PREPARING ROW
|
STA
|
45.400
|
$4,500.000
|
$1,341.990
|
$140.000
|
$660.490
|
$1,258.820
|
$485.000
|
|
|
PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
30.000
|
$300.000
|
$682.500
|
$1,000.000
|
$824.000
|
$650.000
|
$650.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
10.000
|
$2,000.000
|
$1,942.500
|
$1,300.000
|
$2,060.000
|
$1,850.000
|
$1,850.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
10.000
|
$25.000
|
$73.260
|
$50.100
|
$18.450
|
$25.000
|
$30.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
745.000
|
$15.000
|
$13.320
|
$15.000
|
$15.735
|
$50.000
|
$20.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
1,268.000
|
$10.000
|
$6.660
|
$5.000
|
$5.970
|
$15.000
|
$3.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
19,896.000
|
$15.000
|
$12.840
|
$6.000
|
$16.575
|
$15.680
|
$15.530
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
7,972.000
|
$20.000
|
$12.840
|
$7.000
|
$7.939
|
$13.440
|
$18.610
|
|
|
BLADING
|
HR
|
38.000
|
$100.000
|
$96.900
|
$110.000
|
$112.492
|
$89.600
|
$100.000
|
|
|
BLOCK SODDING
|
SY
|
520.000
|
$6.000
|
$17.300
|
$6.000
|
$17.819
|
$17.300
|
$17.300
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
2,050.000
|
$0.300
|
$0.500
|
$0.550
|
$0.515
|
$0.500
|
$0.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
120,540.000
|
$0.200
|
$0.140
|
$0.250
|
$0.124
|
$0.120
|
$0.120
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
30,140.000
|
$0.150
|
$0.140
|
$0.200
|
$0.144
|
$0.140
|
$0.140
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
30,140.000
|
$0.150
|
$0.140
|
$0.200
|
$0.144
|
$0.140
|
$0.140
|
|
|
VEGETATIVE WATERING
|
MG
|
1,018.500
|
$20.000
|
$16.650
|
$15.000
|
$24.109
|
$14.480
|
$15.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
29,108.000
|
$62.000
|
$53.330
|
$70.000
|
$45.855
|
$63.070
|
$88.930
|
|
|
FL BS (RDWY DEL) (TY E GR 1-2)
|
TON
|
1,488.000
|
$55.000
|
$22.590
|
$40.000
|
$23.300
|
$30.960
|
$48.720
|
|
|
CEMENT
|
TON
|
1,266.000
|
$150.000
|
$155.610
|
$165.000
|
$179.760
|
$160.000
|
$150.510
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
137,796.000
|
$2.000
|
$1.600
|
$1.500
|
$1.587
|
$2.690
|
$1.650
|
|
|
ASPH (RC-250)
|
GAL
|
24,120.000
|
$5.000
|
$3.890
|
$3.750
|
$3.941
|
$4.170
|
$4.140
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
848.000
|
$150.000
|
$54.420
|
$110.000
|
$81.019
|
$88.340
|
$87.650
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
1,410.000
|
$100.000
|
$67.460
|
$97.000
|
$86.149
|
$86.300
|
$93.480
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
973.000
|
$100.000
|
$67.430
|
$86.000
|
$80.669
|
$91.880
|
$94.710
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
91,763.000
|
$3.500
|
$3.620
|
$3.100
|
$3.348
|
$3.600
|
$3.600
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
250.000
|
$75.000
|
$69.460
|
$150.000
|
$80.541
|
$71.640
|
$92.060
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
7,217.000
|
$2.000
|
$1.590
|
$1.250
|
$1.030
|
$2.860
|
$2.280
|
|
|
CEM STABIL BKFL
|
CY
|
218.000
|
$120.000
|
$131.250
|
$140.000
|
$103.000
|
$100.000
|
$125.000
|
|
|
CUT & RESTORING PAV
|
SY
|
98.000
|
$130.000
|
$151.680
|
$100.000
|
$128.750
|
$125.000
|
$125.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
40.000
|
$15.000
|
$21.000
|
$20.000
|
$12.360
|
$12.000
|
$20.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
500.000
|
$15.000
|
$47.250
|
$35.000
|
$56.650
|
$55.000
|
$45.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
17.000
|
$650.000
|
$545.990
|
$800.000
|
$499.550
