.490 $1,260.000 $425.000
MOBILIZATION
LS 1.000 $106,000.000 $140,000.000 $84,672.500 $107,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $4,000.000 $6,000.000 $1,030.000 $920.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 720.000 $4.000 $5.750 $4.700 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 720.000 $1.000 $2.000 $2.250 $1.750
CONC CURB & GUTTER (TY II)
LF 200.000 $50.000 $45.000 $42.250 $36.500
DRIVEWAYS (CONC)
SY 125.800 $70.000 $98.000 $172.650 $155.000
CONC SIDEWALKS (6")
SY 427.200 $80.000 $80.000 $165.450 $81.000
CURB RAMPS (TY 7)
SY 32.300 $140.000 $80.000 $259.200 $164.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,060.000 $0.250 $0.500 $0.680 $1.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 12,056.000 $0.250 $0.400 $0.680 $0.600
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,383.000 $1.500 $1.780 $2.330 $1.150
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 530.000 $0.500 $0.750 $0.600 $1.150
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 6,028.000 $0.500 $0.700 $0.600 $1.150
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 330.000 $7.500 $7.000 $9.400 $9.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 45.000 $15.000 $20.000 $18.800 $18.000
REFL PAV MRKR TY II-A-A
EA 103.000 $4.000 $12.000 $6.250 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $7,500.000 $4,830.000 $1,335.000
TMA (STATIONARY)
EA 2.000 $8,500.000 $7,500.000 $450.000 $2,615.000
TMA (MOBILE OPERATION)
DAY 10.000 $500.000 $200.000 $800.000 $360.000
Totals: $1,378,429.000 $1,439,982.026 $1,461,281.040 $1,780,164.950