|
|
PREPARING ROW
|
STA
|
36.000
|
$1,000.000
|
$2,402.000
|
$4,000.000
|
$2,000.000
|
$15,000.000
|
$2,460.340
|
|
|
PREP ROW (TREE)(LESS THAN 24" DIA)
|
EA
|
20.000
|
$280.000
|
$1,606.000
|
$825.000
|
$500.000
|
$300.000
|
$379.160
|
|
|
PREP ROW (TREE)(GREATER THAN 24" DIA)
|
EA
|
3.000
|
$2,250.000
|
$2,142.000
|
$1,000.000
|
$2,950.000
|
$500.000
|
$581.450
|
|
|
REMOVING STAB BASE AND ASPH PAV (13")
|
SY
|
10,281.000
|
$10.000
|
$6.700
|
$6.750
|
$6.500
|
$0.100
|
$4.580
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,270.000
|
$8.000
|
$18.600
|
$12.500
|
$16.000
|
$25.000
|
$20.940
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
5,017.000
|
$13.140
|
$38.600
|
$9.500
|
$40.000
|
$20.000
|
$55.070
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
3,725.000
|
$42.000
|
$118.000
|
$50.000
|
$40.000
|
$150.000
|
$53.690
|
|
|
BLOCK SODDING
|
SY
|
23,735.000
|
$7.530
|
$3.450
|
$3.500
|
$3.120
|
$5.000
|
$3.570
|
|
|
FERTILIZER
|
AC
|
4.900
|
$662.220
|
$857.000
|
$850.000
|
$662.580
|
$888.000
|
$757.970
|
|
|
VEGETATIVE WATERING
|
MG
|
588.000
|
$13.750
|
$25.000
|
$25.000
|
$22.130
|
$25.000
|
$40.310
|
|
|
LIME TRT(MIX EXST MATL & NEW BASE)(6")
|
SY
|
6,577.000
|
$10.000
|
$5.450
|
$6.750
|
$8.320
|
$3.250
|
$5.230
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
89.000
|
$450.000
|
$166.000
|
$165.000
|
$270.690
|
$165.000
|
$191.420
|
|
|
CEMENT
|
TON
|
89.000
|
$250.000
|
$146.000
|
$155.000
|
$227.410
|
$150.000
|
$153.160
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
6,577.000
|
$2.500
|
$5.450
|
$4.500
|
$6.670
|
$3.000
|
$5.230
|
|
|
ASPHALT STAB BASE (GR 2)(PG 70)
|
TON
|
7,596.000
|
$86.000
|
$84.300
|
$80.000
|
$89.670
|
$85.000
|
$106.960
|
|
|
SALV,HAUL & STKPL RCL APH PV (2")
|
SY
|
62,864.000
|
$1.050
|
$0.010
|
$2.000
|
$0.010
|
$0.100
|
$1.830
|
|
|
SLV, HAUL & STKPL RCL APH PV (13")
|
SY
|
10,281.000
|
$1.300
|
$0.010
|
$1.500
|
$4.280
|
$0.100
|
$3.890
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
15,814.000
|
$3.000
|
$3.300
|
$4.000
|
$3.170
|
$4.000
|
$4.920
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
528.000
|
$118.000
|
$97.400
|
$175.000
|
$200.450
|
$120.000
|
$140.710
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
7,322.000
|
$71.890
|
$86.600
|
$95.000
|
$98.110
|
$94.000
|
$109.820
|
|
|
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
|
TON
|
1,519.000
|
$73.690
|
$92.100
|
$100.000
|
$98.110
|
$97.000
|
$114.400
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
1,309.000
|
$72.000
|
$81.900
|
$75.000
|
$93.890
|
$120.000
|
$105.820
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
62,864.000
|
$1.500
|
$1.850
|
$2.000
|
$1.600
|
$0.100
|
$1.620
|
|
|
CEM STABIL BKFL
|
CY
|
80.000
|
$60.000
|
$134.000
|
$90.000
|
$60.000
|
$130.000
|
$47.460
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,232.000
|
$18.000
|
$41.000
|
$35.000
|
$28.000
|
$25.000
|
$17.730
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
420.000
|
$109.730
|
$129.000
|
$125.000
|
$175.000
|
$90.000
|
$184.870
|
|
|
PRESTR CONC PIL (20 IN SQ)
|
LF
|
612.000
|
$95.930
|
$139.000
|
$140.000
|
$175.000
|
$105.000
|
$204.810
|
|
|
CL C CONC (ABUT)
|
CY
|
36.600
|
$880.000
|
$1,285.000
|
$1,600.000
|
$1,400.000
|
$1,300.000
|
$1,431.860
|
|
|
CL C CONC (CAP)
|
CY
|
40.400
|
$960.000
|
$1,285.000
|
$1,700.000
|
$1,050.000
|
$1,500.000
|
$2,561.340
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
46.000
|
$750.000
|
$428.000
|
$525.000
|
$661.000
|
$500.000
|
$600.580
|
|
|
REINF CONC SLAB
|
SF
|
9,084.000
|
$20.000
|
$19.300
|
$22.250
|
$23.500
|
$25.000
|
$20.760
|
|
|
APPROACH SLAB
|
CY
|
71.000
|
$461.000
|
$921.000
|
$575.000
|
$650.000
|
$500.000
|
$516.370
|
|
|
RETAINING WALL (MSE)
|
SF
|
11,854.200
|
$43.000
|
$47.900
|
$45.000
|
$48.500
|
$30.000
|
$33.680
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,161.000
|
$145.000
|
$209.000
|
$175.000
|
$200.000
|
$140.000
|
$178.250
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
17.000
|
$400.000
|
$495.000
|
$875.000
|
$560.410
|
$500.000
|
$528.510
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
21.500
|
$300.000
|
$539.000
|
$725.000
|
$610.430
|
$650.000
|
$575.420
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
325.000
|
$400.340
|
$85.700
|
$150.000
|
$230.000
|
$120.000
|
$156.860
