COLLIN SH 289 (0091-05-059)

Items: 155

County: COLLIN
Length: N/A
Highway: SH 289
District: DALLAS
Control Number: 0091-05-059
DBE Goal: N/A
Project: CM 1902(218)
Guaranty: N/A
Time: 211 WORKING DAYS
Engineer's Estimate: $3,935,248.95
Date: 07/10/2019 (6 years ago)
Contract Number: N/A
Type: WIDEN OVERPASS; INTERSECTION IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$3,935,248.95
$4,599,208.90
Over/Under Est: 16.87% $663,959.95
Over/Under Est: 45.9% $1,806,396.05
Amt Left: 24.84% $1,142,436.10
Over/Under Est: 47.12% $1,854,221.51
Amt Left: 25.88% $1,190,261.56
Delta: -0.83% -$47,825.46
$6,819,821.61
Over/Under Est: 73.3% $2,884,572.66
Amt Left: 48.28% $2,220,612.71
Delta: -17.80% -$1,030,351.15

Bid Items & Bid Tabulations

155 Total 0 of 155
COLLIN  |  SH 289  |  DALLAS  |  0091-05-059  |  07/10/2019  |  $3,935,248.95  |  CM 1902(218)  |  WIDEN OVERPASS; INTERS IMPRVS  |  211 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J.D. ABRAMS, L.P.
IOWA BRIDGE & CULVERT, LC
ED BELL CONSTRUCTION COMPANY
REBCON, INC.
PREPARING ROW
STA 13.750 $5,000.000 $38,500.000 $32,000.000 $31,500.000 $49,000.000
REMOVING CONC (PAV)
SY 774.000 $12.000 $35.000 $50.000 $20.000 $75.000
REMOVING CONC (RIPRAP)
SY 89.000 $20.000 $40.000 $60.000 $20.000 $75.000
REMOVING CONC (MEDIANS)
SY 276.000 $20.000 $25.000 $36.000 $30.000 $175.000
REMOVING CONC (CURB)
LF 1,444.000 $5.000 $7.500 $15.000 $10.000 $3.000
REMOVING CONC (RETAINING WALLS)
SY 41.000 $70.000 $370.000 $1,000.000 $500.000 $1,600.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 597.000 $20.000 $43.000 $28.000 $25.000 $185.000
REMOVE CONC (RAIL)
LF 333.000 $40.000 $35.000 $55.000 $50.000 $140.000
EXCAVATION (ROADWAY)
CY 579.000 $30.000 $18.000 $55.000 $20.000 $60.000
EXCAVATION (SPECIAL)
CY 5,452.000 $15.000 $2.000 $75.000 $40.000 $95.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 336.000 $15.000 $10.000 $100.000 $10.000 $50.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 262.000 $5.000 $2.000 $100.000 $100.000 $130.000
FURNISHING AND PLACING TOPSOIL
CY 101.000 $25.000 $56.000 $105.000 $98.960 $100.000
BLOCK SODDING
SY 1,802.000 $5.000 $7.000 $6.000 $5.440 $6.000
DRILL SEEDING (TEMP) (WARM)
SY 2,636.000 $0.250 $1.300 $2.000 $1.310 $2.000
VEGETATIVE WATERING
MG 385.000 $10.000 $17.000 $72.000 $68.250 $100.000
IRRIGATION SYSTEM
LS 1.000 $15,000.000 $44,000.000 $60,000.000 $45,564.750 $75,000.000
PLANT MATERIAL (5-GAL)
EA 64.000 $30.000 $70.000 $77.000 $73.240 $77.000
MULCH
CY 17.000 $40.000 $94.000 $104.000 $98.440 $104.000
PLANT BED PREPARATION
SY 142.000 $7.000 $32.000 $35.000 $33.080 $35.000
PLANT SOIL MIX (SOIL AMENDED)
CY 34.000 $40.000 $95.000 $105.000 $99.230 $104.000
LIME (HYDRATED LIME (SLURRY))
TON 27.000 $200.000 $308.000 $260.000 $200.000 $250.000
LIME TRT (EXST MATL) (6")
SY 1,751.000 $5.000 $13.000 $7.000 $8.000 $20.000
SUPERPAVE MIXTURES SP-B SAC-B PG64-22
