WILSON US 181 (0100-03-084)

Items: 120

County: WILSON
Length: N/A
Highway: US 181
District: SAN ANTONIO
Control Number: 0100-03-084
DBE Goal: N/A
Project: NH 1902(210)
Guaranty: N/A
Time: 136 WORKING DAYS
Engineer's Estimate: $12,796,765.43
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$12,796,765.43
$10,328,208.03
Over/Under Est: -19.29% -$2,468,557.40
$10,608,086.47
Over/Under Est: -17.1% -$2,188,678.96
Amt Left: 2.71% $279,878.44
$12,469,772.34
Over/Under Est: -2.56% -$326,993.09
Amt Left: 20.74% $2,141,564.31
Delta: -17.55% -$1,861,685.87
Over/Under Est: -0.45% -$57,573.43
Amt Left: 23.34% $2,410,983.97
Delta: -2.16% -$269,419.66
Over/Under Est: 1.6% $204,254.73
Amt Left: 25.88% $2,672,812.13
Delta: -2.06% -$261,828.16
Over/Under Est: 2.25% $288,469.38
Amt Left: 26.69% $2,757,026.78
Delta: -0.65% -$84,214.65
$13,629,366.57
Over/Under Est: 6.51% $832,601.14
Amt Left: 31.96% $3,301,158.54
Delta: -4.16% -$544,131.76

Bid Items & Bid Tabulations

120 Total 0 of 120
WILSON  |  US 181  |  SAN ANTONIO  |  0100-03-084  |  07/09/2019  |  $12,796,765.43  |  NH 1902(210)  |  SURF/ROADWAY RESTOR  |  136 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
HUNTER INDUSTRIES, LTD.
DEAN WORD COMPANY, LTD.
TEXAS MATERIALS GROUP, INC.
CLARK CONSTRUCTION OF TEXAS, INC.
LONE STAR PAVING COMPANY
AUSTIN MATERIALS, LLC
REMOVING CONC (MEDIANS)
SY 90.000 $6.000 $43.000 $35.000 $19.350 $24.560 $37.000 $10.260 $45.000
REMOVING CONC (SIDEWALKS)
SY 15.000 $8.750 $43.000 $35.000 $19.350 $147.330 $36.750 $12.930 $75.000
REMOVING CONCRETE(MOW STRIP)
LF 2,915.000 $10.000 $10.000 $8.500 $8.865 $8.730 $8.700 $8.410 $8.500
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 6.800 $25.000 $150.000 $96.360 $88.400 $262.030 $89.250 $6.220 $100.000
BACKFILL (TY A)
STA 324.750 $225.000 $90.000 $95.550 $187.469 $280.000 $189.310 $227.300 $204.000
BACKFILL (TY B)
STA 501.000 $150.000 $90.000 $95.550 $118.500 $230.000 $357.710 $187.750 $264.000
BLADING
HR 58.000 $100.000 $80.000 $91.200 $111.505 $145.990 $150.000 $164.810 $126.000
COMPOST MANUF TOPSOIL (4")
SY 9,414.000 $1.500 $1.500 $2.200 $0.873 $0.800 $1.000 $0.770 $12.000
BLOCK SODDING
SY 9,414.000 $4.000 $4.750 $4.750 $4.940 $5.350 $5.250 $5.220 $5.350
VEGETATIVE WATERING
MG 146.900 $20.000 $25.000 $19.980 $21.758 $18.000 $250.000 $38.450 $252.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 9,000.000 $87.000 $76.500 $67.590 $79.887 $88.450 $102.600 $105.440 $85.000
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 65,526.000 $96.000 $74.250 $69.690 $79.676 $88.000 $97.770 $99.220 $80.000
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 13,324.000 $96.000 $75.750 $64.670 $79.953 $85.500 $82.210 $99.810 $79.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 15,529.000 $41.000 $37.500 $37.380 $38.975 $50.000 $52.800 $65.520 $41.500
PLANE ASPH CONC PAV (1")
SY 154,486.000 $0.900 $0.900 $0.530 $2.047 $1.350 $1.030 $1.200 $2.100
PLANE ASPH CONC PAV (2")
SY 564,378.000 $1.000 $0.900 $1.910 $1.956 $2.000 $1.810 $1.880 $3.400
RIPRAP (CONC)(4 IN)
CY 5.350 $480.000 $750.000 $540.000 $802.500 $525.000 $567.000 $565.610 $850.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 303.900 $200.000 $135.000 $120.000 $192.600 $150.000 $165.000 $82.400 $150.000
RIPRAP (MOW STRIP)(4 IN)
CY 223.200 $425.000 $435.000 $455.000 $535.000 $425.000 $455.000 $526.030 $420.000
CLEANING AND SEALING JOINTS
LF 371.000 $20.000 $45.000 $45.000 $48.150 $43.230 $47.000 $49.440 $45.000
CLEAN EXIST CULVERTS
EA 9.000 $2,500.000 $1,500.000 $2,500.000 $2,461.000 $1,800.000 $2,550.000 $2,417.160 $3,000.000
MOBILIZATION
LS 1.000 $1,116,326.440 $625,000.000 $894,802.800 $951,715.136 $600,000.000 $345,000.000 $55,292.000 $682,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $2,500.000 $4,565.800 $5,503.318 $8,000.000 $3,000.000 $1,379.980 $23,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $18.000 $13.000 $25.000 $13.520 $13.500 $13.650 $14.280 $13.500
