Show Job Controls
Bid Cobra

LLANO SH 261 (0547-01-026)

Items: 48

County: LLANO
Length: N/A
Highway: SH 261
District: AUSTIN
Control Number: 0547-01-026
DBE Goal: N/A
Project: SSW 547-1-26
Guaranty: N/A
Time: 95 WORKING DAYS
Engineer's Estimate: $591,698.02
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: SAFETY IMPROVEMENTS PROJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$591,698.02
$788,949.05
Over/Under Est: 33.34% $197,251.03
Over/Under Est: 64.9% $383,990.13
Amt Left: 23.67% $186,739.10
$995,835.40
Over/Under Est: 68.3% $404,137.38
Amt Left: 26.22% $206,886.35
Delta: -2.06% -$20,147.25

Bid Items & Bid Tabulations

48 Total 0 of 48
LLANO  |  SH 261  |  AUSTIN  |  0547-01-026  |  07/09/2019  |  $591,698.02  |  SSW 547-1-26  |  SAFETY IMPRVS PROJECTS  |  95 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACME BRIDGE COMPANY, INC.
AARON CONCRETE CONTRACTORS, L.P.
3LW CIVIL LLC
PREPARING ROW
STA 57.100 $1,416.000 $800.000 $1,500.000 $1,000.000
REMOVING CONC (RIPRAP)
SY 39.000 $10.000 $26.200 $41.000 $40.000
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 2,356.000 $4.000 $6.000 $5.000 $11.000
EXCAVATION (ROADWAY)
CY 1,382.000 $5.000 $13.000 $30.000 $25.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 275.000 $6.000 $11.000 $28.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 6,310.000 $0.750 $1.500 $2.500 $7.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 6,310.000 $0.200 $0.260 $0.300 $2.000
BROADCAST SEED (TEMP) (WARM)
SY 3,155.000 $0.100 $0.510 $0.500 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 3,155.000 $0.080 $0.510 $0.500 $0.500
VEGETATIVE WATERING
MG 190.000 $25.000 $38.000 $40.000 $220.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 200.000 $1.500 $2.650 $2.800 $5.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 1,339.000 $33.500 $55.000 $90.000 $90.000
PRIME COAT (MC-30)
GAL 1,268.000 $5.000 $5.200 $7.000 $5.850
ASPH (TIER II)
GAL 7,448.000 $4.000 $3.850 $5.000 $4.350
AGGR(TY-PD GR-4 SAC-B)
CY 153.000 $85.000 $166.000 $180.000 $188.000
D-GR HMA(SQ) TY-D PG70-22
TON 523.000 $120.000 $178.000 $150.000 $200.000
CUT & RESTORE ASPH PAVING
SY 36.000 $125.000 $125.000 $250.000 $130.000
FLOWABLE BACKFILL
CY 17.000 $200.000 $125.000 $160.000 $300.000
TEMPORARY SPL SHORING
SF 625.000 $50.000 $40.000 $75.000 $30.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 48.000 $1,200.000 $650.000 $1,000.000 $750.000
RC PIPE (CL III)(18 IN)
LF 80.000 $48.000 $80.000 $110.000 $80.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 172.000 $125.000 $218.000 $180.000 $175.000
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $10,000.000 $9,000.000 $19,000.000 $14,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $15,000.000 $10,000.000 $33,000.000 $20,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $900.000 $1,500.000 $1,800.000 $1,700.000
SET (TY II) (DES 1) (RCP) (3: 1) (C)
EA 6.000 $2,000.000 $1,500.000 $1,600.000 $2,000.000
SET (TY II) (DES 1) (RCP) (4: 1) (C)
EA 2.000 $2,500.000 $2,500.000 $2,600.000 $2,000.000
REMOV STR (WINGWALL)
EA 2.000 $800.000 $511.000 $4,100.000 $2,000.000
REMOV STR (PIPE)
LF 139.000 $15.000 $10.600 $35.000 $35.000
MOBILIZATION
LS 1.000 $55,000.000 $69,000.000 $90,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,129.810 $22,000.000 $15,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 330.000 $22.500 $53.400 $56.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 330.000 $12.000 $37.400 $40.000 $13.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,314.000 $2.570 $5.300 $5.600 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,314.000 $0.760 $2.150 $2.200 $5.000
REMOVE METAL BEAM GUARD FENCE
LF 700.000 $1.380 $5.300 $6.000 $4.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $224.740 $321.000 $350.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $768.270 $450.000 $615.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $554.930 $659.000 $665.000 $750.000
REMOVE SM RD SN SUP&AM
EA 11.000 $115.060 $160.000 $170.000 $150.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 8.000 $80.000 $26.700 $56.000 $75.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 15,555.000 $0.140 $0.130 $0.150 $0.500
REFL PAV MRK TY II (Y) 4" (BRK)
LF 560.000 $0.130 $0.160 $0.200 $0.300
REFL PAV MRK TY II (Y) 4" (SLD)
LF 13,296.000 $0.140 $0.160 $0.200 $0.550
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 15,555.000 $0.550 $0.900 $1.000 $1.300
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 13,296.000 $0.540 $0.940 $1.000 $2.500
REFL PAV MRKR TY II-A-A
EA 195.000 $3.600 $7.200 $7.500 $7.000
TMA (STATIONARY)
DAY 30.000 $241.760 $275.000 $150.000 $275.000
Totals: $591,698.020 $788,949.050 $975,688.150 $995,835.400