KERR SH 16 (0291-03-071)

Items: 108

County: KERR
Length: N/A
Highway: SH 16
District: SAN ANTONIO
Control Number: 0291-03-071
DBE Goal: N/A
Project: STP 1902(214)
Guaranty: N/A
Time: 110 WORKING DAYS
Engineer's Estimate: $5,209,150.12
Date: 07/10/2019 (6 years ago)
Contract Number: N/A
Type: BASE REPAIR, SC, OVERLAY & PAVEMENT MARKINGS, ETC
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$5,209,150.12
$4,928,309.14
Over/Under Est: -5.39% -$280,840.98
Over/Under Est: 4.83% $251,739.08
Amt Left: 10.81% $532,580.06
Over/Under Est: 10.45% $544,160.39
Amt Left: 16.74% $825,001.37
Delta: -5.35% -$292,421.31
Over/Under Est: 12.92% $673,004.98
Amt Left: 19.35% $953,845.96
Delta: -2.24% -$128,844.59
$6,526,086.00
Over/Under Est: 25.28% $1,316,935.88
Amt Left: 32.42% $1,597,776.86
Delta: -10.95% -$643,930.90

Bid Items & Bid Tabulations

108 Total 0 of 108
KERR  |  SH 16  |  SAN ANTONIO  |  0291-03-071  |  07/10/2019  |  $5,209,150.12  |  STP 1902(214)  |  BASE REPAIR, SC, OVERLAY & PAVMT MRK...  |  110 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONE STAR PAVING COMPANY
ANGEL BROTHERS HOLDINGS CORP.
HUNTER INDUSTRIES, LTD.
CLARK CONSTRUCTION OF TEXAS, INC.
ALLEN KELLER COMPANY
REMOVING CONC (SIDEWALKS)
SY 3.000 $10.000 $200.000 $230.000 $98.340 $52.500 $380.000
REMOVING CONC (CURB)
LF 5.000 $2.000 $200.000 $140.000 $26.640 $21.000 $230.000
REMOVING CONCRETE(MOW STRIP)
LF 2,978.000 $8.800 $10.000 $13.000 $9.990 $9.350 $14.500
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 29.000 $6.300 $100.000 $60.000 $96.360 $152.250 $130.000
BACKFILL (TY A)
STA 102.000 $30.000 $165.000 $120.000 $147.510 $285.550 $385.000
BACKFILL (TY B)
STA 231.000 $100.000 $165.000 $120.000 $147.510 $268.930 $125.000
COMPOST MANUF TOPSOIL
CY 29.000 $50.000 $90.000 $115.000 $95.500 $89.250 $115.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 3,333.000 $0.150 $1.000 $0.400 $0.300 $0.530 $0.350
VEGETATIVE WATERING
MG 52.000 $20.000 $100.000 $52.000 $36.630 $525.000 $125.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 3,333.000 $1.000 $1.050 $1.850 $1.500 $1.050 $1.800
ASPH (RC-250)
GAL 2,137.000 $4.000 $3.300 $4.650 $9.900 $7.500 $6.850
AGGR (TY-B GR-5)
CY 77.000 $90.000 $100.000 $170.000 $240.900 $191.000 $345.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 4,400.000 $87.000 $100.000 $95.000 $99.110 $125.570 $100.000
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 24,408.000 $95.000 $90.300 $93.000 $99.100 $103.710 $97.000
TBWC (MEMBRANE)
GAL 3,664.000 $3.000 $3.000 $3.950 $4.590 $5.000 $5.000
TBWC (ASPHALT)
TON 36.000 $130.000 $120.000 $137.000 $130.800 $136.410 $150.000
TBWC (AGGREGATE) (TY C) (SAC-A)
TON 683.000 $120.000 $120.000 $137.000 $130.800 $136.410 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 20,056.000 $55.000 $44.000 $49.000 $44.710 $53.290 $75.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 4,371.000 $2.000 $2.000 $1.600 $2.030 $5.000 $5.000
PLANE ASPH CONC PAV(0" TO 2")
SY 10,683.000 $1.700 $1.250 $1.600 $2.030 $5.000 $5.000
PLANE ASPH CONC PAV (2")
SY 20,955.000 $1.150 $1.750 $1.600 $2.030 $4.000 $2.250
CUT & RESTORING PAV
SY 408.000 $68.000 $50.000 $200.000 $148.070 $169.000 $55.000
RIPRAP (CONC)(4 IN)
CY 1.000 $380.000 $500.000 $1,500.000 $2,332.520 $630.000 $1,460.000
RIPRAP (MOW STRIP)(4 IN)
CY 201.000 $550.000 $500.000 $600.000 $550.000 $475.500 $470.000
CLEANING EXISTING JOINTS
LF 500.000 $10.000 $15.000 $14.000 $3.250 $13.000 $14.600
HEADER TYPE EXPANSION JOINT
CF 92.000 $340.000 $450.000 $450.000 $299.560 $425.000 $485.000
JOINT SEALANT
LF 500.000 $15.000 $15.000 $11.500 $29.480 $11.000 $12.000
MOBILIZATION
LS 1.000 $300,000.000 $125,000.000 $338,000.000 $575,178.120 $205,000.000 $480,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $6,500.000 $12,000.000 $7,000.000 $2,299.690 $3,000.000 $8,250.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 300.000 $30.000 $22.000 $30.000 $26.800 $23.100 $33.000
