0206-01-050
|
ANDERSON
|
TYLER
|
$13,463,239
|
US 79
|
NH 1902(161)
|
07/09/2019
|
09/27/2024
|
BASE & SURF, WIDEN STRS, REPLC BR...
|
MADDEN CONTRACTING COMPANY, LLC.
($14,425,842)
|
|
|
0548-01-034
|
ANDREWS
|
ODESSA
|
$10,643,351
|
SH 176
|
STP 2019(944)HES
|
07/09/2019
|
09/27/2024
|
GR,STR,BASE,SURF,SIGN,&ILL
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($14,337,021)
|
|
|
0336-05-066
|
ANGELINA
|
LUFKIN
|
$2,135,153
|
SH 103
|
BR 1902(158)
|
07/10/2019
|
09/27/2024
|
BRIDGE MAINT
|
STATELINE CONSTRUCTION, LLC
($2,152,215)
|
|
|
0911-00-076
|
ANGELINA
|
LUFKIN
|
$4,274,919
|
VA
|
STP 1902(159)
|
07/09/2019
|
09/27/2024
|
PEDESTRIAN, SIDEWALKS & CURB RAMPS
|
ENCINO LANDSCAPE, INC.
($5,294,836)
|
|
|
2507-01-020
|
ANGELINA
|
LUFKIN
|
$3,873,890
|
FM 326
|
STP 1902(160)
|
07/09/2019
|
09/27/2024
|
REHAB OF EXIST ROAD
|
PINTO CONSTRUCTION CO., INC.
($3,646,857)
|
|
|
6335-09-001
|
AUSTIN
|
YOAKUM
|
$156,055
|
FM1458
|
RMC - 633509001
|
07/19/2019
|
11/15/2023
|
CONSTRUCTION OF SIDEWALKS/PARKING LO...
|
CONSTAR CONSTRUCTION
($246,913)
|
|
|
0017-09-105
|
BEXAR
|
SAN ANTONIO
|
$727,467
|
IH 35
|
NH 1902(205)
|
07/09/2019
|
09/27/2024
|
LANDSCAPE DEVELOPMENT
|
ENCINO LANDSCAPE, INC.
($641,593)
|
|
|
0017-10-288
|
BEXAR
|
SAN ANTONIO
|
$1,222,847
|
IH 35
|
STP 1902(206)HES
|
07/10/2019
|
09/27/2024
|
HAZARD ELIM & SAFETY
|
E-Z BEL CONSTRUCTION, LLC
($1,477,237)
|
|
|
0253-04-158
|
BEXAR
|
SAN ANTONIO
|
$2,215,587
|
US 281
|
NH 1902(213)
|
07/10/2019
|
09/27/2024
|
CORRIDOR TRAF MGT
|
THE LEVY COMPANY, INC.
($2,343,348)
|
|
|
0521-04-204
|
BEXAR
|
SAN ANTONIO
|
$88,927,911
|
IH 410
|
NH 1902(215)
|
07/09/2019
|
11/15/2023
|
GR, STRS, BASE, SURF, SIGN & UTIL
|
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
($77,332,883)
|
|
|
0915-12-622
|
BEXAR
|
SAN ANTONIO
|
$1,778,970
|
CS
|
STP 1902(200)HES
|
07/10/2019
|
09/27/2024
|
HAZARD ELIM & SAFETY
|
E-Z BEL CONSTRUCTION, LLC
($1,694,498)
|
|
|
6345-21-001
|
BEXAR
|
SAN ANTONIO
|
$572,087
|
IH0037
|
RMC - 634521001
|
07/09/2019
|
11/15/2023
|
BRIDGE JOINT REPAIR
|
MPB, INC.
($698,380)
|
|
|
6341-70-001
|
BOSQUE
|
WACO
|
$747,671
|
SH0022
|
RMC - 634170001
|
07/10/2019
|
11/15/2023
|
BASE FAILURE PAVMT REPAIR
|
BICK'S CONSTRUCTION, INC.
($790,263)
|
|
|
6343-78-001
|
BRAZOS
|
BRYAN
|
$228,354
|
SH0021
|
RMC - 634378001
|
07/16/2019
|
11/15/2023
|
TREE RMVL
|
PATTERSON'S COMPLETE TREE SERVICE LLC
($267,500)
|
|
|
6346-24-001
|
BRAZOS
|
BRYAN
|
$608,560
|
US0190
|
RMC - 634624001
|
07/10/2019
|
11/15/2023
|
INSTL OF DRIVEWAY PIPE
|
R&M INCORPORATED
($715,533)
|
|
|
6346-63-001
|
BRAZOS
|
BRYAN
|
$1,953,075
|
SH0006
|
RMC - 634663001
|
07/10/2019
|
11/15/2023
|
FLAGGING AND TRAF CONTROL
|
NIXON ENGINEERING
($1,841,225)
|
|
|
6344-87-001
|
BREWSTER
|
EL PASO
|
$92,176
|
SH0118
|
RMC - 634487001
|
07/02/2019
|
09/27/2024
|
JANITORIAL MAINT
|
RWCS JANITORIAL LLC
($99,500)
|
|
|
1090-05-018
|
CALHOUN
|
YOAKUM
|
$4,403,927
|
FM 1593
|
STP 1902(171)
|
07/10/2019
|
09/27/2024
|
RESTORE EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($4,811,548)
|
|
|
6321-86-001
|
CALHOUN
|
YOAKUM
|
$150,000
|
SH0035
|
RMC - 632186001
|
07/17/2019
|
11/15/2023
|
FENDER REPAIRS
|
TEXAS GULF CONSTRUCTION COMPANY, INC.
($147,105)
|
|
|
0919-00-079
|
CASS
|
ATLANTA
|
$1,266,420
|
VA
|
STP 1902(197)
|
07/09/2019
|
09/27/2024
|
PAVMT MRK
|
STRIPE-A-ZONE, INC.
($1,112,297)
|
|
|
6342-45-001
|
CHAMBERS
|
BEAUMONT
|
$232,868
|
IH0010
|
RMC - 634245001
|
07/10/2019
|
11/15/2023
|
MBGF/GUARDRAIL REPAIRS
|
ISI CONTRACTING, INC.
