VAL VERDE PW (0922-11-043)

Items: 39

County: VAL VERDE
Length: N/A
Highway: PW
District: LAREDO
Control Number: 0922-11-043
DBE Goal: N/A
Project: C 922-11-43
Guaranty: N/A
Time: 123 WORKING DAYS
Engineer's Estimate: $4,213,914.96
Date: 07/10/2019 (6 years ago)
Contract Number: N/A
Type: BASE, SURF TREAT, GRAD, STR, PAV MRK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$4,213,914.96
1
$3,978,828.43
Over/Under Est: -5.58% -$235,086.53
Over/Under Est: 10.21% $430,278.61
Amt Left: 16.72% $665,365.14
Subcontractor Percentage Amount
DEPENDABLE FENCE 1.86% $83,653.01
Total: 1.86% $83,653.01

Bid Items & Bid Tabulations

39 Total 0 of 39
VAL VERDE  |  PW  |  LAREDO  |  0922-11-043  |  07/10/2019  |  $4,213,914.96  |  C 922-11-43  |  BASE, SURF TREAT, GRAD, STR, PAV MRK  |  123 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 250.420 $600.000 $800.000 $623.940
EXCAVATION (ROADWAY)
CY 1,392.000 $8.000 $18.000 $45.970
EXCAVATION (SPECIAL)
CY 11,170.000 $33.000 $18.000 $62.150
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 9,965.000 $15.000 $8.400 $37.320
BLADING
HR 126.000 $200.000 $150.000 $227.920
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 10.490 $1,485.000 $1,430.000 $1,210.900
PROOF ROLLING
HR 79.000 $220.000 $102.000 $127.110
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 3,107.000 $187.000 $78.000 $85.470
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
CY 7,409.000 $35.000 $78.000 $77.950
LIME (HYDRATED LIME (SLURRY))
TON 1,203.000 $168.000 $252.000 $214.560
LIME TRT (SUBGRADE)(8")
SY 43,873.000 $2.980 $4.000 $3.900
LIME TRT (NEW BASE) (7")
SY 37,410.000 $2.450 $4.400 $3.090
ASPH (AC-15P)
GAL 1,772.000 $7.000 $10.000 $7.140
ASPH (CRS-1P)
GAL 5,337.000 $11.000 $10.000 $5.510
ASPH (RC-250)
GAL 4,268.000 $9.000 $10.000 $8.100
AGGR(TY-PD GR-3 SAC-A)
CY 157.000 $264.000 $105.000 $177.140
AGGR(TY-PD GR-4 SAC-A)
CY 108.000 $264.000 $110.000 $257.510
AGGR(TY-PB GR-3 SAC-B)
CY 24.000 $80.000 $150.000 $505.070
AGGR(TY-PB GR-4 SAC-B)
CY 21.000 $90.000 $150.000 $569.250
CONC PVMT (CONT REINF - CRCP) (8")
SY 1,500.000 $142.880 $400.000 $211.360
CEM STABIL BKFL
CY 44.000 $330.000 $300.000 $338.690
RIPRAP (CONC)(4 IN)
CY 525.000 $1,100.000 $750.000 $893.770
RC PIPE (CL III)(24 IN)
LF 335.000 $220.000 $112.890 $93.160
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 4.000 $11,000.000 $7,425.000 $9,623.310
REMOV STR (PIPE)
EA 3.000 $2,750.000 $2,025.000 $1,876.950
MOBILIZATION
LS 1.000 $680,186.070 $400,000.000 $583,168.500
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $6,600.000 $8,500.000 $1,610.360
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $6,600.000 $8,500.000 $1,803.930
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,790.000 $17.600 $6.200 $9.590
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 8,341.000 $10.000 $7.500 $11.720
BIODEG EROSN CONT LOGS (REMOVE)
LF 10,131.000 $2.000 $1.200 $2.340
DRIVEWAYS (SURF TREAT)
SY 370.000 $25.000 $50.550 $70.830
DRIVEWAYS (BASE)
SY 312.000 $20.000 $42.940 $49.090
MTL W-BEAM GD FEN (TIM POST)
LF 3,400.000 $46.200 $26.230 $24.630
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $5,280.000 $1,367.400 $1,447.590
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 66.000 $44.000 $72.090 $73.700
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 8.000 $220.000 $433.120 $100.650
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 11,982.000 $1.100 $3.000 $0.710
REFL PAV MRKR TY II-A-A
EA 151.000 $11.000 $80.000 $6.460
Totals: $4,213,914.960 $3,978,828.430 $4,644,193.576