PREPARING ROW
|
STA
|
145.000
|
$1,583.000
|
$4,827.590
|
$10,350.000
|
$6,275.000
|
$5,080.000
|
$1,200.000
|
$4,288.100
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
222.000
|
$9.000
|
$9.990
|
$14.810
|
$10.000
|
$18.000
|
$21.000
|
$11.300
|
|
|
REMOVING STAB BASE & ASPH PAV (0"-10")
|
SY
|
10,681.000
|
$7.000
|
$4.470
|
$2.500
|
$4.000
|
$4.300
|
$6.500
|
$3.300
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
6,277.000
|
$6.000
|
$3.330
|
$1.600
|
$1.000
|
$2.000
|
$6.250
|
$4.600
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
94,758.000
|
$6.500
|
$6.840
|
$3.500
|
$6.000
|
$4.700
|
$5.000
|
$7.100
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
109,337.000
|
$6.700
|
$7.620
|
$5.000
|
$2.000
|
$6.000
|
$7.000
|
$5.800
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
138,859.000
|
$13.000
|
$15.660
|
$18.000
|
$18.000
|
$25.600
|
$20.000
|
$21.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
27,619.000
|
$28.000
|
$5.000
|
$2.650
|
$3.000
|
$7.000
|
$4.500
|
$4.100
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
2,440.000
|
$0.190
|
$0.500
|
$1.680
|
$0.500
|
$0.500
|
$0.500
|
$0.300
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
198,856.000
|
$0.280
|
$0.780
|
$0.290
|
$0.300
|
$0.300
|
$0.300
|
$0.300
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
99,430.000
|
$0.270
|
$0.300
|
$0.290
|
$0.300
|
$0.300
|
$0.300
|
$0.300
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
99,430.000
|
$0.280
|
$0.300
|
$0.290
|
$0.300
|
$0.300
|
$0.300
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
5,966.000
|
$10.000
|
$21.030
|
$1.000
|
$15.000
|
$21.000
|
$18.000
|
$9.700
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
198,161.000
|
$0.830
|
$0.680
|
$0.690
|
$0.680
|
$0.750
|
$0.700
|
$1.100
|
|
|
WILDFLOWER SEEDING
|
AC
|
41.080
|
$2,500.000
|
$1,500.000
|
$2,226.000
|
$1,500.000
|
$1,300.000
|
$1,750.000
|
$1,851.500
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
16,120.000
|
$41.000
|
$32.270
|
$28.000
|
$34.000
|
$37.000
|
$44.000
|
$41.700
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
1,635.000
|
$170.000
|
$136.500
|
$125.000
|
$170.000
|
$168.000
|
$175.000
|
$168.800
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
72,644.000
|
$3.100
|
$1.030
|
$2.500
|
$3.500
|
$3.000
|
$2.700
|
$7.200
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
14,529.000
|
$3.300
|
$3.830
|
$3.000
|
$3.400
|
$4.000
|
$4.000
|
$3.800
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
70.000
|
$70.000
|
$131.010
|
$100.000
|
$80.000
|
$185.000
|
$170.000
|
$89.600
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
14,688.000
|
$63.000
|
$54.900
|
$72.000
|
$68.000
|
$71.000
|
$68.000
|
$76.100
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
5,504.000
|
$70.000
|
$60.240
|
$85.000
|
$84.000
|
$82.000
|
$75.000
|
$94.000
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
232.610
|
$91.000
|
$99.090
|
$110.000
|
$121.000
|
$140.000
|
$122.000
|
$135.500
|
|
|
TOM - C (AGGREGATE) SAC - B
|
TON
|
2,707.000
|
$88.000
|
$99.090
|
$110.000
|
$121.000
