PREPARING ROW
|
STA
|
258.000
|
$100.000
|
$722.340
|
$750.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
460.000
|
$5.320
|
$13.680
|
$14.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
15,238.000
|
$10.440
|
$21.780
|
$14.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
20,349.000
|
$8.370
|
$16.020
|
$21.750
|
|
|
BLADING
|
STA
|
258.000
|
$142.300
|
$319.140
|
$34.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
70,900.000
|
$0.160
|
$0.320
|
$0.400
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
70,900.000
|
$0.100
|
$0.160
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
1,107.000
|
$18.550
|
$20.520
|
$8.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
15,790.000
|
$2.680
|
$2.270
|
$3.000
|
|
|
PROOF ROLLING
|
HR
|
50.000
|
$50.480
|
$117.000
|
$104.000
|
|
|
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
|
CY
|
13,347.000
|
$27.000
|
$72.630
|
$75.250
|
|
|
REWORK BS MTL (TY B) (8") (ORD COMP)
|
SY
|
57,200.000
|
$1.770
|
$2.340
|
$3.000
|
|
|
ASPH (RC-250)
|
GAL
|
14,872.000
|
$4.130
|
$6.570
|
$6.300
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
750.000
|
$89.030
|
$115.360
|
$170.000
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
686.000
|
$87.210
|
$115.360
|
$155.000
|
|
|
AGGR (TY-B GR-5)
|
CY
|
536.000
|
$91.960
|
$101.440
|
$170.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
56,520.000
|
$3.820
|
$5.260
|
$5.250
|
|
|
FLOWABLE BACKFILL
|
CY
|
303.000
|
$130.910
|
$180.000
|
$670.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,045.000
|
$11.190
|
$65.000
|
$20.100
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
1,055.000
|
$17.800
|
$65.000
|
$51.300
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
835.000
|
$358.570
|
$600.000
|
$700.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
312.000
|
$459.310
|
$700.000
|
$635.000
|
|
|
RAIL (TY T223)
|
LF
|
163.000
|
$125.030
|
$140.000
|
$170.000
|
|
|
GABIONS (PVC)( 3FT X 3 FT)
|
CY
|
1.670
|
$316.350
|
$1,923.950
|
$1,350.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
21.000
|
$78.180
|
$300.000
|
$210.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
34.000
|
$148.310
|
$460.000
|
$250.000
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
67.000
|
$430.000
|
$600.000
|
$230.000
|
|
|
CMP (GAL STL 42 IN)
|
LF
|
36.000
|
$199.200
|
$730.000
|
$300.000
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
28.000
|
$292.300
|
$1,200.000
|
$400.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
280.000
|
$501.820
|
$1,150.000
|
$1,950.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
|
LF
|
5.000
|
$812.060
|
$2,000.000
|
$1,900.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$7,616.230
|
$13,000.000
|
$7,560.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
7.000
|
$10,437.320
|
$19,000.000
|
$12,840.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 72 IN)
|
EA
|
2.000
|
$22,636.990
|
$35,000.000
|
$18,600.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$25,229.170
|
$27,000.000
|
$25,600.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
2.000
|
$30,495.990
|
$48,000.000
|
$32,600.000
|
|
|
WINGWALL (PW - 2) (HW=12 FT)
|
EA
|
1.000
|
$62,927.750
|
$72,000.000
|
$53,850.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$11,693.410
|
$24,000.000
|
$14,500.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$19,000.000
|
$31,000.000
|
$21,850.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
3.000
|
$27,378.570
|
$39,000.000
|
$28,300.000
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (P)
|
EA
|
14.000
|
$588.170
|
$2,300.000
|
$1,100.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$550.490
|
$2,400.000
|
$1,275.000
|
|
|
SET (TY II) (15 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$890.860
|
$2,800.000
|
$1,170.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,330.200
|
$3,200.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (CMP) (3: 1) (C)
|
EA
|
2.000
|
$621.970
|
$2,900.000
|
$2,100.000
|
|
|
SET (TY II) (30 IN) (CMP) (3: 1) (C)
|
EA
|
4.000
|
$1,314.290
|
$3,300.000
|
$2,325.000
|
|
|
SET (TY II) (36 IN) (CMP) (3: 1) (C)
|
EA
|
8.000
|
$2,444.700
|
$4,400.000
|
$2,800.000
|
|
|
SET (TY II) (42 IN) (CMP) (3: 1) (C)
|
EA
|
6.000
|
$2,100.000
|
$5,200.000
|
$3,230.000
|
|
|
SET (TY II) (48 IN) (CMP) (3: 1) (C)
|
EA
|
3.000
|
$3,690.240
|
$6,500.000
|
$4,450.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$1,641.710
|
$4,500.000
|
$3,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
13.000
|
$1,496.030
|
$2,500.000
|
$3,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
212.000
|
$14.450
|
$20.000
|
$26.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$24,560.000
|
$20,000.000
|
$18,320.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$357,781.950
|
$727,301.470
|
$640,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$8,129.820
|
$6,623.270
|
$15,600.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
