PREPARING ROW
|
AC
|
12.520
|
$6,500.000
|
$20,000.000
|
|
|
PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
23.000
|
$1,200.000
|
$1,180.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
144.000
|
$75.000
|
$173.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
1,468.000
|
$12.000
|
$29.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
290.000
|
$14.000
|
$24.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
141.000
|
$9.000
|
$38.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
5,110.000
|
$8.000
|
$11.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
209.000
|
$6.000
|
$24.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
10,411.000
|
$4.000
|
$14.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
11,843.000
|
$5.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY AND CHANNEL)
|
CY
|
17.000
|
$15.000
|
$131.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
1,531.000
|
$10.000
|
$18.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
13,054.000
|
$0.750
|
$3.350
|
|
|
BLOCK SODDING
|
SY
|
13,054.000
|
$4.000
|
$4.900
|
|
|
VEGETATIVE WATERING
|
MG
|
238.000
|
$18.000
|
$60.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
5,173.000
|
$55.000
|
$150.000
|
|
|
CEMENT
|
TON
|
952.000
|
$150.000
|
$237.000
|
|
|
CEMENT TREAT (NEW BASE) (8")
|
SY
|
23,935.000
|
$2.000
|
$6.250
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
23,748.000
|
$1.750
|
$11.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
4,536.000
|
$4.000
|
$5.900
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
15,048.000
|
$3.000
|
$2.950
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
507.000
|
$120.000
|
$306.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
5,157.000
|
$90.000
|
$156.000
|
|
|
D-GR HMA TY B SAC-B PG (64-22)
|
TON
|
31.000
|
$120.000
|
$516.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
23,977.000
|
$1.500
|
$5.700
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
50.000
|
$200.000
|
$505.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
190.000
|
$175.000
|
$606.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
105.000
|
$250.000
|
$706.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
35.000
|
$400.000
|
$810.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
410.000
|
$225.000
|
$402.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
91.000
|
$275.000
|
$606.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
130.000
|
$900.000
|
$538.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
7.700
|
$500.000
|
$1,630.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
103.000
|
$75.000
|
$391.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
111.000
|
$60.000
|
$144.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
5.000
|
$800.000
|
$1,980.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,200.000
|
$1,980.000
|
|
|
REMOV STR (SET)
|
EA
|
7.000
|
$500.000
|
$430.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,000.000
|
$922.000
|
|
|
REMOV STR (PIPE)
|
LF
|
72.000
|
$15.000
|
$18.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
258.000
|
$40.000
|
$12.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$250,000.000
|
$893,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$5,000.000
|
$4,480.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
165.000
|
$25.000
|
$39.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
165.000
|
$8.000
|
$16.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
334.000
|
$20.000
|
$36.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
334.000
|
$5.000
|
$17.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
520.000
|
$2.500
|
$4.350
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
520.000
|
$1.000
|
$3.750
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
462.000
|
$7.000
|
$9.850
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
140.000
|
$12.000
|
$144.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$30.000
|
$113.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
300.000
|
$10.000
|
$73.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$15.000
|
$124.000
|
|
|
CONC CURB & GUTTER (TY A)
|
LF
|
4,405.000
|
$12.000
|
$39.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
112.000
|
$75.000
|
$121.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
216.000
|
$50.000
|
$119.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
913.000
|
$65.000
