Bid Cobra

GOLIAD SH 239 (0516-02-031)

Items: 119

County: GOLIAD
Length: N/A
Highway: SH 239
District: CORPUS CHRISTI
Control Number: 0516-02-031
DBE Goal: N/A
Project: F 2022(257)
Guaranty: N/A
Time: 225 WORKING DAYS
Engineer's Estimate: $10,169,972.65
Date: 01/07/2022 (4 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$10,169,972.65
$10,110,262.65
Over/Under Est: -0.59% -$59,710.00
$10,597,660.91
Over/Under Est: 4.21% $427,688.26
Amt Left: 4.82% $487,398.26
$11,344,455.59
Over/Under Est: 11.55% $1,174,482.94
Amt Left: 12.21% $1,234,192.94
Delta: -7.05% -$746,794.68
Over/Under Est: 23.54% $2,394,275.31
Amt Left: 24.27% $2,453,985.31
Delta: -10.75% -$1,219,792.37
Over/Under Est: 25.31% $2,573,684.17
Amt Left: 26.05% $2,633,394.17
Delta: -1.43% -$179,408.86
Subcontractor Percentage Amount
LISKA CONSTRUCTION COMPANY, INC. 12.47% $1,269,668.44
TERRA CONSTRUCTION LLC 3.78% $384,871.43
TEXAS GUARDRAIL CONTRACTORS LLC 2.53% $257,599.13
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 2.09% $212,799.28
FLASHER EQUIPMENT COMPANY 1.10% $111,999.62
DIIBS SPECIALISTS, LLC 0.41% $41,745.31
HIGHWAY BARRICADES AND SERVICES, LLC 0.41% $41,745.31
EGGEMEYER LAND CLEARING, LLC 0.28% $28,508.99
BARRICADES UNLIMITED 0.19% $19,345.39
SURFACE PREPARATION TECHNOLOGIES, LLC 0.13% $13,236.32
TORO BRAVO CONSTRUCTION, LLC 0.00% $0.00
M & D FOUNDATION DRILLING INDUSTRIES, INC. 0.00% $0.00
Total: 23.39% $2,381,519.22

Bid Items & Bid Tabulations

119 Total 0 of 119
GOLIAD  |  SH 239  |  CORPUS CHRISTI  |  0516-02-031  |  01/07/2022  |  $10,169,972.65  |  F 2022(257)  |  REHAB EXIST ROADWAY  |  225 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
FARIS INDUSTRIES, INC.
CK NEWBERRY, LLC
ANDERSON COLUMBIA CO., INC.
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 255.500 $550.000 $373.840 $557.920 $200.000 $500.000 $1,140.000
REMOVING CONC (RIPRAP)
SY 30.000 $10.000 $16.650 $40.000 $25.000 $70.000 $18.250
REMOVING STAB BASE AND ASPH PAV(4"-16")
SY 1,592.000 $5.000 $4.560 $5.110 $15.000 $14.000 $7.000
EXCAVATION (ROADWAY)
CY 61,960.000 $9.500 $8.940 $8.610 $8.500 $8.500 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 17,061.000 $10.000 $8.940 $10.320 $9.250 $18.000 $11.000
BLADING
HR 81.500 $100.000 $91.200 $75.250 $130.000 $120.000 $115.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 207,036.000 $0.400 $0.340 $0.330 $0.340 $0.320 $0.340
CELL FBR MLCH SEED(TEMP)(WARM)
SY 103,518.000 $0.300 $0.310 $0.260 $0.300 $0.240 $0.320
CELL FBR MLCH SEED(TEMP)(COOL)
SY 103,518.000 $0.300 $0.310 $0.260 $0.300 $0.240 $0.320
VEGETATIVE WATERING
MG 5,141.000 $18.000 $16.650 $3.000 $12.000 $30.000 $15.000
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 23,639.000 $1.000 $1.330 $2.150 $1.500 $1.400 $1.750
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
CY 17,937.000 $58.000 $61.580 $65.780 $77.500 $88.000 $86.000
CEMENT
TON 1,227.000 $160.000 $168.000 $160.000 $165.000 $184.000 $176.000
CEMENT TREAT (MX EXST MTL & NW BS)(9")
SY 127,436.000 $1.600 $1.710 $1.510 $1.150 $2.900 $1.650
CEMENT TREAT(NEW BASE)(9")
SY 6,693.000 $1.600 $1.940 $1.510 $1.150 $2.900 $1.650
ASPH (RC-250)
GAL 26,824.000 $4.000 $3.950 $4.350 $3.750 $3.500 $4.950
AGGR(TY-B GR-5 SAC-B)
CY 990.000 $85.000 $69.460 $101.050 $115.000 $125.000 $150.000
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 50,967.000 $3.300 $3.620 $3.640 $3.250 $3.250 $4.000