900.000
|
$27.010
|
$41.480
|
$54.250
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
900.000
|
$8.730
|
$9.790
|
$12.800
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,332.000
|
$20.270
|
$19.290
|
$25.200
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,332.000
|
$6.940
|
$8.410
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
14,368.000
|
$2.200
|
$3.750
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
14,368.000
|
$0.490
|
$0.500
|
$0.650
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,610.000
|
$3.170
|
$7.600
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,610.000
|
$0.730
|
$1.000
|
$1.300
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
912.000
|
$103.080
|
$128.700
|
$230.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
700.000
|
$30.230
|
$40.000
|
$83.250
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$38.780
|
$40.000
|
$84.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
3,440.000
|
$7.000
|
$20.000
|
$18.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,280.000
|
$12.110
|
$20.000
|
$16.200
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
700.000
|
$6.940
|
$15.000
|
$26.150
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$8.640
|
$15.000
|
$35.400
|
|
|
DRIVEWAYS (CONC)
|
SY
|
132.000
|
$67.230
|
$100.000
|
$110.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
5,189.000
|
$11.790
|
$31.500
|
$38.600
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
649.000
|
$4.850
|
$31.500
|
$38.600
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,475.000
|
$22.610
|
$31.610
|
$41.300
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
23.000
|
$1,383.180
|
$540.000
|
$706.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,970.790
|
$2,675.180
|
$2,845.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
19.000
|
$1,168.570
|
$1,689.640
|
$2,210.000
|
|
|
PIPE UNDERDRAINS (TY 7) (6")
|
LF
|
834.000
|
$35.710
|
$42.000
|
$60.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
360.000
|
$26.090
|
$42.000
|
$60.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
27.000
|
$512.930
|
$315.000
|
$410.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
24.000
|
$552.480
|
$547.000
|
$715.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
6.000
|
$790.070
|
$672.000
|
$880.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$639.910
|
$655.000
|
$856.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
36.000
|
$104.690
|
$118.000
|
$154.000
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
2.000
|
$311.040
|
$345.000
|
$451.000
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
6.000
|
$305.880
|
$345.000
|
$451.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
51.000
|
$20.060
|
$7.000
|
$9.150
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
83.000
|
$24.450
|
$26.000
|
$64.500
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$31.140
|
$26.000
|
$34.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
17.000
|
$55.100
|
$87.000
|
$114.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
51,480.000
|
$0.260
|
$0.320
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
51,480.000
|
$0.260
|
$0.320
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
597.000
|
$2.930
|
$3.470
|
$4.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
25,740.000
|
$0.470
|
$0.630
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
25,740.000
|
$0.450
|
$0.630
|
$0.800
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,932.000
|
$0.440
|
$1.430
|
$3.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
90.000
|
$6.100
|
$8.000
|
$10.400
|
|
|
PAVEMENT SEALER 4"
|
LF
|
49,529.000
|
$0.130
|
$0.140
|
$0.180
|
|
|
PAVEMENT SEALER 6"
|
LF
|
51,126.000
|
$0.180
|
$0.210
|
$0.300
|
|
|
PAVEMENT SEALER 24"
|
LF
|
90.000
|
$2.220
|
$5.000
|
$6.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
51,126.000
|
$0.430
|
$0.560
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
520.000
|
$0.400
|
$1.000
|
$1.300
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
49,009.000
|
$0.380
|
$0.420
|
$0.560
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
51,126.000
|
$0.800
|
$1.030
|
$1.350
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
520.000
|
$0.620
|
$5.000
|
$6.500
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
49,009.000
|
$0.600
|
$0.740
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
619.000
|
$3.120
|
$10.000
|
$13.000
|
|
|
TREE PROTECTION
|
EA
|
7.000
|
$267.230
|
$574.910
|
$650.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
1.000
|
$193.870
|
$592.480
|
$425.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,937.880
|
$12,000.000
|
$22,200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
185.000
|
$176.060
|
$350.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$239.860
|
$1,000.000
|
$400.000
|
|
Totals: |
$4,040,561.794
|
$7,314,033.356
|
$7,763,107.010
|