TON 109.000 $120.000 $150.000 $160.000 $160.000 $400.000
CONC PVMT (JOINTED - CPCD) (10")
SY 1,587.000 $110.000 $90.000 $85.000 $120.000 $150.000
TEMPORARY SPL SHORING
SF 846.000 $30.000 $100.000 $150.000 $75.000 $125.000
DRILL SHAFT (18 IN)
LF 20.000 $75.000 $250.000 $300.000 $189.000 $600.000
DRILL SHAFT (30 IN)
LF 315.000 $150.000 $400.000 $375.000 $315.000 $550.000
DRILL SHAFT (36 IN)
LF 64.000 $150.000 $400.000 $400.000 $275.000 $450.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 12.000 $325.000 $270.000 $260.000 $300.710 $300.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $425.000 $470.000 $510.000 $588.690 $550.000
CL C CONC (ABUT)(HPC)(EXTEND)
CY 54.500 $1,300.000 $1,850.000 $1,250.000 $2,000.000 $3,000.000
CL C CONC (CAP)(HPC)
CY 25.100 $1,200.000 $2,200.000 $1,250.000 $2,000.000 $3,500.000
CL C CONC (COLUMN)(HPC)
CY 35.000 $1,000.000 $1,500.000 $1,250.000 $2,000.000 $3,500.000
CL C CONC (CRASHWALL)(HPC)
CY 79.400 $825.000 $700.000 $1,000.000 $1,500.000 $2,400.000
REINF CONC SLAB (EXTEND SLAB)(HPC)
SF 8,196.000 $23.000 $29.000 $32.000 $50.000 $50.000
BRIDGE SIDEWALK
SF 3,541.000 $11.000 $18.500 $20.000 $20.000 $25.000
APPROACH SLAB (HPC)
CY 64.000 $700.000 $750.000 $750.000 $750.000 $1,200.000
RETAINING WALL (MSE)
SF 882.000 $70.000 $106.000 $125.000 $100.000 $175.000
PRESTR CONC BOX BEAM (5B20)
LF 592.500 $220.000 $240.000 $250.000 $400.000 $400.000
PRESTR CONC GIRDER (TX54)
LF 632.750 $170.000 $170.000 $200.000 $400.000 $350.000
PNEUMATICALLY PLACED CONC (ENCASEMENT)
SF 30,140.000 $22.000 $1.000 $16.000 $20.000 $11.400
RIPRAP (CONC)(4 IN)
CY 26.000 $450.000 $475.000 $750.000 $750.000 $2,000.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 57.000 $200.000 $170.000 $200.000 $200.000 $275.000
STR STEEL (MISC NON - BRIDGE)
LB 425.000 $20.000 $25.500 $24.000 $20.000 $18.000
RAIL (TY C221)(HPC)
LF 351.300 $135.000 $225.000 $200.000 $175.000 $225.000
ARMOR JOINT (SEALED)
LF 69.000 $315.000 $120.000 $100.000 $60.000 $150.000
RC PIPE (CL III)(18 IN)
LF 35.000 $65.000 $242.000 $350.000 $250.000 $300.000
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 1.000 $4,500.000 $3,400.000 $5,000.000 $8,000.000 $7,500.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 1.000 $5,000.000 $4,900.000 $5,000.000 $9,000.000 $8,500.000
ADJUSTING MANHOLES (SANITARY)
EA 1.000 $2,000.000 $2,000.000 $2,500.000 $2,500.000 $3,500.000
REMOV STR (BOX CULVERT)
EA 1.000 $500,000.000 $100,000.000 $500,000.000 $500,000.000 $250,000.000
REMOV STR (INLET)
EA 2.000 $800.000 $500.000 $5,000.000 $1,000.000 $1,100.000
MOBILIZATION
LS 1.000 $350,000.000 $1,300,000.000 $570,000.000 $562,000.000 $680,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $20,000.000 $17,500.000 $40,000.000 $42,000.000 $30,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 834.000 $16.000 $30.000 $40.000 $38.120 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 834.000 $8.000 $9.000 $20.000 $19.940 $18.700