($268,740)
|
|
|
0198-07-014
|
CHEROKEE
|
TYLER
|
$14,670,601
|
SH 204
|
STP 1902(166)
|
07/10/2019
|
09/27/2024
|
GRADING, BS, ASPH PV, DRNAGE, SIGNIN...
|
MADDEN CONTRACTING COMPANY, LLC.
($13,705,298)
|
|
|
0137-10-025
|
CLAY
|
WICHITA FALLS
|
$700,318
|
FM 174
|
STP 1902(144)HES
|
07/09/2019
|
09/27/2024
|
MILLED CENTERLINE RUMBLE STRIPS
|
STRIPE-A-ZONE, INC.
($656,778)
|
|
|
6331-12-001
|
COKE
|
SAN ANGELO
|
$435,583
|
US0277
|
RMC - 633112001
|
07/10/2019
|
11/15/2023
|
BRIDGE AND RAIL REPAIR
|
SCR CIVIL CONSTRUCTION, LLC
($419,185)
|
|
|
0091-05-059
|
COLLIN
|
DALLAS
|
$3,935,249
|
SH 289
|
CM 1902(218)
|
07/10/2019
|
09/27/2024
|
WIDEN OVERPASS; INTERS IMPRVS
|
J.D. ABRAMS, L.P.
($4,599,209)
|
|
|
6343-92-001
|
COLLIN
|
DALLAS
|
$497,185
|
US0075
|
RMC - 634392001
|
07/10/2019
|
11/15/2023
|
REPAIR/REPLACE CONC BARRIER
|
GHB EQUIPMENT COMPANY, L.L.C.
($456,836)
|
|
|
6344-41-001
|
COMANCHE
|
BROWNWOOD
|
$489,324
|
FM1476
|
RMC - 634441001
|
07/09/2019
|
11/15/2023
|
INSTL CURVE SIGNS
|
ELLIS-MCGINNIS CONSTRUCTION CO.
($457,150)
|
|
|
0070-05-037
|
CONCHO
|
SAN ANGELO
|
$13,126,208
|
US 87
|
NH 1902(151)
|
07/09/2019
|
09/27/2024
|
CONSTRUCT PASSING LANES
|
ALLEN KELLER COMPANY
($13,599,408)
|
|
|
0823-01-036
|
COOKE
|
WICHITA FALLS
|
$5,721,881
|
FM 2382
|
STP 1902(147)
|
07/10/2019
|
09/27/2024
|
WIDEN PAVMT AND OVERLAY
|
EUROVIA ATLANTIC COAST LLC
($6,142,770)
|
|
|
0925-14-009
|
COTTLE
|
CHILDRESS
|
$506,173
|
CR
|
BR 2018(497)
|
07/10/2019
|
09/27/2024
|
REPL OF EXIST BRIDGE
|
EARTH BUILDERS, L.P.
($818,430)
|
|
|
1643-01-016
|
CROCKETT
|
SAN ANGELO
|
$14,208,778
|
SH 137
|
STP 1902(153)
|
07/10/2019
|
09/27/2024
|
RESTOR OF EXIST ROAD
|
REECE ALBERT, INC.
($16,675,320)
|
|
|
0196-03-278
|
DALLAS
|
DALLAS
|
$4,588,941
|
IH 35E
|
NH 1902(220)
|
07/09/2019
|
09/27/2024
|
FDR-CP, MILL, OV, PAV MRKS ON NB FRO...
|
O. TREVINO CONSTRUCTION, LLC
($4,269,055)
|
|
|
0918-00-288
|
DALLAS
|
DALLAS
|
$2,500,000
|
VA
|
STP 1902(116)
|
07/10/2019
|
09/27/2024
|
INSTL OF NON-SITE SPECIFIC TRAF SIG
|
DURABLE SPECIALTIES, INC.
($2,286,000)
|
|
|
6342-56-001
|
DALLAS
|
DALLAS
|
$462,202
|
US0080
|
RMC - 634256001
|
07/09/2019
|
11/15/2023
|
MISCELLANEOUS CONC REPAIR
|
DBI SERVICES, LLC
($505,520)
|
|
|
6342-57-001
|
DALLAS
|
DALLAS
|
$447,809
|
US0067
|
RMC - 634257001
|
07/10/2019
|
11/15/2023
|
MISCELLANEOUS CONC REPAIR
|
SELECT STRIPING LLC
($460,760)
|
|
|
6342-70-001
|
DALLAS
|
DALLAS
|
$1,192,329
|
IH0635
|
RMC - 634270001
|
07/09/2019
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
FOUTSCO PAVING COMPANY, LLC
($989,553)
|
|
|
6342-71-001
|
DALLAS
|
DALLAS
|
$1,180,595
|
IH0020
|
RMC - 634271001
|
07/09/2019
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
PEACHTREE CONSTRUCTION, LTD.
($1,255,242)
|
|
|
6342-72-001
|
DALLAS
|
DALLAS
|
$555,988
|
SL0012
|
RMC - 634272001
|
07/10/2019
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
PEACHTREE CONSTRUCTION, LTD.
($511,923)
|
|
|
6342-73-001
|
DALLAS
|
DALLAS
|
$388,104
|
FM1382
|
RMC - 634273001
|
07/10/2019
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
FOUTSCO PAVING COMPANY, LLC
($422,344)
|
|
|
6343-27-001
|
DALLAS
|
DALLAS
|
$3,995,035
|
US0080
|
RMC - 634327001
|
07/09/2019
|
11/15/2023
|
GUARD FENCE & CABLE REPAIR
|
FIREMAN EXCAVATING, INC.
($3,273,523)
|
|
|
6344-38-001
|
DALLAS
|
DALLAS
|
$582,000
|
IH0035E
|
RMC - 634438001
|
07/10/2019
|
11/15/2023
|
ON-CALL TRAF CONTROL SERVICES
|
TOTAL HIGHWAY MAINTENANCE, LLC
($599,100)
|
|
|
0136-03-065
|
DELTA
|
PARIS
|
$1,468,011
|
SH 24
|
STP 1902(104)HES
|
07/10/2019
|
09/27/2024
|
IMPROVE GUARDRAIL TO DESIGN STANDARD...
|
DBI SERVICES, LLC
($1,347,221)
|
|
|
0918-46-279
|
DENTON
|
DALLAS
|
$2,980,437
|
VA
|
STP 1902(221)
|
07/09/2019
|
09/27/2024
|
CONSTRUCT CURB RAMP IMPRVS IN DENTON...
|
J.R. POPE COMPANY, INC.
