VICTORIA SL 463 (2350-01-060)

Items: 157

County: VICTORIA
Length: N/A
Highway: SL 463
District: YOAKUM
Control Number: 2350-01-060
DBE Goal: N/A
Project: F 2022(146)
Guaranty: N/A
Time: 360 WORKING DAYS
Engineer's Estimate: $12,773,486.10
Date: 10/06/2022 (3 years ago)
Contract Number: N/A
Type: ADD 2 LANES FOR 4-LANE DIVIDED
Mail/Deliver Bids To: N/A
CLAYTON HARRIS
JAMES JANAK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$12,773,486.10
$13,851,977.64
Over/Under Est: 8.44% $1,078,491.54
$16,270,743.95
Over/Under Est: 27.38% $3,497,257.85
Amt Left: 17.46% $2,418,766.31
Subcontractor Percentage Amount
JB PINNACLE GROUP, LLC 4.62% $644,983.11
A. H. BECK FOUNDATION CO., INC. 4.28% $597,516.82
THIRD COAST SERVICES LLC 2.56% $357,393.24
DEPENDABLE FENCE 1.15% $160,547.74
TEXAS CUTTING & CORING GP, INC. 0.91% $127,042.13
HIGHWAY BARRICADES AND SERVICES, LLC 0.86% $120,061.79
DORAN STEEL, INC. 0.62% $86,556.18
TECHNICAL STRUCTURAL REPAIR GROUP, LLC 0.55% $76,783.70
S&S BRIDGE PAINTING 0.48% $67,011.23
LONE STAR EROSION CONTROL 0.31% $43,278.09
FLASHER EQUIPMENT COMPANY 0.26% $36,297.75
EGGEMEYER LAND CLEARING, LLC 0.09% $12,564.61
PRIMATE CONSTRUCTION, LP 0.07% $9,772.47
SK CONCRETE SERVICES LLC 0.04% $5,584.27
Total: 16.80% $2,345,393.13

Bid Items & Bid Tabulations

157 Total 0 of 157
VICTORIA  |  SL 463  |  YOAKUM  |  2350-01-060  |  10/06/2022  |  $12,773,486.10  |  F 2022(146)  |  ADD 2 LANES FOR 4-LANE DIVIDED  |  360 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
CK NEWBERRY, LLC
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 5.000 $500.000 $2,875.500 $5,000.000
REMOVING CONC (RIPRAP)
SY 317.000 $18.000 $10.260 $25.000
REMOVING CONC (CURB)
LF 3,650.000 $7.000 $10.260 $6.000
REMOVING CONC (CTB)
LF 20.000 $25.000 $85.500 $100.000
REMOVING CONC (FLUME)
SY 374.000 $15.000 $10.260 $30.000
EXCAVATION (ROADWAY)
CY 10,925.600 $13.000 $12.600 $18.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 57,088.600 $11.000 $20.750 $26.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 194.000 $30.000 $28.260 $27.000
BACKFILL (TY B)
STA 21.700 $160.000 $153.980 $150.000
BLADING
HR 100.000 $130.000 $140.400 $125.000
FURNISHING AND PLACING TOPSOIL (4")
SY 78,995.000 $2.500 $1.030 $1.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 73,704.000 $0.350 $0.260 $0.250
BROADCAST SEED (TEMP) (WARM)
SY 18,427.000 $0.350 $0.250 $0.200
BROADCAST SEED (TEMP) (COOL)
SY 18,427.000 $0.350 $0.250 $0.200
VEGETATIVE WATERING
MG 887.880 $35.000 $17.100 $20.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 5,291.000 $1.500 $1.210 $2.500
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 11,568.200 $86.000 $79.730 $110.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 578.000 $275.000 $270.000 $300.000
LIME TRT (SUBGRADE)(8")
SY 36,331.000 $3.500 $2.690 $4.000
PRIME COAT (MC-30)
GAL 6,562.000 $4.500 $5.800 $6.000
AGGR(TY-PE GR-3 SAC-B)
CY 386.000 $125.000 $127.540 $200.000
AGGR(TY-PE GR-4 SAC-B)
CY 532.000 $125.000 $127.700 $175.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 36,644.000 $5.000 $4.710 $4.750
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 3,588.000 $65.000 $56.950 $100.000
PLANE ASPH CONC PAV(0" TO 2")
SY 20,065.000 $2.250 $1.850 $2.000
PLANE ASPH CONC PAV (0" TO 5")
SY 4,950.000 $3.800 $3.470 $2.500
PLANE ASPH CONC PAV(MICRO)(0"-3")
SY 3,552.000 $10.000 $4.550 $3.500
CEM STABIL BKFL
CY 18.600 $125.000 $200.000 $300.000
FLOWABLE BACKFILL
CY 5.000 $215.000 $350.000 $600.000
TEMPORARY SPL SHORING
SF 730.000 $35.000 $100.000 $60.000
TEMPORARY SPL SHORING (RAILROAD CANT)
SF 475.000 $230.000 $400.000 $125.000
DRILL SHAFT (18 IN)
LF 180.000 $150.000 $221.840 $150.000
DRILL SHAFT (36 IN)
LF 1,608.000 $300.000 $431.990 $350.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 40.000 $200.000 $185.000 $300.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 20.000 $220.000 $265.000 $400.000
CL A CONC (FLUME)
CY 110.100 $450.000 $1,000.000 $750.000
CL C CONC (ABUT)
CY 68.600 $1,200.000 $2,000.000 $1,700.000
CL C CONC (CAP)
CY 143.800 $1,400.000 $1,800.000 $2,700.000
CL C CONC (COLUMN)
CY 210.300 $1,400.000 $1,600.000 $1,600.000
CL C CONC (CRASHWALL)
CY 161.100 $1,100.000 $1,200.000 $800.000
CL C CONC (RAIL FOUNDATION)
CY 29.200 $500.000 $1,000.000 $1,000.000