|
$132.000
|
$122.000
|
$135.500
|
|
|
PLANE ASPH CONC PAV (0"- 2 1/2")
|
SY
|
2,296.000
|
$1.500
|
$3.610
|
$3.000
|
$2.710
|
$3.500
|
$3.250
|
$3.500
|
|
|
CEM STABIL BKFL
|
CY
|
307.000
|
$100.000
|
$161.260
|
$120.000
|
$115.000
|
$115.000
|
$255.000
|
$104.900
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,672.000
|
$3.550
|
$3.150
|
$2.390
|
$5.000
|
$2.000
|
$4.500
|
$5.900
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
192.000
|
$67.000
|
$108.940
|
$100.000
|
$45.000
|
$40.000
|
$56.000
|
$126.400
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,103.000
|
$156.000
|
$172.370
|
$150.000
|
$130.000
|
$127.000
|
$147.000
|
$258.000
|
|
|
CL C CONC (ABUT)
|
CY
|
87.200
|
$838.000
|
$1,000.000
|
$800.000
|
$1,000.000
|
$995.000
|
$765.000
|
$822.700
|
|
|
CL C CONC (BENT)
|
CY
|
412.400
|
$1,000.000
|
$1,000.000
|
$850.000
|
$1,000.000
|
$1,075.000
|
$805.000
|
$944.400
|
|
|
REINF CONC SLAB
|
SF
|
59,800.000
|
$15.000
|
$17.000
|
$18.000
|
$15.480
|
$15.250
|
$17.500
|
$19.400
|
|
|
APPROACH SLAB
|
CY
|
113.400
|
$448.000
|
$550.000
|
$400.000
|
$400.000
|
$320.000
|
$550.000
|
$511.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
9,700.000
|
$42.000
|
$38.780
|
$62.000
|
$69.000
|
$65.750
|
$98.000
|
$65.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
7,766.520
|
$136.000
|
$130.000
|
$135.000
|
$150.000
|
$128.500
|
$162.000
|
$158.500
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
9.000
|
$400.000
|
$650.000
|
$450.000
|
$500.000
|
$500.000
|
$540.000
|
$561.700
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
658.000
|
$98.000
|
$156.500
|
$100.000
|
$145.000
|
$100.000
|
$140.000
|
$122.300
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
117.000
|
$105.000
|
$182.750
|
$140.000
|
$150.000
|
$135.000
|
$130.000
|
$135.600
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
98.000
|
$450.000
|
$454.110
|
$450.000
|
$450.000
|
$450.000
|
$525.000
|
$447.900
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
22.000
|
$439.000
|
$445.710
|
$500.000
|
$550.000
|
$450.000
|
$540.000
|
$434.900
|
|
|
RAIL (TY T223)
|
LF
|
2,688.000
|
$90.000
|
$96.000
|
$100.000
|
$115.000
|
$95.000
|
$91.000
|
$100.900
|
|
|
RAIL (TY SSTR)
|
LF
|
719.000
|
$43.000
|
$56.450
|
$75.000
|
$50.000
|
$70.000
|
$79.000
|
$62.100
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
260.000
|
$84.000
|
$83.100
|
$90.000
|
$100.000
|
$85.000
|
$100.000
|
$113.800
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
172.000
|
$334.000
|
$467.240
|
$400.000
|
$430.000
|
$410.000
|
$507.000
|
$455.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)
|
LF
|
805.000
|
$660.000
|
$716.080
|
$500.000
|
$660.000
|
$580.000
|
$815.000
|
$752.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
61.000
|
$51.000
|
$72.450
|
$65.410
|
$60.000
|
$75.000
|
$107.000
|
$70.200
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
206.000
|
$70.000
|
$86.100
|
$67.760
|
$75.000
|
$72.000
|
$88.000
|
$87.800
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
219.000
|
$66.000
|
$73.500
|
$61.770
|
$85.000
|