|
$97.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
4.000
|
$2,200.000
|
$8,010.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
4.000
|
$2,500.000
|
$5,720.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
2.000
|
$1,800.000
|
$5,720.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
213.000
|
$65.000
|
$189.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
267.000
|
$5.000
|
$18.000
|
|
|
GATE (REMOVE)
|
EA
|
1.000
|
$500.000
|
$1,180.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
20.000
|
$200.000
|
$909.000
|
|
|
IN RD IL (TY SA) 50T-12 (400W EQ) LED
|
EA
|
28.000
|
$4,000.000
|
$3,980.000
|
|
|
IN RD IL (TY SA) 50T-12-12(400W EQ)LED
|
EA
|
11.000
|
$6,400.000
|
$5,270.000
|
|
|
CONDT (PVC) (SCH 40) (1") (CONC ENCSE)
|
LF
|
130.000
|
$20.000
|
$24.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
7,282.000
|
$10.000
|
$18.000
|
|
|
CONDT (PVC) (SCH 40) (2") (CONC ENCSE)
|
LF
|
260.000
|
$10.000
|
$25.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
1,546.000
|
$10.000
|
$21.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
160.000
|
$15.000
|
$25.000
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
305.000
|
$25.000
|
$41.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
2,400.000
|
$20.000
|
$29.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
995.000
|
$20.000
|
$34.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
6,685.000
|
$1.000
|
$1.200
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
560.000
|
$1.000
|
$1.450
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
42,520.000
|
$1.500
|
$1.450
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
718.000
|
$1.500
|
$1.700
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
264.000
|
$1.500
|
$1.850
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
40.000
|
$1,000.000
|
$1,070.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
10.000
|
$800.000
|
$1,270.000
|
|
|
GROUND BOX TY 1 (122422)
|
EA
|
27.000
|
$3,500.000
|
$3,930.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
|
EA
|
2.000
|
$7,200.000
|
$7,220.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)GC(O)
|
EA
|
2.000
|
$6,000.000
|
$6,630.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(N)GC(O)
|
EA
|
1.000
|
$6,000.000
|
$5,900.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)GC(O)
|
EA
|
1.000
|
$6,000.000
|
$5,930.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
34.750
|
$22.000
|
$26.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
48.000
|
$650.000
|
$736.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
4.000
|
$500.000
|
$442.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
31.000
|
$50.000
|
$82.000
|
|
|
INS OH SN SUP(25 FT BAL TEE)
|
EA
|
1.000
|
$22,000.000
|
$42,400.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
1.000
|
$23,500.000
|
$48,800.000
|
|
|
INS OH SN SUP(75 FT BRDG)
|
EA
|
1.000
|
$34,500.000
|
$50,700.000
|
|
|
INS OH SN SUP(100 FT BRDG)
|
EA
|
1.000
|
$30,000.000
|
$67,100.000
|
|
|
INS OH SN SUP(105 FT BRDG)
|
EA
|
1.000
|
$45,500.000
|
$70,600.000
|
|
|
INS OH SN SUP(115 FT BRDG)
|
EA
|
1.000
|
$50,000.000
|
$82,600.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
2.000
|
$700.000
|
$589.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
150.000
|
$0.600
|
$1.750
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
144.000
|
$8.000
|
$7.050
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
3,423.000
|
$0.600
|
$1.200
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
3,849.000
|
$0.150
|
$0.300
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
140.000
|
$0.200
|
$0.550
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
8,774.000
|
$0.150
|
$0.450
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
25,108.000
|
$0.300
|
$0.600
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
1,395.000
|
$0.500
|
$0.900
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
401.000
|
$2.500
|
$3.550
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
81.000
|
$50.000
|
$100.000
|
|
REFL PAV MRK TY II (W) (NUMBER)
|
EA
|
65.000
|
$100.000
|
$77.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
11.000
|
$65.000
|
$135.000
|
|
REFL PAV MRK TY II (W) (SYMBOL)
|
EA
|
7.000
|
$150.000
|
$112.000
|
|
REFL PAV MRK TY II (W) 18" (YLD TRI)
|
EA
|
7.000
|
$30.000
|
$35.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
3,746.000
|
$0.150
|
$0.300