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,667.000 $2.500 $4.000 $4.000 $3.340 $3.140
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,667.000 $0.500 $0.500 $2.000 $1.230 $1.160
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 25.000 $4.000 $5.500 $28.000 $29.320 $27.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 25.000 $1.000 $1.250 $17.000 $17.590 $16.500
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 100.000 $8.000 $3.500 $37.000 $59.460 $52.470
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,700.000 $40.000 $20.000 $8.000 $31.500 $35.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,700.000 $17.000 $9.000 $8.000 $10.500 $15.000
CONC CURB (MONO) (TY II)
LF 2,546.000 $8.000 $8.000 $6.000 $4.000 $5.000
CONC SIDEWALKS (4")
SY 287.000 $65.000 $68.000 $66.000 $90.000 $55.030
CURB RAMPS (TY 1)
EA 1.000 $2,500.000 $2,400.000 $2,475.000 $1,500.000 $3,000.000
CURB RAMPS (TY 2)
EA 3.000 $2,500.000 $1,980.000 $2,475.000 $1,600.000 $3,500.000
CURB RAMPS (TY 7)
EA 1.000 $2,500.000 $2,400.000 $2,475.000 $1,400.000 $4,000.000
CURB RAMPS (TY 10)
EA 6.000 $2,500.000 $1,800.000 $2,475.000 $1,400.000 $2,900.000
CURB RAMPS (TY 21)
EA 3.000 $3,500.000 $2,500.000 $3,025.000 $1,300.000 $5,000.000
CURB RAMPS (TY 22)
EA 2.000 $3,500.000 $4,200.000 $3,960.000 $2,500.000 $6,000.000
CONC MEDIAN
SY 856.000 $60.000 $81.000 $100.000 $70.000 $75.000
MTL W-BEAM GD FEN (TIM POST)
LF 167.000 $20.000 $31.500 $25.000 $31.500 $33.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,500.000 $1,700.000 $1,980.000 $2,285.460 $1,835.000
REMOVE METAL BEAM GUARD FENCE
LF 316.000 $2.000 $4.750 $5.000 $4.730 $4.950
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $500.000 $185.000 $303.000 $183.750 $192.500
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $1,000.000 $550.000 $1,500.000 $840.000 $880.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 5.000 $8,000.000 $8,000.000 $10,000.000 $8,400.000 $9,500.000
CHAIN LINK FENCE (REMOVE)
LF 307.000 $5.000 $20.000 $15.000 $11.550 $5.000
CHAIN LINK FENCE (INSTALL) (8')
LF 462.000 $30.000 $38.000 $84.000 $121.800 $150.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 1.000 $3,300.000 $2,850.000 $2,809.000 $3,264.240 $2,808.470
CONDT (PVC) (SCH 40) (2")
LF 4,268.000 $13.000 $11.500 $11.000 $11.860 $10.210
CONDT (PVC) (SCH 40) (3")
LF 162.000 $15.000 $13.000 $17.000 $19.360 $16.650
CONDT (PVC) (SCH 40) (4")
LF 192.000 $15.000 $22.000 $24.000 $26.980 $23.210
CONDT (PVC) (SCH 40) (4") (BORE)
LF 383.000 $20.000 $43.000 $26.000 $30.120 $25.920
ELEC CONDR (NO.8) BARE
LF 798.000 $1.300 $2.200 $2.000 $1.730 $1.490
ELEC CONDR (NO.4) BARE
LF 100.000 $1.300 $2.400 $3.000 $2.510 $2.160
ELEC CONDR (NO.2) INSULATED
LF 2,000.000 $1.300 $3.000 $3.000 $2.620 $2.260
GROUND BOX TY D (162922)
EA 4.000 $765.000 $1,410.000 $1,000.000 $1,052.220 $906.180
