FAYETTE FM 2714 (3135-01-005)

Items: 87

County: FAYETTE
Length: N/A
Highway: FM 2714
District: YOAKUM
Control Number: 3135-01-005
DBE Goal: N/A
Project: C 3135-1-5
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $1,987,083.68
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,987,083.68
$1,960,940.48
Over/Under Est: -1.32% -$26,143.20
Over/Under Est: 4.64% $92,269.75
Amt Left: 6.04% $118,412.95
Over/Under Est: 14.77% $293,536.92
Amt Left: 16.3% $319,680.12
Delta: -9.68% -$201,267.17

Bid Items & Bid Tabulations

87 Total 0 of 87
FAYETTE  |  FM 2714  |  YOAKUM  |  3135-01-005  |  07/09/2019  |  $1,987,083.68  |  C 3135-1-5  |  REHAB EXIST ROADWAY  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
HUNTER INDUSTRIES, LTD.
BRANNAN PAVING CO., LTD.
PREPARING ROW
STA 1.600 $3,000.000 $13,200.000 $27,840.000 $12,200.000
REMOVING CONC (RIPRAP)
SY 5.000 $50.000 $72.000 $27.780 $105.000
EXCAVATION (ROADWAY)
CY 2,914.000 $15.000 $9.300 $16.650 $22.570
SUBGRADE WIDENING (ORD COMP)
STA 102.650 $400.000 $618.000 $1,235.420 $784.210
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 2,166.000 $15.000 $23.000 $19.800 $18.010
BLADING
HR 50.000 $100.000 $110.000 $102.600 $125.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 34,217.000 $0.400 $0.130 $0.150 $0.150
DRILL SEEDING (TEMP) (WARM)
SY 8,554.000 $0.250 $0.130 $0.100 $0.100
DRILL SEEDING (TEMP) (COOL)
SY 8,554.000 $0.250 $0.130 $0.100 $0.100
VEGETATIVE WATERING
MG 288.020 $20.000 $25.000 $32.940 $20.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 8,530.000 $80.000 $69.490 $74.640 $77.590
FL BS (RDWY DEL)(TY E GR 1-2)(FNL POS)
CY 711.000 $95.000 $70.000 $74.620 $84.190
LIME TRT (EXST MATL) (6")
SY 15,738.000 $3.250 $3.400 $2.510 $3.430
LIME (HYD, COM OR QK)(SLURRY)
TON 113.000 $350.000 $207.000 $157.500 $209.970
CEMENT
TON 194.000 $150.000 $153.000 $157.500 $141.600
CEMENT TREAT (MX EXST MTL & NW BS) (6")
SY 21,237.000 $2.000 $0.970 $2.280 $1.910
ASPH (RC-250)
GAL 6,387.000 $4.000 $4.300 $4.290 $4.760
AGGR(TY-E GR-5 SAC-B)
CY 228.000 $120.000 $156.000 $77.450 $113.750
AGGR(TY-PE GR-3 SAC-B)
CY 376.000 $120.000 $154.000 $106.680 $117.570
AGGR(TY-PE GR-4 SAC-B)
CY 246.000 $120.000 $133.000 $101.390 $118.620
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 23,632.000 $3.250 $3.600 $4.060 $4.460
CEM STABIL BKFL
CY 69.600 $150.000 $92.300 $155.000 $120.000
CUT & RESTORING PAV
SY 33.000 $100.000 $135.000 $165.000 $205.760
TRENCH EXCAVATION PROTECTION
LF 80.000 $3.000 $15.500 $30.000 $130.000
TEMPORARY SPL SHORING
SF 296.000 $10.000 $63.200 $40.000 $58.000
RIPRAP (CONC)(5 IN)
CY 45.000 $470.000 $456.000 $510.000 $645.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 20.000 $125.000 $426.000 $126.000 $284.000
CMP (GAL STL 24 IN)
LF 8.000 $75.000 $82.000 $79.000 $142.000
CMP AR (GAL STL DES 2)
LF 120.000 $60.000 $89.000 $62.000 $108.000
CMP AR (GAL STL DES 3)
LF 40.000 $70.000 $144.000 $74.000 $112.000
CMP AR (GAL STL DES 4)
LF 24.000 $80.000 $91.000 $112.000 $123.000
CONC BOX CULV (6 FT X 3 FT)
LF 8.000 $650.000 $3,545.000 $655.000 $815.000
CONC BOX CULV (6 FT X 6 FT)
LF 14.000 $800.000 $1,688.000 $780.000 $910.000
CONC BOX CULV (10 FT X 6 FT)
LF 28.000 $950.000 $1,920.000 $950.000 $1,025.000
RC PIPE (CL III)(18 IN)
LF 72.000 $75.000 $59.000 $80.000 $165.000
RC PIPE (CL III)(24 IN)
LF 30.000 $90.000 $75.000 $90.000 $190.000
RC PIPE (CL III)(30 IN)
LF 142.000 $120.000 $112.000 $106.000 $228.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $4,500.000 $3,772.000 $3,500.000 $5,200.000
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 1.000 $5,500.000 $3,772.000 $3,500.000 $4,200.000
WINGWALL (FW - S) (HW=7 FT)
EA 2.000 $16,000.000 $16,750.000 $14,800.000 $14,560.000
SET (TY I)(S=10 FT)(HW=7FT)(3:1)(C)