($2,979,677)
|
|
|
6337-07-001
|
DENTON
|
DALLAS
|
$538,945
|
IH0035
|
BPM - 633707001
|
07/10/2019
|
11/15/2023
|
BPM - BRIDGE JOINT REPAIR
|
SELECT STRIPING LLC
($555,904)
|
|
|
0228-06-087
|
ECTOR
|
ODESSA
|
$600,977
|
US 385
|
STP 2019(821)HES
|
07/09/2019
|
09/27/2024
|
TRAF SIGNAL IMPRVS
|
AMERICAN LIGHTING AND SIGNALIZATION, LLC
($698,268)
|
|
|
0906-00-184
|
ECTOR
|
ODESSA
|
$933,092
|
VA
|
C 906-00-184
|
07/10/2019
|
09/27/2024
|
GUARDRAIL UPGRADES
|
HJC FARMS, INC.
($890,538)
|
|
|
6333-28-001
|
ELLIS
|
DALLAS
|
$640,643
|
SH0034
|
RMC - 633328001
|
07/09/2019
|
11/15/2023
|
REFLECTORIZED PAVMT MRK AND MARKERS
|
TOTAL HIGHWAY MAINTENANCE, LLC
($619,012)
|
|
|
6341-60-001
|
ELLIS
|
DALLAS
|
$255,688
|
US0287
|
RMC - 634160001
|
07/16/2019
|
11/15/2023
|
ON-CALL REFLECTORIZED PAVMT MRK
|
STRIPING TECHNOLOGY, L.P.
($282,300)
|
|
|
2121-04-111
|
EL PASO
|
EL PASO
|
$689,549
|
IH 10
|
NH 1902(112)
|
07/09/2019
|
09/27/2024
|
LANDSCAPE & SCENIC ENHAN
|
DOUBLE H CONTRACTING INC.
($896,244)
|
|
|
2552-01-058
|
EL PASO
|
EL PASO
|
$16,799,428
|
SL 375
|
STP 1902(114)HES
|
07/10/2019
|
09/27/2024
|
REHAB OF EXIST ROAD
|
J. A. R. CONCRETE, INC.
($13,858,443)
|
|
|
6341-72-001
|
FALLS
|
WACO
|
$570,797
|
FM0147
|
RMC - 634172001
|
07/10/2019
|
11/15/2023
|
BASE FAILURE PAVMT REPAIR
|
KNIFE RIVER CORPORATION - SOUTH
($507,128)
|
|
|
0901-32-085
|
FANNIN
|
PARIS
|
$1,372,879
|
CR
|
BR 2015(754)
|
07/09/2019
|
09/27/2024
|
BRIDGE REPL
|
STATELINE CONSTRUCTION, LLC
($1,358,596)
|
|
|
0323-02-034
|
FAYETTE
|
YOAKUM
|
$16,938,585
|
SH 95
|
STP 1902(163)
|
07/10/2019
|
09/27/2024
|
REHAB OF EXIST ROAD
|
HUNTER INDUSTRIES, LTD.
($15,550,417)
|
|
|
2820-01-012
|
FAYETTE
|
YOAKUM
|
$6,542,148
|
FM 2762
|
C 2820-1-12
|
07/10/2019
|
09/27/2024
|
RESTORE EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($6,090,094)
|
|
|
3135-01-005
|
FAYETTE
|
YOAKUM
|
$1,987,084
|
FM 2714
|
C 3135-1-5
|
07/09/2019
|
09/27/2024
|
REHAB EXIST ROADWAY
|
KNIFE RIVER CORPORATION - SOUTH
($1,960,940)
|
|
|
0017-07-136
|
FRIO
|
SAN ANTONIO
|
$921,017
|
IH 35
|
STP 1902(204)HES
|
07/09/2019
|
09/27/2024
|
INSTAL FLASH BEACON & SAFETY LIGHT A...
|
E-Z BEL CONSTRUCTION, LLC
($952,818)
|
|
|
0051-04-067
|
GALVESTON
|
HOUSTON
|
$8,180,409
|
SH 87
|
NH 1902(174)
|
07/10/2019
|
09/27/2024
|
SURF/ROADWAY RESTOR
|
ANGEL BROTHERS HOLDINGS CORP.
($10,994,230)
|
|
|
0367-05-050
|
GALVESTON
|
HOUSTON
|
$26,142,000
|
SH 87
|
FBD 1902(343)
|
07/10/2019
|
09/27/2024
|
CONSTRUCTION OF A NEW 70 CAR FERRY B...
|
GULF ISLAND FABRICATION, INC.
($32,943,459)
|
|
|
6344-20-001
|
GALVESTON
|
HOUSTON
|
$425,195
|
FM2004
|
RMC - 634420001
|
07/09/2019
|
11/15/2023
|
REFL PAVMT MRK (LONG LINE)
|
PMI PAVEMENT MARKING, LLC
($535,586)
|
|
|
0155-04-055
|
GOLIAD
|
CORPUS CHRISTI
|
$29,312,416
|
US 183
|
STP 1902(107)
|
07/09/2019
|
09/27/2024
|
REHAB ROADWAY AND ADD PASSING LANES
|
HUNTER INDUSTRIES, LTD.
($31,126,365)
|
|
|
0729-01-039
|
GRAYSON
|
PARIS
|
$11,922,009
|
FM 121
|
STP 2016(622)
|
07/10/2019
|
09/27/2024
|
WIDEN NON-FREEWAY
|
MARIO SINACOLA & SONS EXCAVATING, INC.
($13,617,112)
|
|
|
0901-19-179
|
GRAYSON
|
PARIS
|
$1,125,202
|
CR
|
BR 2016(434)
|
07/09/2019
|
09/27/2024
|
BRIDGE REPL
|
HODGES AND SON CONSTRUCTION COMPANY, INC.
