ATASCOSA SH 132 (0017-13-012)

Items: 153

County: ATASCOSA
Length: N/A
Highway: SH 132
District: SAN ANTONIO
Control Number: 0017-13-012
DBE Goal: N/A
Project: F 2022(688)
Guaranty: N/A
Time: 410 WORKING DAYS
Engineer's Estimate: $5,479,624.25
Date: 06/30/2022 (3 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
CHRISTEN LONGORIA
JULES ZINSMEYER
WILL LOCKETT
CARLOS ARCILA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$5,479,624.25
$6,628,642.00
Over/Under Est: 20.97% $1,149,017.75
$7,176,599.57
Over/Under Est: 30.97% $1,696,975.32
Amt Left: 8.27% $547,957.57
Over/Under Est: 34.5% $1,890,254.41
Amt Left: 11.18% $741,236.66
Delta: -2.69% -$193,279.09
Over/Under Est: 35.45% $1,942,357.67
Amt Left: 11.97% $793,339.92
Delta: -0.71% -$52,103.26
Over/Under Est: 35.63% $1,952,206.54
Amt Left: 12.12% $803,188.79
Delta: -0.13% -$9,848.87
Over/Under Est: 48.65% $2,665,850.39
Amt Left: 22.88% $1,516,832.64
Delta: -9.60% -$713,643.85
Over/Under Est: 51.13% $2,801,698.22
Amt Left: 24.93% $1,652,680.47
Delta: -1.67% -$135,847.83
Subcontractor Percentage Amount
INTERSTATE CONCRETE & STEEL SERVICES INCORPORATED 10.08% $668,167.11
E-Z BEL CONSTRUCTION, LLC 3.69% $244,596.89
FLORIDA TRAFFIC CONTROL DEVICES, INC. 3.49% $231,339.61
LONE STAR EROSION CONTROL 2.89% $191,567.75
HIGHWAY BARRICADES AND SERVICES, LLC 1.57% $104,069.68
FLASHER EQUIPMENT COMPANY 1.10% $72,915.06
BARRICADES UNLIMITED 0.28% $18,560.20
ROADWAY SPECIALTIES, INC. 0.23% $15,245.88
PROFESSIONAL TRAFFIC CONTROL LLC 0.13% $8,617.23
PINNACLE GRINDING AND GROOVING LLC 0.13% $8,617.23
Total: 23.59% $1,563,696.64

Bid Items & Bid Tabulations

153 Total 0 of 153
ATASCOSA  |  SH 132  |  SAN ANTONIO  |  0017-13-012  |  06/30/2022  |  $5,479,624.25  |  F 2022(688)  |  WIDEN ROAD - ADD LANES  |  410 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
RELMCO, INC.
TEXAS MATERIALS GROUP, INC.
ACME BRIDGE COMPANY, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
H. L. ZUMWALT CONSTRUCTION, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 115.000 $1,000.000 $1,658.340 $500.000 $2,650.000 $1,280.000 $4,614.190 $250.000 $312.340
REMOVING CONC (DRIVEWAYS)
SY 772.000 $11.500 $63.000 $20.000 $26.000 $16.800 $9.950 $16.000 $25.820
REMOVING CONC (CURB)
LF 133.000 $6.000 $12.600 $15.000 $10.000 $9.100 $11.780 $5.000 $6.910
REMOVING CONC (SIDEWALK OR RAMP)
SY 57.000 $20.000 $75.240 $20.000 $25.000 $28.900 $43.380 $25.000 $31.160
REMOVING CONC (FLUME)
SY 55.000 $40.000 $75.240 $20.000 $25.000 $30.000 $44.960 $13.000 $32.290
REMOVING STAB BASE & ASPH PAV(15"-20")
SY 543.000 $8.500 $15.660 $9.000 $24.250 $13.000 $25.030 $9.000 $23.680
REMOVING STAB BASE AND ASPH PAV(8")
SY 5,123.000 $4.000 $9.000 $3.000 $10.300 $6.600 $13.000 $6.000 $6.220
REMOVING UNTREATED BASE (8")
SY 1,588.000 $7.000 $6.840 $3.500 $10.300 $6.600 $7.440 $10.000 $4.230
EXCAVATION (ROADWAY)
CY 15,154.000 $9.450 $18.360 $10.000 $21.000 $18.300 $20.000 $11.500 $12.540
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 6,726.000 $16.000 $18.360 $12.000 $7.900 $11.400 $10.000 $24.000 $10.970
COMPOST MANUF TOPSOIL (4")
SY 73,334.000 $2.000 $0.850 $4.000 $1.790 $2.090 $1.200 $2.430 $2.180
BLOCK SODDING
SY 82.000 $7.000 $15.000 $16.500 $20.450 $15.900 $15.000 $15.000 $17.820
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 73,334.000 $0.900 $0.220 $0.230 $0.220 $0.230 $0.220 $0.360 $0.240