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
CY 1,571.000 $85.000 $86.570 $87.550 $95.000 $140.000 $145.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,000.000 $35.000 $33.920 $39.020 $45.000 $36.000 $49.000
CEM STABIL BKFL
CY 150.000 $150.000 $220.500 $117.500 $200.000 $120.000 $158.000
TEMPORARY SPL SHORING
SF 1,893.000 $20.000 $30.000 $22.000 $15.000 $20.000 $29.000
DRILL SHAFT (36 IN)
LF 1,004.000 $250.000 $241.290 $267.500 $400.000 $310.000 $227.000
CL C CONC (ABUT)
CY 65.400 $1,000.000 $1,312.480 $1,225.000 $2,500.000 $1,350.000 $1,520.000
CL C CONC (CAP)
CY 54.600 $1,200.000 $1,286.230 $1,275.000 $3,000.000 $1,400.000 $1,375.000
CL C CONC (COLUMN)
CY 15.700 $1,000.000 $1,233.730 $850.000 $2,250.000 $960.000 $1,600.000
REINF CONC SLAB
SF 9,300.000 $20.000 $24.150 $22.000 $25.000 $24.000 $29.000
PRESTR CONC GIRDER (TX28)
LF 1,149.000 $145.000 $150.150 $157.500 $200.000 $180.000 $180.000
RIPRAP (CONC)(5 IN)
CY 24.000 $500.000 $510.970 $485.000 $650.000 $520.000 $495.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 228.000 $500.000 $524.990 $490.000 $600.000 $550.000 $530.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 196.000 $150.000 $162.030 $165.000 $140.000 $185.000 $185.000
RIPRAP (MOW STRIP)(4 IN)
CY 58.000 $520.000 $515.960 $475.000 $650.000 $500.000 $485.000
RAIL (TY T223)
LF 358.000 $100.000 $152.250 $135.000 $250.000 $150.000 $115.000
ARMOR JOINT (SEALED)
LF 112.000 $100.000 $110.250 $119.270 $100.000 $135.000 $117.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 10.000 $600.000 $696.800 $694.820 $1,000.000 $750.000 $710.000
RC PIPE (CL III)(18 IN)
LF 840.000 $65.000 $72.340 $66.470 $85.000 $75.000 $68.000
RC PIPE (CL III)(24 IN)
LF 88.000 $75.000 $147.120 $82.700 $95.000 $92.000 $84.500
RC PIPE (CL III)(42 IN)
LF 32.000 $175.000 $212.000 $185.490 $225.000 $190.000 $189.000
RC PIPE (CL IV)(24 IN)
LF 16.000 $175.000 $101.330 $84.220 $130.000 $95.000 $86.000
RC PIPE (CL IV)(30 IN)
LF 40.000 $200.000 $133.990 $115.570 $150.000 $130.000 $118.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
EA 1.000 $8,000.000 $9,770.580 $7,750.000 $20,000.000 $8,800.000 $8,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 46.000 $1,200.000 $1,500.710 $1,249.920 $2,000.000 $1,400.000 $1,275.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,500.000 $1,744.870 $1,231.720 $2,500.000 $1,400.000 $1,260.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $1,500.000 $1,960.880 $1,231.720 $2,600.000 $1,400.000 $1,260.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 16.000 $1,500.000 $1,961.280 $1,231.720 $2,400.000 $1,400.000 $1,260.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 10.000 $2,000.000 $2,466.820 $3,500.000 $2,500.000 $4,000.000 $3,575.000
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 2.000 $6,000.000 $8,614.460 $5,540.920 $8,000.000 $6,300.000 $5,660.000
CLEAN EXIST CULVERTS
EA 8.000 $2,000.000 $2,248.240 $2,250.000 $3,000.000 $2,500.000 $2,300.000
REMOV STR (WINGWALL)
EA 1.000 $2,000.000 $1,754.460 $1,125.000 $2,000.000 $1,400.000 $1,250.000
REMOV STR (PIPE)
LF 693.000 $20.000 $17.550 $12.260 $15.000 $14.000 $12.500
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $80,000.000 $62,999.140 $77,500.000 $100,000.000 $80,000.000 $90,000.000
MOBILIZATION