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $6.750 $2.000 $2.000 $2.080 $10.500 $2.100 $2.200 $10.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,025.000 $4.000 $2.950 $2.950 $3.068 $5.000 $3.250 $3.240 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,025.000 $1.000 $1.000 $1.000 $1.040 $1.000 $1.100 $1.100 $1.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 144.000 $75.000 $85.000 $85.500 $48.800 $65.000 $100.000 $203.260 $100.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 308.000 $30.000 $85.000 $96.900 $156.275 $75.000 $100.000 $269.180 $88.500
CONC CURB (TY I)
LF 196.000 $35.000 $50.000 $25.000 $21.400 $15.000 $26.250 $12.360 $20.000
CURB RAMPS (TY 1)
EA 2.000 $1,440.000 $2,200.000 $1,600.000 $3,182.180 $2,000.000 $1,700.000 $1,862.420 $1,500.000
CURB RAMPS (TY 10)
EA 1.000 $1,480.000 $2,200.000 $2,100.000 $3,386.550 $2,000.000 $2,205.000 $1,867.810 $1,750.000
CURB RAMPS (TY 22)
EA 1.000 $2,400.000 $2,200.000 $2,800.000 $3,422.930 $3,500.000 $2,940.000 $3,296.120 $3,500.000
RUMBLE STRIPS (SHOULDER)
LF 168,323.000 $0.250 $0.220 $0.120 $0.155 $0.250 $0.110 $0.180 $0.120
RUMBLE STRIPS (CENTERLINE)
LF 9,213.000 $0.250 $0.400 $0.180 $0.495 $0.380 $0.400 $0.820 $0.180
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 18,920.000 $0.190 $0.320 $0.180 $0.339 $0.380 $0.300 $0.270 $0.180
MTL W-BEAM GD FEN (TIM POST)
LF 2,755.000 $22.000 $17.000 $17.000 $21.320 $20.000 $17.500 $18.680 $21.950
MTL W-BEAM GD FEN (STEEL POST)
LF 75.000 $50.000 $50.000 $50.000 $76.388 $40.000 $55.000 $54.940 $45.450
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,800.000 $1,880.000 $2,380.000 $1,849.230 $1,800.000 $2,500.000 $2,065.570 $1,630.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,000.000 $855.000 $855.000 $1,118.000 $1,100.000 $941.000 $939.400 $925.000
REMOVE METAL BEAM GUARD FENCE
LF 2,767.500 $2.750 $1.000 $1.000 $1.144 $1.750 $1.100 $1.100 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $250.000 $80.000 $80.000 $130.000 $200.000 $88.000 $87.900 $150.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $165.000 $125.000 $125.000 $78.000 $100.000 $140.000 $137.340 $195.000
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $2,800.000 $2,150.000 $2,150.000 $2,861.040 $2,750.000 $2,200.000 $2,362.220 $2,730.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $250.000 $155.000 $155.000 $109.200 $150.000 $171.000 $170.300 $255.000
ALUMINUM SIGNS (TY G)
SF 533.500 $25.000 $30.000 $25.000 $36.400 $25.000 $85.000 $27.470 $25.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $300.000 $465.000 $465.180 $483.787 $450.000 $490.000 $494.420 $452.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 119.000 $350.000 $512.000 $512.880 $533.395 $485.000 $520.000 $554.850 $507.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 8.000 $875.000 $558.000 $558.630 $580.975 $735.000 $590.000 $807.550 $738.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 72.000 $650.000 $625.000 $625.970 $651.009 $745.000 $630.000 $840.510 $768.000
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 9.000 $985.000 $769.000 $769.800 $800.592 $805.000 $810.000 $884.460 $808.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 381.000 $125.000 $250.000 $250.000 $260.000 $245.000 $253.000 $247.210 $226.000
REMOVE SM RD SN SUP&AM