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
3,222.000
|
$0.150
|
$0.550
|
|
|
PAVEMENT SEALER 4"
|
LF
|
7,595.000
|
$0.100
|
$0.300
|
|
|
PAVEMENT SEALER 6"
|
LF
|
8,914.000
|
$0.150
|
$0.550
|
|
|
PAVEMENT SEALER 8"
|
LF
|
25,108.000
|
$0.250
|
$0.600
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,395.000
|
$0.500
|
$0.900
|
|
|
PAVEMENT SEALER 24"
|
LF
|
187.000
|
$1.000
|
$3.550
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
81.000
|
$20.000
|
$100.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
11.000
|
$20.000
|
$135.000
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
7.000
|
$40.000
|
$112.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
7.000
|
$20.000
|
$35.000
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
11.000
|
$50.000
|
$77.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
3.000
|
$30,000.000
|
$42,900.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$5,000.000
|
$6,540.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
21.000
|
$185.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
6.000
|
$185.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
22.000
|
$185.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
7.000
|
$185.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
22.000
|
$185.000
|
$265.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
5.000
|
$250.000
|
$265.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
12.000
|
$450.000
|
$683.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
25.000
|
$110.000
|
$124.000
|
|
|
BACK PLATE (12")(4 SEC)
|
EA
|
2.000
|
$140.000
|
$183.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
766.000
|
$2.000
|
$2.950
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
1,047.000
|
$2.500
|
$3.300
|
|
|
TRF SIG CBL (TY A)(12 AWG)(9 CONDR)
|
LF
|
747.000
|
$3.500
|
$3.950
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
1,018.000
|
$1.500
|
$2.200
|
|
|
INS TRF SIG PL AM (S)1 ARM(20')LUM
|
EA
|
2.000
|
$5,300.000
|
$10,400.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(24')LUM
|
EA
|
1.000
|
$6,000.000
|
$10,800.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
1.000
|
$7,500.000
|
$11,900.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
3.000
|
$8,000.000
|
$12,200.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
4.000
|
$2,000.000
|
$3,840.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
12.000
|
$800.000
|
$942.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
2.000
|
$3,000.000
|
$4,340.000
|
|
|
REMOVAL OF TIMBER POLES
|
EA
|
9.000
|
$2,000.000
|
$589.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
6.000
|
$750.000
|
$1,180.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
12.000
|
$750.000
|
$1,180.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$44,600.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
1,330.000
|
$3.000
|
$5.300
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(48 FIBER)
|
LF
|
6,745.000
|
$2.000
|
$6.000
|
|
|
ITS GRND MNT CAB (TY 4) (CONF 1)
|
EA
|
5.000
|
$12,000.000
|
$15,700.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
12.000
|
$5,000.000
|
$11,200.000
|
|
|
CCTV FIELD CONTROLLER
|
EA
|
12.000
|
$2,500.000
|
$3,260.000
|
|
|
CCTV MOUNT (POLE)
|
EA
|
12.000
|
$750.000
|
$1,060.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
3,855.000
|
$15.000
|
$77.000
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
2,690.000
|
$30.100
|
$41.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
166.000
|
$3.500
|
$2.950
|
|
|
GROUND BOX (PREPARE)
|
EA
|
4.000
|
$300.000
|
$336.000
|
|
|
ITS POLE (20 FT)(130 MPH)
|
EA
|
1.000
|
$6,500.000
|
$7,770.000
|
|
|
ITS POLE (40 FT)(130 MPH)
|
EA
|
5.000
|
$9,000.000
|
$10,800.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
4.000
|
$6,700.000
|
$6,370.000
|
|
|
DMS CABINET FOUNDATION
|
EA
|
2.000
|
$1,000.000
|
$3,210.000
|
|
|
TMA (STATIONARY)
|
DAY
|
8.000
|
$150.000
|
$1,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
32.000
|
$50.000
|
$100.000
|
|
|
COLOR DMS (FOUNDATION MNT CABINET)
|
EA
|
2.000
|
$1,000.000
|
$192,000.000
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
7.000
|
$6,000.000
|
$8,810.000
|
|
|
ITS RVSD (DATA COLLECT ONLY) SYS
|
EA
|
5.000
|
$7,500.000
|
$10,000.000
|
|
|
LCS SYSTEM
|
EA
|
4.000
|
$21,800.000
|
$24,900.000
|
|
|
LCS SIGNAL UNIT
|
EA
|
25.000
|
$9,000.000
|
$11,000.000
|
|
Totals: |
$4,337,546.450
|
$8,996,758.500
|