($1,226,218)
|
|
|
6342-34-001
|
GRAYSON
|
PARIS
|
$797,485
|
US0075
|
RMC - 634234001
|
07/10/2019
|
11/15/2023
|
BRIDGE REPAIR AND FULL DEPTH CONC RE...
|
GHB EQUIPMENT COMPANY, L.L.C.
($741,270)
|
|
|
6345-41-001
|
GRAYSON
|
PARIS
|
$321,900
|
US0075
|
RMC - 634541001
|
07/09/2019
|
11/15/2023
|
CLEANING AND SWEEPING HWYS
|
SWEEPING SERVICES OF TEXAS - OPERATING, L.P.
($380,150)
|
|
|
0366-12-030
|
GUADALUPE
|
SAN ANTONIO
|
$987,189
|
BS 123B
|
STP 2019(901)HES
|
07/09/2019
|
09/27/2024
|
SIG
|
E-Z BEL CONSTRUCTION, LLC
($997,498)
|
|
|
0067-04-055
|
HALE
|
LUBBOCK
|
$36,184,961
|
IH 27
|
STP 1902(148)HES
|
07/10/2019
|
09/27/2024
|
SAFETY
|
WEBBER, LLC
($34,365,850)
|
|
|
0050-09-095
|
HARRIS
|
HOUSTON
|
$2,114,748
|
US 290
|
NH 1902(173)
|
07/09/2019
|
09/27/2024
|
LANDSCAPE DEVELOPMENT
|
YELLOWSTONE LANDSCAPE - CENTRAL, INC.
($1,648,298)
|
|
|
0110-05-132
|
HARRIS
|
HOUSTON
|
$1,708,904
|
IH 45
|
NH 1902(176)
|
07/10/2019
|
09/27/2024
|
LANDSCAPE DEVELOPMENT
|
YELLOWSTONE LANDSCAPE - CENTRAL, INC.
($1,723,384)
|
|
|
0271-14-235
|
HARRIS
|
HOUSTON
|
$1,534,231
|
IH 610
|
NH 1902(179)
|
07/09/2019
|
09/27/2024
|
LANDSCAPE DEVELOPMENT
|
YELLOWSTONE LANDSCAPE - CENTRAL, INC.
($1,238,911)
|
|
|
0912-70-093
|
HARRIS
|
HOUSTON
|
$4,168,235
|
CS
|
BR 2014(687)
|
07/10/2019
|
09/27/2024
|
REPLACE BRIDGE
|
RAGLE CONSTRUCTION, INC.
($4,947,624)
|
|
|
0912-72-340
|
HARRIS
|
HOUSTON
|
$13,717,932
|
CS
|
STP 1902(181)MM
|
07/09/2019
|
09/27/2024
|
WIDEN TO 4-LN DIVIDED RDWY, BRIDGE,...
|
ISI CONTRACTING, INC.
($15,109,139)
|
|
|
0912-72-373
|
HARRIS
|
HOUSTON
|
$13,262,878
|
CS
|
STP 2018(495)MM
|
07/10/2019
|
09/27/2024
|
RECON ROADWAY, DRAINAGE, SIDEWALKS,...
|
SER CONSTRUCTION PARTNERS, LLC
($13,891,860)
|
|
|
1062-04-058
|
HARRIS
|
HOUSTON
|
$22,007,351
|
FM 2100
|
NH 1902(182)
|
07/09/2019
|
09/27/2024
|
WIDEN TO 4-LANE DIVIDED
|
SER CONSTRUCTION PARTNERS, LLC
($25,495,057)
|
|
|
6344-99-001
|
HARRIS
|
HOUSTON
|
$9,031,196
|
IH0610
|
RMC - 634499001
|
07/09/2019
|
11/15/2023
|
GENERAL MAINT HOU METRO AREA
|
ISI CONTRACTING, INC.
($7,890,503)
|
|
|
6345-28-001
|
HARRIS
|
HOUSTON
|
$298,934
|
IH0010
|
RMC - 634528001
|
07/16/2019
|
11/15/2023
|
MOW
|
YELLOWSTONE LANDSCAPE - CENTRAL, INC.
($379,171)
|
|
|
6347-29-001
|
HARRIS
|
HOUSTON
|
$2,679,000
|
US0059
|
RMC - 634729001
|
07/10/2019
|
11/15/2023
|
DEBRIS RMVL & DISPOSAL_FOR EMERGENCY...
|
TOM-MAC, INC.
($2,626,915)
|
|
|
3545-02-007
|
HAYS
|
AUSTIN
|
$16,636,059
|
FM 110
|
CC 3545-2-7
|
07/10/2019
|
09/27/2024
|
CONSTRUCT NEW ROAD
|
HUNTER INDUSTRIES, LTD.
($16,235,482)
|
|
|
6345-68-001
|
HOPKINS
|
PARIS
|
$25,621
|
IH0030
|
RMC - 634568001
|
07/18/2019
|
11/15/2023
|
LANDSCAPE MAINT
|
WILLIAM CURTIS SMITH
($35,000)
|
|
|
0937-02-030
|
HOUSTON
|
LUFKIN
|
$1,363,450
|
FM 227
|
BR 1902(071)
|
07/10/2019
|
09/27/2024
|
REPLACE BRIDGE AND APPROACHES
|
A. L. HELMCAMP, INC.
($1,388,286)
|
|
|
0668-04-004
|
HOWARD
|
ABILENE
|
$6,507,229
|
FM 700
|
STP 2019(922)
|
07/10/2019
|
09/27/2024
|
CONSTRUCT OVERPASS AT US 87
|
GILVIN-TERRILL, LTD.
