PREPARING ROW
|
STA
|
343.200
|
$1,000.000
|
$1,400.000
|
$1,615.000
|
$450.000
|
$500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
562.000
|
$11.000
|
$15.000
|
$7.000
|
$45.000
|
$30.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
616.000
|
$14.000
|
$16.000
|
$8.000
|
$23.000
|
$20.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
131.000
|
$11.000
|
$5.000
|
$8.000
|
$8.000
|
$12.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
6,068.000
|
$3.000
|
$4.000
|
$2.500
|
$4.500
|
$12.000
|
|
|
REMOVING STAB BASE & ASPH PAV(14")
|
SY
|
17,832.000
|
$5.000
|
$5.500
|
$2.250
|
$7.500
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
18,624.000
|
$11.000
|
$11.500
|
$13.500
|
$12.000
|
$34.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
5,747.000
|
$12.000
|
$16.000
|
$26.000
|
$17.000
|
$24.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
86,242.000
|
$0.700
|
$0.950
|
$1.500
|
$1.750
|
$2.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
86,242.000
|
$0.200
|
$0.190
|
$0.250
|
$0.240
|
$0.200
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
43,121.000
|
$0.100
|
$0.180
|
$0.150
|
$0.240
|
$0.100
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
43,121.000
|
$0.100
|
$0.180
|
$0.150
|
$0.240
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
2,588.000
|
$15.000
|
$7.000
|
$27.000
|
$36.000
|
$35.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
15,712.000
|
$45.000
|
$44.500
|
$42.000
|
$49.000
|
$75.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
6,420.000
|
$5.000
|
$4.000
|
$4.500
|
$4.740
|
$4.700
|
|
|
ASPH (TIER II)
|
GAL
|
40,007.000
|
$3.500
|
$3.100
|
$3.300
|
$3.600
|
$3.500
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
877.000
|
$95.000
|
$82.000
|
$88.000
|
$94.900
|
$94.000
|
|
|
D-GR HMA(SQ) TY-D PG70-22
|
TON
|
3,527.000
|
$105.000
|
$95.000
|
$99.000
|
$108.000
|
$125.000
|
|
|
CUT & RESTORING PAV
|
SY
|
310.000
|
$207.000
|
$95.000
|
$203.000
|
$67.000
|
$99.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
251.000
|
$178.000
|
$130.000
|
$142.000
|
$180.000
|
$250.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
80.000
|
$2.300
|
$1.000
|
$22.000
|
$21.000
|
$20.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
7.000
|
$700.000
|
$375.000
|
$145.000
|
$155.000
|
$600.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
69.000
|
$360.000
|
$450.000
|
$385.000
|
$380.000
|
$600.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
91.000
|
$95.000
|
$95.000
|
$125.000
|
$150.000
|
$140.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
139.000
|
$420.000
|
$450.000
|
$425.000
|
$535.000
|
$500.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
225.000
|
$80.000
|
$120.000
|
$85.000
|
$86.000
|
$81.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
120.000
|
$320.000
|
$380.000
|
$330.000
|
$480.000
|
$380.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
181.000
|
$700.000
|
$440.000
|
$470.000
|
$550.000
|
$510.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
45.000
|
$507.000
|
$800.000
|
$525.000
|
$803.000
|
$740.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
160.000
|
$102.000
|
$80.000
|
$105.000
|
$145.000
|
$175.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
27.000
|
$142.000
|
$222.000
|
$510.000
|
$370.000
|
$430.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
1,592.000
|
$65.000
|
$70.000
|
$77.000
|
$87.000
|
$73.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
824.000
|
$95.000
|
$72.000
|
$90.000
|
$110.000
|
$125.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 2)
|
LF
|
424.000
|
$175.000
|
$115.000
|
$140.000
|
$265.000
|
$200.000
|
|
|
RC PIPE (ARCH)(CL IV)(DES 3)
|
LF
|
1,336.000
|
$233.000
|
$165.000
|
$165.000
|
$275.000
|
$210.000
|
|
|
RC PIPE (ARCH)(CL IV)(DES 4)
|
LF
|
488.000
|
$308.000
|