EA 4.000 $19,000.000 $14,426.000 $13,650.000 $14,950.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $11,250.000 $17,800.000 $9,400.000 $10,650.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $1,590.000 $1,320.000 $1,500.000 $2,500.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $1,500.000 $820.000 $1,600.000 $3,100.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $2,400.000 $3,050.000 $2,100.000 $3,200.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 3.000 $1,800.000 $1,800.000 $2,200.000 $3,650.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $1,580.000 $1,500.000 $2,300.000 $3,650.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 30.000 $1,100.000 $750.000 $1,400.000 $2,400.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 10.000 $1,200.000 $900.000 $1,600.000 $2,500.000
SET (TY II) (DES 4) (CMP) (6: 1) (P)
EA 8.000 $2,000.000 $1,600.000 $2,800.000 $4,200.000
CLEAN EXIST CULVERTS
EA 2.000 $1,100.000 $750.000 $2,500.000 $900.000
REMOV STR (SMALL)
EA 7.000 $900.000 $1,860.000 $900.000 $850.000
MOBILIZATION
LS 1.000 $180,000.000 $174,800.000 $195,540.390 $219,161.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,500.000 $1,200.000 $5,252.850 $7,637.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $40.000 $27.200 $25.000 $25.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $10.000 $10.000 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 460.000 $3.000 $5.430 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 460.000 $1.000 $1.000 $2.000 $2.000
DRIVEWAYS (SURF TREAT)
SY 1,019.000 $25.000 $24.500 $35.040 $40.790
TURNOUTS (SURF TREAT)
SY 264.000 $35.000 $34.250 $35.040 $39.820
MTL W-BEAM GD FEN (TIM POST)
LF 415.540 $22.000 $25.000 $22.250 $28.220
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 46.960 $70.000 $65.200 $64.350 $59.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $2,874.000 $2,745.000 $2,500.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $350.000 $326.000 $350.000 $450.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 10.000 $150.000 $244.500 $170.000 $115.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $175.000 $272.000 $230.000 $190.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $900.000 $962.000 $754.580 $785.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $950.000 $1,000.000 $865.960 $825.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 10.000 $425.000 $340.000 $361.300 $340.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 3.000 $450.000 $400.000 $426.210 $350.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 1.000 $50.000 $163.000 $125.000 $125.000
REMOVE SM RD SN SUP&AM
EA 16.000 $75.000 $110.000 $100.000 $75.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 25.000 $25.000 $20.000 $13.000 $25.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 12.000 $65.000 $50.000 $46.950 $55.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,628.000 $0.250 $0.270 $0.260 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 50,355.000 $0.250 $0.200 $0.260 $0.260
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,306.000 $2.000 $1.000 $1.620 $1.500
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 16,785.000 $0.800 $0.870 $0.900 $0.900
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
LF 876.000 $0.800 $0.870 $1.000 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 20,530.000 $0.400 $0.490 $0.450 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(060MIL)
LF 876.000 $0.350 $0.490 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(060MIL)
LF 16,785.000 $0.350 $0.380 $0.450 $0.450
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 16.000 $20.000 $22.000 $20.000 $20.000
REFL PAV MRKR TY II-A-A
EA 254.000 $4.000 $5.000 $5.000 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $9,300.000 $7,587.570 $5,400.000
TMA (STATIONARY)
EA 2.000 $8,000.000 $10,700.000 $7,587.570 $15,000.000
TMA (MOBILE OPERATION)
DAY 6.000 $500.000 $110.000 $303.500 $500.000
Totals: $1,987,083.680 $1,960,940.482 $2,079,353.453 $2,280,620.615