LS 1.000 $922,000.000 $856,184.380 $1,165,744.690 $450,000.000 $1,250,000.000 $1,079,700.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $5,000.000 $3,489.130 $3,400.000 $10,000.000 $3,100.000 $19,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 400.000 $30.000 $34.990 $32.250 $35.000 $36.000 $35.750
ROCK FILTER DAMS (REMOVE)
LF 400.000 $10.000 $12.590 $19.950 $13.000 $22.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $20.000 $24.470 $34.750 $25.000 $38.000 $30.650
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $5.000 $7.420 $26.250 $8.000 $30.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,258.000 $4.000 $4.050 $2.950 $4.000 $3.000 $3.060
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,258.000 $1.000 $0.820 $1.450 $1.000 $1.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 900.000 $6.000 $6.640 $10.000 $6.000 $11.000 $6.130
BIODEG EROSN CONT LOGS (REMOVE)
LF 900.000 $1.750 $0.730 $1.900 $1.000 $2.000 $1.000
CONSTRUCTING DETOURS
SY 1,055.000 $75.000 $21.720 $64.800 $75.000 $75.000 $60.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 14.000 $4,000.000 $1,000.000 $3,000.000 $7,500.000 $8,000.000 $5,500.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 870.000 $30.000 $18.370 $28.400 $80.000 $32.000 $30.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 630.000 $10.000 $7.350 $12.000 $20.000 $14.000 $9.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 870.000 $10.000 $14.700 $15.000 $30.000 $17.000 $20.000
DRIVEWAYS (CONC)
SY 106.000 $75.000 $94.640 $82.680 $150.000 $140.000 $90.000
DRIVEWAYS (ACP)
SY 3,213.000 $35.000 $30.660 $35.850 $30.000 $65.000 $50.000
RUMBLE STRIPS (SHOULDER)
LF 50,450.000 $0.150 $0.160 $0.070 $0.200 $0.200 $0.160
RUMBLE STRIPS (CENTERLINE)
LF 24,950.000 $0.150 $0.160 $0.110 $0.300 $0.250 $0.230
MTL W-BEAM GD FEN (TIM POST)
LF 750.000 $25.000 $22.560 $24.870 $25.000 $28.000 $27.600
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,823.790 $2,089.000 $2,500.000 $2,900.000 $2,655.000
REMOVE METAL BEAM GUARD FENCE
LF 750.000 $5.000 $1.020 $1.250 $2.000 $1.400 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $2,664.010 $2,508.000 $3,000.000 $2,800.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $268.410 $350.000 $350.000 $400.000 $280.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $1,500.000 $850.000 $1,000.000 $1,700.000 $965.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,100.000 $550.000 $750.000 $1,000.000 $1,130.000 $620.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,000.000 $8,120.000 $7,500.000 $15,000.000 $8,100.000 $8,975.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 13.000 $250.000 $175.000 $175.000 $250.000 $200.000 $178.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $300.000 $185.000 $185.000 $275.000 $210.000 $188.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $600.000 $525.000 $525.000 $600.000 $590.000 $536.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 12.000 $525.000 $700.000 $700.000 $800.000 $790.000 $715.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 4.000 $650.000 $850.000 $850.000 $1,000.000 $960.000 $868.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 13.000 $675.000 $775.000 $775.000 $900.000 $870.000 $790.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $850.000 $950.000 $950.000 $1,200.000 $1,070.000 $970.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $900.000 $1,300.000 $1,300.000 $1,500.000 $1,460.000 $1,325.000