DRILL SEED (TEMP)(WARM OR COOL)
SY 73,334.000 $0.600 $0.160 $0.170 $0.200 $0.170 $0.160 $0.360 $0.180
VEGETATIVE WATERING
MG 1,722.300 $13.500 $23.940 $20.000 $17.000 $41.800 $20.000 $25.000 $32.640
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 73,334.000 $0.900 $0.890 $0.950 $0.970 $0.940 $0.890 $1.000 $0.990
PROOF ROLLING
HR 20.000 $172.000 $128.700 $80.000 $118.000 $101.000 $110.000 $80.000 $87.090
FL BS (CMP IN PLACE)(TY D GR 1-2)(11")
SY 27,538.000 $17.750 $14.840 $38.000 $26.000 $37.200 $22.390 $23.000 $23.490
FB(CMP IN PLC)(TY D GR 1-2 OR 5)(12")
SY 437.000 $15.000 $25.760 $65.000 $53.000 $57.600 $32.790 $30.000 $56.900
PRIME COAT(MC-30 OR AE-P)
GAL 6,631.000 $5.000 $6.650 $4.460 $5.750 $4.500 $4.170 $4.000 $7.010
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 17,348.000 $32.000 $42.890 $40.950 $43.150 $41.300 $50.000 $57.000 $71.140
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,894.000 $40.000 $66.890 $54.600 $63.000 $55.100 $70.000 $70.000 $79.430
PLANE ASPH CONC PAV(0" TO 4")
SY 31,742.000 $2.500 $1.970 $3.670 $2.750 $3.700 $4.520 $3.000 $3.680
PLANE ASPH CONC PAV (2" TO 2.5")
SY 3,787.000 $2.000 $3.590 $3.410 $4.250 $3.450 $3.550 $4.000 $4.020
FLOWABLE BACKFILL
CY 224.000 $165.000 $225.000 $165.000 $235.000 $212.000 $203.110 $150.000 $152.630
TEMPORARY SPL SHORING
SF 2,100.000 $12.400 $21.970 $25.000 $21.000 $21.200 $50.000 $23.000 $85.720
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 39.000 $300.000 $378.500 $430.000 $408.000 $435.000 $325.000 $440.000 $497.780
CL A CONC (MISC)
CY 4.000 $700.000 $2,000.000 $1,200.000 $1,550.000 $1,060.000 $750.000 $880.000 $847.680
RIPRAP (CONC)(5 IN)
CY 5.000 $450.000 $650.460 $800.000 $600.000 $625.000 $1,096.990 $800.000 $1,002.650
RIPRAP (SPECIAL)
CY 14.000 $200.000 $738.660 $600.000 $685.000 $710.000 $996.620 $550.000 $556.660
SALVAGED ROCK RIPRAP (DRY)
SY 184.000 $200.000 $49.610 $80.000 $55.000 $47.700 $25.870 $34.000 $59.610
GABION MATTRESSES (GALV)(12 IN)
SY 41.000 $95.000 $217.920 $85.000 $200.000 $154.000 $191.930 $200.000 $174.640
CONC BOX CULV (3 FT X 2 FT)
LF 40.000 $153.000 $488.820 $924.000 $455.000 $471.000 $525.840 $440.000 $420.510
CONC BOX CULV (6 FT X 6 FT)
LF 45.000 $550.000 $988.620 $959.000 $920.000 $954.000 $2,000.000 $770.000 $940.110
CONC BOX CULV (8 FT X 6 FT)
LF 41.000 $750.000 $1,153.390 $994.000 $1,070.000 $1,110.000 $1,030.600 $1,500.000 $1,240.250
RC PIPE (CL III)(18 IN)
LF 579.000 $70.000 $76.270 $86.800 $66.500 $68.900 $85.540 $83.000 $82.440
RC PIPE (CL III)(24 IN)
LF 250.000 $80.000 $109.040 $106.960 $91.000 $94.300 $118.240 $95.000 $103.950
RC PIPE (ARCH)(CL III)(DES 1)
LF 310.000 $150.000 $241.470 $238.560 $199.000 $207.000 $222.650 $220.000 $194.720
RC PIPE (ARCH)(CL III)(DES 2)
LF 64.000 $155.000 $230.680 $287.280 $215.000 $222.000 $250.460 $230.000 $240.860
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $33,000.000 $38,446.280 $36,456.000 $35,800.000 $37,100.000 $52,392.040 $49,000.000 $78,151.340
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $16,000.000 $6,700.640 $15,386.000 $6,230.000 $6,460.000 $20,194.480 $13,000.000 $19,885.160
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $28,000.000 $26,363.170 $25,571.000 $24,500.000 $25,400.000 $31,127.960 $36,000.000 $23,573.490
