Show Job Controls
Bid Cobra

JACKSON US 59 (0089-05-047)

Items: 49

County: JACKSON
Length: 6.9460 MILES
Highway: US 59
District: YOAKUM
Control Number: 0089-05-047
DBE Goal: 0.0%
Project: C 89-5-47
Guaranty: $100,000.00
Time: 135 WORKING DAYS
Engineer's Estimate: $8,850,914.95
Date: 12/02/2025 (6 months ago)
Contract Number: 12253018
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00124553
Project Description: PFC
Mail/Deliver Bids To: N/A
JAMES JANAK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$8,850,914.95
$9,131,385.82
Over/Under Est: 3.17% $280,470.87
Over/Under Est: 21.16% $1,872,782.87
Amt Left: 17.44% $1,592,312.00
$13,077,202.12
Over/Under Est: 47.75% $4,226,287.17
Amt Left: 43.21% $3,945,816.30
Delta: -21.95% -$2,353,504.30

Bid Items & Bid Tabulations

49 Total 0 of 49
JACKSON  |  US 59  |  YOAKUM  |  0089-05-047  |  12/02/2025  |  $8,850,914.95  |  C 89-5-47  |  SURF/ROADWAY RESTOR  |  135 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
DURWOOD GREENE CONSTRUCTION CO.
MBN ENTERPRISES LLC
BACKFILL (TY B)
STA 733.540 $145.000 $114.800 $125.000 $150.000
BLADING
HR 40.000 $120.000 $55.000 $100.000 $300.000
AGGR (TY-PB, GR-4)(SAC-B)
CY 2,916.000 $110.000 $128.600 $150.000 $105.000
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 128,940.000 $3.250 $3.040 $3.650 $4.500
D-GR HMA TY-D SAC-B PG76-22
TON 30,909.000 $90.000 $103.460 $129.000 $160.000
PFC-C PG76-22 SAC-A
TON 19,475.000 $115.000 $145.560 $184.000 $175.000
TACK COAT
GAL 19,767.000 $3.500 $3.140 $2.500 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 800.000 $120.000 $82.370 $120.000 $90.000
FLEX PAV STR REPAIR(1.5" -3.5")
SY 346.000 $65.000 $52.880 $78.000 $50.000
PLANE ASPH CONC PAV(0" TO 2")
SY 99,798.000 $1.650 $1.110 $1.500 $3.500
PLANE ASPH CONC PAV(2")
SY 259,841.000 $1.150 $1.440 $2.250 $3.750
PLANE ASPH CONC PAV (0" TO 1.5")
SY 33,704.000 $1.600 $1.160 $1.500 $3.500
FULL - DEPTH REPAIR CRCP (8")
CY 92.000 $1,500.000 $1,220.000 $575.000 $700.000
FULL - DEPTH REPAIR CPJR (12")
CY 120.000 $1,500.000 $875.000 $375.000 $700.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 100.000 $300.000 $88.000 $60.000 $100.000
CLEANING AND SEALING EXISTING JOINTS
LF 3,332.400 $32.000 $35.000 $19.000 $6.000
MOBILIZATION
LS 1.000 $930,000.000 $600,050.290 $300,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $3,000.000 $6,093.910 $6,500.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $6,500.000 $4,600.620 $12,250.000 $8,000.000
TMA (STATIONARY)
DAY 120.000 $275.000 $81.190 $300.000 $200.000
TMA (MOBILE OPERATION)
DAY 30.000 $275.000 $270.620 $350.000 $300.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 146,708.000 $0.150 $0.160 $0.280 $0.500
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $2,500.000 $4,400.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $25,000.000 $35,000.000 $34,000.000 $3,000.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 62,514.000 $0.350 $0.200 $0.220 $0.550
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 945.000 $0.750 $0.500 $0.550 $1.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 277,512.000 $0.400 $0.200 $0.220 $0.550
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 5,160.000 $1.000 $0.450 $0.500 $1.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 27,171.000 $0.600 $0.450 $0.500 $1.000
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 1,650.000 $2.000 $3.200 $3.500 $5.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 1,125.000 $0.350 $0.500 $0.550 $0.550
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 272,853.000 $0.400 $0.200 $0.220 $0.500
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 316.000 $1.250 $0.700 $0.750 $1.000
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 1,720.000 $1.500 $0.900 $1.000 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 9,057.000 $1.100 $0.900 $0.950 $0.660
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
LF 73,354.000 $1.000 $0.450 $0.500 $0.950
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
LF 73,354.000 $1.000 $0.450 $0.500 $0.950
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 18,338.000 $0.900 $0.750 $0.800 $0.800
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 82,504.000 $0.900 $0.750 $0.800 $0.800
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 375.000 $0.900 $0.750 $0.800 $1.000
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 81,851.000 $0.900 $0.750 $0.800 $0.800
PREFAB PM TY C (W)(12")(SLD)
LF 550.000 $10.000 $8.000 $9.000 $9.000
PREFAB PM TY C (W)(ARROW)
EA 2.000 $225.000 $350.000 $400.000 $250.000
PREFAB PM TY C (W)(WORD)
EA 1.000 $275.000 $400.000 $500.000 $250.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 150.000 $40.000 $50.000 $55.000 $30.000
REFL PAV MRKR TY II-A-A
EA 60.000 $6.500 $6.000 $7.000 $8.000
REFL PAV MRKR TY II-C-R
EA 1,578.000 $6.500 $6.000 $7.000 $5.000
ELIM EXT PM & MRKS (6")
LF 146,708.000 $0.500 $0.350 $0.100 $0.350
TMSP RADAR SPEED CONTROL MONITOR
EA 4.000 $8,000.000 $2,976.870 $6,000.000 $1,000.000
Totals: $8,850,914.950 $9,131,385.822 $10,723,697.820 $13,077,202.120