Show Job Controls
Bid Cobra

REFUGIO SH 35 (0180-02-041)

Items: 85

County: REFUGIO
Length: N/A
Highway: SH 35
District: CORPUS CHRISTI
Control Number: 0180-02-041
DBE Goal: N/A
Project: C 180-2-41
Guaranty: N/A
Time: 129 WORKING DAYS
Engineer's Estimate: $5,718,658.02
Date: 02/05/2021 (5 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (7)
E
Engineer's Estimate
$5,718,658.02
$4,992,797.77
Over/Under Est: -12.69% -$725,860.25
Over/Under Est: -4.91% -$281,005.11
Amt Left: 8.91% $444,855.14
$5,949,871.83
Over/Under Est: 4.04% $231,213.81
Amt Left: 19.17% $957,074.06
Delta: -9.42% -$512,218.92
Over/Under Est: 4.31% $246,455.16
Amt Left: 19.47% $972,315.41
Delta: -0.26% -$15,241.35
Over/Under Est: 4.69% $267,985.92
Amt Left: 19.91% $993,846.17
Delta: -0.36% -$21,530.76
Over/Under Est: 5.17% $295,595.20
Amt Left: 20.46% $1,021,455.45
Delta: -0.46% -$27,609.28
Over/Under Est: 8.51% $486,885.57
Amt Left: 24.29% $1,212,745.82
Delta: -3.18% -$191,290.37

