Show Job Controls
Bid Cobra

TRAVIS VA (0914-00-420)

Items: 84

County: TRAVIS
Length: N/A
Highway: VA
District: AUSTIN
Control Number: 0914-00-420
DBE Goal: N/A
Project: STP 1902(186)
Guaranty: N/A
Time: 288 WORKING DAYS
Engineer's Estimate: $1,964,523.30
Date: 07/10/2019 (6 years ago)
Contract Number: N/A
Type: CONSTRUCT CURB RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$1,964,523.30
$2,396,038.45
Over/Under Est: 21.97% $431,515.15

Bid Items & Bid Tabulations

84 Total 0 of 84
TRAVIS  |  VA  |  AUSTIN  |  0914-00-420  |  07/10/2019  |  $1,964,523.30  |  STP 1902(186)  |  CONSTRUCT CURB RAMPS  |  288 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
PREPARING ROW
AC 2.400 $5,000.000 $15,000.000
REMOVING CONC (SIDEWALKS)
SY 321.000 $15.000 $15.000
REMOVING CONC (DRIVEWAYS)
SY 680.000 $15.000 $15.000
REMOVING CONC (CURB)
LF 3,103.000 $6.500 $5.000
REMOVING CONC (MISC)
SY 308.000 $44.000 $15.000
REMOVING STAB BASE AND ASPH PAV (3")
SY 39.000 $3.250 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 136.000 $7.000 $20.000
BLOCK SODDING
SY 3,099.000 $6.000 $4.000
VEGETATIVE WATERING
MG 191.600 $17.000 $12.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 3,099.000 $1.500 $1.000
FLEX PAVEMENT STRUCTURE REPAIR (2-8")
SY 2,505.000 $70.000 $100.000
FLOWABLE BACKFILL
CY 1.000 $130.000 $200.000
BRIDGE SIDEWALK
SF 29.000 $9.500 $100.000
RIPRAP (CONC) (CL B) (6")
CY 122.000 $550.000 $500.000
RIPRAP (STONE TY F)(GROUT)(6 IN)
CY 1.000 $700.000 $500.000
RAIL (HANDRAIL)(TY B)
LF 215.000 $100.000 $150.000
RC PIPE (CL III)(24 IN)
LF 30.000 $65.000 $90.000
INLET (COMPL)(PCO)(4FT)(RIGHT)
EA 1.000 $4,000.000 $5,000.000
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 2.000 $5,500.000 $6,000.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 1.000 $4,500.000 $6,000.000
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
EA 2.000 $3,600.000 $5,000.000
CAST-IN-PLACE TRENCH DRAIN
LF 188.000 $300.000 $690.000
ADJUSTING MANHOLES
EA 5.000 $1,000.000 $500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 9.000 $450.000 $500.000
ADJUSTING INLET (CAP)
EA 2.000 $1,500.000 $1,500.000
ADJUSTING MANHOLES (WATER METER)
EA 2.000 $850.000 $500.000
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 3.000 $2,000.000 $500.000
PIPE (PVC) (SCH 40) (6 IN)
LF 28.000 $48.000 $30.000
MOBILIZATION
LS 1.000 $178,600.000 $220,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $3,500.000 $14,200.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,120.000 $2.300 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,120.000 $0.400 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,228.000 $1.600 $3.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,228.000 $0.250 $0.500
REMOVE AND RELAY PAVERS
SY 54.000 $60.000 $90.000
CONC CURB (TY I)
LF 103.000 $15.000 $20.000
CONC CURB (TY II)
LF 2,750.000 $15.000 $20.000
CONC CURB (TY C1)
LF 396.000 $65.000 $120.000
CONC CURB (TY F1)
LF 331.000 $92.000 $100.000
CONC CURB (MOUNTABLE)
LF 73.000 $10.000 $40.000
DRIVEWAYS (CONC)
SY 861.000 $77.500 $80.000
CONC SIDEWALKS (4")
SY 666.000 $50.000 $80.000
CONC SIDEWALKS (5")
SY 3,340.000 $60.000 $90.000
CURB RAMPS (TY 1)
EA 65.000 $1,400.000 $1,600.000
CURB RAMPS (TY 2)
EA 4.000 $1,850.000 $1,600.000
CURB RAMPS (TY 3)
EA 4.000 $1,400.000 $1,600.000
CURB RAMPS (TY 5)
EA 1.000 $2,000.000 $1,800.000
CURB RAMPS (TY 7)
EA 35.000 $1,600.000 $1,600.000
CURB RAMPS (TY 10)
EA 7.000 $1,800.000 $1,600.000
CURB RAMPS (TY 20)
EA 1.000 $2,000.000 $3,000.000
CURB RAMPS (TY 21)
EA 10.000 $3,000.000 $1,800.000
CURB RAMPS
SY 243.000 $500.000 $140.000
CURB RAMPS (TY 2)(MOD)
EA 27.000 $2,800.000 $3,000.000
CONCRETE SIDEWALK (STEPS)
SY 4.000 $650.000 $200.000
GROUND BOX TY D (162922)
EA 23.000 $800.000 $800.000
REMOVE GROUND BOX
EA 4.000 $152.000 $200.000
ALUMINUM SIGNS (TY A)
SF 37.000 $38.000 $40.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 25.000 $16.000 $40.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 41.000 $450.000 $400.000
PREFAB PAV MRK TY B (W)(4")(SLD)
LF 68.000 $7.000 $10.000
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 332.000 $9.500 $10.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 10,293.000 $20.000 $20.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 2.000 $250.000 $320.000
PREFAB PAV MRK TY B (W)(WORD)
EA 1.000 $440.000 $500.000
PREFAB PAV MRK TY B (Y)(4")(SLD)
LF 96.000 $6.500 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,969.000 $0.400 $0.500
ELIM EXT PAV MRK & MRKS (8")
LF 117.000 $0.850 $0.750
ELIM EXT PAV MRK & MRKS (12")
LF 6,922.000 $3.000 $2.000
ELIM EXT PAV MRK & MRKS (24")
LF 2,394.000 $5.750 $3.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $80.000 $100.000
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $650.000 $900.000
PED POLE ASSEMBLY
EA 9.000 $2,300.000 $2,000.000
RELOCATE PED POLE ASSEMBLY
EA 4.000 $1,200.000 $1,200.000
REMOVE PED POLE ASSEMBLY
EA 5.000 $350.000 $500.000
PED DETECT PUSH BUTTON (APS)
EA 31.000 $900.000 $1,000.000
REMOVAL OF SIGNAL RELATED SIGNS
EA 4.000 $48.000 $50.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 5.000 $70.000 $100.000
REPLACE OF PEDESTRIAN PUSH BUTTONS
EA 10.000 $130.000 $500.000
REMOV PED SIG LED TRAF SIG LAMP UNIT
EA 6.000 $170.000 $100.000
RELOCATE OF PEDESTRIAN PUSH BUTTON
EA 16.000 $500.000 $300.000
RETROFIT DET WARN SURF(SURF APPLIED)
EA 10.000 $400.000 $420.000
RETROFIT DET WARN SURF(CAST IN PLACE)
EA 10.000 $800.000 $500.000
GROUND BOX W/ APRON (ADJUST)
EA 1.000 $1,400.000 $500.000
TMA (STATIONARY)
EA 288.000 $200.000 $1.000
Totals: $1,964,523.300 $2,396,038.450