PREPARING ROW
|
STA
|
255.500
|
$550.000
|
$373.840
|
$557.920
|
$200.000
|
$500.000
|
$1,140.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
30.000
|
$10.000
|
$16.650
|
$40.000
|
$25.000
|
$70.000
|
$18.250
|
|
|
REMOVING STAB BASE AND ASPH PAV(4"-16")
|
SY
|
1,592.000
|
$5.000
|
$4.560
|
$5.110
|
$15.000
|
$14.000
|
$7.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
61,960.000
|
$9.500
|
$8.940
|
$8.610
|
$8.500
|
$8.500
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
17,061.000
|
$10.000
|
$8.940
|
$10.320
|
$9.250
|
$18.000
|
$11.000
|
|
|
BLADING
|
HR
|
81.500
|
$100.000
|
$91.200
|
$75.250
|
$130.000
|
$120.000
|
$115.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
207,036.000
|
$0.400
|
$0.340
|
$0.330
|
$0.340
|
$0.320
|
$0.340
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
103,518.000
|
$0.300
|
$0.310
|
$0.260
|
$0.300
|
$0.240
|
$0.320
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
103,518.000
|
$0.300
|
$0.310
|
$0.260
|
$0.300
|
$0.240
|
$0.320
|
|
|
VEGETATIVE WATERING
|
MG
|
5,141.000
|
$18.000
|
$16.650
|
$3.000
|
$12.000
|
$30.000
|
$15.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
23,639.000
|
$1.000
|
$1.330
|
$2.150
|
$1.500
|
$1.400
|
$1.750
|
|
|
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
|
CY
|
17,937.000
|
$58.000
|
$61.580
|
$65.780
|
$77.500
|
$88.000
|
$86.000
|
|
|
CEMENT
|
TON
|
1,227.000
|
$160.000
|
$168.000
|
$160.000
|
$165.000
|
$184.000
|
$176.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(9")
|
SY
|
127,436.000
|
$1.600
|
$1.710
|
$1.510
|
$1.150
|
$2.900
|
$1.650
|
|
|
CEMENT TREAT(NEW BASE)(9")
|
SY
|
6,693.000
|
$1.600
|
$1.940
|
$1.510
|
$1.150
|
$2.900
|
$1.650
|
|
|
ASPH (RC-250)
|
GAL
|
26,824.000
|
$4.000
|
$3.950
|
$4.350
|
$3.750
|
$3.500
|
$4.950
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
990.000
|
$85.000
|
$69.460
|
$101.050
|
$115.000
|
$125.000
|
$150.000
|
|
|
ASPH(AC-15P, HFRS-2P OR CRS-2P)
|
GAL
|
50,967.000
|
$3.300
|
$3.620
|
$3.640
|
$3.250
|
$3.250
|
$4.000
|
|
|
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
|
CY
|
1,571.000
|
$85.000
|
$86.570
|
$87.550
|
$95.000
|
$140.000
|
$145.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,000.000
|
$35.000
|
$33.920
|
$39.020
|
$45.000
|
$36.000
|
$49.000
|
|
|
CEM STABIL BKFL
|
CY
|
150.000
|
$150.000
|
$220.500
|
$117.500
|
$200.000
|
$120.000
|
$158.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,893.000
|
$20.000
|
$30.000
|
$22.000
|
$15.000
|
$20.000
|
$29.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,004.000
|
$250.000
|
$241.290
|
$267.500
|
$400.000
|
$310.000
|
$227.000
|
|
|
CL C CONC (ABUT)
|
CY
|
65.400
|
$1,000.000
|
$1,312.480
|
$1,225.000
|
$2,500.000
|
$1,350.000
|
$1,520.000
|
|
|
CL C CONC (CAP)
|
CY
|
54.600
|
$1,200.000
|
$1,286.230
|
$1,275.000
|
$3,000.000
|
$1,400.000
|
$1,375.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
15.700
|
$1,000.000
|
$1,233.730
|
$850.000
|
$2,250.000
|
$960.000
|
$1,600.000
|
|
|
REINF CONC SLAB
|
SF
|
9,300.000
|
$20.000
|
$24.150
|
$22.000
|
$25.000
|
$24.000
|
$29.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,149.000
|
$145.000
|
$150.150
|
$157.500
|
$200.000
|
$180.000
|
$180.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
24.000
|
$500.000
|
$510.970
|
$485.000
|
$650.000
|
$520.000
|
$495.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
228.000
|
$500.000
|
$524.990
|
$490.000
|
$600.000
|
$550.000
|
$530.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
196.000
|
$150.000
|
$162.030
|
$165.000
|
$140.000
|
$185.000
|
$185.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
58.000
|
$520.000
|
$515.960
|
$475.000
|
$650.000
|
$500.000
|
$485.000
|
|
|
RAIL (TY T223)
|
LF
|
358.000
|
$100.000
|
$152.250
|
$135.000
|
$250.000
|
$150.000
|
$115.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
112.000
|
$100.000
|
$110.250
|
$119.270
|
$100.000
|
$135.000
|
$117.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
10.000
|
$600.000
|
$696.800
|
$694.820
|
$1,000.000
|
$750.000
|
$710.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
840.000
|
$65.000
|
$72.340
|
$66.470
|
$85.000
|
$75.000
|
$68.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
88.000
|
$75.000
|
$147.120
|
$82.700
|
$95.000
|
$92.000
|
$84.500
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
32.000
|
$175.000
|
$212.000
|
$185.490
|
$225.000
|
$190.000
|
$189.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
16.000
|
$175.000
|
$101.330
|
$84.220
|
$130.000
|
$95.000
|
$86.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
40.000
|
$200.000
|
$133.990
|
$115.570
|
$150.000
|
$130.000
|
$118.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