$200.000
|
$210.000
|
$360.000
|
$260.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$4,420.000
|
$4,000.000
|
$3,500.000
|
$1,835.000
|
$20,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$8,000.000
|
$6,500.000
|
$7,600.000
|
$4,900.000
|
$17,500.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$13,000.000
|
$12,000.000
|
$9,500.000
|
$12,500.000
|
$29,500.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
3.000
|
$15,000.000
|
$18,000.000
|
$16,300.000
|
$16,000.000
|
$43,000.000
|
|
|
WINGWALL (SW - 0) (HW=5 FT)
|
EA
|
4.000
|
$6,670.000
|
$12,000.000
|
$7,650.000
|
$7,800.000
|
$23,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
80.000
|
$795.000
|
$1,000.000
|
$1,600.000
|
$1,000.000
|
$1,800.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$800.000
|
$1,100.000
|
$1,700.000
|
$975.000
|
$1,700.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,100.000
|
$1,200.000
|
$1,700.000
|
$1,200.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$1,160.000
|
$1,300.000
|
$2,100.000
|
$1,270.000
|
$1,900.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,800.000
|
$1,350.000
|
$2,000.000
|
$2,350.000
|
$2,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,580.000
|
$1,450.000
|
$2,300.000
|
$2,360.000
|
$2,200.000
|
|
|
SET (TY II) (DES 2) (RCP) (4: 1) (C)
|
EA
|
12.000
|
$3,750.000
|
$1,200.000
|
$1,800.000
|
$2,050.000
|
$2,400.000
|
|
|
SET (TY II) (DES 2) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,100.000
|
$1,250.000
|
$3,000.000
|
$3,200.000
|
$1,900.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
70.000
|
$2,800.000
|
$1,400.000
|
$3,000.000
|
$3,700.000
|
$3,100.000
|
|
|
SET (TY II) (DES 4) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$3,200.000
|
$2,000.000
|
$6,200.000
|
$7,700.000
|
$3,300.000
|
|
|
REMOV STR (SET)
|
EA
|
64.000
|
$380.000
|
$150.000
|
$170.000
|
$500.000
|
$330.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,440.000
|
$1,500.000
|
$2,900.000
|
$3,600.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
3,603.000
|
$14.000
|
$12.000
|
$7.000
|
$17.000
|
$38.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$471,000.000
|
$500,000.000
|
$555,000.000
|
$545,000.000
|
$470,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$5,000.000
|
$14,500.000
|
$11,000.000
|
$17,000.000
|
$1,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,760.000
|
$28.000
|
$25.000
|
$30.000
|
$33.000
|
$28.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,760.000
|
$7.700
|
$12.000
|
$15.000
|
$16.000
|
$14.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,419.000
|
$2.200
|
$2.500
|
$2.500
|
$3.300
|
$2.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,419.000
|
$0.400
|
$0.500
|
$0.250
|
$0.600
|
$0.200
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
240.000
|
$39.000
|
$30.000
|
$12.000
|
$97.000
|
$32.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$41.000
|
$30.000
|
$12.000
|
$93.500
|
$32.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
240.000
|
$8.000
|
$15.000
|
$12.000
|
$16.000
|
$32.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$10.000
|
$15.000
|
$12.000
|
$16.000
|
$32.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
688.000
|
$82.000
|
$82.000
|
$67.000
|
$91.000
|
$64.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,302.000
|
$38.000
|
$37.000
|
$41.000
|
$52.000
|
$38.000
|
|
|
TURNOUTS (ACP)
|
SY
|
855.000
|
$45.000
|
$36.500
|
$44.000
|
$56.000
|
$26.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
4,909.000
|
$22.000
|
$10.000
|
$15.000
|
$23.500
|
$16.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,500.000
|
$20.000
|
$22.500
|
$22.000
|
$23.500
|
$22.000
|
|
|
SHORT RADIUS
|
LF
|
178.000
|
$30.000
|
$25.000
|
$26.000
|
$29.000
|
$27.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$700.000
|
$700.000