REINF CONC SLAB (EXTEND SLAB)
SF 38,426.000 $30.000 $40.000 $30.000
APPROACH SLAB
CY 89.000 $400.000 $1,250.000 $850.000
PRESTR CONC GIRDER (TX28)
LF 477.000 $190.000 $175.000 $250.000
PRESTR CONC GIRDER (TX40)
LF 3,161.940 $200.000 $175.000 $260.000
PRESTR CONC GIRDER (TX54)
LF 1,610.940 $225.000 $175.000 $275.000
EPOXY WATERPROOF FINISH (TY X)
SF 3,858.900 $12.000 $12.000 $15.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 3,552.000 $15.000 $5.950 $7.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 50.000 $300.000 $462.400 $200.000
RIPRAP (CONC)(5 IN)
CY 27.200 $500.000 $600.000 $850.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 68.000 $500.000 $700.000 $800.000
RIPRAP (CONC) (CL B) (4")
CY 0.700 $550.000 $800.000 $1,600.000
RIPRAP (MOW STRIP)(4 IN)
CY 79.600 $475.000 $750.000 $800.000
RAIL (TY SSTR)
LF 1,829.000 $110.000 $75.000 $110.000
RAIL (CLF-RO)
LF 206.000 $100.000 $63.550 $275.000
RAIL (TY T80PP)
LF 181.000 $180.000 $350.000 $250.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 184.000 $110.000 $262.120 $275.000
CONC BOX CULV (8 FT X 5 FT)
LF 24.000 $650.000 $1,800.000 $1,000.000
RC PIPE (CL III)(24 IN)
LF 6.000 $95.000 $500.000 $200.000
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)
EA 6.000 $14,500.000 $16,000.000 $22,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $2,500.000 $4,500.000 $4,000.000
DIAMOND GRINDING SLAB
SY 3,552.000 $15.000 $13.300 $8.000
MOBILIZATION
LS 1.000 $1,156,000.000 $1,137,858.380 $1,250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $6,500.000 $2,626.200 $3,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $32.500 $36.750 $50.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $10.000 $12.600 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 790.000 $3.000 $4.460 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 790.000 $1.000 $2.100 $2.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 7,140.000 $40.000 $40.000 $78.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 8,550.000 $10.000 $9.000 $16.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 7,140.000 $7.000 $9.000 $20.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 5,445.000 $80.000 $90.000 $100.000
PERM CTB (SGL SLOPE) (TY 4) (42 )
LF 230.000 $192.000 $350.000 $275.000
CONC CURB & GUTTER (TY I)
LF 3,006.000 $25.000 $20.000 $32.000
MTL W-BEAM GD FEN (TIM POST)
LF 750.000 $28.000 $26.900 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 9.000 $2,100.000 $2,435.000 $2,200.000
REMOVE METAL BEAM GUARD FENCE
LF 1,625.000 $2.250 $2.750 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $175.000 $225.000 $250.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $230.000 $225.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $3,000.000 $3,260.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 7.000 $300.000 $225.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 8.000 $1,300.000 $1,075.000 $1,700.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $750.000 $875.000 $600.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $22,000.000 $24,950.000 $28,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $8,000.000 $8,475.000 $10,000.000
IN RD IL (TY SP) 48S-10-10(400W EQ)LED
EA 23.000 $4,500.000 $6,675.000 $12,000.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 2.000 $4,200.000 $5,700.000 $6,500.000
CONDT (PVC) (SCH 40) (2")
LF 5,870.000 $10.000 $11.000 $15.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 210.000 $20.000 $24.000 $60.000
ELEC CONDR (NO.8) BARE
LF 6,080.000 $1.800 $1.850 $1.750
ELEC CONDR (NO.8) INSULATED
LF 12,700.000 $2.250 $1.950 $2.250
GROUND BOX TY A (122311)W/APRON
EA 4.000 $1,000.000 $910.000 $1,100.000
ELC SRV TY A 120/240 060(NS)SS(E)PS(U)
EA 1.000 $6,000.000 $7,500.000 $9,500.000
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
EA 2.000 $6,500.000 $8,550.000 $9,500.000
ALUMINUM SIGNS (TY G)
SF 396.500 $27.000 $36.000 $30.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 21.000 $22.000 $39.210 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $1,000.000 $600.000 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $1,050.000 $925.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 2.000 $1,200.000 $1,600.000 $1,800.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 6.000 $650.000 $425.000 $500.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $575.000 $475.000 $600.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $1,900.000 $4,850.440 $3,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $500.000 $550.000 $700.000