GROUND BOX TY D (162922)W/APRON
EA 3.000 $900.000 $1,410.000 $1,100.000 $1,231.590 $1,059.630
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $450.000 $490.000 $500.000 $469.620 $491.980
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $600.000 $500.000 $500.000 $447.780 $469.110
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $750.000 $740.000 $721.000 $688.000 $720.760
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $725.000 $870.000 $824.000 $786.260 $823.700
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 1.000 $3,000.000 $3,275.000 $4,000.000 $3,728.010 $3,905.540
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 7.000 $425.000 $355.000 $355.000 $338.380 $354.500
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 364.000 $1.550 $2.100 $2.000 $1.050 $1.100
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 753.000 $2.000 $3.100 $4.000 $3.470 $3.630
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 227.000 $5.000 $6.100 $6.000 $5.570 $5.830
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 9.000 $3.000 $61.000 $83.000 $78.750 $82.500
PAVEMENT SEALER 4"
LF 4,370.000 $0.250 $0.250 $1.000 $0.530 $0.550
PAVEMENT SEALER 8"
LF 364.000 $0.500 $0.400 $1.000 $0.530 $0.550
PAVEMENT SEALER 12"
LF 753.000 $2.000 $0.800 $2.000 $1.580 $1.650
PAVEMENT SEALER 24"
LF 227.000 $3.000 $1.600 $3.000 $2.360 $2.480
PAVEMENT SEALER (ARROW)
EA 11.000 $25.000 $21.500 $44.000 $42.000 $44.000
PAVEMENT SEALER (WORD)
EA 11.000 $40.000 $31.500 $66.000 $63.000 $66.000
PAVEMENT SEALER (YLD TRI)
EA 9.000 $6.000 $10.500 $44.000 $42.000 $44.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 680.000 $0.500 $1.100 $2.000 $1.050 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,443.000 $0.500 $0.950 $2.000 $1.050 $1.100
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,247.000 $1.000 $0.950 $2.000 $1.050 $1.100
PREFAB PAV MRK TY C (W) (ARROW)
EA 11.000 $200.000 $240.000 $209.000 $199.500 $209.000
PREFAB PAV MRK TY C (W) (WORD)
EA 11.000 $300.000 $320.000 $253.000 $241.500 $253.000
REFL PAV MRKR TY II-C-R
EA 30.000 $4.000 $10.500 $11.000 $10.500 $11.000
PAV SURF PREP FOR MRK (4")
LF 4,370.000 $0.150 $0.250 $1.000 $0.530 $0.550
PAV SURF PREP FOR MRK (8")
LF 364.000 $0.300 $0.400 $1.000 $0.530 $0.550
PAV SURF PREP FOR MRK (12")
LF 753.000 $0.550 $0.800 $1.000 $0.790 $0.830
PAV SURF PREP FOR MRK (24")
LF 227.000 $1.200 $1.300 $2.000 $1.050 $1.100
PAV SURF PREP FOR MRK (ARROW)
EA 11.000 $22.000 $10.500 $33.000 $31.500 $33.000
PAV SURF PREP FOR MRK (WORD)
EA 11.000 $20.000 $15.500 $44.000 $42.000 $44.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 9.000 $15.000 $5.100 $22.000 $21.000 $22.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $4,500.000 $10,750.000 $9,372.000 $10,892.940 $9,372.000
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 1.000 $15,000.000 $19,000.000 $12,000.000 $13,860.890 $11,925.540
