Show Job Controls
Bid Cobra

DIMMIT FM 2688 (2660-01-012)

Items: 84

County: DIMMIT
Length: N/A
Highway: FM 2688
District: LAREDO
Control Number: 2660-01-012
DBE Goal: N/A
Project: C 2660-1-12
Guaranty: N/A
Time: 292 WORKING DAYS
Engineer's Estimate: $18,754,770.60
Date: 09/08/2022 (3 years ago)
Contract Number: N/A
Type: BASE, ACP, GRAD, STR, PAV MRKS, SIGNS
Mail/Deliver Bids To: N/A
ANTONIO REYNA1
ALBERTO CHAVEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$18,754,770.60
$12,957,924.78
Over/Under Est: -30.91% -$5,796,845.82
Over/Under Est: -26.62% -$4,993,398.85
Amt Left: 6.2% $803,446.97
$14,998,596.65
Over/Under Est: -20.03% -$3,756,173.95
Amt Left: 15.75% $2,040,671.87
Delta: -8.99% -$1,237,224.90
Over/Under Est: -18.12% -$3,398,171.09
Amt Left: 18.51% $2,398,674.73
Delta: -2.39% -$358,002.86
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 2.55% $328,350.08
LONE STAR EROSION CONTROL 1.81% $233,064.18
EGGEMEYER LAND CLEARING, LLC 0.44% $56,656.48
STX CIVIL 0.35% $45,067.66
FLASHER EQUIPMENT COMPANY 0.19% $24,465.30
WEST TEXAS ROCK RESOURCES, LLC 0.08% $10,301.18
Total: 5.42% $697,904.88