($7,761,126)
|
|
|
2121-06-044
|
HUDSPETH
|
EL PASO
|
$2,923,780
|
IH 10
|
STP 1902(355)HES
|
07/09/2019
|
09/27/2024
|
SAFETY
|
DAN WILLIAMS COMPANY
($2,234,212)
|
|
|
6344-59-001
|
HUDSPETH
|
EL PASO
|
$61,980
|
IH0010
|
RMC - 634459001
|
07/23/2019
|
11/15/2023
|
PICNIC AREA MAINT
|
ABOVE ALL CONSTRUCTION
($75,000)
|
|
|
0249-07-075
|
JACK
|
FORT WORTH
|
$2,656,496
|
US 281
|
NH 1902(228)
|
07/09/2019
|
09/27/2024
|
RESURF ROADWAY
|
EUROVIA ATLANTIC COAST LLC
($2,511,823)
|
|
|
0089-03-092
|
JACKSON
|
YOAKUM
|
$1,927,735
|
US 59
|
STP 1902(165)HES
|
07/09/2019
|
09/27/2024
|
MODIFY BRIDGE RAIL AND APPROACH GUAR...
|
3LW CIVIL LLC
($1,939,360)
|
|
|
6337-84-001
|
JASPER
|
BEAUMONT
|
$737,167
|
SH0063
|
RMC - 633784001
|
07/10/2019
|
11/15/2023
|
MILL & INLAY
|
TEXAS MATERIALS GROUP, INC.
($798,730)
|
|
|
0667-02-111
|
JEFFERSON
|
BEAUMONT
|
$638,807
|
FM 366
|
STP 2019(742)HES
|
07/10/2019
|
09/27/2024
|
IMPROVE TRAF SIG
|
TRAF-TEX, INC.
($785,720)
|
|
|
6344-35-001
|
JEFFERSON
|
BEAUMONT
|
$535,932
|
IH0010
|
RMC - 634435001
|
07/10/2019
|
11/15/2023
|
METAL BEAM GUARD FENCE REPAIRS
|
ISI CONTRACTING, INC.
($646,261)
|
|
|
6347-30-001
|
JEFFERSON
|
BEAUMONT
|
$1,648,500
|
IH0010
|
RMC - 634730001
|
07/09/2019
|
11/15/2023
|
CALLOUT DEBRIS RMVL AND DISPOSAL
|
TOM-MAC, INC.
($1,343,287)
|
|
|
0255-01-084
|
JIM WELLS
|
CORPUS CHRISTI
|
$5,227,164
|
US 281
|
C 255-1-84
|
07/09/2019
|
09/27/2024
|
OVERLAY ROADWAY
|
HUNTER INDUSTRIES, LTD.
($5,930,379)
|
|
|
0142-15-026
|
KENDALL
|
SAN ANTONIO
|
$11,445,737
|
IH 10
|
NH 2019(788)
|
07/09/2019
|
09/27/2024
|
GRAD, BASE, SURF, STR, PAV'T MRKMT
|
HUNTER INDUSTRIES, LTD.
($12,602,402)
|
|
|
0291-03-071
|
KERR
|
SAN ANTONIO
|
$5,209,150
|
SH 16
|
STP 1902(214)
|
07/10/2019
|
09/27/2024
|
BASE REPAIR, SC, OVERLAY & PAVMT MRK...
|
LONE STAR PAVING COMPANY
($4,928,309)
|
|
|
6335-57-001
|
KIMBLE
|
SAN ANGELO
|
$443,734
|
FM2169
|
RMC - 633557001
|
07/09/2019
|
11/15/2023
|
CRACK SEAL - CLEANING AND SEALING CR...
|
D & M CONTRACTORS, LLC
($394,047)
|
|
|
6343-31-001
|
KIMBLE
|
SAN ANGELO
|
$520,700
|
IH0010
|
RMC - 634331001
|
07/09/2019
|
11/15/2023
|
METAL BEAM GUARDFENCE REPAIR/UPGRADE
|
K-BAR SERVICES, INC.
($632,830)
|
|
|
6344-26-001
|
LAMAR
|
PARIS
|
$312,290
|
US0082
|
RMC - 634426001
|
07/10/2019
|
11/15/2023
|
TRAF SIGNAL MAINT
|
NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION
($352,440)
|
|
|
6345-63-001
|
LAMAR
|
PARIS
|
$3,240,274
|
US0082
|
RMC - 634563001
|
07/09/2019
|
11/15/2023
|
ON CALL TRAF CONTROL SERVICES
|
AREA WIDE PROTECTIVE, INC.
($2,865,010)
|
|
|
6341-75-001
|
LIMESTONE
|
WACO
|
$192,803
|
SH0007
|
RMC - 634175001
|
07/10/2019
|
11/15/2023
|
BASE FAILURE PAVMT REPAIR
|
TEXAS MATERIALS GROUP, INC.
($212,367)
|
|
|
6345-39-001
|
LIMESTONE
|
WACO
|
$255,993
|
FM0634
|
RMC - 634539001
|
07/10/2019
|
11/15/2023
|
SEAL COAT AND PAVMT RERAIRS
|
TEXAS MATERIALS GROUP, INC.
($297,981)
|
|
|
0355-01-050
|
LIPSCOMB
|
AMARILLO
|
$3,039,978
|
SH 15
|
BR 1902(140)
|
07/09/2019
|
09/27/2024
|
BRIDGE REPL
|
EARTH BUILDERS, L.P.
($3,368,933)
|
|
|
0547-01-026
|
LLANO
|
AUSTIN
|
$591,698
|
SH 261
|
SSW 547-1-26
|
07/09/2019
|
09/27/2024
|
SAFETY IMPRVS PROJECTS
|
ACME BRIDGE COMPANY, INC.
($788,949)
|
|
|
0783-02-099
|
LUBBOCK
|
LUBBOCK
|
$1,356,002
|
SL 289
|
STP 1902(149)HES
|
07/09/2019
|
09/27/2024
|
SAFETY IMPRVS
|
MASSANA CONSTRUCTION INC.
($1,071,270)
|
|
|
0909-22-177
|
MCLENNAN
|
WACO
|
$970,069
|
CR
|
BR 2018(221)
|
07/10/2019
|
09/27/2024
|
REPL BR & APPRS
|
JAMES CONSTRUCTION GROUP, L.L.C.
($999,330)
|
|
|
6341-69-001
|
MCLENNAN
|
WACO
|
$976,504
|
FM3400
|
RMC - 634169001
|
07/10/2019
|
11/15/2023
|
BASE FAILURE PAVMT REPAIR
|
TEXAS MATERIALS GROUP, INC.
