GONZALES FM 794 (1133-02-032)

Items: 120

County: GONZALES
Length: N/A
Highway: FM 794
District: YOAKUM
Control Number: 1133-02-032
DBE Goal: N/A
Project: F 2021(596)
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $6,350,417.65
Date: 06/04/2021 (5 years ago)
Contract Number: N/A
Type: WIDEN ROADWAY AND INSTALL CENTERLINE RUMBLE STRIP
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$6,350,417.65
$5,212,300.95
Over/Under Est: -17.92% -$1,138,116.70
$5,747,011.55
Over/Under Est: -9.5% -$603,406.10
Amt Left: 10.26% $534,710.60
Over/Under Est: -4.84% -$307,241.57
Amt Left: 15.94% $830,875.13
Delta: -5.15% -$296,164.53
$6,302,414.00
Over/Under Est: -0.76% -$48,003.65
Amt Left: 20.91% $1,090,113.05
Delta: -4.29% -$259,237.92
Over/Under Est: 3.62% $229,765.52
Amt Left: 26.24% $1,367,882.22
Delta: -4.41% -$277,769.17
Subcontractor Percentage Amount
INTERSTATE CONCRETE & STEEL SERVICES INCORPORATED 16.32% $850,647.52
BATTERSON, LLP 3.16% $164,708.71
LONE STAR EROSION CONTROL 2.23% $116,234.31
DEPENDABLE FENCE 1.22% $63,590.07
THIRD COAST SERVICES LLC 0.99% $51,601.78
AUSTIN WOOD RECYCLING 0.90% $46,910.71
CLEAN SCAPES L.P. 0.83% $43,262.10
Total: 25.65% $1,336,955.20

Bid Items & Bid Tabulations

120 Total 0 of 120
GONZALES  |  FM 794  |  YOAKUM  |  1133-02-032  |  06/04/2021  |  $6,350,417.65  |  F 2021(596)  |  WIDEN ROADWAY AND INSTL CENTERLINE...  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
CK NEWBERRY, LLC
DEAN WORD COMPANY, LTD.
FARIS INDUSTRIES, INC.
BRANNAN PAVING CO., LTD.
PREPARING ROW
STA 45.400 $4,500.000 $1,341.990 $140.000 $660.490 $1,258.820 $485.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 30.000 $300.000 $682.500 $1,000.000 $824.000 $650.000 $650.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 10.000 $2,000.000 $1,942.500 $1,300.000 $2,060.000 $1,850.000 $1,850.000
REMOVING CONC (RIPRAP)
SY 10.000 $25.000 $73.260 $50.100 $18.450 $25.000 $30.000
REMOVING CONC (DRIVEWAYS)
SY 745.000 $15.000 $13.320 $15.000 $15.735 $50.000 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 1,268.000 $10.000 $6.660 $5.000 $5.970 $15.000 $3.000
EXCAVATION (ROADWAY)
CY 19,896.000 $15.000 $12.840 $6.000 $16.575 $15.680 $15.530
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 7,972.000 $20.000 $12.840 $7.000 $7.939 $13.440 $18.610
BLADING
HR 38.000 $100.000 $96.900 $110.000 $112.492 $89.600 $100.000
BLOCK SODDING
SY 520.000 $6.000 $17.300 $6.000 $17.819 $17.300 $17.300
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 2,050.000 $0.300 $0.500 $0.550 $0.515 $0.500 $0.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 120,540.000 $0.200 $0.140 $0.250 $0.124 $0.120 $0.120
DRILL SEEDING (TEMP) (WARM)
SY 30,140.000 $0.150 $0.140 $0.200 $0.144 $0.140 $0.140
DRILL SEEDING (TEMP) (COOL)
SY 30,140.000 $0.150 $0.140 $0.200 $0.144 $0.140 $0.140
VEGETATIVE WATERING
MG 1,018.500 $20.000 $16.650 $15.000 $24.109 $14.480 $15.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 29,108.000 $62.000 $53.330 $70.000 $45.855 $63.070 $88.930
FL BS (RDWY DEL) (TY E GR 1-2)
TON 1,488.000 $55.000 $22.590 $40.000 $23.300 $30.960 $48.720
CEMENT
TON 1,266.000 $150.000 $155.610 $165.000 $179.760 $160.000 $150.510
CEMENT TREAT (EXIST MATL) (6")
SY 137,796.000 $2.000 $1.600 $1.500 $1.587 $2.690 $1.650
ASPH (RC-250)
GAL 24,120.000 $5.000 $3.890 $3.750 $3.941 $4.170 $4.140