$72.000
|
$88.000
|
$99.500
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$3,800.000
|
$7,874.770
|
$3,521.690
|
$6,000.000
|
$5,000.000
|
$4,000.000
|
$7,021.700
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
4.000
|
$9,300.000
|
$11,549.660
|
$10,622.550
|
$16,200.000
|
$17,200.000
|
$11,000.000
|
$9,256.800
|
|
|
SET (TY I)(S= 8 FT)(HW= 9 FT)(4:1) (C)
|
EA
|
10.000
|
$18,000.000
|
$18,899.440
|
$10,220.840
|
$17,000.000
|
$16,240.000
|
$18,000.000
|
$13,205.900
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$766.000
|
$1,574.950
|
$1,747.310
|
$1,850.000
|
$1,200.000
|
$1,900.000
|
$2,165.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$833.000
|
$1,837.450
|
$2,043.360
|
$2,000.000
|
$1,200.000
|
$2,050.000
|
$2,340.600
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,115.000
|
$2,099.940
|
$2,510.760
|
$2,200.000
|
$1,800.000
|
$2,000.000
|
$2,574.600
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
9.000
|
$2,559.000
|
$2,675.150
|
$1,542.060
|
$6,000.000
|
$2,225.000
|
$2,800.000
|
$2,432.600
|
|
|
PIPE (PVC) (SCH 40) (4 IN)
|
LF
|
1,440.000
|
$36.000
|
$7.000
|
$8.290
|
$25.000
|
$6.000
|
$11.000
|
$5.400
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
18.000
|
$40.000
|
$107.270
|
$387.770
|
$70.000
|
$92.000
|
$180.000
|
$48.600
|
|
|
PIPE (PVC) (SCH 40) (12 IN)
|
LF
|
1,002.000
|
$42.000
|
$90.260
|
$104.940
|
$90.000
|
$72.000
|
$20.000
|
$56.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$440.000
|
$782.420
|
$642.180
|
$800.000
|
$366.000
|
$800.000
|
$369.600
|
|
|
REMOV STR (PIPE)
|
LF
|
6.000
|
$15.000
|
$73.500
|
$214.060
|
$19.000
|
$113.000
|
$110.000
|
$13.900
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,046,451.820
|
$1,400,000.000
|
$1,400,000.000
|
$1,700,000.000
|
$1,600,000.000
|
$1,600,000.000
|
$2,050,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$1,500.000
|
$2,268.450
|
$2,500.000
|
$1,000.000
|
$2,850.000
|
$1,500.000
|
$4,862.700
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
440.000
|
$42.000
|
$48.000
|
$52.000
|
$48.000
|
$50.000
|
$48.000
|
$62.700
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
440.000
|
$8.000
|
$12.000
|
$7.000
|
$5.000
|
$12.500
|
$12.000
|
$15.200
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
240.000
|
$20.000
|
$12.000
|
$30.000
|
$31.000
|
$12.500
|
$12.000
|
$9.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
240.000
|
$7.300
|
$2.000
|
$7.300
|
$1.000
|
$2.000
|
$2.000
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
16,011.000
|
$2.400
|
$1.750
|
$2.000
|
$1.750
|
$2.000
|
$1.750
|
$1.900
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
16,011.000
|
$0.640
|
$0.600
|
$0.410
|
$0.100
|
$0.650
|
$0.600
|
$0.300
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
560.000
|
$5.000
|
$4.500
|
$4.440
|
$4.500
|
$4.750
|
$4.500
|
$5.900
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
560.000
|
$1.100
|
$1.000
|
$0.880
|
$0.100
|
$1.100
|
$1.000
|
$1.100
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,323.000
|
$49.000
|
$43.800
|
$60.530
|
$65.000
|
$52.000
|
$40.000