|
$485.000
|
$520.000
|
|
|
CL C CONC (RAC-R)
|
CY
|
36.000
|
$400.000
|
$519.740
|
$825.000
|
$2,266.000
|
$2,200.000
|
$495.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
37.300
|
$500.000
|
$456.740
|
$650.000
|
$21,130.450
|
$550.000
|
$435.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
99.000
|
$250.000
|
$150.000
|
$200.000
|
$206.000
|
$200.000
|
$140.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
205.900
|
$150.000
|
$199.500
|
$200.000
|
$262.650
|
$255.000
|
$190.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
1,029.000
|
$65.000
|
$55.650
|
$60.000
|
$49.440
|
$48.000
|
$53.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
16.000
|
$85.000
|
$74.550
|
$80.000
|
$94.760
|
$92.000
|
$71.000
|
|
|
CMP (GAL STL 15 IN)
|
LF
|
286.000
|
$60.000
|
$50.400
|
$55.000
|
$46.350
|
$45.000
|
$48.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
60.000
|
$525.000
|
$341.250
|
$300.000
|
$458.350
|
$445.000
|
$325.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
36.000
|
$550.000
|
$362.240
|
$375.000
|
$540.750
|
$525.000
|
$345.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
9.000
|
$750.000
|
$866.240
|
$1,500.000
|
$824.000
|
$800.000
|
$825.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
1,126.000
|
$75.000
|
$57.750
|
$55.000
|
$49.440
|
$48.000
|
$55.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
402.000
|
$80.000
|
$60.900
|
$60.000
|
$51.500
|
$50.000
|
$58.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
72.000
|
$100.000
|
$85.050
|
$110.000
|
$98.880
|
$96.000
|
$81.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$13,000.000
|
$4,735.430
|
$13,000.000
|
$5,150.000
|
$5,000.000
|
$4,510.000
|
|
|
SET (REPLACE PIPE RUNNER ASSEMBLY)
|
EA
|
1.000
|
$2,000.000
|
$131.250
|
$6,000.000
|
$5,150.000
|
$5,000.000
|
$125.000
|
|
|
SET (REPLACE PIPE RUNNER)
|
EA
|
1.000
|
$2,400.000
|
$839.990
|
$1,200.000
|
$2,060.000
|
$2,000.000
|
$800.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
1.000
|
$6,000.000
|
$6,662.160
|
$12,000.000
|
$4,635.000
|
$4,500.000
|
$6,345.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$7,500.000
|
$4,882.430
|
$12,000.000
|
$6,180.000
|
$6,000.000
|
$4,650.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
4.000
|
$8,600.000
|
$8,242.380
|
$18,000.000
|
$8,755.000
|
$8,500.000
|
$7,850.000
|
|
|
SET (TY II) (15 IN) (CMP) (6: 1) (P)
|
EA
|
30.000
|
$725.000
|
$1,018.490
|
$1,300.000
|
$927.000
|
$900.000
|
$970.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
46.000
|
$825.000
|
$923.990
|
$1,350.000
|
$927.000
|
$900.000
|
$880.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
60.000
|
$850.000
|
$1,039.490
|
$1,400.000
|
$1,030.000
|
$1,000.000
|
$990.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
28.000
|
$950.000
|
$1,028.990
|
$1,500.000
|
$1,030.000
|
$1,000.000
|
$980.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$1,200.000
|
$1,490.980
|
$1,600.000
|
$1,545.000
|
$1,500.000
|
$1,420.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,100.000
|
$1,364.980
|
$2,200.000
|
$1,236.000
|
$1,200.000
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,750.000
|
$1,364.980
|
$2,400.000
|
$1,545.000
|
$1,500.000
|
$1,300.000
|
|
|
REMOV STR (SMALL)
|
EA
|
23.000
|
$1,100.000
|
$944.990
|
$650.000
|
$772.500
|
$750.000
|
$900.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$600,000.000
|
$462,269.310
|
$300,000.000
|
$604,126.187
|
$692,573.280
|
$482,500.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$4,000.000
|
$2,978.160
|
$10,000.000