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $5,800.000 $6,261.250 $10,990.000 $5,825.000 $6,040.000 $13,553.830 $15,000.000 $8,492.080
SET (TY II) (15 IN) (CMP) (6: 1) (P)
EA 2.000 $1,400.000 $1,318.160 $1,820.000 $1,225.000 $1,270.000 $1,702.120 $1,500.000 $1,333.700
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 2.000 $1,800.000 $1,537.850 $1,925.000 $1,430.000 $1,480.000 $1,802.810 $1,600.000 $1,616.640
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 20.000 $1,800.000 $1,746.560 $1,841.000 $1,625.000 $1,680.000 $1,850.390 $1,800.000 $1,756.640
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $2,000.000 $1,845.420 $2,270.000 $1,720.000 $1,780.000 $2,253.800 $2,100.000 $2,881.640
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 16.000 $2,100.000 $2,636.320 $4,872.000 $2,450.000 $2,540.000 $1,983.730 $2,600.000 $2,366.640
SET (TY II) (DES 2) (RCP) (6: 1) (P)
EA 2.000 $2,200.000 $3,185.550 $5,852.000 $2,960.000 $3,070.000 $1,854.890 $2,600.000 $3,491.640
CLEAN EXIST CULVERTS
EA 5.000 $2,400.000 $2,306.780 $1,200.000 $2,145.000 $2,220.000 $3,020.880 $2,800.000 $3,001.800
REMOV STR (SET)
EA 12.000 $480.000 $659.080 $800.000 $613.000 $636.000 $578.890 $500.000 $513.510
REMOV STR (WINGWALL)
EA 6.000 $2,500.000 $1,263.240 $800.000 $1,175.000 $1,220.000 $2,872.990 $1,950.000 $2,791.620
REMOV STR (BOX CULVERT)
LF 14.000 $45.000 $439.390 $100.000 $408.000 $424.000 $156.490 $170.000 $382.590
REMOV STR (PIPE)
EA 4.000 $730.000 $1,043.540 $900.000 $970.000 $1,010.000 $1,019.610 $500.000 $840.490
MOBILIZATION
LS 1.000 $528,300.000 $652,923.040 $610,000.000 $735,855.000 $600,000.000 $735,751.340 $400,000.000 $891,891.030
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 26.000 $5,815.000 $3,000.000 $5,000.000 $6,000.000 $8,690.000 $1,713.480 $10,000.000 $2,145.590
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 240.000 $21.500 $80.000 $25.800 $36.500 $25.400 $24.000 $35.000 $26.810
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 160.000 $26.000 $80.000 $31.170 $41.000 $30.700 $29.000 $36.000 $32.580
ROCK FILTER DAMS (REMOVE)
LF 400.000 $8.750 $25.600 $8.600 $5.900 $8.500 $8.000 $10.000 $9.070
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 312.000 $36.500 $29.000 $31.170 $76.000 $30.700 $29.000 $39.000 $32.250
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $5.000 $2.000 $2.150 $11.650 $2.100 $2.000 $8.000 $2.550
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,948.000 $2.500 $2.250 $2.420 $4.050 $2.400 $2.250 $3.600 $2.530
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,730.000 $0.700 $0.750 $0.800 $0.500 $0.790 $0.750 $1.000 $0.890
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 40.000 $4.000 $10.000 $10.750 $7.600 $10.600 $10.000 $6.000 $13.710
CONC CURB (TY I)
LF 220.000 $12.000 $35.280 $30.000 $32.700 $33.900 $15.410 $40.000 $35.880
DRIVEWAYS (CONC)
SY 582.000 $75.000 $93.710 $75.000 $107.000 $90.100 $97.860 $125.000 $104.180
DRIVEWAYS (ACP)
SY 216.000 $40.000 $49.500 $36.750 $108.000 $28.600 $26.940 $47.000 $59.990
DRIVEWAYS (ACP)(TYPE 1)
SY 2,719.000 $32.000 $54.180 $31.500 $56.600 $72.400 $37.840 $60.000 $55.770
CONC SIDEWALKS (4")
SY 120.000 $55.000 $82.690 $80.000 $88.000 $79.500 $81.420 $75.000 $103.180
CURB RAMPS (TY 1)