ROCK FILTER DAMS (REMOVE)
LF 300.000 $8.000 $8.000 $6.500 $5.700 $8.400 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,500.000 $2.500 $2.250 $3.000 $2.500 $2.360 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,500.000 $0.750 $1.000 $0.600 $0.500 $1.050 $0.600
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,513.000 $3.000 $3.050 $5.500 $4.800 $3.200 $5.850
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,513.000 $1.000 $1.000 $1.000 $0.800 $1.050 $1.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 40.000 $100.000 $125.000 $102.670 $125.400 $100.000 $180.000
CONC CURB (MONO) (TY II)
LF 5.000 $5.000 $100.000 $439.920 $260.000 $42.000 $280.000
CONC SIDEWALKS (4")
SY 3.000 $52.000 $100.000 $700.000 $425.000 $68.250 $520.000
CURB RAMPS (TY 10)
EA 3.000 $1,500.000 $2,000.000 $4,000.000 $3,500.000 $2,415.000 $1,950.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 25,835.000 $0.150 $0.200 $0.250 $0.180 $0.190 $0.250
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 12,752.000 $0.150 $0.220 $0.350 $0.200 $0.210 $0.250
MTL W-BEAM GD FEN (TIM POST)
LF 2,705.000 $20.500 $17.500 $27.000 $16.000 $26.050 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,730.000 $2,000.000 $2,900.000 $2,280.000 $2,400.000 $2,150.000
SHORT RADIUS
LF 15.000 $30.000 $60.000 $55.000 $56.000 $50.200 $60.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $850.000 $900.000 $900.000 $836.000 $957.600 $1,100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,130.000 $1,000.000 $1,115.000 $929.000 $1,144.500 $1,325.000
REMOVE METAL BEAM GUARD FENCE
LF 4,210.000 $2.000 $1.200 $2.900 $1.000 $1.580 $1.800
REMOVE TERMINAL ANCHOR SECTION
EA 14.000 $150.000 $160.000 $170.000 $150.000 $157.500 $180.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $290.000 $105.000 $170.000 $100.000 $157.500 $180.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $420.000 $152.000 $225.000 $150.000 $157.500 $180.000
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $3,000.000 $2,200.000 $3,350.000 $2,180.000 $3,129.000 $3,625.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $250.000 $175.000 $345.000 $150.000 $157.500 $180.000
PIPE UNDERDRAINS (TY 7) (6")
LF 1,452.000 $26.000 $50.000 $52.000 $43.840 $55.000 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 23.000 $398.200 $420.000 $495.000 $487.360 $511.730 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 21.000 $499.610 $470.000 $640.000 $561.030 $589.080 $680.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $650.280 $660.000 $765.000 $669.070 $702.520 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $800.000 $728.000 $820.000 $716.050 $751.850 $875.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $789.250 $800.000 $900.000 $790.460 $829.980 $960.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $715.000 $900.000 $925.000 $810.020 $850.520 $985.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $801.930 $900.000 $920.000 $803.370 $843.540 $980.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,361.250 $1,700.000 $2,000.000 $1,744.560 $1,831.790 $2,125.000
REMOVE SM RD SN SUP&AM
EA 41.000 $90.000 $100.000 $115.000 $100.000 $105.000 $125.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 28.000 $60.000 $70.000 $25.750 $22.530 $23.660 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 15.000 $9.230 $25.000 $14.900 $13.000 $13.650 $16.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 2.000 $50.000 $70.000 $27.500 $24.070 $25.270 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 55.000 $20.000 $25.000 $19.000 $16.750 $17.600 $20.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 20.000 $18.330 $25.000 $19.000 $16.750 $17.600 $20.000
INSTL DEL ASSN (OM-2Z)(FLX)(WAP)
EA 20.000 $72.410 $70.000 $72.500 $63.500 $66.680 $78.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 7,021.000 $0.260 $0.300 $0.300 $0.250 $1.050 $0.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 50,587.000 $0.280 $0.300 $0.300 $0.250 $0.270 $0.500