|
$750.000
|
$816.000
|
$770.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
25.000
|
$25.000
|
$21.000
|
$22.000
|
$23.500
|
$22.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
150.000
|
$65.000
|
$52.000
|
$56.000
|
$60.000
|
$56.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
275.000
|
$2.000
|
$1.550
|
$2.000
|
$2.400
|
$2.200
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$180.000
|
$130.000
|
$137.000
|
$150.000
|
$140.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
13.000
|
$2,500.000
|
$3,000.000
|
$2,900.000
|
$3,150.000
|
$2,900.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$250.000
|
$210.000
|
$251.000
|
$270.000
|
$250.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
40.000
|
$160.000
|
$155.000
|
$180.000
|
$200.000
|
$195.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
4.000
|
$190.000
|
$180.000
|
$203.000
|
$220.000
|
$240.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
3.000
|
$330.000
|
$290.000
|
$325.000
|
$350.000
|
$475.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
24.000
|
$420.000
|
$430.000
|
$490.000
|
$550.000
|
$405.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
8.000
|
$530.000
|
$500.000
|
$553.000
|
$600.000
|
$480.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
36.000
|
$500.000
|
$500.000
|
$545.000
|
$595.000
|
$510.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
68.000
|
$78.000
|
$100.000
|
$110.000
|
$120.000
|
$62.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
15.000
|
$70.000
|
$46.000
|
$50.000
|
$54.000
|
$58.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
39.000
|
$18.000
|
$17.000
|
$18.000
|
$20.000
|
$32.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
966.000
|
$3.000
|
$3.000
|
$4.000
|
$4.000
|
$3.350
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
4,230.000
|
$0.700
|
$0.610
|
$0.750
|
$4.300
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
198.000
|
$7.000
|
$8.100
|
$9.000
|
$14.000
|
$8.900
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
38,430.000
|
$0.700
|
$0.600
|
$0.600
|
$0.630
|
$0.650
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
662.000
|
$4.500
|
$6.100
|
$7.000
|
$8.000
|
$6.700
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
67,681.000
|
$0.200
|
$0.130
|
$0.150
|
$0.140
|
$0.150
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
662.000
|
$2.900
|
$3.100
|
$3.000
|
$2.600
|
$3.350
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
6,246.000
|
$0.200
|
$0.160
|
$0.150
|
$0.170
|
$0.200
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
26,925.000
|
$0.200
|
$0.130
|
$0.150
|
$0.150
|
$0.150
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
67,681.000
|
$0.300
|
$0.370
|
$0.400
|
$0.350
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
6,246.000
|
$0.300
|
$0.410
|
$0.500
|
$0.370
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
26,925.000
|
$0.300
|
$0.380
|
$0.400
|
$0.340
|
$0.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
655.000
|
$3.000
|
$4.100
|
$5.000
|
$6.600
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
9,774.000
|
$0.400
|
$0.700
|
$0.750
|
$1.100
|
$0.700
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$6,000.000
|
$9,000.000
|
$7,900.000
|
$9,250.000
|
$8,500.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$650.000
|
$400.000
|
$1,100.000
|
$715.000
|
$370.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(ROUT)
|
LF
|
156.000
|
$120.000
|
$65.000
|
$14.000
|
$44.000
|
$50.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$9,500.000
|
$10,000.000
|
$16,350.000
|
$30,000.000
|
$16,000.000
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
CY
|
43.000
|
$100.000
|
$115.000
|
$215.000
|
$97.000
|
$100.000
|
|
Totals: |
$5,183,728.300
|
$5,125,069.160
|
$5,648,684.350
|
$6,232,430.340
|
$6,951,877.100
|