EA 1.000 $2,000.000 $2,535.700 $1,500.000 $2,560.000 $2,440.000 $2,927.430 $2,000.000 $3,995.490
CURB RAMPS (TY 7)
EA 7.000 $2,000.000 $2,535.700 $1,500.000 $2,560.000 $2,440.000 $2,683.240 $2,200.000 $2,475.390
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 19,832.000 $0.130 $0.450 $0.390 $0.390 $0.260 $0.660 $0.200 $1.380
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $26.000 $30.760 $26.870 $34.750 $32.600 $25.000 $35.000 $27.860
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,570.000 $1,478.180 $1,451.250 $1,788.000 $1,570.000 $1,350.000 $1,650.000 $1,593.380
REMOVE METAL BEAM GUARD FENCE
LF 175.000 $1.750 $1.380 $1.075 $2.300 $1.450 $1.000 $3.000 $1.720
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $290.000 $840.890 $123.620 $460.000 $891.000 $115.000 $900.000 $234.880
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,135.000 $3,802.870 $3,332.500 $3,525.000 $4,030.000 $3,100.000 $4,200.000 $3,518.380
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $250.000 $274.890 $161.250 $355.000 $291.000 $150.000 $320.000 $273.380
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 19.000 $225.000 $305.000 $327.870 $310.000 $307.000 $290.000 $300.000 $341.200
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 6.000 $270.000 $345.000 $370.870 $350.000 $366.000 $345.000 $360.000 $397.560
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 14.000 $500.000 $860.000 $924.500 $875.000 $715.000 $675.000 $900.000 $953.740
CONDT (PVC) (SCH 80) (2")
LF 415.000 $13.000 $16.310 $21.500 $20.430 $18.800 $15.000 $22.000 $31.060
CONDT (PVC) (SCH 80) (2") (BORE)
LF 350.000 $25.000 $21.650 $27.950 $26.560 $24.900 $30.000 $30.000 $65.210
CONDT (PVC) (SCH 80) (3")
LF 165.000 $20.000 $24.290 $25.800 $24.520 $27.900 $21.000 $26.000 $42.460
CONDT (PVC) (SCH 80) (3") (BORE)
LF 360.000 $35.000 $32.770 $34.400 $32.690 $37.700 $40.000 $36.000 $83.900
ELEC CONDR (NO.6) BARE
LF 1,190.000 $1.600 $1.290 $1.610 $1.530 $1.500 $1.450 $1.650 $2.620
ELEC CONDR (NO.6) INSULATED
LF 70.000 $2.000 $1.620 $1.610 $1.530 $1.850 $2.000 $1.650 $4.300
TRAY CABLE (4 CONDR) (12 AWG)
LF 600.000 $2.500 $2.210 $2.680 $2.550 $2.550 $2.000 $2.750 $3.810
GROUND BOX TY D (162922)W/APRON
EA 6.000 $1,150.000 $1,132.230 $1,343.750 $1,275.000 $1,300.000 $1,200.000 $1,300.000 $1,888.060
ELC SRV TY D 120/240 060(NS)SS(E)SP(U)
EA 1.000 $5,400.000 $5,741.150 $10,750.000 $10,200.000 $6,600.000 $5,500.000 $11,000.000 $9,348.380
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 27.000 $770.000 $760.000 $817.000 $775.000 $901.000 $850.000 $820.000 $840.010
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 29.000 $960.000 $927.000 $996.525 $945.000 $1,190.000 $1,125.000 $1,000.000 $1,023.440
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,000.000 $2,250.000 $2,418.750 $2,290.000 $1,510.000 $1,425.000 $1,600.000 $2,583.380
REMOVE SM RD SN SUP&AM
EA 29.000 $100.000 $97.000 $104.270 $99.000 $84.800 $80.000 $130.000 $110.440
REMOVE DELIN & OBJECT MARKER ASSMS
EA 9.000 $25.000 $10.000 $10.750 $10.200 $31.800 $30.000 $15.000 $23.040
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 9.000 $40.000 $83.000 $89.225 $84.750 $26.500 $25.000 $87.000 $103.340
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 584.000 $0.500 $1.100 $1.180 $1.120 $1.150 $1.100 $1.100 $1.270
