Show Job Controls
Bid Cobra

GONZALES FM 108 (0715-01-022)

Items: 120

County: GONZALES
Length: N/A
Highway: FM 108
District: YOAKUM
Control Number: 0715-01-022
DBE Goal: N/A
Project: STP 1902(298)HES
Guaranty: N/A
Time: 250 WORKING DAYS
Engineer's Estimate: $13,561,434.75
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: SAFETY TREAT FIXED OBJECTS,ETC.
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$13,561,434.75
$12,569,349.99
Over/Under Est: -7.32% -$992,084.76
$13,512,161.85
Over/Under Est: -0.36% -$49,272.90
Amt Left: 7.5% $942,811.86
Over/Under Est: 8.73% $1,184,030.35
Amt Left: 17.31% $2,176,115.11
Delta: -9.13% -$1,233,303.25
Subcontractor Percentage Amount
RELMCO, INC. 14.29% $1,831,439.37
HILL COUNTRY BRIDGE, INC. 4.17% $534,436.82
INTERSTATE BARRICADES & MARKINGS, INC. 1.49% $190,961.84
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.89% $114,064.45
VOGES DRILLING CO. 0.83% $106,374.72
BEAVER BOYS SERVICES 0.59% $75,615.76
HEMPHILL WBE PILE DRIVING CO. 0.56% $71,770.89
AREA WIDE PROTECTIVE, INC. 0.19% $24,350.84
MURRAY CONSTRUCTION 0.18% $23,069.22
PRIMATE CONSTRUCTION, LP 0.05% $6,408.12
Total: 23.24% $2,978,492.03