VEH SIG SEC (12")LED(GRN)
EA 5.000 $210.000 $285.000 $276.000 $319.950 $275.280
VEH SIG SEC (12")LED(GRN ARW)
EA 7.000 $205.000 $295.000 $276.000 $319.950 $275.280
VEH SIG SEC (12")LED(YEL)
EA 8.000 $210.000 $285.000 $276.000 $319.950 $275.280
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $225.000 $285.000 $276.000 $319.950 $275.280
VEH SIG SEC (12")LED(RED)
EA 8.000 $205.000 $290.000 $276.000 $319.950 $275.280
VEH SIG SEC (12")LED(RED ARW)
EA 8.000 $325.000 $275.000 $276.000 $319.950 $275.280
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $500.000 $975.000 $583.000 $676.650 $582.180
BACK PLATE (12")(3 SEC)
EA 8.000 $100.000 $130.000 $165.000 $187.620 $161.430
BACK PLATE (12")(5 SEC)
EA 4.000 $120.000 $146.000 $165.000 $225.850 $194.320
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 577.000 $1.000 $2.600 $2.000 $2.050 $1.760
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 705.000 $1.500 $2.700 $2.000 $2.340 $2.010
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
LF 2,498.000 $3.000 $2.900 $2.000 $2.190 $1.880
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 1,049.000 $3.400 $5.400 $5.000 $4.900 $4.210
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 3,959.000 $1.100 $2.100 $2.000 $1.750 $1.510
INS TRF SIG PL AM (S)1 ARM(24')
EA 1.000 $3,500.000 $6,550.000 $5,400.000 $6,249.690 $5,377.080
INS TRF SIG PL AM(S)1 ARM(65')
EA 2.000 $18,000.000 $29,000.000 $25,000.000 $27,736.870 $23,864.060
PED POLE ASSEMBLY
EA 8.000 $2,500.000 $3,510.000 $2,222.000 $2,581.960 $2,221.450
PED DETECT PUSH BUTTON (APS)
EA 12.000 $800.000 $970.000 $810.000 $937.790 $806.850
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,000.000 $5,510.000 $3,243.000 $3,768.420 $3,242.250
REMOVAL OF CONDUIT
LF 560.000 $3.000 $9.500 $15.000 $2.560 $11.000
FULL - WIDTH MOWING
AC 1.000 $250.000 $505.000 $3,000.000 $1,000.000 $2,000.000
LITTER REMOVAL
CYC 1.000 $4,000.000 $3,000.000 $1,500.000 $1,000.000 $1,500.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
MI 1.000 $1,000.000 $4,000.000 $5,000.000 $1,000.000 $1,500.000
TREE PROTECTION
EA 9.000 $250.000 $140.000 $2,500.000 $1,000.000 $450.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $16,000.000 $4,000.000 $15,000.000 $15,750.000 $12,000.000
VIVDS COMMUNICATION CABLE (COAXIAL)
LF 1,291.000 $2.100 $4.700 $5.000 $3.540 $3.050
ITS MULTI-DUCT CND (PVC-40)
LF 100.000 $20.000 $18.000 $125.000 $145.240 $124.960
CONDUIT (PREPARE)
LF 966.000 $2.000 $4.000 $6.000 $6.810 $5.860
GROUND BOX (PREPARE)
EA 6.000 $210.000 $505.000 $300.000 $340.410 $292.880
TMA (STATIONARY)
EA 5.000 $22,000.000 $0.010 $30,000.000 $64.550 $10,000.000
TMA (MOBILE OPERATION)
HR 224.000 $35.000 $94.000 $100.000 $10.500 $75.000
ITS GND BOX (POLY) TY 1 (243648)W/APRN
EA 2.000 $1,000.000 $3,205.000 $4,205.000 $4,883.640 $4,201.750
Totals: $3,935,248.950 $4,599,208.900 $5,741,645.000 $5,789,470.460 $6,819,821.610