|
|
REMOVING CONC (RIPRAP)
|
SY
|
43,700.500
|
$30.000
|
$10.000
|
$10.500
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
26,854.000
|
$20.000
|
$30.000
|
$29.000
|
$30.000
|
|
|
BLADING
|
STA
|
705.700
|
$150.000
|
$140.000
|
$300.000
|
$230.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
54,275.000
|
$4.000
|
$4.000
|
$3.900
|
$4.000
|
|
|
CEM STABIL BKFL
|
CY
|
263.640
|
$200.000
|
$100.000
|
$360.000
|
$214.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
495.000
|
$10.000
|
$5.200
|
$20.000
|
$14.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
20.000
|
$1,000.000
|
$387.000
|
$400.000
|
$528.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
664.000
|
$200.000
|
$134.000
|
$140.000
|
$185.000
|
|
|
CL C CONC (MISC)
|
CY
|
50.000
|
$1,000.000
|
$663.000
|
$900.000
|
$1,600.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
100.000
|
$200.000
|
$177.000
|
$140.000
|
$240.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
100.000
|
$200.000
|
$56.750
|
$140.000
|
$180.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
26,797.000
|
$600.000
|
$291.000
|
$430.000
|
$470.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
90.240
|
$200.000
|
$250.000
|
$300.000
|
$490.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
8.000
|
$250.000
|
$500.000
|
$350.000
|
$390.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
7.000
|
$300.000
|
$600.000
|
$430.000
|
$460.000
|
|
|
INLET (COMPL) (DROP) (SPL)
|
EA
|
34.000
|
$20,000.000
|
$7,586.000
|
$13,000.000
|
$14,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
32.000
|
$2,000.000
|
$1,640.000
|
$2,000.000
|
$712.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,289,000.000
|
$3,436,500.000
|
$3,600,000.000
|
$4,150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$20,000.000
|
$25,000.000
|
$30,000.000
|
$25,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
666.000
|
$30.000
|
$30.000
|
$35.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
666.000
|
$10.000
|
$10.000
|
$11.000
|
$10.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
1,590.000
|
$8.000
|
$5.000
|
$13.000
|
$7.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
69,300.000
|
$30.000
|
$70.000
|
$88.000
|
$30.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
69,300.000
|
$15.000
|
$8.000
|
$11.000
|
$5.000
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
58,859.000
|
$55.000
|
$94.300
|
$72.100
|
$88.000
|
|
|
PERM CTB (F-SHAPE) (TY 2)
|
LF
|
1,670.000
|
$150.000
|
$300.000
|
$250.000
|
$160.000
|
|
|
PERM CTB (F-SHAPE) (TY 3)
|
LF
|
1,543.000
|
$250.000
|
$309.000
|
$250.000
|
$270.000
|
|
|
PERM CTB (F-SHAPE) (TY 4)
|
LF
|
10,961.000
|
$200.000
|
$450.000
|
$300.000
|
$870.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
600.000
|
$25.000
|
$27.400
|
$30.000
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,000.000
|
$2,220.000
|
$2,400.000
|
$2,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
14,934.500
|
$7.000
|
$3.000
|
$3.200
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
41.000
|
$350.000
|
$350.000
|
$380.000
|
$360.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
11.000
|
$350.000
|
$350.000
|
$380.000
|
$360.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
28.000
|
$350.000
|
$350.000
|
$380.000
|
$360.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
51.000
|
$350.000
|
$350.000
|
$380.000
|
$360.000
|
|
|
GDRAIL END TRT(INSTALL)(HBA POST)
|
EA
|
3.000
|
$2,600.000
|
$2,810.000
|
$3,000.000
|
$2,900.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
15.000
|
$3,000.000
|
$2,140.000
|
$1,100.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
14.000
|
$12,000.000
|
$11,840.000
|
$11,000.000
|
$6,900.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
204.000
|
$600.000
|
$516.000
|
$550.000
|
$520.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
14.000
|
$600.000
|
$181.000
|
$200.000
|
$180.000
|
|
|
REPLACE LUMINAIRE W/LED (150W EQ)
|
EA
|
152.000
|
$600.000
|
$361.000
|
$380.000
|
$360.000
