Show Job Controls
Bid Cobra

KARNES US 181 (0100-06-065)

Items: 60

County: KARNES
Length: N/A
Highway: US 181
District: CORPUS CHRISTI
Control Number: 0100-06-065
DBE Goal: N/A
Project: NH 2019(989)
Guaranty: N/A
Time: 204 WORKING DAYS
Engineer's Estimate: $15,175,931.95
Date: 06/04/2019 (7 years ago)
Contract Number: N/A
Type: PAVEMENT REPAIR AND STRUCTURAL OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$15,175,931.95
$15,738,942.45
Over/Under Est: 3.71% $563,010.50
Over/Under Est: 15.71% $2,384,558.22
Amt Left: 11.57% $1,821,547.72
Over/Under Est: 23.7% $3,597,375.20
Amt Left: 19.28% $3,034,364.70
Delta: -6.91% -$1,212,816.98

Bid Items & Bid Tabulations

60 Total 0 of 60
KARNES  |  US 181  |  CORPUS CHRISTI  |  0100-06-065  |  06/04/2019  |  $15,175,931.95  |  NH 2019(989)  |  PAVMT REPAIR AND STRUCTURAL OVERLAY  |  204 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANGEL BROTHERS HOLDINGS CORP.
HAAS-ANDERSON CONSTRUCTION, LTD.
REMOVING CONCRETE(MOW STRIP)
LF 5,050.000 $10.000 $7.800 $10.500 $9.800
BACKFILL (TY A OR B)
STA 1,294.000 $125.000 $94.650 $100.000 $168.000
ASPH (MULTI OPTION)
GAL 256,229.000 $3.000 $2.840 $3.600 $3.050
AGGR (MULTI OPTION)
CY 5,973.000 $65.000 $54.820 $50.000 $104.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 108,404.000 $105.000 $107.360 $125.000 $137.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 4,800.000 $30.000 $21.540 $31.500 $27.000
PLANE ASPH CONC PAV(0" TO 3")
SY 25,644.000 $2.000 $2.330 $2.500 $1.650
PLANE ASPH CONC PAV (3")
SY 77,653.000 $2.000 $2.330 $2.500 $2.450
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 20.000 $225.000 $250.000 $185.000 $168.000
RIPRAP (MOW STRIP)(4 IN)
CY 657.000 $500.000 $433.140 $475.000 $516.000
CLEANING AND SEALING EXISTING JOINTS
LF 800.000 $25.000 $27.580 $44.000 $34.000
CLEAN EXIST CULVERTS
EA 3.000 $2,000.000 $1,651.920 $2,700.000 $3,300.000
MOBILIZATION
LS 1.000 $700,000.000 $1,303,697.850 $900,000.000 $323,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,000.000 $2,503.650 $3,500.000 $1,470.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,960.000 $2.500 $2.300 $3.000 $2.550
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,960.000 $1.000 $1.050 $0.250 $1.200
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 3,700.000 $32.000 $24.090 $25.000 $74.000
RUMBLE STRIPS (SHOULDER)
LF 258,680.000 $0.150 $0.120 $0.220 $0.150
RUMBLE STRIPS (CENTERLINE)
LF 129,340.000 $0.150 $0.140 $0.350 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $25.000 $25.000 $21.000 $23.000
REMOVE METAL BEAM GUARD FENCE
LF 350.000 $3.000 $1.390 $2.000 $2.150
GUARDRAIL END TREATMENT (INSTALL)
EA 101.000 $3,000.000 $2,300.000 $2,260.000 $2,890.000
GUARDRAIL END TREATMENT (REMOVE)
EA 101.000 $300.000 $175.000 $100.000 $406.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 5.000 $775.000 $1,100.000 $750.000 $811.000
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 2.000 $3,300.000 $6,000.000 $3,800.000 $4,110.000
CONDT (PVC) (SCH 40) (2")
LF 455.000 $8.000 $12.150 $10.000 $11.000
ELEC CONDR (NO.12) INSULATED
LF 550.000 $1.250 $1.000 $1.500 $1.600
ELEC CONDR (NO.8) BARE
LF 1,675.000 $1.500 $1.100 $1.800 $1.950
ELEC CONDR (NO.8) INSULATED
LF 3,350.000 $1.500 $1.150 $1.800 $2.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $500.000 $1,450.000 $750.000 $811.000
ELC SRV TY A 120/240 060(NS)SS(E)GC(O)
EA 1.000 $6,000.000 $8,375.000 $6,250.000 $6,760.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 202.000 $25.000 $18.000 $8.000 $35.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 14,833.000 $0.250 $0.200 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 260,823.000 $0.250 $0.200 $0.270 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,469.000 $0.500 $0.450 $0.620 $0.650
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 9,868.000 $0.250 $0.200 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 244,978.000 $0.250 $0.200 $0.270 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8,900.000 $1.000 $1.490 $0.550 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 42,670.000 $1.000 $1.490 $0.550 $1.100
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 1,700.000 $0.350 $2.000 $0.320 $0.350
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 3,469.000 $0.500 $0.850 $0.650 $0.700
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 1,045.000 $1.500 $2.500 $1.350 $1.450
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 242.000 $5.000 $5.000 $2.700 $2.900
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 14,833.000 $0.250 $0.280 $0.300 $0.300
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 260,923.000 $0.200 $0.280 $0.270 $0.300
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 9,868.000 $0.200 $0.280 $0.300 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 244,978.000 $0.250 $0.280 $0.270 $0.300
PREFAB PAV MRK TY C (W) (ARROW)
EA 18.000 $175.000 $185.000 $185.000 $200.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 12.000 $430.000 $375.000 $525.000 $568.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $300.000 $245.000 $275.000 $297.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 24.000 $30.000 $25.000 $22.000 $24.000
REFL PAV MRKR TY I-C
EA 780.000 $3.000 $5.000 $3.500 $3.800
REFL PAV MRKR TY II-A-A
EA 4,533.000 $3.000 $5.000 $3.250 $3.500
REFL PAV MRKR TY II-C-R
EA 87.000 $3.000 $5.000 $3.500 $3.800
REMOVE CONDUCTOR
LF 2,805.000 $1.000 $0.700 $1.300 $1.400
REPLACE BREAKAWAY FUSE HOLDER
EA 5.000 $300.000 $135.000 $220.000 $238.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 180.000 $75.000 $61.890 $60.000 $65.000
CONDUIT (PREPARE)
LF 920.000 $5.000 $1.000 $2.500 $2.700
TMA (STATIONARY)
EA 2.000 $6,000.000 $7,735.740 $10,500.000 $100.000
TMA (MOBILE OPERATION)
DAY 90.000 $200.000 $309.430 $200.000 $10.000
Totals: $15,175,931.950 $15,738,942.450 $17,560,490.170 $18,773,307.150