Bid Items & Bid Tabulations

85 Total 0 of 85
REFUGIO  |  SH 35  |  CORPUS CHRISTI  |  0180-02-041  |  02/05/2021  |  $5,718,658.02  |  C 180-2-41  |  WIDEN ROAD - ADD LANES  |  129 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
REXCO CONSTRUCTION SERVICES, INC.
BAY LTD.
J. CARROLL WEAVER, INC.
HAAS-ANDERSON CONSTRUCTION, LTD.
TIERRA LEASE SERVICE, LLC
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 498.260 $800.000 $183.450 $240.550 $130.000 $86.580 $47.000 $100.000 $50.000
REMOVING CONCRETE(MOW STRIP)
LF 1,667.000 $15.000 $5.610 $8.300 $6.500 $2.220 $9.450 $10.000 $14.000
SUBGRADE WIDENING (DENS CONT)
STA 90.000 $500.000 $447.000 $209.000 $1,400.000 $408.930 $1,300.000 $320.000 $2,425.000
BACKFILL (TY A OR B)
STA 498.260 $150.000 $106.050 $122.100 $210.000 $108.280 $117.000 $225.000 $100.000
FURNISHING AND PLACING TOPSOIL (4")
SY 5,995.000 $0.500 $0.890 $1.880 $2.000 $1.380 $0.850 $4.000 $0.800
BROADCAST SEED (TEMP) (WARM)
SY 2,998.000 $0.540 $0.250 $0.480 $1.000 $1.280 $0.300 $0.720 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 2,998.000 $0.540 $0.250 $0.480 $1.000 $1.280 $0.300 $0.720 $0.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 5,995.000 $0.150 $0.400 $0.450 $1.000 $1.220 $0.450 $0.800 $0.500
VEGETATIVE WATERING
MG 110.000 $20.000 $16.650 $25.000 $47.000 $19.980 $56.000 $30.000 $15.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 4,416.000 $70.000 $76.010 $73.080 $90.000 $80.560 $88.000 $80.000 $85.000
LIME (HYD, COM OR QK)(SLURRY)
TON 354.980 $200.000 $162.750 $195.370 $220.000 $184.810 $218.000 $225.000 $200.000
LIME TRT (SUBGRADE)(8")
SY 17,750.190 $3.000 $1.600 $2.310 $2.500 $3.710 $3.300 $3.250 $3.300
PRIME COAT (MC-30)
GAL 4,251.000 $4.000 $3.470 $3.880 $3.500 $3.460 $3.450 $4.000 $3.950
ASPH (MULTI OPTION)
GAL 6,798.000 $2.500 $2.830 $2.460 $2.500 $3.100 $2.000 $2.500 $2.650
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 3,130.000 $80.000 $83.630 $89.700 $100.000 $108.400 $115.000 $80.000 $100.000
ASPH (AC-15P OR AC-20-5TR)
GAL 88,349.000 $3.000 $3.090 $3.000 $3.000 $2.830 $2.650 $2.750 $3.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 10,933.000 $42.000 $28.980 $30.010 $35.000 $40.820 $40.000 $50.000 $43.000
PLANE ASPH CONC PAV(0" TO 4")
SY 60,665.000 $2.500 $1.130 $1.710 $1.250 $3.000 $2.000 $1.200 $1.350
PLANE ASPH CONC PAV (2")
SY 2,500.000 $2.000 $3.260 $1.710 $2.000 $12.150 $2.000 $3.500 $2.500
CEM STABIL BKFL
CY 15.000 $68.000 $180.000 $150.000 $115.000 $172.050 $54.000 $100.000 $180.000
TRENCH EXCAVATION PROTECTION
LF 42.000 $9.000 $10.000 $1,075.600 $49.000 $11.100 $1.000 $25.000 $100.000
RIPRAP (CONC)(4 IN)
CY 15.000 $500.000 $470.000 $625.000 $800.000 $888.000 $541.000 $625.000 $540.000
RIPRAP (MOW STRIP)(4 IN)
CY 442.700 $500.000 $475.000 $444.400 $500.000 $493.950 $483.000 $465.000 $590.000
RAIL (TY T631)
LF 600.000 $85.000 $70.000 $89.770 $80.000 $77.700 $78.000 $105.000 $75.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 117.000 $500.000 $600.000 $715.000 $500.000 $333.000 $424.000 $370.000 $540.000
RC PIPE (CL III)(24 IN)
LF 76.000 $90.000 $85.000 $113.000 $150.000 $166.500 $91.000 $85.000 $100.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $14,312.000 $13,000.000 $41,000.000 $32,000.000 $4,995.000 $18,400.000 $34,000.000 $21,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 6.000 $2,500.000 $1,400.000 $1,706.760 $1,500.000 $2,442.000 $1,840.000 $1,600.000 $2,250.000
CLEAN EXIST CULVERTS
EA 12.000 $1,350.000 $2,400.000 $1,925.000 $2,000.000 $888.000 $2,790.000 $700.000 $1,000.000
REMOV STR (WINGWALL)
EA 1.000 $1,500.000 $2,000.000 $4,300.000 $15,000.000 $2,775.000 $4,690.000 $1,000.000 $7,400.000
MOBILIZATION
LS 1.000 $450,000.000 $381,500.000 $233,710.000 $100,000.000 $157,184.270 $255,000.000 $250,000.000 $297,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $8,500.000 $2,970.000 $1,035.250 $9,500.000 $3,330.000 $2,170.000 $2,500.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $25.000 $30.000 $47.980 $130.000 $75.480 $33.000 $30.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $11.000 $15.220 $8.690 $88.000 $39.960 $17.000 $10.000 $9.300
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,092.000 $25.000 $15.980 $10.000 $43.000 $5.550 $24.000 $20.000 $24.000
CONSTRUCTION EXITS (REMOVE)
SY 1,092.000 $8.000 $8.880 $8.150 $12.000 $15.260 $6.900 $5.000 $6.150
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,530.000 $2.500 $2.180 $2.580 $3.000 $2.550 $2.450 $2.250 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,530.000 $1.000 $0.660 $0.450 $1.500 $0.560 $0.750 $0.550 $0.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 300.000 $7.500 $4.760 $8.590 $7.000 $10.820 $5.400 $6.500 $9.200
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $1.500 $0.660 $1.010 $3.000 $4.380 $0.750 $2.150 $1.050
DRIVEWAYS AND TURNOUTS (SURF TREAT)
SY 781.000 $30.000 $30.660 $21.960 $26.000 $24.420 $32.000 $20.000 $20.000
RUMBLE STRIPS (SHOULDER)
LF 99,385.000 $0.150 $0.100 $0.280 $0.200 $0.170 $0.200 $0.150 $0.170
RUMBLE STRIPS (CENTERLINE)