|
$4,134.317
|
$12,346.280
|
$3,060.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
150.000
|
$30.000
|
$55.000
|
$27.000
|
$21.630
|
$21.000
|
$21.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
150.000
|
$10.000
|
$7.000
|
$11.000
|
$7.210
|
$7.000
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
26,839.000
|
$3.000
|
$1.750
|
$3.000
|
$1.803
|
$1.750
|
$1.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
26,839.000
|
$1.000
|
$0.650
|
$0.750
|
$0.670
|
$0.650
|
$0.650
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
50.000
|
$5.000
|
$10.000
|
$7.000
|
$10.300
|
$10.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
50.000
|
$3.000
|
$2.000
|
$1.000
|
$2.060
|
$2.000
|
$2.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
360.000
|
$80.000
|
$32.720
|
$78.000
|
$14.132
|
$105.000
|
$76.840
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
360.000
|
$20.000
|
$11.750
|
$23.000
|
$3.250
|
$20.000
|
$20.850
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
360.000
|
$20.000
|
$17.400
|
$25.000
|
$5.037
|
$30.000
|
$48.650
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
861.000
|
$35.000
|
$29.400
|
$33.000
|
$41.200
|
$40.000
|
$28.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
342.000
|
$45.000
|
$35.040
|
$40.000
|
$20.672
|
$29.120
|
$13.410
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
1,934.000
|
$30.000
|
$30.660
|
$18.000
|
$22.149
|
$30.570
|
$15.450
|
|
|
DRIVEWAYS (CONC)
|
SY
|
848.000
|
$100.000
|
$78.750
|
$125.000
|
$123.600
|
$126.720
|
$75.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
480.000
|
$65.000
|
$39.420
|
$40.000
|
$41.270
|
$42.400
|
$89.880
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,641.000
|
$50.000
|
$30.660
|
$18.000
|
$23.615
|
$30.570
|
$53.600
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
1,158.000
|
$35.000
|
$26.280
|
$15.000
|
$27.071
|
$30.570
|
$55.540
|
|
|
CONC SIDEWALKS (5")
|
SY
|
544.000
|
$70.000
|
$54.600
|
$85.000
|
$92.700
|
$90.000
|
$52.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
11.000
|
$250.000
|
$1,291.480
|
$165.000
|
$154.500
|
$150.000
|
$1,230.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
62.000
|
$250.000
|
$1,291.480
|
$175.000
|
$154.500
|
$150.000
|
$1,230.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$22.500
|
$22.720
|
$25.000
|
$23.402
|
$22.710
|
$22.710
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,800.000
|
$2,068.000
|
$1,800.000
|
$1,919.990
|
$1,680.380
|
$1,680.380
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,300.000
|
$2.750
|
$2.000
|
$2.250
|
$2.060
|
$1.640
|
$1.640
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
16.000
|
$250.000
|
$195.000
|
$225.000
|
$200.850
|
$189.120
|
$189.120
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,850.000
|
$2,435.000
|
$2,800.000
|
$2,508.050
|
$2,904.680
|
$2,904.680
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$575.000
|
$700.000
|
$592.250
|
$1,500.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$850.000
|
$545.000
|
$600.000
|
$561.350
|
$1,000.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$7,500.000
|
$7,175.000
|
$7,800.000
|
$7,390.250
|
$7,000.000
|
$7,000.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
5.000
|
$300.000
|
$290.000
|
$300.000
|
$247.200
|
$240.000
|
$240.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
49.000
|
$175.000
|
$170.000
|
$175.000
|
$144.200
|
$140.000
|
$140.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
14.000
|
$225.000
|
$180.000
|
$200.000
|
$180.250
|
$175.000