1.000
|
$8,000.000
|
$9,770.580
|
$7,750.000
|
$20,000.000
|
$8,800.000
|
$8,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
46.000
|
$1,200.000
|
$1,500.710
|
$1,249.920
|
$2,000.000
|
$1,400.000
|
$1,275.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$1,744.870
|
$1,231.720
|
$2,500.000
|
$1,400.000
|
$1,260.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$1,960.880
|
$1,231.720
|
$2,600.000
|
$1,400.000
|
$1,260.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$1,500.000
|
$1,961.280
|
$1,231.720
|
$2,400.000
|
$1,400.000
|
$1,260.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$2,000.000
|
$2,466.820
|
$3,500.000
|
$2,500.000
|
$4,000.000
|
$3,575.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$6,000.000
|
$8,614.460
|
$5,540.920
|
$8,000.000
|
$6,300.000
|
$5,660.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
8.000
|
$2,000.000
|
$2,248.240
|
$2,250.000
|
$3,000.000
|
$2,500.000
|
$2,300.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$2,000.000
|
$1,754.460
|
$1,125.000
|
$2,000.000
|
$1,400.000
|
$1,250.000
|
|
|
REMOV STR (PIPE)
|
LF
|
693.000
|
$20.000
|
$17.550
|
$12.260
|
$15.000
|
$14.000
|
$12.500
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$80,000.000
|
$62,999.140
|
$77,500.000
|
$100,000.000
|
$80,000.000
|
$90,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$922,000.000
|
$856,184.380
|
$1,165,744.690
|
$450,000.000
|
$1,250,000.000
|
$1,079,700.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$5,000.000
|
$3,489.130
|
$3,400.000
|
$10,000.000
|
$3,100.000
|
$19,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
400.000
|
$30.000
|
$34.990
|
$32.250
|
$35.000
|
$36.000
|
$35.750
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
400.000
|
$10.000
|
$12.590
|
$19.950
|
$13.000
|
$22.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$20.000
|
$24.470
|
$34.750
|
$25.000
|
$38.000
|
$30.650
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$5.000
|
$7.420
|
$26.250
|
$8.000
|
$30.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,258.000
|
$4.000
|
$4.050
|
$2.950
|
$4.000
|
$3.000
|
$3.060
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,258.000
|
$1.000
|
$0.820
|
$1.450
|
$1.000
|
$1.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
900.000
|
$6.000
|
$6.640
|
$10.000
|
$6.000
|
$11.000
|
$6.130
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
900.000
|
$1.750
|
$0.730
|
$1.900
|
$1.000
|
$2.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,055.000
|
$75.000
|
$21.720
|
$64.800
|
$75.000
|
$75.000
|
$60.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
14.000
|
$4,000.000
|
$1,000.000
|
$3,000.000
|
$7,500.000
|
$8,000.000
|
$5,500.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
870.000
|
$30.000
|
$18.370
|
$28.400
|
$80.000
|
$32.000
|
$30.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
630.000
|
$10.000
|
$7.350
|
$12.000
|
$20.000
|
$14.000
|
$9.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
870.000
|
$10.000
|
$14.700
|
$15.000
|
$30.000
|
$17.000
|
$20.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
106.000
|
$75.000
|
$94.640
|
$82.680
|
$150.000
|
$140.000
|
$90.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,213.000
|
$35.000
|
$30.660
|
$35.850
|
$30.000
|
$65.000
|
$50.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
50,450.000
|
$0.150
|
$0.160
|
$0.070
|
$0.200
|
$0.200
|
$0.160
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
24,950.000
|
$0.150
|
$0.160
|
$0.110
|
$0.300
|
$0.250
|
$0.230
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
750.000
|
$25.000
|
$22.560
|
$24.870
|
$25.000
|
$28.000
|
$27.600
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$1,823.790
|
$2,089.000
|
$2,500.000
|
$2,900.000
|
$2,655.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
750.000
|
$5.000
|
$1.020
|
$1.250
|
$2.000
|
$1.400
|
$1.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$2,664.010
|
$2,508.000
|
$3,000.000
|
$2,800.000
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$268.410
|
$350.000
|
$350.000
|
$400.000
|
$280.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,000.000
|
$1,500.000
|
$850.000
|
$1,000.000
|
$1,700.000
|
$965.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,100.000
|
$550.000
|
$750.000
|
$1,000.000
|
$1,130.000
|
$620.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,000.000
|
$8,120.000
|
$7,500.000
|
$15,000.000
|
$8,100.000
|
$8,975.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
13.000
|
$250.000
|
$175.000
|
$175.000
|
$250.000
|
$200.000
|
$178.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$300.000
|
$185.000
|
$185.000
|
$275.000
|
$210.000
|
