JACKSON SH 111 (0346-01-040)

Items: 75

County: JACKSON
Length: N/A
Highway: SH 111
District: YOAKUM
Control Number: 0346-01-040
DBE Goal: N/A
Project: F 2023(114)
Guaranty: N/A
Time: 210 WORKING DAYS
Engineer's Estimate: $10,070,391.97
Date: 09/07/2022 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
MICHAEL BRZOZOWSKI
JAMES JANAK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$10,070,391.97
$9,898,507.43
Over/Under Est: -1.71% -$171,884.54
Over/Under Est: 3.42% $344,864.51
Amt Left: 5.22% $516,749.05
Over/Under Est: 19.13% $1,926,653.34
Amt Left: 21.2% $2,098,537.88
Delta: -15.19% -$1,581,788.83
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 3.70% $367,824.44
LONE STAR EROSION CONTROL 2.94% $292,271.31
RUCOBA & MAYA CONSTRUCTION, LLC 2.58% $256,482.99
SURFACE PREPARATION TECHNOLOGIES, LLC 0.30% $29,823.60
THIRD COAST SERVICES LLC 0.22% $21,870.64
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.22% $21,870.64
FLASHER EQUIPMENT COMPANY 0.14% $13,917.68
CHEROKEE SERVICES 0.09% $8,947.08
Total: 10.19% $1,013,008.38