AGGR(TY-E GR-5 SAC-B)
CY 848.000 $150.000 $54.420 $110.000 $81.019 $88.340 $87.650
AGGR(TY-PE GR-3 SAC-B)
CY 1,410.000 $100.000 $67.460 $97.000 $86.149 $86.300 $93.480
AGGR(TY-PE GR-4 SAC-B)
CY 973.000 $100.000 $67.430 $86.000 $80.669 $91.880 $94.710
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 91,763.000 $3.500 $3.620 $3.100 $3.348 $3.600 $3.600
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 250.000 $75.000 $69.460 $150.000 $80.541 $71.640 $92.060
PLANE ASPH CONC PAV(0" TO 2")
SY 7,217.000 $2.000 $1.590 $1.250 $1.030 $2.860 $2.280
CEM STABIL BKFL
CY 218.000 $120.000 $131.250 $140.000 $103.000 $100.000 $125.000
CUT & RESTORING PAV
SY 98.000 $130.000 $151.680 $100.000 $128.750 $125.000 $125.000
TRENCH EXCAVATION PROTECTION
LF 40.000 $15.000 $21.000 $20.000 $12.360 $12.000 $20.000
TEMPORARY SPL SHORING
SF 500.000 $15.000 $47.250 $35.000 $56.650 $55.000 $45.000
CL C CONC (RAIL FOUNDATION)
CY 17.000 $650.000 $545.990 $800.000 $499.550 $485.000 $520.000
CL C CONC (RAC-R)
CY 36.000 $400.000 $519.740 $825.000 $2,266.000 $2,200.000 $495.000
RIPRAP (CONC)(5 IN)
CY 37.300 $500.000 $456.740 $650.000 $21,130.450 $550.000 $435.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 99.000 $250.000 $150.000 $200.000 $206.000 $200.000 $140.000
RETROFIT RAIL (TY SSTR)
LF 205.900 $150.000 $199.500 $200.000 $262.650 $255.000 $190.000
CMP (GAL STL 18 IN)
LF 1,029.000 $65.000 $55.650 $60.000 $49.440 $48.000 $53.000
CMP (GAL STL 24 IN)
LF 16.000 $85.000 $74.550 $80.000 $94.760 $92.000 $71.000
CMP (GAL STL 15 IN)
LF 286.000 $60.000 $50.400 $55.000 $46.350 $45.000 $48.000
CONC BOX CULV (3 FT X 3 FT)
LF 60.000 $525.000 $341.250 $300.000 $458.350 $445.000 $325.000
CONC BOX CULV (5 FT X 2 FT)
LF 36.000 $550.000 $362.240 $375.000 $540.750 $525.000 $345.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 9.000 $750.000 $866.240 $1,500.000 $824.000 $800.000 $825.000
RC PIPE (CL III)(15 IN)
LF 1,126.000 $75.000 $57.750 $55.000 $49.440 $48.000 $55.000
RC PIPE (CL III)(18 IN)
LF 402.000 $80.000 $60.900 $60.000 $51.500 $50.000 $58.000
RC PIPE (CL III)(24 IN)
LF 72.000 $100.000 $85.050 $110.000 $98.880 $96.000 $81.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $13,000.000 $4,735.430 $13,000.000 $5,150.000 $5,000.000 $4,510.000
SET (REPLACE PIPE RUNNER ASSEMBLY)
EA 1.000 $2,000.000 $131.250 $6,000.000 $5,150.000 $5,000.000 $125.000
SET (REPLACE PIPE RUNNER)
EA 1.000 $2,400.000 $839.990 $1,200.000 $2,060.000 $2,000.000 $800.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 1.000 $6,000.000 $6,662.160 $12,000.000 $4,635.000 $4,500.000 $6,345.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $7,500.000 $4,882.430 $12,000.000 $6,180.000 $6,000.000 $4,650.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1) (C)
EA 4.000 $8,600.000 $8,242.380 $18,000.000 $8,755.000 $8,500.000 $7,850.000
SET (TY II) (15 IN) (CMP) (6: 1) (P)
EA 30.000 $725.000 $1,018.490 $1,300.000 $927.000 $900.000 $970.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 46.000 $825.000 $923.990 $1,350.000 $927.000 $900.000 $880.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 60.000 $850.000 $1,039.490 $1,400.000 $1,030.000 $1,000.000 $990.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 28.000 $950.000 $1,028.990 $1,500.000 $1,030.000 $1,000.000 $980.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000 $1,200.000 $1,490.980 $1,600.000 $1,545.000 $1,500.000 $1,420.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,100.000 $1,364.980 $2,200.000 $1,236.000 $1,200.000 $1,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,750.000 $1,364.980 $2,400.000 $1,545.000 $1,500.000 $1,300.000