$188.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$600.000
|
$525.000
|
$525.000
|
$600.000
|
$590.000
|
$536.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
12.000
|
$525.000
|
$700.000
|
$700.000
|
$800.000
|
$790.000
|
$715.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
4.000
|
$650.000
|
$850.000
|
$850.000
|
$1,000.000
|
$960.000
|
$868.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
13.000
|
$675.000
|
$775.000
|
$775.000
|
$900.000
|
$870.000
|
$790.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$850.000
|
$950.000
|
$950.000
|
$1,200.000
|
$1,070.000
|
$970.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$900.000
|
$1,300.000
|
$1,300.000
|
$1,500.000
|
$1,460.000
|
$1,325.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
2.000
|
$800.000
|
$575.000
|
$575.000
|
$600.000
|
$650.000
|
$585.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
36.000
|
$70.000
|
$70.000
|
$70.000
|
$100.000
|
$80.000
|
$71.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
39.000
|
$200.000
|
$125.000
|
$125.000
|
$500.000
|
$140.000
|
$127.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$20.000
|
$18.000
|
$18.000
|
$50.000
|
$20.000
|
$18.400
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
16.000
|
$20.000
|
$15.000
|
$15.000
|
$50.000
|
$17.000
|
$15.300
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
20.000
|
$27.000
|
$35.000
|
$35.000
|
$50.000
|
$40.000
|
$35.750
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
16.000
|
$120.000
|
$85.000
|
$85.000
|
$100.000
|
$96.000
|
$86.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
16.000
|
$75.000
|
$90.000
|
$90.000
|
$150.000
|
$100.000
|
$91.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
50,900.000
|
$0.300
|
$0.240
|
$0.240
|
$0.500
|
$0.400
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
162,800.000
|
$0.300
|
$0.240
|
$0.240
|
$0.390
|
$0.400
|
$0.250
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
6,820.000
|
$0.700
|
$0.630
|
$0.630
|
$0.560
|
$0.600
|
$0.640
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$8.000
|
$12.000
|
$12.000
|
$15.000
|
$16.000
|
$12.260
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
12,000.000
|
$0.750
|
$0.630
|
$0.630
|
$0.750
|
$0.600
|
$0.640
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
8,127.000
|
$1.750
|
$1.470
|
$0.940
|
$2.000
|
$1.250
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
610.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$0.850
|
$1.020
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
50,890.000
|
$0.300
|
$0.400
|
$0.400
|
$0.500
|
$0.400
|
$0.410
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
4,420.000
|
$0.300
|
$0.440
|
$0.440
|
$0.500
|
$0.400
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
28,344.000
|
$0.300
|
$0.410
|
$0.410
|
$0.500
|
$0.400
|
$0.420
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
18.000
|
$12.000
|
$25.000
|
$25.000
|
$20.000
|
$16.000
|
$25.540
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$250.000
|
$250.000
|
$250.000
|
$300.000
|
$250.000
|
$255.390
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
4.000
|
$300.000
|
$250.000
|
$250.000
|
$350.000
|
$280.000
|
$255.390
|
|
REFL PAV MRKR TY I-C
|
EA
|
37.000
|
$3.000
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
$6.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
770.000
|
$3.500
|
$3.770
|
$3.770
|
$6.000
|
$4.500
|
$3.850
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
16,800.000
|
$1.000
|
$0.470
|
$0.470
|
$2.000
|
$0.600
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
155.000
|
$0.100
|
$3.000
|
$3.000
|
$1.000
|
$1.000
|
$3.060
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
0.430
|
$20,000.000
|
$2,100.000
|
$23,700.000
|
$50,000.000
|
$26,800.000
|
$5,000.000
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
36,760.000
|
$75.000
|
$74.190
|
$74.900
|
$81.000
|
$85.000
|
$86.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
14,411.000
|
$80.000
|
$84.690
|
$87.190
|
$96.000
|
$97.000
|
$98.000
|
|
|
TACK COAT
|
GAL
|
21,378.000
|
$3.000
|
$3.170
|
$2.220
|
$3.500
|
$3.000
|
$3.240
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
4.000
|
$400.000
|
$150.000
|
$113.400
|
$500.000
|
$130.000
|
$340.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$7,500.000
|
$20,000.000
|
$25,000.000
|
$33,200.000
|
$12,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$300.000
|
$350.000
|
$300.000
|
$375.000
|
$175.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$75.000
|
$100.000
|
$20.000
|
$25.000
|
$40.000
|
$55.000
|
|
Totals: |
$10,169,972.650
|
$10,110,262.661
|
$10,597,660.915
|
$11,344,455.590
|
$12,564,247.960
|
$12,743,656.820
|