Bid Items & Bid Tabulations

120 Total 0 of 120
GONZALES  |  FM 108  |  YOAKUM  |  0715-01-022  |  08/07/2019  |  $13,561,434.75  |  STP 1902(298)HES  |  SAFETY TREAT FIXED OBJECTS,ETC.  |  250 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
DEAN WORD COMPANY, LTD.
ANGEL BROTHERS HOLDINGS CORP.
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 43.000 $600.000 $1,431.000 $1,029.600 $2,000.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 11.000 $1,900.000 $2,481.000 $3,276.000 $4,300.000
EXCAVATION (ROADWAY)
CY 7,718.000 $15.000 $19.980 $12.249 $14.500
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 15,017.000 $15.000 $18.930 $14.777 $23.750
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 12.000 $15.000 $192.720 $54.550 $145.000
BLADING
HR 25.000 $100.000 $102.600 $111.000 $110.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 95.000 $850.000 $556.660 $578.926 $650.000
DRILL SEEDING (TEMP) (WARM)
AC 24.000 $850.000 $439.640 $457.226 $500.000
DRILL SEEDING (TEMP) (COOL)
AC 24.000 $850.000 $439.640 $457.226 $500.000
VEGETATIVE WATERING
MG 1,290.000 $15.000 $27.690 $18.519 $18.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 49,283.000 $70.000 $58.290 $55.601 $57.850
FL BS (RDWY DEL) (TY E GR 1-2)
TON 60,002.000 $32.000 $27.180 $25.979 $25.500
RWRK BS MTL(TY C)(6")(ORD CMP)(ORG POS)
CY 21,958.000 $7.000 $9.120 $10.802 $9.520
CEMENT
TON 3,685.000 $150.000 $147.000 $147.680 $146.000
CEMENT TREAT(EXIST MATL)(8")
SY 221,773.000 $2.000 $2.050 $1.706 $1.950
ASPH (RC-250)
GAL 44,354.000 $4.000 $3.950 $4.114 $4.100
AGGR(TY-E GR-5 SAC-B)
CY 1,584.000 $85.000 $73.120 $82.280 $111.000
AGGR(TY-PE GR-3 SAC-B)
CY 2,609.000 $85.000 $88.230 $88.971 $111.000
AGGR(TY-PE GR-4 SAC-B)
CY 1,784.000 $85.000 $88.240 $87.637 $124.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 167,559.000 $4.000 $3.420 $3.359 $3.380
D-GR HMA TY-B PG70-22
TON 4,461.000 $80.000 $77.580 $81.739 $77.000
D-GR HMA TY-D SAC-B PG70-22
TON 1,115.000 $85.000 $89.490 $78.119 $94.000
CEM STABIL BKFL
CY 482.000 $135.000 $152.330 $150.800 $165.000
CUT & RESTORING PAV
SY 214.000 $100.000 $63.000 $208.000 $58.000
TEMPORARY SPL SHORING
SF 2,887.000 $16.000 $26.250 $41.600 $85.000
DRILL SHAFT (24 IN)
LF 890.000 $150.000 $185.050 $183.300 $208.000
CL C CONC (ABUT)
CY 31.600 $1,000.000 $1,128.660 $1,118.000 $1,640.000
CL C CONC (CAP)
CY 22.600 $1,000.000 $1,417.390 $1,404.000 $1,740.000
CL C CONC (COLUMN)
CY 8.100 $1,000.000 $1,548.630 $1,534.000 $2,580.000
CL C CONC (RAC-R)
CY 16.000 $1,000.000 $1,262.530 $2,912.000 $1,200.000
REINF CONC SLAB (SLAB BEAM)
SF 4,170.000 $17.000 $28.240 $27.976 $27.000
PRESTR CONC SLAB BEAM (4SB12)
LF 354.000 $175.000 $185.310 $183.560 $200.000
PRESTR CONC SLAB BEAM (5SB12)
LF 531.000 $180.000 $185.310 $183.560 $215.000
RIPRAP (CONC)(5 IN)
CY 105.200 $450.000 $446.220 $520.000 $525.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 251.600 $145.000 $131.900 $171.530 $170.000
RIPRAP (CONC)(DISSIPATER)
CY 10.900 $500.000 $634.680 $676.000 $815.000
RAIL (TY T223)
LF 1,018.000 $95.000 $120.740 $119.600 $104.500
ARMOR JOINT (SEALED)
LF 90.000 $80.000 $80.840 $80.080 $94.000
CMP (GAL STL 18 IN)
LF 48.000 $75.000 $58.690 $62.400 $130.000
CMP (GAL STL 24 IN)
LF 8.000 $90.000 $121.480 $208.000 $132.000
CMP (GAL STL 15 IN)
LF 9.000 $65.000 $111.920 $208.000 $124.000
CONC BOX CULV (8 FT X 5 FT)
LF 224.000 $775.000 $659.240 $1,040.000 $765.000
CONC BOX CULV (10 FT X 7 FT)
LF 141.000 $900.000 $713.840 $1,300.000 $1,200.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 81.000 $600.000 $215.650 $806.000 $860.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 476.000 $550.000 $606.010 $832.000 $865.000
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
LF 64.000 $750.000 $685.180 $936.000 $1,150.000
CONC BOX CULV (9 FT X 5 FT)(EXTEND)
LF 233.000 $800.000 $574.620 $1,248.000 $1,790.000
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 26.000 $550.000 $600.550 $728.000 $1,025.000
CONC BOX CULV (4 FT X 1.5 FT)(EXTEND)
LF 8.000 $350.000 $1,091.920 $624.000 $980.000
RC PIPE (CL III)(12 IN)
LF 4.000 $55.000 $129.670 $197.600 $374.000
RC PIPE (CL III)(15 IN)
LF 9.000 $75.000 $129.670 $208.000 $313.000
RC PIPE (CL III)(18 IN)
LF 957.000 $85.000 $54.320 $62.400 $105.000
RC PIPE (CL III)(24 IN)
LF 63.000 $95.000 $66.880 $114.400 $185.000
WINGWALL (FW - 0) (HW=8 FT)
EA 2.000 $17,000.000 $11,028.360 $18,720.000 $42,300.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $22,000.000 $15,054.800 $20,800.000 $42,300.000
WINGWALL (PW - 2) (HW=6 FT)
EA 1.000 $15,000.000 $21,933.870 $36,400.000 $48,000.000
WINGWALL (SW - 0) (HW=7 FT)
EA 2.000 $13,000.000 $16,487.940 $12,480.000 $21,500.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $5,500.000 $4,913.620 $6,760.000 $18,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 1.000 $6,000.000 $5,596.070 $7,280.000 $18,800.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
EA 4.000 $7,100.000 $4,094.690 $8,320.000 $4,400.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 6.000 $7,300.000 $4,367.670 $9,880.000 $8,900.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 24.000 $8,500.000 $4,367.670 $12,480.000 $6,650.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
