SAN AUGUSTINE CR (0911-30-030)

Items: 49

County: SAN AUGUSTINE
Length: N/A
Highway: CR
District: LUFKIN
Control Number: 0911-30-030
DBE Goal: N/A
Project: BR 2018(430)
Guaranty: N/A
Time: 182 WORKING DAYS
Engineer's Estimate: $1,071,323.50
Date: 07/10/2019 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,071,323.50
$1,141,154.95
Over/Under Est: 6.52% $69,831.45
Over/Under Est: 11.91% $127,622.20
Amt Left: 5.06% $57,790.75
Over/Under Est: 12% $128,531.30
Amt Left: 5.14% $58,699.85
Delta: -0.08% -$909.10
$1,262,969.50
Over/Under Est: 17.89% $191,646.00
Amt Left: 10.67% $121,814.55
Delta: -5.26% -$63,114.70
Over/Under Est: 21.45% $229,833.00
Amt Left: 14.02% $160,001.55
Delta: -3.02% -$38,187.00

Bid Items & Bid Tabulations

49 Total 0 of 49
SAN AUGUSTINE  |  CR  |  LUFKIN  |  0911-30-030  |  07/10/2019  |  $1,071,323.50  |  BR 2018(430)  |  BRIDGE REPL  |  182 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STATELINE CONSTRUCTION, LLC
DREWERY CONSTRUCTION COMPANY, INCORPORATED
EAST TEXAS BRIDGE, INC.
PIERCE R & B LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 12.050 $3,000.000 $1,650.000 $4,000.000 $2,000.000 $3,000.000 $4,000.000
OBLITERATING ABANDONED ROAD
SY 276.000 $15.000 $17.000 $4.000 $30.000 $18.000 $30.000
EXCAVATION (ROADWAY)
CY 849.000 $10.000 $18.000 $19.000 $12.000 $18.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 306.000 $5.000 $26.000 $25.000 $20.000 $22.000 $40.000
FURNISHING AND PLACING TOPSOIL (4")
SY 3,679.000 $4.000 $2.000 $3.000 $2.000 $2.700 $3.000
BROADCAST SEED (TEMP) (WARM)
SY 1,840.000 $1.000 $1.500 $0.550 $1.300 $1.400 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 1,840.000 $1.000 $1.500 $0.550 $1.300 $1.400 $1.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 3,679.000 $1.000 $2.500 $0.550 $1.500 $1.500 $3.000
VEGETATIVE WATERING
MG 130.000 $40.000 $10.000 $52.000 $12.000 $35.000 $1.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 249.000 $3.000 $5.250 $4.200 $2.200 $2.450 $4.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 1,261.000 $28.000 $25.000 $24.400 $30.000 $23.500 $30.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 966.000 $28.000 $25.000 $24.400 $30.000 $23.500 $30.000
CEM STABIL BKFL
CY 115.000 $200.000 $195.000 $162.000 $150.000 $200.000 $200.000
DRILL SHAFT (24 IN)
LF 225.000 $125.000 $195.000 $161.000 $180.000 $201.000 $185.000
DRILL SHAFT (30 IN)
LF 480.000 $195.000 $225.000 $246.000 $265.000 $273.000 $190.000
CL C CONC (ABUT)
CY 76.200 $900.000 $1,050.000 $1,100.000 $900.000 $1,200.000 $1,100.000
REINF CONC SLAB (BOX BEAM)
SF 3,309.000 $20.000 $19.250 $22.000 $16.000 $20.000 $20.000
REINF CONC SLAB (SLAB BEAM)
SF 1,300.000 $15.000 $20.000 $20.000 $16.000 $22.000 $20.000
SHEAR KEY
CY 26.100 $200.000 $325.000 $370.000 $400.000 $500.000 $800.000
PRESTR CONC BOX BEAM (4B20)
LF 163.500 $210.000 $259.000 $275.000 $250.000 $270.000 $295.000
PRESTR CONC BOX BEAM (5B20)
LF 109.000 $220.000 $259.000 $275.000 $250.000 $295.000 $295.000
PRESTR CONC BOX BEAM (4B34)
LF 283.500 $220.000 $275.000 $267.000 $250.000 $290.000 $345.000
PRESTR CONC BOX BEAM (5B34)
LF 189.000 $230.000 $275.000 $267.000 $250.000 $325.000 $345.000
PRESTR CONC SLAB BEAM (5SB15)
LF 247.500 $150.000 $222.000 $221.000 $215.000 $290.000 $235.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 693.000 $175.000 $155.000 $170.000 $150.000 $130.000 $200.000
RAIL (TY T223)
LF 234.000 $150.000 $110.000 $168.000 $90.000 $110.000 $110.000
RAIL (TY T631LS)
LF 266.000 $65.000 $71.000 $54.000 $66.000 $75.000 $85.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $15,000.000 $12,500.000 $11,000.000 $11,000.000 $10,000.000 $12,000.000
MOBILIZATION
LS 1.000 $100,000.000 $100,000.000 $100,000.000 $100,000.000 $126,000.000 $120,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $1,500.000 $1,250.000 $1,500.000 $7,000.000 $2,200.000 $1,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 95.000 $30.000 $44.000 $34.000 $45.000 $44.000 $5.000
ROCK FILTER DAMS (REMOVE)
LF 95.000 $10.000 $12.000 $8.400 $7.000 $8.300 $1.000
CONSTRUCTION PERIMETER FENCE
LF 118.000 $2.000 $12.000 $3.150 $6.000 $6.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,523.000 $3.000 $2.500 $2.600 $4.000 $3.500 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,523.000 $1.000 $1.150 $1.050 $1.000 $1.110 $1.000
CONSTRUCTING DETOURS
SY 42.000 $75.000 $85.000 $70.000 $50.000 $105.000 $60.000
MTL W-BEAM GD FEN (TIM POST)
LF 421.500 $25.000 $22.000 $23.000 $22.000 $21.750 $22.000
MTL BEAM GD FEN TRANS (TL2)
EA 3.000 $1,200.000 $1,025.000 $945.000 $1,000.000 $1,025.000 $1,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,200.000 $1,250.000 $1,050.000 $1,300.000 $1,250.000 $1,400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,500.000 $2,750.000 $2,600.000 $2,800.000 $2,740.000 $2,600.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 1.000 $11,000.000 $25,200.000 $26,000.000 $25,000.000 $25,000.000 $25,000.000
WIRE FENCE (TY C)
LF 700.000 $15.000 $12.000 $10.000 $12.000 $8.750 $20.000
GATE (TY 1)
EA 1.000 $1,500.000 $2,500.000 $1,400.000 $2,000.000 $1,475.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 3.000 $80.000 $500.000 $70.000 $200.000 $100.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 3.000 $50.000 $25.000 $16.000 $30.000 $40.000 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 17.000 $40.000 $25.000 $16.000 $30.000 $26.000 $30.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 6.000 $75.000 $45.000 $57.000 $50.000 $60.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 17.000 $50.000 $30.000 $29.000 $30.000 $31.000 $50.000
CATTLE GUARD
EA 1.000 $6,000.000 $3,500.000 $15,000.000 $8,000.000 $15,000.000 $15,000.000
Totals: $1,071,323.500 $1,141,154.950 $1,198,945.700 $1,199,854.800 $1,262,969.505 $1,301,156.500