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,341.000 $0.570 $0.550 $0.600 $0.550 $0.530 $0.800
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 18.000 $70.000 $100.000 $110.000 $100.000 $79.000 $185.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 18.000 $70.000 $125.000 $130.000 $125.000 $79.000 $185.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 218.000 $3.300 $10.000 $12.000 $10.000 $2.650 $12.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 510.000 $7.750 $12.000 $14.000 $12.000 $7.400 $8.500
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 4,150.000 $0.600 $1.000 $1.000 $1.000 $0.800 $0.800
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 52,830.000 $0.600 $0.600 $0.700 $0.600 $0.800 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,688.000 $0.900 $1.000 $1.000 $1.780 $1.690 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 4,694.000 $1.050 $1.000 $1.000 $1.780 $1.690 $2.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,804.000 $0.750 $0.800 $1.000 $0.800 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 971.000 $5.500 $6.100 $6.500 $6.100 $7.400 $7.800
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 43.000 $105.000 $125.000 $130.000 $125.000 $131.500 $185.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 40.000 $130.000 $150.000 $155.000 $150.000 $160.000 $185.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 21.000 $60.000 $40.000 $45.000 $40.000 $30.000 $75.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 11.000 $340.000 $375.000 $400.000 $375.000 $265.000 $540.000
PAVEMENT SEALER 4"
LF 97,450.000 $0.170 $0.200 $0.200 $0.150 $0.200 $0.300
PAVEMENT SEALER 6"
LF 61,441.000 $0.250 $0.250 $0.250 $0.200 $0.270 $0.300
PAVEMENT SEALER 8"
LF 5,804.000 $0.340 $0.250 $0.300 $0.250 $0.350 $0.500
PAVEMENT SEALER 24"
LF 959.000 $2.080 $3.000 $3.100 $3.000 $3.150 $3.650
PAVEMENT SEALER (ARROW)
EA 43.000 $60.000 $45.000 $50.000 $45.000 $70.000 $75.000
PAVEMENT SEALER (WORD)
EA 40.000 $65.000 $65.000 $70.000 $65.000 $79.000 $75.000
PAVEMENT SEALER (MED NOSE)
EA 11.000 $450.000 $100.000 $110.000 $100.000 $131.500 $300.000
PAVEMENT SEALER (YLD TRI)
EA 21.000 $30.000 $15.000 $20.000 $15.000 $16.000 $40.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 9,120.000 $0.500 $0.400 $0.400 $0.350 $0.530 $0.600
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 52,182.000 $0.500 $0.500 $0.550 $0.500 $0.450 $0.700
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 6,390.000 $0.700 $0.350 $0.400 $0.350 $0.530 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 62,661.000 $0.500 $0.400 $0.400 $0.350 $0.450 $0.500
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 7,393.000 $0.510 $0.900 $1.000 $0.900 $0.800 $1.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 9,259.000 $0.900 $1.700 $1.750 $1.650 $0.900 $1.500
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 720.000 $0.600 $0.900 $1.000 $0.900 $0.800 $1.800
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 11,166.000 $0.600 $1.000 $1.000 $0.900 $0.800 $1.000
REFL PAV MRKR TY I-C
EA 698.000 $4.150 $3.000 $4.000 $3.000 $5.300 $4.600
REFL PAV MRKR TY II-A-A
EA 2,421.000 $3.790 $3.000 $4.000 $3.000 $5.300 $4.600
UNDERSEAL COURSE
GAL 42,665.000 $2.600 $3.200 $3.950 $4.820 $3.100 $4.300
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 336.000 $55.000 $100.000 $77.000 $300.000 $100.000 $105.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 40.000 $14.600 $23.000 $25.000 $22.000 $27.000 $24.000
TMA (STATIONARY)
DAY 91.000 $165.000 $250.000 $175.000 $300.000 $400.000 $250.000
TMA (MOBILE OPERATION)
DAY 111.000 $165.000 $250.000 $175.000 $300.000 $250.000 $1,250.000
Totals: $5,209,150.120 $4,928,309.140 $5,460,889.200 $5,753,310.510 $5,882,155.100 $6,526,086.000