($1,041,147)
|
|
|
0380-09-093
|
MIDLAND
|
ODESSA
|
$1,902,606
|
BS 349C
|
STP 2019(752)HES
|
07/10/2019
|
09/27/2024
|
TRAF SIG, SIDEWALKS, & FLASHING YELL...
|
WILLIS ELECTRIC CO., LP
($2,375,886)
|
|
|
0110-02-027
|
MONTGOMERY
|
HOUSTON
|
$4,785,350
|
SH 75
|
BR 1902(363)
|
07/10/2019
|
09/27/2024
|
BRIDGE AND APPROACH REPL
|
SMITH & COMPANY
($5,663,720)
|
|
|
3538-01-053
|
MONTGOMERY
|
HOUSTON
|
$438,798
|
SH 242
|
BR 1902(184)
|
07/09/2019
|
09/27/2024
|
REPLACE BEARING PADS
|
SCR CIVIL CONSTRUCTION, LLC
($485,103)
|
|
|
0176-01-081
|
NACOGDOCHES
|
LUFKIN
|
$77,867,878
|
US 59
|
NH 1902(081)
|
07/09/2019
|
09/27/2024
|
CONSTRUCT 4 LANE DIRECT CONNECTION
|
LONGVIEW BRIDGE AND ROAD, LTD.
($86,198,369)
|
|
|
0122-01-043
|
NAVARRO
|
DALLAS
|
$4,467,711
|
US 287
|
STP 1902(238)
|
07/10/2019
|
09/27/2024
|
PAVMT REPAIR, OVERLAY AND PAVMT MRK
|
KNIFE RIVER CORPORATION - SOUTH
($8,291,649)
|
|
|
6338-25-001
|
NAVARRO
|
DALLAS
|
$186,553
|
SH0022
|
RMC - 633825001
|
07/16/2019
|
11/15/2023
|
MISCELLANEOUS CONC REPAIR
|
ROAD DOCTORS LLC
($199,755)
|
|
|
6341-43-001
|
NAVARRO
|
DALLAS
|
$359,928
|
US0287
|
RMC - 634143001
|
07/09/2019
|
11/15/2023
|
POTHOLE REPAIR
|
DBI SERVICES, LLC
($621,400)
|
|
|
0916-00-221
|
NUECES
|
CORPUS CHRISTI
|
$2,602,317
|
VA
|
STP 1902(109)
|
07/09/2019
|
09/27/2024
|
CONSTRUCT SIDEWALKS AND UPGRADE ADA...
|
CLORE EQUIPMENT LLC
($2,575,369)
|
|
|
1088-04-025
|
NUECES
|
CORPUS CHRISTI
|
$3,670,136
|
FM 892
|
STP 1902(110)
|
07/10/2019
|
09/27/2024
|
REHAB AND WIDEN ROADWAY
|
J. CARROLL WEAVER, INC.
($3,732,484)
|
|
|
2263-02-089
|
NUECES
|
CORPUS CHRISTI
|
$4,337,546
|
SH 361
|
STP 1902(242)
|
07/09/2019
|
09/27/2024
|
FERRY OPERATIONS PROJECTS
|
HAAS-ANDERSON CONSTRUCTION, LTD.
($8,996,759)
|
|
|
0063-04-060
|
PANOLA
|
ATLANTA
|
$4,885,597
|
US 59
|
NH 1902(194)
|
07/10/2019
|
09/27/2024
|
CPCD & PAV MRKS
|
EAST TEXAS BRIDGE, INC.
($4,379,892)
|
|
|
0365-01-050
|
PARKER
|
FORT WORTH
|
$391,790
|
SH 171
|
STP 2019(875)
|
07/09/2019
|
09/27/2024
|
LANDSCAPE DEVELOPMENT
|
APEX LANDSCAPE & IRRIGATION, LLC
($391,373)
|
|
|
6343-22-001
|
PARKER
|
FORT WORTH
|
$337,556
|
FM1886
|
RMC - 634322001
|
07/09/2019
|
11/15/2023
|
CLEANING AND SEALING JOINTS AND CRAC...
|
D & M CONTRACTORS, LLC
($261,505)
|
|
|
0911-04-076
|
POLK
|
LUFKIN
|
$1,593,654
|
CR
|
BR 2016(774)
|
07/09/2019
|
09/27/2024
|
BRIDGE REPL
|
LONGVIEW BRIDGE AND ROAD, LTD.
($1,682,521)
|
|
|
0275-01-204
|
POTTER
|
AMARILLO
|
$4,330,374
|
IH 40
|
STP 1902(138)HES
|
07/10/2019
|
09/27/2024
|
INSTL MEDIAN BARRIER
|
MASSANA CONSTRUCTION INC.
($4,995,101)
|
|
|
0558-09-035
|
REAGAN
|
SAN ANGELO
|
$16,879,598
|
SH 137
|
STP 2019(831)
|
07/10/2019
|
09/27/2024
|
RESTOR OF EXIST ROAD
|
RK HALL, LLC
($17,898,104)
|
|
|
0371-03-123
|
REFUGIO
|
CORPUS CHRISTI
|
$3,155,745
|
US 77
|
NH 1902(108)
|
07/10/2019
|
09/27/2024
|
MILL AND OVERLAY ROADWAY
|
HUNTER INDUSTRIES, LTD.
($3,620,226)
|
|
|
0911-30-030
|
SAN AUGUSTINE
|
LUFKIN
|
$1,071,324
|
CR
|
BR 2018(430)
|
07/10/2019
|
09/27/2024
|
BRIDGE REPL
|
STATELINE CONSTRUCTION, LLC
($1,141,155)
|
|
|
0908-19-027
|
SCURRY
|
ABILENE
|
$1,038,145
|
VA
|
STP 1902(339)
|
07/09/2019
|
09/27/2024
|
SPOT REPAIR, MILLING. HMAC
|
RK HALL, LLC
($1,138,633)
|
|
|
0259-02-051
|
SOMERVELL
|
FORT WORTH
|
$10,439,745
|
US 67
|
STP 2019(208)HES
|
07/10/2019
|
09/27/2024
|
GR,DR,STR,BS,HMAC,PAV
|
JAY MILLS CONTRACTING, INCORPORATED
($13,062,197)
|
|
|
0907-11-006
|
STERLING
|
SAN ANGELO
|
$1,274,064
|
CR
|
BR 1702(584)
|
07/09/2019
|
09/27/2024
|
BRIDGE REPL
|
ACME BRIDGE COMPANY, INC.