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 603.000 $1.000 $3.750 $4.030 $3.830 $3.950 $3.750 $2.300 $34.760
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 53,217.000 $0.500 $0.450 $0.480 $0.460 $0.480 $0.450 $1.000 $0.990
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 63,046.000 $0.450 $0.450 $0.480 $0.460 $0.480 $0.450 $1.100 $1.050
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,330.000 $1.400 $1.620 $2.000 $1.200 $2.050 $1.000 $1.250 $1.140
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 644.000 $1.750 $1.620 $2.000 $1.200 $2.050 $1.000 $1.250 $2.620
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 2,276.000 $1.800 $3.000 $3.220 $3.060 $3.200 $3.000 $1.200 $1.260
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 560.000 $0.900 $1.100 $1.180 $1.120 $1.150 $1.100 $1.200 $1.360
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 703.000 $6.700 $5.250 $5.600 $5.360 $5.600 $5.250 $7.000 $7.520
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 6.000 $125.000 $75.000 $80.620 $76.500 $79.500 $75.000 $220.000 $238.060
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $150.000 $85.000 $91.370 $86.000 $90.100 $85.000 $220.000 $274.190
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 16.000 $6.000 $4.500 $4.830 $4.600 $4.750 $4.500 $7.200 $14.250
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 1.000 $461.000 $550.000 $591.250 $560.000 $583.000 $550.000 $440.000 $548.380
PAVEMENT SEALER 4"
LF 4,542.000 $0.150 $0.400 $0.430 $0.410 $0.420 $0.400 $0.350 $0.360
PAVEMENT SEALER 8"
LF 560.000 $0.320 $0.800 $0.860 $0.820 $0.850 $0.800 $0.500 $0.680
PAVEMENT SEALER 24"
LF 464.000 $2.310 $2.000 $2.150 $2.040 $2.100 $2.000 $2.200 $2.430
PAVEMENT SEALER (ARROW)
EA 6.000 $40.550 $12.000 $12.900 $12.250 $12.700 $12.000 $30.000 $45.560
PAVEMENT SEALER (WORD)
EA 4.000 $47.950 $8.000 $8.600 $8.150 $8.500 $8.000 $40.000 $65.600
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,367.000 $0.400 $0.650 $0.690 $0.660 $0.690 $0.650 $0.470 $0.540
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 21,797.000 $0.500 $0.470 $0.500 $0.480 $0.500 $0.470 $0.450 $0.460
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,737.000 $0.350 $0.600 $0.640 $0.610 $0.640 $0.600 $0.450 $0.480
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 21,517.000 $0.500 $0.470 $0.500 $0.480 $0.500 $0.470 $0.450 $0.460
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 882.000 $0.600 $3.000 $3.220 $3.060 $3.200 $3.000 $8.800 $8.920
PREFAB PAV MRK TY C (W) (ARROW)
EA 22.000 $220.000 $185.000 $198.870 $189.000 $196.000 $185.000 $275.000 $279.930
REFL PAV MRKR TY I-C
EA 71.000 $4.500 $4.750 $5.100 $4.850 $5.000 $4.750 $450.000 $5.930
REFL PAV MRKR TY II-A-A
EA 642.000 $3.950 $3.750 $4.030 $3.830 $3.950 $3.750 $450.000 $4.570
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $27,500.000 $32,563.720 $26,875.000 $25,600.000 $37,400.000 $33,000.000 $28,000.000 $49,608.380
REMOVING TRAFFIC SIGNALS
EA 1.000 $3,500.000 $3,006.390 $5,375.000 $5,110.000 $3,460.000 $4,500.000 $5,500.000 $8,358.380
VEH SIG SEC (12")LED(GRN)
EA 8.000 $250.000 $201.130 $284.870 $270.000 $231.000 $200.000 $280.000 $343.550
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $250.000 $201.130 $284.870 $270.000 $231.000 $200.000 $280.000 $357.100
VEH SIG SEC (12")LED(YEL)