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
20.000
|
$575.000
|
$642.000
|
$625.000
|
$728.650
|
$500.000
|
$686.380
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
1,967.000
|
$38.000
|
$62.100
|
$90.000
|
$55.000
|
$45.000
|
$73.210
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
92.000
|
$90.000
|
$54.600
|
$100.000
|
$130.000
|
$100.000
|
$103.060
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
182.000
|
$207.000
|
$129.000
|
$150.000
|
$104.890
|
$90.000
|
$104.050
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
24.000
|
$1,331.000
|
$1,071.000
|
$1,000.000
|
$4,107.280
|
$1,100.000
|
$1,429.500
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
2.000
|
$350.000
|
$1,606.000
|
$1,000.000
|
$2,603.540
|
$1,000.000
|
$587.450
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$56,000.000
|
$60,609.000
|
$65,000.000
|
$53,000.000
|
$60,000.000
|
$59,028.890
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$50,694.000
|
$175,000.000
|
$500,000.000
|
$513,000.000
|
$560,000.000
|
$605,950.820
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$5,000.000
|
$14,331.000
|
$2,725.000
|
$6,403.280
|
$13,600.000
|
$2,982.630
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
160.000
|
$28.860
|
$30.000
|
$31.000
|
$24.980
|
$28.400
|
$28.580
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
160.000
|
$11.250
|
$9.650
|
$12.000
|
$8.140
|
$11.000
|
$9.310
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
200.000
|
$28.790
|
$19.300
|
$35.000
|
$31.560
|
$33.030
|
$36.100
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
200.000
|
$9.400
|
$8.550
|
$11.250
|
$7.570
|
$10.750
|
$8.660
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,896.000
|
$1.000
|
$2.300
|
$3.100
|
$1.720
|
$2.880
|
$1.970
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,896.000
|
$0.500
|
$0.800
|
$0.500
|
$0.400
|
$0.480
|
$0.460
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,157.000
|
$80.000
|
$66.400
|
$65.000
|
$74.000
|
$50.000
|
$66.390
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,500.000
|
$7.540
|
$5.350
|
$15.000
|
$11.560
|
$9.000
|
$16.390
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,230.000
|
$3.640
|
$13.000
|
$10.000
|
$4.320
|
$7.000
|
$5.750
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,500.000
|
$4.760
|
$22.000
|
$15.000
|
$11.190
|
$9.000
|
$12.590
|
|
|
LANDSCAPE PAVERS
|
SY
|
33.000
|
$100.000
|
$120.000
|
$170.000
|
$178.450
|
$150.000
|
$85.800
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,921.000
|
$25.000
|
$15.700
|
$30.000
|
$19.520
|
$11.000
|
$17.400
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,929.000
|
$29.000
|
$26.700
|
$60.000
|
$24.950
|
$30.000
|
$31.720
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,100.000
|
$1,906.000
|
$2,250.000
|
$1,780.000
|
$750.000
|
$2,036.270
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$2.750
|
$3.200
|
$1.750
|
$3.000
|
$5.000
|
$3.430
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,877.000
|
$28.320
|
$3,000.000
|
$2,645.000
|
$1,350.000
|
$3,025.800
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$296.000
|
$268.000
|
$250.000
|
$250.000
|
$350.000
|
$285.990
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,354.500
|
$4,444.000
|
$4,600.000
|
$4,150.000
|
$1,000.000
|
$4,747.480
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
4.000
|
$1,379.690
|
$1,071.000
|
$1,100.000
|
$1,000.000
|
$1,000.000
|
$1,143.970
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$2,184.270
|
$25,860.000
|
$25,000.000
|
$24,150.000
|
$27,000.000
|
$27,626.900
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
60.000
|
$8.500
|
$5.700
|
$6.000
|
$5.330
|
$5.330
|
$6.100
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
60.000
|
$1.500
|
$1.100
|
$1.100
|
$1.030
|
$1.030
|
$1.180
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
200.500
|
$19.000
|
$40.700
|
$30.000
|
$26.000
|
$20.000
|
$29.740
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
42.000
|
$488.000
|
$346.000
|
$350.000
|
$323.000
|
$354.030
|
$369.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
52.000
|
$601.000
|
$435.000
|
$450.000
|
$406.000
|
$458.490
|
$464.450
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
92.000
|
$73.000
|
$64.300
|
$50.000
|
$60.000
|
$90.000
|
$68.640
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