EA 6.000 $9,000.000 $6,551.500 $13,520.000 $6,650.000
SET (TY I)(S= 7 FT)(HW= 7 FT)(3:1) (C)
EA 4.000 $8,000.000 $6,415.010 $14,560.000 $12,850.000
SET (TY I)(S= 9 FT)(HW= 6 FT)(3:1) (C)
EA 4.000 $13,000.000 $6,687.990 $15,600.000 $12,300.000
SET (TY II) (12 IN) (RCP) (3: 1) (C)
EA 4.000 $900.000 $1,049.920 $780.000 $1,100.000
SET (TY II) (15 IN) (CMP) (6: 1) (P)
EA 2.000 $1,200.000 $1,049.920 $832.000 $1,060.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 2.000 $1,250.000 $1,102.420 $832.000 $1,120.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 20.000 $1,350.000 $1,102.420 $936.000 $1,170.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 7.000 $1,300.000 $1,102.420 $832.000 $1,200.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 15.000 $1,350.000 $1,102.420 $884.000 $1,200.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 64.000 $1,400.000 $1,102.420 $988.000 $1,350.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000 $1,550.000 $1,154.910 $1,248.000 $1,350.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 10.000 $1,600.000 $1,154.910 $988.000 $1,600.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,650.000 $1,154.910 $1,248.000 $1,600.000
REMOV STR (BOX CULVERT)
EA 3.000 $9,000.000 $15,748.800 $20,800.000 $25,000.000
REMOV STR (PIPE)
LF 29.000 $20.000 $83.990 $31.200 $1,500.000
MOBILIZATION
LS 1.000 $1,100,000.000 $1,245,930.350 $1,471,013.420 $1,669,800.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $3,500.000 $3,500.000 $4,383.365 $14,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 460.000 $30.000 $33.860 $35.984 $39.000
ROCK FILTER DAMS (REMOVE)
LF 460.000 $10.000 $8.380 $8.154 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,100.000 $3.000 $5.610 $3.640 $3.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,100.000 $1.000 $1.020 $0.572 $0.500
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 14.000 $5,500.000 $2,624.800 $2,453.000 $3,300.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 1,560.000 $30.000 $25.520 $23.540 $31.500
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 1,560.000 $10.000 $10.360 $12.840 $11.000
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 1,560.000 $15.000 $15.560 $21.400 $14.000
DRIVEWAYS (CONC)
SY 263.000 $75.000 $68.240 $130.000 $125.000
DRIVEWAYS (SURF TREAT)
SY 4,965.000 $25.000 $35.040 $18.629 $36.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,500.000 $25.000 $22.090 $22.277 $21.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $1,900.000 $1,867.470 $1,791.440 $2,150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $2,600.000 $2,457.300 $2,478.320 $2,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 8.000 $1,300.000 $732.140 $738.400 $1,100.000
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $1,200.000 $500.120 $504.400 $670.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 8.000 $10,000.000 $6,857.350 $6,916.000 $9,175.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 4.000 $300.000 $375.000 $390.000 $415.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 8.000 $250.000 $115.000 $119.600 $128.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 2.000 $275.000 $150.000 $156.000 $166.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $580.000 $385.000 $400.400 $428.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $600.000 $515.000 $535.600 $570.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 30.000 $400.000 $270.000 $280.800 $300.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 3.000 $450.000 $340.000 $353.600 $375.000
REMOVE SM RD SN SUP&AM
EA 38.000 $75.000 $55.000 $57.200 $60.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
EA 12.000 $50.000 $52.000 $54.080 $58.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 48.000 $65.000 $55.000 $57.200 $61.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 56.000 $75.000 $56.000 $58.240 $62.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 54.000 $45.000 $10.000 $10.400 $11.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 220,250.000 $0.250 $0.260 $0.270 $0.240
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 27,006.000 $0.250 $0.260 $0.291 $0.240
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 231,950.000 $0.250 $0.260 $0.270 $0.240
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 144.000 $3.000 $10.270 $6.240 $6.670
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 480.000 $5.000 $5.130 $3.921 $3.890
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 32,415.000 $2.000 $1.780 $1.255 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 108,025.000 $0.450 $0.260 $0.374 $0.390
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 45,925.000 $0.700 $0.260 $0.666 $0.670
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 44,195.000 $0.700 $0.260 $0.666 $0.670
REFL PAV MRKR TY II-A-A
EA 2,483.000 $3.000 $5.130 $3.921 $3.900
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $7,690.840 $17,120.000 $13,500.000
TMA (STATIONARY)
EA 2.000 $8,000.000 $7,690.840 $17,120.000 $20,000.000
TMA (MOBILE OPERATION)
DAY 150.000 $500.000 $307.630 $508.250 $395.000
Totals: $13,561,434.750 $12,569,350.009 $13,512,161.964 $14,745,465.100