($1,323,346)
|
|
|
0008-16-046
|
TARRANT
|
FORT WORTH
|
$1,965,477
|
IH 20
|
NH 1902(223)
|
07/10/2019
|
09/27/2024
|
INSTL ILLUM
|
MICA CORPORATION
($1,511,129)
|
|
|
0013-10-086
|
TARRANT
|
FORT WORTH
|
$458,355
|
BU 287P
|
STP 1902(225)
|
07/09/2019
|
09/27/2024
|
LANDSCAPE & SCENIC ENHAN
|
APEX LANDSCAPE & IRRIGATION, LLC
($433,944)
|
|
|
0172-06-093
|
TARRANT
|
FORT WORTH
|
$1,084,734
|
SS 280
|
NH 1902(227)
|
07/09/2019
|
09/27/2024
|
OVERLAY WORK
|
FOUTSCO PAVING COMPANY, LLC
($1,037,381)
|
|
|
0902-00-210
|
TARRANT
|
FORT WORTH
|
$982,841
|
VA
|
C 902-00-210
|
07/09/2019
|
09/27/2024
|
UPGRADE DYNAMIC MESSAGE SIGN BOARDS
|
MICA CORPORATION
($965,583)
|
|
|
0902-90-097
|
TARRANT
|
FORT WORTH
|
$325,374
|
CS
|
STP 2019(877)HES
|
07/10/2019
|
09/27/2024
|
INSTL TRAF SIGNAL
|
DURABLE SPECIALTIES, INC.
($360,000)
|
|
|
0902-90-106
|
TARRANT
|
FORT WORTH
|
$4,182,326
|
VA
|
NH 1902(230)
|
07/10/2019
|
09/27/2024
|
INSTL/REHAB ITS
|
AMERICAN LIGHTING AND SIGNALIZATION, LLC
($4,346,467)
|
|
|
1068-01-222
|
TARRANT
|
FORT WORTH
|
$3,795,234
|
IH 30
|
BR 1902(232)
|
07/09/2019
|
09/27/2024
|
PAINT STEEL CAPS, CLEAN AND SEAL JOI...
|
SOUTHERN ROAD & BRIDGE, LLC
($3,103,006)
|
|
|
1068-02-149
|
TARRANT
|
FORT WORTH
|
$6,599,856
|
IH 30
|
NH 1902(217)
|
07/10/2019
|
09/27/2024
|
RESURF ROADWAY
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($7,324,716)
|
|
|
2374-05-086
|
TARRANT
|
FORT WORTH
|
$1,395,291
|
IH 20
|
NH 1902(236)
|
07/09/2019
|
09/27/2024
|
RESURF ROADWAY
|
PEACHTREE CONSTRUCTION, LTD.
($1,509,515)
|
|
|
6327-82-001
|
TARRANT
|
FORT WORTH
|
$547,534
|
SH0180
|
BPM - 632782001
|
07/10/2019
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
GIBSON & ASSOCIATES, INC.
($390,423)
|
|
|
0908-00-092
|
TAYLOR
|
ABILENE
|
$1,034,741
|
VA
|
STP 1902(338)
|
07/09/2019
|
09/27/2024
|
SPOT REPAIR,MILL, HMAC
|
BONTKE BROTHERS CONSTRUCTION COMPANY
($1,171,614)
|
|
|
0908-00-093
|
TAYLOR
|
ABILENE
|
$1,142,398
|
VA
|
STP 1902(340)
|
07/09/2019
|
09/27/2024
|
SPOT REPAIR, MILL, HMAC
|
BONTKE BROTHERS CONSTRUCTION COMPANY
($1,285,512)
|
|
|
6336-68-001
|
TOM GREEN
|
SAN ANGELO
|
$166,674
|
US0067
|
RMC - 633668001
|
07/16/2019
|
11/15/2023
|
REPLACE SIGNS IN DISTRICT
|
HJC FARMS, INC.
($155,949)
|
|
|
6343-55-001
|
TOM GREEN
|
SAN ANGELO
|
$573,758
|
SH0208
|
RMC - 634355001
|
07/10/2019
|
11/15/2023
|
METAL BEAM GUARDFENCE
|
ELITE CASTLE RESOURCES LLC
($499,554)
|
|
|
0113-13-181
|
TRAVIS
|
AUSTIN
|
$3,394,650
|
SH 71
|
STP 1902(189)HES
|
07/09/2019
|
09/27/2024
|
HAZARD ELIM & SAFETY
|
DAN WILLIAMS COMPANY
($4,150,515)
|
|
|
0914-00-420
|
TRAVIS
|
AUSTIN
|
$1,964,523
|
VA
|
STP 1902(186)
|
07/10/2019
|
09/27/2024
|
CONSTRUCT CURB RAMPS
|
ENCINO LANDSCAPE, INC.
($2,396,038)
|
|
|
1378-01-041
|
TRAVIS
|
AUSTIN
|
$1,271,682
|
RM 1431
|
STP 1902(187)
|
07/10/2019
|
09/27/2024
|
HWY IMPRV
|
AARON CONCRETE CONTRACTORS, L.P.
($2,046,650)
|
|
|
2100-01-060
|
TRAVIS
|
AUSTIN
|
$11,163,486
|
RM 2222
|
NH 1902(244)
|
07/10/2019
|
09/27/2024
|
NEW NONFWY, INTRSCTN & OPERATIONAL I...
|
CAPITAL EXCAVATION COMPANY
($15,507,841)
|
|
|
6332-16-001
|
TRAVIS
|
AUSTIN
|
$529,490
|
SH0045
|
RMC - 633216001
|
07/09/2019
|
11/15/2023
|
CONSTRUCT POND SPILLWAY
|
RELMCO, INC.
($538,159)
|
|
|
6340-38-001
|
TRAVIS
|
AUSTIN
|
$392,253
|
US0183
|
RMC - 634038001
|
07/09/2019
|
11/15/2023
|
SWEEPING
|
CEN-TEX IRRIGATION SYSTEMS, INC.
