VICTORIA US 77 (0371-01-090)

Items: 48

County: VICTORIA
Length: N/A
Highway: US 77
District: YOAKUM
Control Number: 0371-01-090
DBE Goal: 200.0%
Project: F 2024(643)
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $10,129,258.70
Date: 01/04/2024 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
CLAYTON HARRIS
JAMES JANAK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$10,129,258.70
$11,515,798.33
Over/Under Est: 13.69% $1,386,539.63
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 4.32% $499,167.83
CLARK CONSTRUCTION OF TEXAS, INC. 3.86% $446,015.70
DEPENDABLE FENCE 1.60% $184,876.97
PRIMATE CONSTRUCTION, LP 0.97% $112,081.67
PROFESSIONAL TRAFFIC CONTROL LLC 0.26% $30,042.51
Total: 11.01% $1,272,184.68

Bid Items & Bid Tabulations

48 Total 0 of 48
VICTORIA  |  US 77  |  YOAKUM  |  0371-01-090  |  01/04/2024  |  $10,129,258.70  |  F 2024(643)  |  SURF/ROADWAY RESTOR  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 95.000 $28.000 $50.600
BACKFILL (TY A)
STA 665.000 $200.000 $194.800
BLADING
HR 20.000 $135.000 $156.000
FL BS (CMP IN PLC)(TY E GR 5)(FNL POS)
CY 380.000 $115.000 $134.200
ASPH (AC-20-5TR)
GAL 218,725.000 $4.500 $4.470
AGGR(TY-PE GR-4 SAC-B)
CY 4,949.000 $150.000 $171.370
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 2,118.000 $65.000 $90.370
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 187.000 $40.000 $92.940
FULL - DEPTH REPAIR CRCP (8")
SY 150.000 $300.000 $498.550
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 100.000 $275.000 $350.000
CLEANING AND SEALING EXISTING JOINTS
LF 5,698.000 $15.000 $20.000
MOBILIZATION
LS 1.000 $920,000.000 $1,155,771.360
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,500.000 $8,362.370
TEMP SEDMT CONT FENCE (INSTALL)
LF 100.000 $3.750 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 100.000 $1.000 $5.000
RUMBLE STRIPS (SHOULDER)
LF 265,980.000 $0.200 $0.140
MTL W-BEAM GD FEN (TIM POST)
LF 2,725.000 $25.000 $26.250
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 16.000 $2,300.000 $2,460.000
REMOVE METAL BEAM GUARD FENCE
LF 3,125.000 $3.100 $3.400
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $3,300.000 $3,045.000
GUARDRAIL END TREATMENT (REMOVE)
EA 19.000 $350.000 $470.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 36.000 $35.000 $24.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 36.000 $35.000 $24.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 45.000 $35.000 $33.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 40.000 $35.000 $33.500
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 66,798.000 $0.450 $0.340
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 267,182.000 $0.450 $0.340
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 468.000 $0.650 $0.520
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 23,608.000 $0.600 $0.520
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,072.000 $6.000 $8.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 30.000 $0.450 $0.340
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 269,648.000 $0.450 $0.340
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 234.000 $1.500 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 11,804.000 $1.150 $0.840
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 560.000 $12.000 $16.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 3.000 $225.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $260.000 $350.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 216.000 $35.000 $25.000
REFL PAV MRKR TY II-C-R
EA 2,284.000 $4.500 $5.000
D-GR HMA TY-D SAC-B PG70-22
TON 8,500.000 $135.000 $130.000
PFC-C (PG76 MIX) SAC-A
TON 35,499.000 $140.000 $168.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $9,742.500
TMA (STATIONARY)
DAY 20.000 $275.000 $324.750
TMA (MOBILE OPERATION)
DAY 20.000 $500.000 $119.070
HPPM-RIB W/RET REQ TYI(W)6"(BRK)100MIL
LF 33,399.000 $0.750 $0.760
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL
LF 133,591.000 $0.750 $0.680
HPPM-RIB W/RET REQ TYI(Y)6"(BRK)100MIL
LF 15.000 $0.750 $100.000
HPPM-RIB W/RET REQ TYI(Y)6"(SLD)100MIL
LF 136,131.000 $0.750 $0.680
Totals: $10,129,258.700 $11,515,798.330