EA 9.000 $82.000 $100.000 $100.000 $104.000 $125.000 $105.000 $137.340 $126.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 6.000 $14.000 $10.000 $12.860 $13.374 $25.000 $13.690 $10.990 $15.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 6.000 $9.500 $12.000 $12.860 $13.374 $25.000 $13.690 $13.180 $15.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 9.000 $13.000 $14.000 $14.000 $13.374 $25.000 $13.690 $15.380 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 22.000 $20.000 $18.000 $18.000 $17.420 $25.000 $17.600 $19.780 $18.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 9,204.000 $0.300 $0.500 $0.250 $0.312 $0.250 $0.260 $0.550 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 53,047.000 $0.300 $0.500 $0.250 $0.270 $0.500 $0.260 $0.550 $0.260
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 30.000 $0.500 $1.000 $0.500 $1.040 $1.000 $0.530 $1.100 $1.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 14,294.000 $0.600 $1.000 $0.500 $0.697 $1.000 $0.530 $1.100 $0.670
WK ZN PAV MRK NON-REMOV (W)18"(SLD)
LF 74.000 $4.250 $4.000 $4.500 $5.200 $4.000 $4.730 $4.390 $5.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 3,550.000 $4.000 $6.000 $6.500 $5.200 $4.600 $6.750 $6.590 $5.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 103.000 $90.000 $200.000 $85.000 $104.000 $200.000 $89.250 $219.740 $100.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 1.000 $75.000 $200.000 $95.000 $312.000 $200.000 $99.750 $219.750 $300.000
WK ZN PAV MRK NON-REMOV (W)(UTURN ARW)
EA 17.000 $90.000 $300.000 $125.000 $253.760 $550.000 $131.250 $329.610 $244.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 101.000 $82.000 $200.000 $135.000 $124.800 $200.000 $141.750 $219.740 $120.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,275.000 $0.300 $0.500 $0.250 $0.312 $0.500 $0.260 $0.550 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 47,401.000 $0.300 $0.500 $0.250 $0.270 $0.500 $0.260 $0.550 $0.260
WK ZN PAV MRK NON-REMOV (Y)(MED NOSE)
EA 14.000 $350.000 $500.000 $300.000 $346.320 $500.000 $315.000 $549.350 $333.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,987.000 $1.000 $0.600 $1.270 $1.286 $1.350 $1.250 $0.550 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,948.000 $0.750 $0.600 $1.270 $1.286 $1.140 $1.250 $0.550 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,017.000 $0.850 $0.650 $1.270 $1.286 $1.000 $1.250 $0.550 $1.500
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 160.000 $1.000 $2.000 $2.500 $1.040 $2.000 $2.630 $2.200 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 30.000 $1.000 $2.000 $3.500 $1.040 $2.000 $3.680 $2.200 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,430.000 $0.620 $1.000 $0.950 $0.728 $1.000 $1.000 $1.100 $0.700
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 22,538.000 $0.750 $1.000 $0.980 $0.728 $1.250 $1.000 $1.100 $0.700
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
LF 74.000 $6.000 $10.000 $4.500 $5.200 $10.000 $4.730 $10.990 $5.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 348.000 $6.200 $5.500 $6.500 $6.729 $5.500 $6.830 $6.040 $6.470
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 4,202.000 $5.250 $6.500 $6.750 $6.115 $6.500 $6.900 $7.140 $5.880
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 45.000 $110.000 $125.000 $95.000 $124.800 $125.000 $100.000 $137.340 $120.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 107.000 $95.000 $150.000 $98.000 $124.800 $150.000 $102.900 $164.810 $120.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 1.000 $200.000 $200.000 $120.000 $230.880 $200.000 $126.000 $219.750 $222.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 17.000 $175.000 $255.000 $125.000 $289.120 $255.000 $131.250 $280.170 $278.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 10.000 $350.000 $300.000 $175.000 $323.440 $300.000 $185.000 $329.610 $311.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 7.000 $155.000 $175.000 $120.000 $139.360 $175.000 $126.000 $192.270 $134.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 115.000 $130.000 $200.000 $125.000 $139.360 $200.000 $131.250 $219.740 $134.000