($422,652)
|
|
|
0024-01-105
|
UVALDE
|
SAN ANTONIO
|
$1,332,255
|
US 90
|
STP 1902(207)HES
|
07/09/2019
|
09/27/2024
|
SFT
|
F & W ELECTRICAL CONTRACTORS, INC.
($1,455,289)
|
|
|
0036-08-054
|
UVALDE
|
SAN ANTONIO
|
$2,485,121
|
US 83
|
STP 1902(208)HES
|
07/10/2019
|
09/27/2024
|
SAFETY IMPRV PROJECTS
|
E-Z BEL CONSTRUCTION, LLC
($3,103,121)
|
|
|
0922-11-043
|
VAL VERDE
|
LAREDO
|
$4,213,915
|
PW
|
C 922-11-43
|
07/10/2019
|
09/27/2024
|
BASE, SURF TREAT, GRAD, STR, PAV MRK
|
RELMCO, INC.
($3,978,828)
|
|
|
1132-01-031
|
VICTORIA
|
YOAKUM
|
$6,259,069
|
FM 1686
|
C 1132-1-31
|
07/10/2019
|
09/27/2024
|
RESTORE ROADWAY
|
BRANNAN PAVING CO., LTD.
($6,536,753)
|
|
|
6346-81-001
|
WALKER
|
BRYAN
|
$243,475
|
SH0030
|
RMC - 634681001
|
07/16/2019
|
11/15/2023
|
SPOT PAVMT MRK
|
D. I. J. CONSTRUCTION, INC.
($322,878)
|
|
|
6345-54-001
|
WALLER
|
HOUSTON
|
$415,550
|
US0290
|
RMC - 634554001
|
07/09/2019
|
11/15/2023
|
ASPH PAVMT REPAIR
|
MAIN LANE INDUSTRIES LTD.
($561,200)
|
|
|
0315-12-016
|
WASHINGTON
|
BRYAN
|
$1,271,590
|
FM 1155
|
STP 1902(115)
|
07/09/2019
|
09/27/2024
|
WIDEN NON-FREEWAY
|
KNIFE RIVER CORPORATION - SOUTH
($1,296,208)
|
|
|
6346-62-001
|
WASHINGTON
|
BRYAN
|
$1,953,075
|
US0290
|
RMC - 634662001
|
07/10/2019
|
11/15/2023
|
FLAGGING AND TRAF CONTROL
|
NIXON ENGINEERING
($1,869,290)
|
|
|
0922-00-065
|
WEBB
|
LAREDO
|
$1,997,496
|
VA
|
STP 1902(188)
|
07/10/2019
|
09/27/2024
|
REMOVE & REPL OF BRIDGE RAIL
|
ANDERSON COLUMBIA CO., INC.
($2,894,261)
|
|
|
6345-09-001
|
WEBB
|
LAREDO
|
$291,450
|
IH0035
|
RMC - 634509001
|
07/11/2019
|
11/15/2023
|
MAINT OF LARGE SIGNS
|
HIGHWAY BARRICADES AND SERVICES, LLC
($341,330)
|
|
|
0925-11-014
|
WHEELER
|
CHILDRESS
|
$1,218,041
|
CR
|
BR 1802(174)
|
07/09/2019
|
09/27/2024
|
BRIDGE REPL
|
COPPELL CONSTRUCTION CO., INC.
($1,545,677)
|
|
|
6345-52-001
|
WICHITA
|
WICHITA FALLS
|
$988,200
|
IH0044
|
RMC - 634552001
|
07/09/2019
|
11/15/2023
|
ONCALL GUARDRAIL & CABLE BARRIER REP...
|
MARCOM'S MOWING SERVICE, LLC
($949,970)
|
|
|
1201-01-014
|
WILLIAMSON
|
AUSTIN
|
$5,183,728
|
FM 970
|
STP 1902(005)HES
|
07/09/2019
|
09/27/2024
|
HAZARD ELIM & SAFETY
|
DAN WILLIAMS COMPANY
($5,125,069)
|
|
|
2211-01-027
|
WILLIAMSON
|
AUSTIN
|
$226,710
|
RM 2338
|
CC 2211-1-27
|
07/09/2019
|
09/27/2024
|
INTERS AND OPERATIONAL IMPRVS
|
JOE BLAND CONSTRUCTION, L.P.
($286,852)
|
|
|
0100-03-084
|
WILSON
|
SAN ANTONIO
|
$12,796,765
|
US 181
|
NH 1902(210)
|
07/09/2019
|
09/27/2024
|
SURF/ROADWAY RESTOR
|
ANGEL BROTHERS HOLDINGS CORP.
($10,328,208)
|
|
|
0143-04-066
|
WILSON
|
SAN ANTONIO
|
$16,296,952
|
US 87
|
STP 1902(212)
|
07/10/2019
|
09/27/2024
|
REHAB EXIST ROADWAY
|
ANGEL BROTHERS HOLDINGS CORP.
($18,988,548)
|
|
|
0013-08-135
|
WISE
|
FORT WORTH
|
$1,103,316
|
US 81
|
NH 1902(224)
|
07/09/2019
|
09/27/2024
|
RESURF ROADWAY
|
JAGOE-PUBLIC COMPANY
($1,170,227)
|
|
|
0816-01-014
|
WISE
|
FORT WORTH
|
$3,383,029
|
FM 455
|
STP 1902(229)
|
07/10/2019
|
09/27/2024
|
REHAB EXIST ROADWAY
|
EUROVIA ATLANTIC COAST LLC
($3,592,305)
|
|
|
0902-20-099
|
WISE
|
FORT WORTH
|
$686,995
|
CR
|
BR 2009(900)
|
07/09/2019
|
09/27/2024
|
REPLACE BRIDGE AND APPROACHES
|
PIERCE R & B LLC
($575,000)
|
|
|
0444-01-041
|
YOUNG
|
WICHITA FALLS
|
$11,677,358
|
SH 114
|
NH 1902(146)
|
07/09/2019
|
09/27/2024
|
UPGRADE TO SUPER-2
|
A. L. HELMCAMP, INC.
($13,329,674)
|