REMOV STR (SMALL)
EA 23.000 $1,100.000 $944.990 $650.000 $772.500 $750.000 $900.000
MOBILIZATION
LS 1.000 $600,000.000 $462,269.310 $300,000.000 $604,126.187 $692,573.280 $482,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $4,000.000 $2,978.160 $10,000.000 $4,134.317 $12,346.280 $3,060.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 150.000 $30.000 $55.000 $27.000 $21.630 $21.000 $21.000
ROCK FILTER DAMS (REMOVE)
LF 150.000 $10.000 $7.000 $11.000 $7.210 $7.000 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 26,839.000 $3.000 $1.750 $3.000 $1.803 $1.750 $1.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 26,839.000 $1.000 $0.650 $0.750 $0.670 $0.650 $0.650
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 50.000 $5.000 $10.000 $7.000 $10.300 $10.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 50.000 $3.000 $2.000 $1.000 $2.060 $2.000 $2.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 360.000 $80.000 $32.720 $78.000 $14.132 $105.000 $76.840
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 360.000 $20.000 $11.750 $23.000 $3.250 $20.000 $20.850
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 360.000 $20.000 $17.400 $25.000 $5.037 $30.000 $48.650
CONC CURB & GUTTER (TY II)
LF 861.000 $35.000 $29.400 $33.000 $41.200 $40.000 $28.000
INTERSECTIONS (ACP)
SY 342.000 $45.000 $35.040 $40.000 $20.672 $29.120 $13.410
INTERSECTIONS (SURF TREAT)
SY 1,934.000 $30.000 $30.660 $18.000 $22.149 $30.570 $15.450
DRIVEWAYS (CONC)
SY 848.000 $100.000 $78.750 $125.000 $123.600 $126.720 $75.000
DRIVEWAYS (ACP)
SY 480.000 $65.000 $39.420 $40.000 $41.270 $42.400 $89.880
DRIVEWAYS (SURF TREAT)
SY 2,641.000 $50.000 $30.660 $18.000 $23.615 $30.570 $53.600
TURNOUTS (SURF TREAT)
SY 1,158.000 $35.000 $26.280 $15.000 $27.071 $30.570 $55.540
CONC SIDEWALKS (5")
SY 544.000 $70.000 $54.600 $85.000 $92.700 $90.000 $52.000
CURB RAMPS (TY 7)
SY 11.000 $250.000 $1,291.480 $165.000 $154.500 $150.000 $1,230.000
CURB RAMPS (TY 10)
SY 62.000 $250.000 $1,291.480 $175.000 $154.500 $150.000 $1,230.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $22.500 $22.720 $25.000 $23.402 $22.710 $22.710
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,800.000 $2,068.000 $1,800.000 $1,919.990 $1,680.380 $1,680.380
REMOVE METAL BEAM GUARD FENCE
LF 1,300.000 $2.750 $2.000 $2.250 $2.060 $1.640 $1.640
REMOVE TERMINAL ANCHOR SECTION
EA 16.000 $250.000 $195.000 $225.000 $200.850 $189.120 $189.120
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,850.000 $2,435.000 $2,800.000 $2,508.050 $2,904.680 $2,904.680