REMOVE SM RD SN SUP&AM
EA 19.000 $80.000 $75.000 $200.000
INSTALL LRSS (STRUCT STEEL)
LB 2,089.000 $5.000 $7.150 $6.000
REMOVE LRSA
EA 2.000 $1,100.000 $500.000 $2,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 22.000 $20.000 $18.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 58.000 $20.000 $21.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 19.000 $25.000 $28.000 $35.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 4.000 $70.000 $65.000 $75.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 8,416.000 $0.450 $0.400 $0.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 34,514.000 $0.210 $0.400 $0.500
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 910.000 $0.500 $0.800 $1.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,180.000 $1.200 $0.800 $1.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 39,054.000 $0.260 $0.400 $0.500
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 528.000 $0.750 $0.400 $0.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 37,181.000 $0.630 $0.400 $0.500
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,057.000 $1.500 $0.800 $1.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 41,853.000 $0.650 $0.400 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,249.000 $1.560 $1.660 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 850.000 $1.300 $1.660 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 455.000 $1.300 $0.800 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,466.000 $1.200 $0.800 $1.000
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 325.000 $6.000 $6.000 $7.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 257.000 $12.000 $12.000 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $200.000 $175.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $250.000 $250.000 $300.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 22.000 $20.000 $12.000 $15.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 345.000 $14.000 $12.000 $15.000
REFL PAV MRKR TY I-C
EA 89.000 $4.000 $2.000 $2.250
REFL PAV MRKR TY II-A-A
EA 318.000 $4.000 $2.000 $2.250
REFL PAV MRKR TY II-C-R
EA 245.000 $4.100 $2.000 $2.250
ELIM EXT PAV MRK & MRKS (4")
LF 19,391.000 $0.500 $1.250 $0.750
ELIM EXT PAV MRK & MRKS (8")
LF 960.000 $0.800 $2.000 $4.000
ELIM EXT PAV MRK & MRKS (12")
LF 110.000 $2.000 $2.500 $6.000
VEH SIG SEC (12")LED(GRN)
EA 8.000 $280.000 $325.000 $300.000
VEH SIG SEC (12")LED(GRN ARW)
EA 4.000 $280.000 $325.000 $300.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $280.000 $325.000 $300.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $280.000 $325.000 $300.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $280.000 $325.000 $300.000
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $280.000 $325.000 $300.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 6.000 $140.000 $180.000 $200.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 4.000 $150.000 $200.000 $200.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 100.000 $4.000 $3.000 $4.000
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $2,500.000 $2,500.000 $8,000.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 300.000 $40.000 $82.450 $35.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 350.000 $30.000 $66.850 $45.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 152.000 $280.000 $1,520.900 $350.000
D-GR HMA TY-B PG64-22
TON 8,631.000 $120.000 $92.100 $135.000
D-GR HMA TY-D SAC-B PG70-22
TON 10,068.000 $120.000 $104.220 $148.000
TACK COAT
GAL 6,167.000 $4.000 $3.470 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 10.000 $9,500.000 $10,097.720 $25,000.000
TMA (STATIONARY)
DAY 30.000 $350.000 $353.420 $400.000
TMA (MOBILE OPERATION)
DAY 30.000 $350.000 $1,009.770 $200.000
HPPM-RIB W/RET REQ TYI(W)4"(BRK)100MIL
LF 4,397.000 $0.850 $0.440 $0.500
HPPM-RIB W/RET REQ TYI(W)4"(SLD)100MIL
LF 17,695.000 $0.850 $0.440 $0.500
HPPM-RIB W/RET REQ TYI(Y)4"(SLD)100MIL
LF 19,226.000 $0.850 $0.440 $0.500
Totals: $12,773,486.100 $13,851,977.660 $16,270,743.950