|
$40.900
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,812.500
|
$19.400
|
$17.000
|
$19.000
|
$17.000
|
$18.000
|
$17.000
|
$20.700
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$1,800.000
|
$1,500.000
|
$1,440.000
|
$1,500.000
|
$1,580.000
|
$1,600.000
|
$1,544.700
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$2.500
|
$1.000
|
$2.000
|
$1.000
|
$1.100
|
$1.000
|
$1.600
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,571.000
|
$2,285.000
|
$2,450.000
|
$2,285.000
|
$2,408.000
|
$2,300.000
|
$2,729.600
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$240.000
|
$150.000
|
$200.000
|
$150.000
|
$158.000
|
$150.000
|
$211.600
|
|
|
PIPE UNDERDRAINS (TY 7) (6")
|
LF
|
200.000
|
$25.000
|
$15.750
|
$22.490
|
$30.000
|
$30.000
|
$170.000
|
$33.600
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
41.000
|
$494.000
|
$422.000
|
$422.000
|
$422.000
|
$606.000
|
$400.000
|
$423.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$560.000
|
$507.000
|
$507.000
|
$507.000
|
$732.000
|
$530.000
|
$498.600
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$560.000
|
$568.000
|
$568.000
|
$568.000
|
$932.000
|
$580.000
|
$706.700
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$650.000
|
$605.000
|
$605.000
|
$605.000
|
$840.000
|
$610.000
|
$533.700
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$82.000
|
$98.000
|
$98.000
|
$98.000
|
$105.000
|
$100.000
|
$95.200
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
5.000
|
$44.000
|
$55.000
|
$55.000
|
$55.000
|
$79.000
|
$60.000
|
$51.300
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,346.000
|
$0.620
|
$1.750
|
$1.000
|
$1.000
|
$0.580
|
$1.000
|
$1.900
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,346.000
|
$0.670
|
$1.750
|
$1.000
|
$1.000
|
$0.600
|
$1.000
|
$1.900
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,209.000
|
$0.780
|
$0.800
|
$0.770
|
$0.800
|
$0.850
|
$0.800
|
$0.800
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,351.000
|
$5.500
|
$5.750
|
$5.780
|
$5.800
|
$6.200
|
$6.000
|
$6.100
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
12.000
|
$108.000
|
$125.000
|
$150.000
|
$150.000
|
$120.000
|
$150.000
|
$132.300
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
12.000
|
$155.000
|
$200.000
|
$150.000
|
$150.000
|
$148.000
|
$150.000
|
$211.600
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
601.000
|
$5.700
|
$5.750
|
$6.000
|
$6.000
|
$5.850
|
$6.000
|
$6.100
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
2,728.000
|
$0.140
|
$0.200
|
$0.200
|
$0.200
|
$0.100
|
$0.200
|
$0.200
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
2,728.000
|
$0.140
|
$0.200
|
$0.200
|
$0.200
|
$0.100
|
$0.200
|
$0.200
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
25,502.000
|
$0.290
|
$0.320
|
$0.400
|
$0.400
|
$0.280
|
$0.400
|
$0.300
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
741.000
|
$0.290
|
$0.320
|
$0.500
|
$0.500
|
$0.260
|
$0.500
|
$0.300
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
29,947.000
|
$0.300
|
$0.320
|
$0.400
|
$0.400
|
$0.280
|
$0.400