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000 $800.000 $575.000 $575.000 $600.000 $650.000 $585.000
REMOVE SM RD SN SUP&AM
EA 36.000 $70.000 $70.000 $70.000 $100.000 $80.000 $71.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 39.000 $200.000 $125.000 $125.000 $500.000 $140.000 $127.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $20.000 $18.000 $18.000 $50.000 $20.000 $18.400
REMOVE DELIN & OBJECT MARKER ASSMS
EA 16.000 $20.000 $15.000 $15.000 $50.000 $17.000 $15.300
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $27.000 $35.000 $35.000 $50.000 $40.000 $35.750
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 16.000 $120.000 $85.000 $85.000 $100.000 $96.000 $86.500
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 16.000 $75.000 $90.000 $90.000 $150.000 $100.000 $91.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 50,900.000 $0.300 $0.240 $0.240 $0.500 $0.400 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 162,800.000 $0.300 $0.240 $0.240 $0.390 $0.400 $0.250
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 6,820.000 $0.700 $0.630 $0.630 $0.560 $0.600 $0.640
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $8.000 $12.000 $12.000 $15.000 $16.000 $12.260
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 12,000.000 $0.750 $0.630 $0.630 $0.750 $0.600 $0.640
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 8,127.000 $1.750 $1.470 $0.940 $2.000 $1.250 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 610.000 $1.000 $1.000 $1.000 $1.000 $0.850 $1.020
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 50,890.000 $0.300 $0.400 $0.400 $0.500 $0.400 $0.410
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 4,420.000 $0.300 $0.440 $0.440 $0.500 $0.400 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 28,344.000 $0.300 $0.410 $0.410 $0.500 $0.400 $0.420
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 18.000 $12.000 $25.000 $25.000 $20.000 $16.000 $25.540
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $250.000 $250.000 $250.000 $300.000 $250.000 $255.390
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $300.000 $250.000 $250.000 $350.000 $280.000 $255.390
REFL PAV MRKR TY I-C
EA 37.000 $3.000 $6.000 $6.000 $6.000 $6.000 $6.100
REFL PAV MRKR TY II-A-A
EA 770.000 $3.500 $3.770 $3.770 $6.000 $4.500 $3.850
ELIM EXT PAV MRK & MRKS (4")
LF 16,800.000 $1.000 $0.470 $0.470 $2.000 $0.600 $0.500
PAV SURF PREP FOR MRK (4")
LF 155.000 $0.100 $3.000 $3.000 $1.000 $1.000 $3.060
TREE AND BRUSH REMOVAL
AC 0.430 $20,000.000 $2,100.000 $23,700.000 $50,000.000 $26,800.000 $5,000.000
D-GR HMA TY-B SAC-B PG64-22
TON 36,760.000 $75.000 $74.190 $74.900 $81.000 $85.000 $86.000
D-GR HMA TY-D SAC-B PG70-22
TON 14,411.000 $80.000 $84.690 $87.190 $96.000 $97.000 $98.000
TACK COAT
GAL 21,378.000 $3.000 $3.170 $2.220 $3.500 $3.000 $3.240
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 4.000 $400.000 $150.000 $113.400 $500.000 $130.000 $340.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $7,500.000 $20,000.000 $25,000.000 $33,200.000 $12,500.000
TMA (STATIONARY)
DAY 40.000 $300.000 $350.000 $300.000 $375.000 $175.000 $400.000
TMA (MOBILE OPERATION)
HR 120.000 $75.000 $100.000 $20.000 $25.000 $40.000 $55.000
Totals: $10,169,972.650 $10,110,262.661 $10,597,660.915 $11,344,455.590 $12,564,247.960 $12,743,656.820