GRAYSON CR (0901-19-179)

Items: 42

County: GRAYSON
Length: N/A
Highway: CR
District: PARIS
Control Number: 0901-19-179
DBE Goal: N/A
Project: BR 2016(434)
Guaranty: N/A
Time: 186 WORKING DAYS
Engineer's Estimate: $1,125,201.65
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,125,201.65
Over/Under Est: 8.98% $101,016.20
Over/Under Est: 15.19% $170,953.95
Amt Left: 5.7% $69,937.75
$1,429,934.46
Over/Under Est: 27.08% $304,732.81
Amt Left: 16.61% $203,716.61
Delta: -10.32% -$133,778.86
Over/Under Est: 29.87% $336,137.80
Amt Left: 19.17% $235,121.60
Delta: -2.20% -$31,404.99
Over/Under Est: 32.71% $368,056.70
Amt Left: 21.78% $267,040.50
Delta: -2.18% -$31,918.90

Bid Items & Bid Tabulations

42 Total 0 of 42
GRAYSON  |  CR  |  PARIS  |  0901-19-179  |  07/09/2019  |  $1,125,201.65  |  BR 2016(434)  |  BRIDGE REPL  |  186 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HODGES AND SON CONSTRUCTION COMPANY, INC.
EAST TEXAS BRIDGE, INC.
PIERCE R & B LLC
STATELINE CONSTRUCTION, LLC
SEMA CONSTRUCTION, INC.
PREPARING ROW
STA 13.720 $1,500.000 $3,000.000 $3,000.000 $3,000.000 $3,350.000 $10,860.000
EXCAVATION (ROADWAY)
CY 296.000 $13.000 $25.000 $15.000 $22.000 $28.000 $25.000
EXCAVATION (CHANNEL)
CY 704.000 $25.000 $25.000 $15.000 $22.000 $31.000 $15.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,072.000 $25.000 $25.000 $20.000 $28.000 $22.000 $18.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 3,054.000 $1.000 $2.500 $1.500 $1.370 $1.900 $0.550
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,527.000 $1.000 $1.500 $1.500 $1.400 $0.750 $0.500
CELL FBR MLCH SEED(TEMP)(COOL)
SY 1,527.000 $1.000 $1.500 $1.500 $1.400 $0.750 $0.500
VEGETATIVE WATERING
MG 45.900 $40.000 $1.000 $25.000 $35.000 $25.000 $35.000
FL BS (CMP IN PLC)(TY D GR 4) (6")
SY 1,849.000 $15.000 $25.000 $20.000 $23.000 $32.000 $11.000
REWORK BS MTL(TY B)(16")(ORD COMP)
SY 728.000 $4.000 $10.000 $30.000 $11.000 $25.000 $9.000
D-GR HMA(SQ) TY-C SAC-A PG64-22
TON 183.000 $125.000 $195.000 $175.000 $162.000 $245.000 $160.000
CEM STABIL BKFL
CY 114.000 $220.000 $190.000 $200.000 $234.000 $285.000 $115.000
TRENCH EXCAVATION PROTECTION
LF 21.000 $15.000 $20.000 $100.000 $18.000 $55.000 $25.000
DRILL SHAFT (24 IN)
LF 420.000 $135.000 $125.000 $180.000 $185.000 $165.000 $165.000
DRILL SHAFT (36 IN)
LF 336.000 $145.000 $190.000 $205.000 $220.000 $210.000 $200.000
CL C CONC (ABUT)
CY 82.800 $1,140.000 $950.000 $1,000.000 $1,300.000 $1,125.000 $1,000.000
REINF CONC SLAB
SF 4,810.000 $14.900 $22.000 $20.000 $22.000 $20.250 $19.000
PRESTR CONC SLAB BEAM (5SB15)
LF 494.610 $215.000 $195.000 $210.000 $248.000 $185.000 $175.000
PRESTR CONC GIRDER (TX34)
LF 338.000 $165.000 $195.000 $180.000 $221.000 $195.000 $180.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 973.000 $130.000 $120.000 $135.000 $144.000 $160.000 $118.000
RAIL (TY T631LS)
LF 590.000 $68.000 $60.000 $70.000 $60.000 $95.000 $50.000
CMP (GAL STL 24 IN)
LF 20.000 $95.000 $50.000 $50.000 $100.000 $95.000 $76.000
CMP (GAL STL 36 IN)
LF 155.000 $120.000 $60.000 $60.000 $120.000 $125.000 $82.000
CONC BOX CULV (9 FT X 9 FT)
LF 41.000 $1,500.000 $1,400.000 $1,250.000 $1,265.000 $1,175.000 $1,120.000
WINGWALL (PW - 2) (HW=11 FT)
EA 2.000 $25,000.000 $32,000.000 $30,000.000 $50,000.000 $48,250.000 $28,000.000
REMOV STR (PIPE)
LF 20.000 $25.000 $25.000 $200.000 $19.000 $695.000 $50.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 4.000 $10,000.000 $11,000.000 $15,000.000 $10,000.000 $14,500.000 $60,415.000
MOBILIZATION
LS 1.000 $76,291.000 $105,000.000 $125,000.000 $142,000.000 $130,000.000 $149,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $2,500.000 $5,750.000 $2,500.000 $2,500.000 $2,250.000 $3,600.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 150.000 $25.000 $5.000 $30.000 $43.000 $28.000 $29.000
ROCK FILTER DAMS (REMOVE)
LF 150.000 $9.500 $1.000 $6.000 $11.000 $10.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,124.000 $25.000 $1.000 $25.000 $27.000 $28.000 $18.000
CONSTRUCTION EXITS (REMOVE)
SY 1,124.000 $10.000 $1.000 $8.000 $11.000 $10.000 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,082.000 $2.750 $1.000 $3.500 $4.400 $3.000 $1.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,082.000 $1.000 $1.000 $0.750 $1.150 $1.000 $0.500
MTL W-BEAM GD FEN (STEEL POST)
LF 387.500 $26.000 $20.000 $25.000 $24.000 $28.000 $24.000
SHORT RADIUS
LF 12.500 $50.000 $50.000 $60.000 $42.000 $35.000 $38.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 3.000 $930.000 $1,000.000 $1,100.000 $565.000 $1,540.000 $560.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,185.000 $1,100.000 $1,300.000 $1,040.000 $1,550.000 $1,100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,575.000 $2,600.000 $2,800.000 $2,700.000 $2,850.000 $2,900.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 36.000 $42.000 $25.000 $30.000 $32.000 $65.000 $32.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $42.000 $30.000 $30.000 $37.000 $65.000 $32.000
Totals: $1,125,201.650 $1,226,217.850 $1,296,155.600 $1,429,934.460 $1,461,339.450 $1,493,258.350