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
97.000
|
$600.000
|
$361.000
|
$380.000
|
$360.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
20.000
|
$2,000.000
|
$1,031.000
|
$1,100.000
|
$1,100.000
|
|
|
IN RD IL (TY SP) 38S-12-12(250W EQ)LED
|
EA
|
196.000
|
$3,500.000
|
$3,300.000
|
$3,400.000
|
$3,300.000
|
|
|
IN RD IL (TY SA) 40T-12 (250W EQ) LED
|
EA
|
48.000
|
$3,500.000
|
$2,940.000
|
$3,100.000
|
$3,000.000
|
|
|
IN RD IL (TY SA) 40T-12-12(250W EQ)LED
|
EA
|
35.000
|
$4,000.000
|
$3,585.000
|
$3,700.000
|
$3,600.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
66,125.000
|
$5.000
|
$6.200
|
$6.500
|
$6.500
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
7,750.000
|
$15.000
|
$12.400
|
$13.000
|
$12.250
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
10.000
|
$20.000
|
$10.350
|
$11.000
|
$11.000
|
|
|
CONDT (RM) (2")
|
LF
|
3,340.000
|
$20.000
|
$27.850
|
$29.000
|
$28.000
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
80,110.000
|
$1.300
|
$1.300
|
$1.400
|
$1.300
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
160,190.000
|
$1.400
|
$1.400
|
$1.500
|
$1.400
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
53.000
|
$700.000
|
$619.000
|
$650.000
|
$650.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
8.000
|
$500.000
|
$258.000
|
$270.000
|
$260.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)SP(O)
|
EA
|
19.000
|
$5,000.000
|
$5,155.000
|
$5,500.000
|
$5,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$800.000
|
$950.000
|
$1,100.000
|
$970.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
30.000
|
$500.000
|
$750.000
|
$800.000
|
$770.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
731.000
|
$50.000
|
$20.000
|
$22.000
|
$21.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
30.000
|
$50.000
|
$20.000
|
$22.000
|
$21.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
17.000
|
$30.000
|
$1.000
|
$10.000
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
4,807.000
|
$3.000
|
$3.450
|
$3.700
|
$3.600
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
14,419.000
|
$3.000
|
$3.450
|
$3.700
|
$3.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
7,212.000
|
$2.000
|
$2.000
|
$0.600
|
$1.800
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
24,031.000
|
$8.000
|
$8.000
|
$9.000
|
$8.250
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,204.000
|
$3.000
|
$6.000
|
$7.000
|
$6.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
96,116.000
|
$0.500
|
$0.400
|
$0.450
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
24,031.000
|
$0.750
|
$0.400
|
$0.450
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
96,116.000
|
$0.500
|
$0.250
|
$0.300
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (10")
|
LF
|
24,031.000
|
$0.750
|
$0.300
|
$0.300
|
$0.350
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$20,000.000
|
$7,500.000
|
$5,000.000
|
$30,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$15,000.000
|
$3,500.000
|
$5,000.000
|
$11,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$15,000.000
|
$22,000.000
|
$25,000.000
|
|
|
FO CBL (12 SMF)
|
LF
|
15.000
|
$20.000
|
$5.150
|
$5.500
|
$5.500
|
|
|
FO CBL (12 SMF)(PIGTAIL)
|
LF
|
10.000
|
$20.000
|
$5.160
|
$5.500
|
$5.500
|
|
|
RELOCATE CCTV FIELD EQUIPMENT
|
EA
|
1.000
|
$3,000.000
|
$2,062.000
|
$2,200.000
|
$2,100.000
|
|
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
|
LF
|
96,116.000
|
$0.600
|
$0.600
|
$0.650
|
$0.700
|
|
|
ITS POLE (40 FT)(REL)
|
EA
|
1.000
|
$4,000.000
|
$1,547.000
|
$1,600.000
|
$1,600.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)(REL)
|
EA
|
1.000
|
$3,000.000
|
$1,031.000
|
$1,100.000
|
$1,100.000
|
|
|
REPLACE LED HIGH MAST ILLUM ASSEMBBLIES
|
EA
|
27.000
|
$8,000.000
|
$9,280.000
|
$10,000.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,412.000
|
$250.000
|
$200.000
|
$200.000
|
$220.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$300.000
|
$300.000
|
$850.000
|
$620.000
|
|
Totals: |
$36,184,960.600
|
$34,365,849.950
|
$37,288,983.500
|
$41,832,065.060
|