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,500.000 $575.000 $700.000 $592.250 $1,500.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $850.000 $545.000 $600.000 $561.350 $1,000.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $7,500.000 $7,175.000 $7,800.000 $7,390.250 $7,000.000 $7,000.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 5.000 $300.000 $290.000 $300.000 $247.200 $240.000 $240.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 49.000 $175.000 $170.000 $175.000 $144.200 $140.000 $140.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 14.000 $225.000 $180.000 $200.000 $180.250 $175.000 $175.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $550.000 $555.000 $600.000 $566.500 $550.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $600.000 $780.000 $750.000 $695.250 $675.000 $675.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $670.000 $690.000 $825.000 $772.500 $750.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $800.000 $630.000 $1,050.000 $978.500 $950.000 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $900.000 $1,055.000 $1,400.000 $1,261.750 $1,225.000 $1,225.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 54.000 $550.000 $250.000 $300.000 $272.950 $265.000 $265.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $500.000 $265.000 $500.000 $463.500 $450.000 $450.000
REMOVE SM RD SN SUP&AM
EA 72.000 $75.000 $60.000 $100.000 $61.800 $60.000 $60.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 6.000 $20.000 $17.000 $20.000 $15.450 $15.000 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 26.000 $20.000 $25.000 $30.000 $25.750 $25.000 $25.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 30.000 $75.000 $75.000 $100.000 $77.250 $75.000 $75.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 76,154.000 $0.300 $0.210 $0.750 $0.227 $0.220 $0.210
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 6,710.000 $0.500 $0.210 $0.750 $0.227 $0.220 $0.210
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 41,287.000 $0.300 $0.210 $0.750 $0.227 $0.220 $0.210
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 11,947.000 $1.750 $1.410 $1.000 $1.387 $1.100 $1.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 12,536.000 $0.800 $0.330 $0.500 $0.536 $0.520 $0.330
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,202.000 $0.800 $0.330 $0.520 $0.577 $0.560 $0.330
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 6,869.000 $0.800 $0.330 $0.520 $0.577 $0.560 $0.330
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 66,425.000 $0.800 $0.540 $0.700 $0.597 $0.580 $0.540
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 5,508.000 $0.800 $0.540 $0.710 $0.597 $0.580 $0.540
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 37,092.000 $0.800 $0.540 $0.700 $0.597 $0.580 $0.540
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 22.000 $15.000 $13.000 $25.000 $20.600 $20.000 $13.000
REFL PAV MRKR TY II-A-A
EA 934.000 $4.000 $3.500 $4.500 $3.430 $3.330 $3.500
D-GR HMA TY-D SAC-B PG70-22
TON 793.000 $120.000 $77.220 $100.000 $89.804 $81.200 $82.920
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,500.000 $8,118.750 $15,000.000 $10,700.000 $22,000.000 $20,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 887.000 $4.000 $4.500 $10.000 $7.210 $7.000 $4.500
TMA (STATIONARY)
DAY 15.000 $300.000 $300.000 $250.000 $256.800 $230.000 $500.000
TMA (MOBILE OPERATION)
DAY 30.000 $300.000 $300.000 $50.000 $460.100 $350.000 $750.000
LEAD LED CHEVRON
EA 2.000 $4,000.000 $7,500.000 $8,500.000 $7,725.000 $7,500.000 $7,500.000
LED CHEVRON
EA 10.000 $2,000.000 $3,650.000 $4,000.000 $3,450.500 $3,350.000 $3,350.000
Totals: $6,350,417.650 $5,212,300.963 $5,747,011.550 $6,043,176.234 $6,302,413.998 $6,580,183.170