LF 47,398.000 $0.180 $0.130 $0.280 $0.200 $0.200 $0.250 $0.150 $0.240
MTL W-BEAM GD FEN (TIM POST)
LF 5,250.000 $22.000 $17.500 $18.690 $20.000 $19.430 $19.000 $20.000 $18.950
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 6.000 $1,000.000 $650.000 $808.000 $750.000 $721.500 $721.000 $750.000 $700.000
REMOVE METAL BEAM GUARD FENCE
LF 5,761.000 $2.500 $1.250 $1.260 $2.000 $1.390 $1.400 $1.500 $1.350
REMOVE TERMINAL ANCHOR SECTION
EA 15.000 $140.000 $165.000 $101.000 $225.000 $183.150 $183.000 $220.000 $180.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $165.000 $175.000 $101.000 $200.000 $194.250 $194.000 $275.000 $190.000
GUARDRAIL END TREATMENT (INSTALL)
EA 36.000 $2,400.000 $2,250.000 $2,272.500 $2,600.000 $2,497.500 $2,500.000 $2,500.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 25.000 $275.000 $250.000 $252.500 $300.000 $277.500 $277.000 $125.000 $270.000
ALUMINUM SIGNS (TY A)
SF 22.000 $30.000 $25.000 $28.280 $50.000 $31.080 $28.000 $30.000 $27.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $467.000 $520.000 $606.000 $850.000 $832.500 $577.000 $800.000 $565.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $620.000 $645.000 $656.500 $1,000.000 $999.000 $715.000 $975.000 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $850.000 $810.000 $828.200 $1,700.000 $1,609.500 $898.000 $1,550.000 $875.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 4.000 $125.000 $95.000 $30.300 $35.000 $83.250 $105.000 $11.000 $102.800
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 10.000 $51.000 $105.000 $50.500 $98.000 $94.350 $116.000 $90.000 $113.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 94.000 $13.000 $25.000 $11.110 $21.000 $19.980 $28.000 $20.000 $27.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $74.000 $105.000 $55.550 $110.000 $105.450 $116.000 $100.000 $110.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 1,880.000 $2.000 $0.250 $0.250 $0.500 $0.280 $0.150 $0.300 $0.250
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 375.000 $0.940 $0.120 $0.350 $0.400 $0.390 $0.550 $0.400 $0.130
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 18,000.000 $0.290 $0.120 $0.180 $0.250 $0.200 $0.150 $0.200 $0.130
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 18,000.000 $0.280 $0.340 $0.180 $0.250 $0.200 $0.150 $0.200 $0.370
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 9,000.000 $0.760 $0.500 $0.530 $0.600 $0.580 $0.700 $0.550 $0.550
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 18,000.000 $0.750 $0.590 $0.510 $0.600 $0.560 $0.700 $0.550 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,982.000 $1.000 $1.410 $1.250 $1.150 $0.890 $1.100 $0.500 $0.800
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,637.000 $0.750 $1.410 $1.250 $1.150 $0.890 $1.100 $0.500 $0.800
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 1,463.000 $0.660 $0.500 $0.450 $0.500 $0.500 $0.450 $0.500 $0.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,592.000 $0.580 $0.600 $0.910 $1.050 $1.000 $0.850 $1.000 $0.650
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 1,650.000 $0.300 $0.290 $0.440 $0.500 $0.490 $0.450 $0.500 $0.300
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 98,305.000 $0.250 $0.290 $0.380 $0.500 $0.420 $0.400 $0.400 $0.300
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 8,703.000 $0.270 $0.310 $0.420 $0.500 $0.470 $0.450 $0.450 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 35,153.000 $0.260 $0.290 $0.400 $0.500 $0.440 $0.400 $0.450 $0.300
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $157.000 $220.000 $202.000 $250.000 $222.000 $244.000 $215.000 $238.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $340.000 $600.000 $454.500 $550.000 $499.500 $410.000 $475.000 $650.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $201.000 $275.000 $252.500 $300.000 $277.500 $258.000 $215.000 $298.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 448.000 $13.000 $10.000 $12.120 $15.000 $13.320 $12.000 $12.500 $10.800
REFL PAV MRKR TY I-C
EA 136.000 $3.000 $4.500 $4.040 $5.000 $4.440 $4.450 $4.200 $4.850
REFL PAV MRKR TY II-A-A
EA 1,165.000 $3.000 $4.500 $4.040 $5.000 $4.440 $3.350 $4.200 $4.850
ELIM EXT PAV MRK & MRKS (4")
LF 11,250.000 $1.000 $0.500 $0.860 $1.500 $0.830 $0.900 $1.250 $0.950
D-GR HMA TY-B SAC-B PG70-22
TON 3,445.750 $70.000 $67.230 $79.670 $85.000 $100.800 $88.000 $95.500 $94.350
D-GR HMA TY-D SAC-B PG70-22
TON 26,496.460 $70.000 $71.310 $84.430 $93.000 $96.920 $96.000 $100.000 $97.300
TACK COAT
GAL 4,673.580 $3.000 $2.960 $3.400 $3.500 $4.230 $3.250 $3.150 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $6,000.000 $14,948.000 $13,600.000 $7,215.000 $20,000.000 $3,500.000 $7,500.000
TMA (STATIONARY)
DAY 53.000 $200.000 $200.000 $212.000 $270.000 $333.000 $10.000 $250.000 $250.000
TMA (MOBILE OPERATION)
HR 640.000 $75.000 $70.000 $45.000 $54.000 $83.250 $10.000 $20.000 $55.000
Totals: $5,718,658.020 $4,992,797.801 $5,437,652.943 $5,949,871.835 $5,965,113.204 $5,986,643.952 $6,014,253.240 $6,205,543.608