|
$175.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
11.000
|
$550.000
|
$555.000
|
$600.000
|
$566.500
|
$550.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$600.000
|
$780.000
|
$750.000
|
$695.250
|
$675.000
|
$675.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$670.000
|
$690.000
|
$825.000
|
$772.500
|
$750.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$800.000
|
$630.000
|
$1,050.000
|
$978.500
|
$950.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$900.000
|
$1,055.000
|
$1,400.000
|
$1,261.750
|
$1,225.000
|
$1,225.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
54.000
|
$550.000
|
$250.000
|
$300.000
|
$272.950
|
$265.000
|
$265.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
1.000
|
$500.000
|
$265.000
|
$500.000
|
$463.500
|
$450.000
|
$450.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
72.000
|
$75.000
|
$60.000
|
$100.000
|
$61.800
|
$60.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
6.000
|
$20.000
|
$17.000
|
$20.000
|
$15.450
|
$15.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
26.000
|
$20.000
|
$25.000
|
$30.000
|
$25.750
|
$25.000
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
30.000
|
$75.000
|
$75.000
|
$100.000
|
$77.250
|
$75.000
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
76,154.000
|
$0.300
|
$0.210
|
$0.750
|
$0.227
|
$0.220
|
$0.210
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
6,710.000
|
$0.500
|
$0.210
|
$0.750
|
$0.227
|
$0.220
|
$0.210
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
41,287.000
|
$0.300
|
$0.210
|
$0.750
|
$0.227
|
$0.220
|
$0.210
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
11,947.000
|
$1.750
|
$1.410
|
$1.000
|
$1.387
|
$1.100
|
$1.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
12,536.000
|
$0.800
|
$0.330
|
$0.500
|
$0.536
|
$0.520
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,202.000
|
$0.800
|
$0.330
|
$0.520
|
$0.577
|
$0.560
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,869.000
|
$0.800
|
$0.330
|
$0.520
|
$0.577
|
$0.560
|
$0.330
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
66,425.000
|
$0.800
|
$0.540
|
$0.700
|
$0.597
|
$0.580
|
$0.540
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
5,508.000
|
$0.800
|
$0.540
|
$0.710
|
$0.597
|
$0.580
|
$0.540
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
37,092.000
|
$0.800
|
$0.540
|
$0.700
|
$0.597
|
$0.580
|
$0.540
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
22.000
|
$15.000
|
$13.000
|
$25.000
|
$20.600
|
$20.000
|
$13.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
934.000
|
$4.000
|
$3.500
|
$4.500
|
$3.430
|
$3.330
|
$3.500
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
793.000
|
$120.000
|
$77.220
|
$100.000
|
$89.804
|
$81.200
|
$82.920
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,500.000
|
$8,118.750
|
$15,000.000
|
$10,700.000
|
$22,000.000
|
$20,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
887.000
|
$4.000
|
$4.500
|
$10.000
|
$7.210
|
$7.000
|
$4.500
|
|
|
TMA (STATIONARY)
|
DAY
|
15.000
|
$300.000
|
$300.000
|
$250.000
|
$256.800
|
$230.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$300.000
|
$300.000
|
$50.000
|
$460.100
|
$350.000
|
$750.000
|
|
|
LEAD LED CHEVRON
|
EA
|
2.000
|
$4,000.000
|
$7,500.000
|
$8,500.000
|
$7,725.000
|
$7,500.000
|
$7,500.000
|
|
|
LED CHEVRON
|
EA
|
10.000
|
$2,000.000
|
$3,650.000
|
$4,000.000
|
$3,450.500
|
$3,350.000
|
$3,350.000
|
|
Totals: |
$6,350,417.650
|
$5,212,300.963
|
$5,747,011.550
|
$6,043,176.234
|
$6,302,413.998
|
$6,580,183.170
|