Bid Items & Bid Tabulations

75 Total 0 of 75
JACKSON  |  SH 111  |  YOAKUM  |  0346-01-040  |  09/07/2022  |  $10,070,391.97  |  F 2023(114)  |  SURF/ROADWAY RESTOR  |  210 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
JAMES CONSTRUCTION GROUP, LLC
TEXAS MATERIALS GROUP, INC.
SUBGRADE WIDENING (ORD COMP)
STA 17.180 $350.000 $1,538.480 $1,085.000 $3,780.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 1,133.000 $19.000 $25.920 $27.000 $94.000
BACKFILL (TY B)
STA 769.350 $155.000 $135.900 $95.000 $321.000
BLADING
HR 50.000 $110.000 $234.000 $108.000 $166.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 2,863.000 $0.350 $0.980 $1.360 $1.050
BROADCAST SEED (TEMP) (WARM)
SY 716.000 $0.350 $0.460 $1.820 $1.500
BROADCAST SEED (TEMP) (COOL)
SY 716.000 $0.350 $0.460 $1.820 $1.500
VEGETATIVE WATERING
MG 24.040 $22.000 $188.070 $145.000 $99.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 470.000 $72.000 $114.160 $141.000 $153.000
PRIME COAT (MC-30)
GAL 223.000 $5.500 $10.080 $8.000 $18.500
AGGR(TY-PE GR-3 SAC-B)
CY 13.000 $104.000 $297.760 $385.000 $473.000
AGGR(TY-PE GR-4 SAC-B)
CY 3,035.000 $110.000 $119.220 $134.000 $169.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 134,583.000 $4.750 $5.040 $4.660 $4.130
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,000.000 $47.000 $69.740 $68.000 $100.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 97.000 $85.000 $229.140 $183.000 $230.000
PLANE ASPH CONC PAV(0" TO 2")
SY 240,596.000 $2.300 $1.960 $2.250 $2.500
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 20.000 $350.000 $489.250 $475.000 $503.500
RIPRAP (CONC)(CL B)
CY 0.700 $500.000 $2,247.050 $2,800.000 $7,600.000
RIPRAP (MOW STRIP)(4 IN)
CY 410.400 $570.000 $674.120 $527.000 $730.000
CLEANING AND SEALING EXISTING JOINTS
LF 239.500 $41.000 $68.970 $40.000 $42.000
RETROFIT RAIL (TY SSTR)
LF 2,846.000 $175.000 $115.200 $379.100 $287.000
MOBILIZATION
LS 1.000 $910,000.000 $910,000.000 $540,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $3,500.000 $8,100.000 $12,000.000 $1,700.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 140.000 $3.800 $4.630 $8.650 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 140.000 $1.000 $2.060 $6.500 $1.700
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 6,150.000 $40.000 $20.000 $35.000 $25.250
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 6,150.000 $9.500 $16.000 $7.100 $8.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 6,150.000 $9.500 $15.000 $9.650 $25.000
RUMBLE STRIPS (SHOULDER)
LF 168,816.000 $0.230 $0.110 $0.240 $0.190
RUMBLE STRIPS (CENTERLINE)
LF 84,408.000 $0.230 $0.110 $0.280 $0.220
MTL W-BEAM GD FEN (TIM POST)
LF 8,973.000 $28.000 $24.670 $24.260 $22.750
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $3,000.000 $1,684.050 $452.250 $2,064.000
REMOVE METAL BEAM GUARD FENCE
LF 9,273.000 $1.750 $2.060 $0.530 $3.250
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $220.000 $360.500 $146.850 $105.840
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,198.150 $3,298.740 $3,069.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $900.000 $1,545.000 $1,596.170 $3,069.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $850.000 $515.000 $851.290 $848.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,250.000 $8,966.150 $9,417.370 $9,313.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 1.000 $2,000.000 $1,905.500 $1,850.000 $1,958.000
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 1.000 $4,000.000 $8,029.880 $7,796.000 $8,251.000
CONDT (PVC) (SCH 40) (2")
LF 96.000 $20.000 $21.630 $21.000 $22.250
ELEC CONDR (NO.8) BARE
LF 96.000 $3.000 $2.830 $2.750 $3.000
ELEC CONDR (NO.8) INSULATED
LF 192.000 $3.000 $2.940 $2.850 $3.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $610.000 $654.050 $500.000 $628.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $700.000 $880.650 $680.000 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,300.000 $1,375.050 $1,135.000 $1,400.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 7.000 $400.000 $463.500 $345.000 $370.000
REMOVE SM RD SN SUP&AM
EA 15.000 $82.000 $61.800 $46.000 $95.250
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 182.000 $23.000 $22.660 $20.000 $15.900
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 188.000 $32.000 $30.900 $34.000 $28.580
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 441,906.000 $0.220 $0.330 $0.320 $0.340
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 839.000 $1.250 $0.710 $0.690 $0.730
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 11,395.000 $0.600 $0.720 $0.700 $0.740
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 530.000 $3.550 $15.450 $15.000 $16.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 51,690.000 $0.350 $0.340 $0.330 $0.350
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 58,137.000 $0.300 $0.340 $0.330 $0.350
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 534.000 $1.200 $1.490 $1.200 $0.480
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 14,742.000 $1.200 $1.490 $1.200 $0.480
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 353.000 $0.550 $0.930 $0.900 $0.950
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,335.000 $0.550 $0.930 $0.900 $0.950
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 216.000 $22.000 $16.480 $16.000 $17.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 14.000 $215.000 $226.600 $220.000 $232.000
PREFAB PAV MRK TY C (W) (WORD)
EA 14.000 $280.000 $293.550 $285.000 $301.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 30.000 $68.000 $21.630 $21.000 $22.250
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 1,178.000 $7.100 $9.270 $9.000 $9.500
REFL PAV MRKR TY I-C
EA 267.000 $4.500 $3.090 $3.000 $3.150
REFL PAV MRKR TY II-A-A
EA 2,034.000 $4.500 $3.090 $3.000 $3.150
D-GR HMA TY-D SAC-B PG70-22
TON 44,113.000 $119.000 $115.200 $118.240 $138.000
D-GR HMA TY-D SAC-B PG76-22
TON 1,549.000 $120.000 $138.780 $129.000 $165.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,200.000 $9,000.000 $10,200.000 $12,000.000
TMA (STATIONARY)
DAY 20.000 $250.000 $220.000 $218.000 $420.000
TMA (MOBILE OPERATION)
DAY 20.000 $300.000 $230.000 $568.000 $400.000
HPPM-RIB W/RET REQ TYI(W)4"(SLD)100MIL
LF 170,428.000 $0.650 $0.620 $0.600 $0.640
HPPM-RIB W/RET REQ TYI(Y)4"(BRK)100MIL
LF 20,079.000 $0.650 $0.820 $0.800 $0.850
HPPM-RIB W/RET REQ TYI(Y)4"(SLD)100MIL
LF 27,281.000 $0.650 $0.820 $0.800 $0.850
Totals: $10,070,391.970 $9,898,507.462 $10,415,256.480 $11,997,045.310