Bid Items & Bid Tabulations

84 Total 0 of 84
DIMMIT  |  FM 2688  |  LAREDO  |  2660-01-012  |  09/08/2022  |  $18,754,770.60  |  C 2660-1-12  |  BASE, ACP, GRAD, STR, PAV MRKS, SIGN...  |  292 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANDERSON COLUMBIA CO., INC.
CK NEWBERRY, LLC
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 231.000 $450.000 $509.490 $750.000 $500.000 $500.000
REMOVING STAB BASE AND ASPH PAV(15")
SY 66,681.000 $7.000 $9.350 $10.000 $12.000 $14.000
EXCAVATION (ROADWAY)
CY 11,558.000 $20.000 $14.940 $16.000 $8.500 $23.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 11,679.000 $20.000 $14.940 $23.000 $9.000 $17.000
BACKFILL (TY A OR B)
STA 231.000 $100.000 $108.900 $150.000 $125.000 $175.000
DRILL SEEDING (PERM)(WARM OR COOL)
SY 123,097.000 $1.000 $0.240 $0.250 $0.200 $0.200
PROOF ROLLING
HR 100.000 $80.000 $128.700 $100.000 $80.000 $139.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 41,796.000 $85.000 $80.530 $90.000 $92.000 $105.000
PRIME COAT (RC-250)
GAL 17,457.000 $6.350 $5.020 $4.800 $5.000 $5.250
AGGR(TY-PB GR-5 SAC-B)
CY 630.000 $148.000 $126.860 $130.000 $100.000 $151.000
CEM STABIL BKFL
CY 396.000 $135.000 $382.290 $175.000 $250.000 $185.000
TRENCH EXCAVATION PROTECTION
LF 115.000 $10.000 $8.360 $20.000 $25.000 $21.000
RIPRAP (CONC)(5 IN)
CY 17.000 $906.980 $716.800 $605.000 $700.000 $675.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 20.000 $300.000 $290.000 $275.000 $325.000 $295.000
RIPRAP (MOW STRIP)(4 IN)
CY 42.000 $906.980 $734.720 $610.000 $700.000 $700.000
CONC BOX CULV (5 FT X 2 FT)
LF 464.000 $700.000 $639.150 $600.000 $700.000 $625.000
CONC BOX CULV (10 FT X 6 FT)
LF 20.000 $1,500.000 $3,584.000 $2,100.000 $2,250.000 $2,000.000
RC PIPE (CL III)(24 IN)
LF 70.000 $120.000 $107.520 $89.000 $125.000 $90.000
RC PIPE (CL V)(24 IN)
LF 656.000 $160.000 $161.280 $123.000 $150.000 $140.000
RC PIPE (CL V)(36 IN)
LF 66.000 $500.000 $418.130 $345.000 $400.000 $325.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 6.000 $17,678.250 $11,349.330 $7,150.000 $8,000.000 $7,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $20,000.000 $14,933.330 $8,500.000 $9,000.000 $8,000.000
WINGWALL (FW - 0) (HW=3 FT)
EA 2.000 $6,554.000 $9,557.330 $9,650.000 $11,000.000 $9,000.000
WINGWALL (FW - 0) (HW=8 FT)
EA 2.000 $13,136.000 $26,282.650 $24,170.000 $27,000.000 $23,000.000
WINGWALL (PW - 1) (HW=3 FT)
EA 4.000 $8,624.000 $11,349.330 $12,345.000 $15,000.000 $11,500.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 7.000 $1,272.000 $2,688.000 $1,717.000 $2,000.000 $1,600.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,099.000 $2,986.660 $2,121.000 $2,400.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,563.000 $4,480.000 $2,222.000 $2,700.000 $2,050.000
REMOV STR (SET)
EA 14.000 $268.000 $1,791.990 $450.000 $1,000.000 $400.000
REMOV STR (WINGWALL)
EA 2.000 $1,801.000 $2,986.660 $1,000.000 $1,500.000 $925.000
REMOV STR (PIPE)
LF 624.000 $34.740 $23.890 $6.000 $10.000 $5.500
MOBILIZATION
LS 1.000 $1,228,370.610 $1,011,668.550 $1,026,000.000 $1,000,000.000 $1,165,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $5,200.000 $7,000.000 $2,700.000 $10,000.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 315.000 $31.000 $37.770 $37.000 $35.000 $53.000
ROCK FILTER DAMS (REMOVE)
LF 315.000 $14.000 $14.440 $14.000 $10.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 134.000 $45.430 $32.220 $32.000 $20.000 $39.000
CONSTRUCTION EXITS (REMOVE)
SY 134.000 $10.440 $11.110 $11.000 $10.000 $13.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $67.000 $105.300 $70.000 $100.000 $110.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,374.000 $8.110 $4.170 $4.000 $4.000 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,374.000 $2.000 $1.390 $1.400 $2.000 $0.250
CONSTRUCTING DETOURS
SY 13,322.000 $103.980 $28.880 $45.000 $65.000 $49.250
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 250.000 $90.000 $128.700 $130.000 $150.000 $0.500
ONE-WAY TRAF CONT (PILOT CAR)
HR 250.000 $148.680 $175.500 $180.000 $175.000 $5.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 15.000 $6,406.000 $2,134.180 $2,680.000 $7,250.000 $1,000.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 11,850.000 $76.000 $34.000 $12.000 $40.000 $50.000
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 42,210.000 $48.000 $9.950 $7.000 $7.000 $3.250
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 11,850.000 $76.000 $16.000 $20.000 $5.000 $17.000
DRIVEWAYS (ACP)
SY 2,205.000 $60.000 $40.500 $70.000 $80.000 $45.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 46,160.000 $1.000 $0.230 $0.150 $0.250 $0.330
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 23,080.000 $1.000 $0.230 $0.150 $0.300 $0.440
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $30.000 $29.330 $29.000 $30.000 $34.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 50.000 $105.000 $92.550 $91.000 $100.000 $115.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,274.000 $3,460.770 $3,440.000 $4,000.000 $3,800.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 48.000 $1,021.000 $833.250 $825.000 $1,000.000 $1,100.000
CRASH CUSH ATTEN (REMOVE)
EA 12.000 $631.000 $388.850 $385.000 $500.000 $1,100.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 12.000 $9,600.000 $8,643.580 $8,600.000 $10,000.000 $8,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $918.520 $636.300 $1,330.000 $1,000.000 $630.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $781.000 $757.500 $1,650.000 $1,200.000 $750.000
REMOVE SM RD SN SUP&AM
EA 3.000 $107.000 $126.250 $165.000 $200.000 $125.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 6.000 $125.000 $219.600 $330.000 $400.000 $400.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $35.000 $35.350 $61.000 $75.000 $35.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 25.000 $79.000 $106.050 $138.000 $150.000 $105.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 22,054.000 $1.000 $0.450 $0.500 $0.500 $0.450
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 2,352.000 $4.000 $2.530 $3.000 $3.000 $2.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 192,638.000 $1.000 $0.510 $0.600 $0.750 $0.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 528.000 $9.000 $7.070 $8.000 $8.000 $7.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 72,000.000 $1.000 $0.510 $0.600 $0.750 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,699.000 $2.000 $1.440 $1.500 $1.250 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 6,719.000 $2.000 $1.440 $1.500 $1.250 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 46,160.000 $0.450 $0.450 $0.500 $0.500 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,595.000 $0.540 $0.450 $0.500 $0.500 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 6,810.000 $0.580 $0.450 $0.500 $0.750 $0.450
REFL PAV MRKR TY II-A-A
EA 370.000 $4.000 $2.530 $3.000 $3.000 $2.500
ELIM EXT PAV MRK & MRKS (4")
LF 264,638.000 $1.000 $0.270 $0.300 $0.500 $0.270
ELIM EXT PAV MRK & MRKS (24")
LF 528.000 $5.000 $2.020 $2.200 $2.500 $2.000
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 7,680.000 $2.000 $2.020 $2.200 $3.000 $2.000
SP MIXES SP-B SAC-B PG70-22
TON 26,165.000 $130.000 $102.060 $114.000 $125.000 $119.000
SP MIXES SP-C SAC-A PG76-22
TON 9,442.000 $150.000 $117.180 $138.000 $140.000 $160.000
BONDING COURSE
GAL 8,477.000 $6.500 $4.290 $5.000 $5.250 $5.750
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,300.000 $10,000.000 $17,300.000 $25,000.000 $15,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 7,680.000 $13.000 $8.080 $9.000 $10.000 $8.000
TMA (STATIONARY)
DAY 200.000 $226.520 $220.000 $180.000 $350.000 $200.000
TMA (MOBILE OPERATION)
HR 100.000 $77.350 $80.000 $60.000 $25.000 $75.000
DRIVEWAY ASSISTANCE DEVICE(DAD) SYSTEM
MO 15.000 $5,700.000 $3,300.000 $2,670.000 $10,000.000 $1,000.000
Totals: $18,754,770.600 $12,957,924.780 $13,761,371.750 $14,998,596.650 $15,356,599.510