3,360.000
|
$0.180
|
$0.270
|
$0.300
|
$0.250
|
$0.400
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
76,978.000
|
$0.140
|
$0.210
|
$0.300
|
$0.200
|
$0.390
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,154.000
|
$0.350
|
$0.320
|
$0.550
|
$0.300
|
$0.800
|
$0.570
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
4,998.000
|
$0.750
|
$1.350
|
$1.050
|
$1.250
|
$1.500
|
$1.140
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
1,352.000
|
$1.910
|
$2.400
|
$2.200
|
$2.250
|
$3.000
|
$2.290
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
62.000
|
$41.000
|
$102.000
|
$83.000
|
$95.000
|
$85.000
|
$85.800
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
26.000
|
$66.000
|
$102.000
|
$83.000
|
$95.000
|
$95.000
|
$85.800
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,320.000
|
$0.130
|
$0.210
|
$0.300
|
$0.200
|
$0.400
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
18,337.000
|
$0.140
|
$0.210
|
$0.300
|
$0.200
|
$0.390
|
$0.320
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
31,600.000
|
$1.100
|
$0.860
|
$1.100
|
$0.800
|
$0.720
|
$1.140
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
15,800.000
|
$1.100
|
$0.860
|
$1.100
|
$0.800
|
$0.720
|
$1.140
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,077.000
|
$0.760
|
$0.540
|
$0.900
|
$0.500
|
$1.250
|
$0.920
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,499.000
|
$2.500
|
$3.200
|
$3.250
|
$3.000
|
$3.200
|
$3.430
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
676.000
|
$5.250
|
$6.400
|
$6.500
|
$6.000
|
$6.250
|
$6.860
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,607.000
|
$0.510
|
$0.540
|
$0.650
|
$0.500
|
$0.840
|
$0.690
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
8,551.000
|
$0.400
|
$0.460
|
$0.650
|
$0.430
|
$0.840
|
$0.690
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,865.000
|
$0.400
|
$0.540
|
$0.650
|
$0.500
|
$0.840
|
$0.690
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
10,760.000
|
$0.480
|
$0.460
|
$0.650
|
$0.430
|
$0.840
|
$0.690
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
6,300.000
|
$0.820
|
$1.600
|
$1.050
|
$1.500
|
$1.950
|
$1.140
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
6,300.000
|
$0.690
|
$1.600
|
$1.050
|
$1.500
|
$1.950
|
$1.140
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
31.000
|
$198.020
|
$2.840
|
$375.000
|
$265.000
|
$270.000
|
$400.390
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
1.000
|
$400.000
|
$3.480
|
$425.000
|
$325.000
|
$367.000
|
$457.590
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
13.000
|
$94.000
|
$2.840
|
$315.000
|
$265.000
|
$321.800
|
$343.190
|
|
REFL PAV MRKR TY I-C
|
EA
|
173.000
|
$4.300
|
$4.500
|
$5.500
|
$4.200
|
$4.000
|
$5.720
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
467.000
|
$3.170
|
$4.500
|
$5.500
|
$4.200
|
$4.000
|
$5.720
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
35,383.000
|
$0.010
|
$0.020
|
$0.030
|
$0.020
|
$0.010
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,077.000
|
$0.100
|
$0.030
|
$0.050
|
$0.030
|
$0.010
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,116.000
|
$0.130
|
$0.050
|
$0.100
|
$0.050
|
$0.010
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
676.000
|
$0.500
|
$0.100
|
$0.210
|
$0.090
|
$0.010
|
$0.230
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
29.000
|
$7.630
|
$12.900
|
$11.000
|
$12.000
|
$0.050
|
$11.440
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
13.000
|
$7.900
|
$12.900
|
$10.500
|
$12.000
|
$0.050
|
$11.440
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
80.000
|
$50.000
|
$82.500
|
$150.000
|
$155.000
|
$100.000
|
$71.820
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$240.000
|
$720.000
|
$250.000
|
$400.000
|
$400.000
|
$22.880
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$15.000
|
$30.000
|
$50.000
|
$96.870
|
$70.000
|
$413.600
|
|
|
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
|
EA
|
12.000
|
$1,000.000
|
$1,501.000
|
$1,500.000
|
$1,401.580
|
$1,401.580
|
$1,603.370
|
|
|
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
|
EA
|
6.000
|
$1,000.000
|
$1,694.000
|
$1,700.000
|
$1,581.960
|
$1,581.960
|
$1,809.720
|
|
Totals: |
$4,785,349.998
|
$5,663,719.670
|
$5,979,455.500
|
$6,022,302.047
|
$6,090,493.910
|
$6,407,632.331
|