|
$0.300
|
|
REFL PAV MRKR TY I-C
|
EA
|
127.000
|
$3.200
|
$4.000
|
$5.000
|
$5.000
|
$3.300
|
$5.000
|
$4.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,081.000
|
$3.130
|
$4.000
|
$3.770
|
$3.770
|
$2.800
|
$3.780
|
$4.200
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,692.000
|
$0.380
|
$0.700
|
$0.670
|
$0.670
|
$0.400
|
$0.680
|
$0.700
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
5,456.000
|
$0.150
|
$0.200
|
$0.200
|
$0.200
|
$0.060
|
$0.200
|
$0.200
|
|
|
NO. OF WORKING DAYS
|
$/D
|
6,500.000
|
$348.000
|
$210.000
|
$200.000
|
$260.000
|
$280.000
|
$348.000
|
$348.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
63,727.000
|
$1.390
|
$0.730
|
$1.250
|
$1.500
|
$1.250
|
$1.850
|
$1.500
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
160.000
|
$50.000
|
$42.000
|
$42.000
|
$42.000
|
$27.000
|
$30.000
|
$92.600
|
|
|
TMA (STATIONARY)
|
DAY
|
26.000
|
$178.410
|
$312.760
|
$334.220
|
$260.000
|
$245.000
|
$250.000
|
$209.400
|
|
|
PRESSURE TAP AND VALVE 8"X8"
|
EA
|
2.000
|
$1,100.000
|
$4,700.000
|
$8,434.260
|
$10,000.000
|
$7,100.000
|
$8,900.000
|
$11,702.800
|
|
|
WET CONNECTION 8 DIA X 8 DIA
|
EA
|
2.000
|
$2,525.000
|
$1,200.000
|
$1,819.650
|
$8,000.000
|
$1,600.000
|
$2,000.000
|
$9,362.200
|
|
|
FIRE HYDRANTS
|
EA
|
1.000
|
$5,000.000
|
$5,100.000
|
$5,409.120
|
$5,200.000
|
$5,640.000
|
$5,700.000
|
$6,085.500
|
|
|
ABND/RMV/DISPOSE EXIST LINE (ALL TY/SZ)
|
LF
|
570.000
|
$15.000
|
$86.000
|
$5.070
|
$27.000
|
$17.000
|
$5.500
|
$31.600
|
|
|
PIPE (8") PVC C-900 DR-14 (ALL DEPTHS)
|
LF
|
860.000
|
$17.570
|
$77.000
|
$56.890
|
$60.000
|
$40.000
|
$60.000
|
$70.200
|
|
|
PIPE ENCASEMENT (16")STEEL(BORE)
|
LF
|
472.000
|
$214.000
|
$156.000
|
$102.930
|
$424.000
|
$380.000
|
$108.000
|
$496.200
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
5.080
|
$7,500.000
|
$10,000.000
|
$6,216.460
|
$10,000.000
|
$4,600.000
|
$6,600.000
|
$11,702.800
|
|
|
ENCASEMENT PIPE 48" DIA TYPE STEEL
|
LF
|
235.000
|
$479.510
|
$350.000
|
$322.980
|
$350.000
|
$245.000
|
$335.000
|
$409.600
|
|
|
CUT/PLUG EXIST WATER LINE (ALL WL SIZE)
|
EA
|
2.000
|
$1,500.000
|
$5,300.000
|
$1,702.530
|
$15,000.000
|
$1,500.000
|
$1,800.000
|
$17,554.200
|
|
|
EXISTING 16" DIA PIPE JOINT RESTRNT DEV
|
LF
|
2.000
|
$1,500.000
|
$1,600.000
|
$7,811.210
|
$1,600.000
|
$3,300.000
|
$2,000.000
|
$1,872.400
|
|
|
PIPE (30 ) DI CLASS 250 (ALL DEPTHS)
|
LF
|
812.000
|
$444.650
|
$240.000
|
$187.150
|
$260.000
|
$195.000
|
$200.000
|
$304.300
|
|
|
WET CONNECTION 30 DIA X 30 DIA
|
EA
|
2.000
|
$14,910.520
|
$25,000.000
|
$33,791.590
|
$31,000.000
|
$6,500.000
|
$36,000.000
|
$36,278.700
|
|
|
WET CONNECTION 36 DIA X 36 DIA
|
EA
|
2.000
|
$21,417.440
|
$30,000.000
|
$36,213.990
|
$40,000.000
|
$8,100.000
|
$43,000.000
|
$46,811.200
|
|
|
AUTO COMBO AIR/VAC RELEASE VALVE AM 4"
|
EA
|
1.000
|
$16,574.060
|
$31,000.000
|
$28,830.490
|
$11,000.000
|
$23,000.000
|
$31,000.000
|
$12,873.100
|
|
Totals: |
$16,636,059.080
|
$16,235,482.385
|
$16,669,113.327
|
$17,599,662.710
|
$18,367,073.990
|
$18,544,783.950
|
$20,518,517.469
|