EA 8.000 $250.000 $201.130 $284.870 $270.000 $231.000 $200.000 $280.000 $343.550
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $250.000 $201.130 $284.870 $270.000 $231.000 $200.000 $280.000 $357.100
VEH SIG SEC (12")LED(RED)
EA 8.000 $250.000 $201.130 $284.870 $270.000 $231.000 $200.000 $280.000 $343.550
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $250.000 $201.130 $284.870 $270.000 $231.000 $200.000 $280.000 $384.190
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $600.000 $487.740 $752.500 $715.000 $561.000 $575.000 $770.000 $981.550
BACKPLATE W/REFL BRDR(4 SEC)
EA 4.000 $125.000 $157.030 $129.000 $123.000 $181.000 $125.000 $135.000 $236.100
BACKPLATE W/REFL BRDR(3 SEC)
EA 6.000 $100.000 $144.460 $118.250 $112.000 $166.000 $95.000 $120.000 $205.060
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,400.000 $2.000 $1.370 $2.250 $2.150 $1.550 $1.500 $2.200 $2.060
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 1,405.000 $2.000 $2.000 $2.580 $2.450 $2.300 $2.000 $2.600 $2.830
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,365.000 $2.700 $2.870 $3.440 $3.270 $3.300 $2.750 $3.500 $3.930
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 2.000 $10,000.000 $11,889.450 $13,437.500 $12,800.000 $13,700.000 $10,500.000 $14,000.000 $13,364.190
INS TRF SIG PL AM(S)2 ARM(36-32')LUM
EA 1.000 $12,000.000 $17,280.220 $15,587.500 $14,820.000 $19,900.000 $15,100.000 $16,000.000 $21,778.380
PED POLE ASSEMBLY
EA 6.000 $2,100.000 $3,137.020 $2,687.500 $2,554.000 $3,610.000 $1,900.000 $2,700.000 $3,538.060
PED DETECT PUSH BUTTON (APS)
EA 8.000 $850.000 $752.400 $967.500 $919.000 $865.000 $650.000 $1,000.000 $1,113.550
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,000.000 $3,356.160 $3,225.000 $3,065.000 $3,860.000 $3,000.000 $3,300.000 $3,848.380
FULL - WIDTH MOWING
CYC 7.000 $5,000.000 $2,500.000 $4,500.000 $2,500.000 $2,720.000 $3,707.000 $6,000.000 $3,813.340
LITTER REMOVAL
CYC 19.000 $1,530.000 $1,500.000 $3,000.000 $1,500.000 $2,360.000 $1,967.000 $2,000.000 $2,894.310
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 19.000 $1,260.000 $3,000.000 $3,000.000 $750.000 $2,360.000 $1,465.000 $3,600.000 $1,566.490
D-GR HMA TY-C PG70-22
TON 7,524.000 $68.000 $106.560 $102.120 $111.000 $101.000 $114.000 $137.000 $131.310
D-GR HMA TY-C SAC-B PG76-22
TON 671.000 $85.000 $124.740 $131.150 $186.000 $129.000 $105.470 $150.000 $137.210
TACK COAT
GAL 88.000 $3.500 $5.490 $4.300 $10.000 $4.250 $3.500 $4.000 $10.060
SP MIXES SP-C SAC-B PG70-22
TON 9,299.000 $89.000 $105.480 $113.140 $114.000 $112.000 $105.000 $150.000 $130.370
UNDERSEAL COURSE
GAL 17,115.000 $3.500 $4.910 $4.560 $4.600 $4.500 $3.920 $4.600 $6.680
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,725.000 $7,500.000 $15,000.000 $18,000.000 $16,700.000 $15,000.000 $10,000.000 $23,408.950
ITS RADIO (DUAL)(2.4 GHZ/5 GHZ)-I-U
EA 1.000 $4,000.000 $5,110.140 $4,300.000 $4,085.000 $5,880.000 $4,350.000 $4,400.000 $4,508.380
TMA (STATIONARY)
DAY 567.000 $175.000 $200.000 $150.000 $180.000 $277.000 $121.000 $295.000 $110.190
RVDS(PRESENCE DETECTION ONLY)
EA 4.000 $7,000.000 $5,562.530 $9,567.500 $9,100.000 $6,400.000 $5,500.000 $9,700.000 $7,397.100
Totals: $5,479,624.250 $6,628,642.002 $7,176,599.585 $7,369,878.660 $7,421,981.920 $7,431,830.790 $8,145,474.640 $8,281,322.472