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
EA 17.000 $25.000 $25.000 $25.000 $45.760 $25.000 $26.250 $27.470 $44.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 364.000 $42.000 $35.000 $26.000 $45.760 $35.000 $27.300 $38.450 $44.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 27.000 $5.000 $7.000 $6.500 $8.320 $7.000 $6.830 $7.690 $8.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 22.000 $330.000 $300.000 $400.000 $392.080 $300.000 $425.000 $329.610 $377.000
PAVEMENT SEALER 4"
LF 199,669.000 $0.240 $0.080 $0.150 $0.260 $0.080 $0.160 $0.090 $0.250
PAVEMENT SEALER 6"
LF 215,176.000 $0.120 $0.100 $0.180 $0.364 $0.180 $0.190 $0.110 $0.350
PAVEMENT SEALER 8"
LF 23,998.000 $0.280 $0.150 $0.300 $0.458 $0.150 $0.320 $0.160 $0.440
PAVEMENT SEALER 18"
LF 74.000 $2.250 $0.450 $2.000 $2.496 $0.450 $2.100 $0.490 $2.400
PAVEMENT SEALER 24"
LF 4,577.000 $2.100 $0.800 $3.000 $2.881 $0.800 $3.150 $0.880 $2.770
PAVEMENT SEALER (ARROW)
EA 152.000 $25.000 $20.000 $65.000 $65.520 $50.000 $68.250 $21.970 $63.000
PAVEMENT SEALER (WORD)
EA 122.000 $30.000 $20.000 $75.000 $65.520 $20.000 $78.750 $21.970 $63.000
PAVEMENT SEALER (MED NOSE)
EA 22.000 $80.000 $25.000 $200.000 $253.760 $25.000 $210.000 $27.470 $244.000
PAVEMENT SEALER (DBL ARROW)
EA 1.000 $72.000 $25.000 $75.000 $96.720 $25.000 $79.000 $27.460 $93.000
PAVEMENT SEALER (UTURN ARROW)
EA 17.000 $71.000 $25.000 $78.000 $149.760 $25.000 $81.900 $27.470 $144.000
PAVEMENT SEALER (LNDP ARROW)
EA 10.000 $141.000 $25.000 $85.000 $184.080 $25.000 $89.250 $27.470 $177.000
PAVEMENT SEALER (YLD TRI)
EA 17.000 $20.000 $7.000 $20.000 $34.320 $7.000 $21.000 $7.690 $33.000
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 65,555.000 $1.000 $1.350 $0.650 $1.279 $1.350 $0.660 $1.480 $1.230
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 28,341.000 $0.400 $0.350 $0.300 $0.437 $0.350 $0.320 $0.380 $0.420
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 53,047.000 $0.350 $0.350 $0.300 $0.416 $0.350 $0.310 $0.380 $0.400
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 75,482.000 $0.500 $0.550 $0.450 $0.562 $0.550 $0.460 $0.600 $0.540
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 5,800.000 $0.300 $0.550 $0.280 $0.458 $0.550 $0.300 $0.600 $0.440
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,275.000 $0.400 $0.350 $0.300 $0.458 $0.350 $0.320 $0.380 $0.440
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 63,645.000 $0.320 $0.350 $0.280 $0.416 $0.350 $0.290 $0.380 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 47,401.000 $0.350 $0.350 $0.300 $0.416 $0.350 $0.320 $0.380 $0.400
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 74,139.000 $0.500 $0.550 $0.450 $0.562 $0.580 $0.460 $0.600 $0.540
REFL PAV MRKR TY I-C
EA 511.000 $3.250 $3.000 $5.000 $3.921 $3.000 $5.250 $3.300 $3.770
REFL PAV MRKR TY II-A-A
EA 2,905.000 $2.950 $3.000 $5.000 $3.463 $3.000 $5.150 $3.300 $3.330
REFL PAV MRKR TY II-C-R
EA 2,510.000 $4.000 $3.000 $5.000 $3.463 $3.000 $5.150 $3.300 $3.330
TREE TRIMMING / BRUSH REMOVAL
MI 7.300 $12,000.000 $5,000.000 $5,775.000 $10,257.530 $5,000.000 $5,100.000 $8,569.910 $4,940.000
UNDERSEAL COURSE
GAL 144,854.000 $2.900 $2.700 $3.080 $4.115 $3.500 $3.150 $1.000 $4.150
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 345.000 $55.000 $70.000 $81.190 $101.650 $75.000 $100.000 $104.380 $82.500
TMA (STATIONARY)
DAY 79.000 $165.000 $100.000 $270.620 $273.920 $200.000 $400.000 $274.680 $322.000
TMA (MOBILE OPERATION)
DAY 310.000 $130.000 $100.000 $108.250 $299.722 $250.000 $150.000 $181.290 $1,142.000
Totals: $12,796,765.435 $10,328,208.030 $10,608,086.482 $12,469,772.543 $12,739,192.009 $13,001,020.162 $13,085,234.844 $13,629,366.570