0058-01-019
|
ANDERSON
|
TYLER
|
$15,115,691
|
SH 294
|
STP 2020(404)
|
12/04/2019
|
11/15/2023
|
SEAL COAT
|
CDM HOLDINGS, LLC
($14,050,797)
|
|
|
0108-06-055
|
ANDERSON
|
TYLER
|
$12,612,281
|
SH 19
|
F 2022(140)
|
12/02/2021
|
11/15/2023
|
SEAL COAT
|
BRANNAN PAVING CO., LTD.
($13,128,959)
|
|
|
0109-01-062
|
ANDERSON
|
TYLER
|
$6,226,272
|
US 287
|
STP 2019(092)
|
10/03/2018
|
11/15/2023
|
BS RPR,TRT SBGD,ACP,OCST,PFC,STRS,SI...
|
A. L. HELMCAMP, INC.
($6,180,317)
|
|
|
0109-02-026
|
ANDERSON
|
TYLER
|
$4,111,723
|
US 287
|
STP 2018(809)
|
05/02/2018
|
11/15/2023
|
PLNG,ACP,OCST,PFC,PVT MRKG
|
BIG CREEK CONSTRUCTION, LTD.
($3,987,345)
|
|
|
0122-04-038
|
ANDERSON
|
TYLER
|
$11,279,435
|
US 287
|
STP 2017(355)
|
01/04/2017
|
11/15/2023
|
ONE COURSE SURF TRT & PVT MRK
|
MISSOURI PETROLEUM PRODUCTS COMPANY LLC
($11,487,064)
|
|
|
0122-04-039
|
ANDERSON
|
TYLER
|
$1,207,241
|
US 287
|
STP 2020(691)
|
04/09/2020
|
11/15/2023
|
INSTL CENTERLINE & EDGELINE RUMBLE S...
|
STRIPE-A-ZONE, INC.
($1,097,778)
|
|
|
0198-03-026
|
ANDERSON
|
TYLER
|
$48,036,549
|
US 175
|
C 198-3-26
|
06/30/2022
|
11/15/2023
|
WIDEN ROAD - ADD LANES
|
BIG CREEK CONSTRUCTION, LTD.
($55,487,305)
|
|
|
0205-07-078
|
ANDERSON
|
TYLER
|
$367,685
|
US 79
|
STP 2020(878)HES
|
06/05/2020
|
11/15/2023
|
IMPROVE AND INTERCON SIG
|
STRIPING TECHNOLOGY, L.P.
($406,417)
|
|
|
0205-07-080
|
ANDERSON
|
TYLER
|
$495,350
|
US 79
|
F 2024(025)
|
09/07/2023
|
11/15/2023
|
RESURF ROADWAY
|
FNH CONSTRUCTION, LLC
($664,721)
|
|
|
0206-01-049
|
ANDERSON
|
TYLER
|
$1,358,585
|
US 79
|
BR 1702(753)
|
08/08/2017
|
11/15/2023
|
CLEAN/PAINT STEEL GRDRS,REPL BR RAIL...
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($1,646,254)
|
|
|
0206-01-050
|
ANDERSON
|
TYLER
|
$13,463,239
|
US 79
|
NH 1902(161)
|
07/09/2019
|
09/27/2024
|
BASE & SURF, WIDEN STRS, REPLC BR...
|
MADDEN CONTRACTING COMPANY, LLC.
($14,425,842)
|
|
|
0520-08-068
|
ANDERSON
|
TYLER
|
$2,276,343
|
SH 155
|
STP 2020(561)
|
02/07/2020
|
11/15/2023
|
PLANING, PVT REPAIR, OCST, ACP, MBGF...
|
REYNOLDS & KAY, LTD.
($1,534,653)
|
|
|
0520-08-071
|
ANDERSON
|
TYLER
|
$16,863,436
|
SH 155
|
C 520-8-71
|
04/07/2022
|
09/24/2024
|
PREVENT MAINT
|
MADDEN CONTRACTING COMPANY, LLC.
($14,607,487)
|
|
|
0520-09-054
|
ANDERSON
|
TYLER
|
$42,940
|
SL 256
|
F 2022(810)
|
08/04/2022
|
11/15/2023
|
LANDSCAPE DEVELOPMENT
|
TIGHT LINE CONSTRUCTION, LLC
($31,901)
|
|
|
0520-09-057
|
ANDERSON
|
TYLER
|
$148,729
|
SL 256
|
C 520-9-057
|
07/02/2026
|
05/01/2026
|
HAZARD ELIM & SAFETY
|
|
|
|
0890-05-009
|
ANDERSON
|
TYLER
|
$1,940,375
|
FM 3309
|
F 2026(218)
|
01/07/2026
|
11/01/2025
|
REHAB EXIST ROADWAY
|
BAKER & COMPANY CONSTRUCTION, LLC
($1,861,683)
|
|
|
0910-08-064
|
ANDERSON
|
TYLER
|
$118,050
|
PW
|
C 910-8-64
|
03/06/2024
|
01/24/2024
|
STATE PARK IMPRVS
|
REYNOLDS & KAY, LTD.
($170,874)
|
|
|
0910-08-067
|
ANDERSON
|
TYLER
|
$796,558
|
CR
|
BR 2015(257)
|
03/07/2017
|
11/15/2023
|
RPLC BRG & APPR, GR, ACP BS & SURF,...
|
LONGVIEW BRIDGE AND ROAD, LTD.
($753,676)
|
|
|
0910-08-068
|
ANDERSON
|
TYLER
|
$636,684
|
CR
|
BR 2015(256)
|
03/05/2019
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
BAKER & REID COMPANY, LLC
($607,852)
|
|
|
0910-08-076
|
ANDERSON
|
TYLER
|
$1,415,845
|
CR
|
BR 2018(262)
|
03/04/2020
|
11/15/2023
|
REPLACE BRIDGES & APPROACHES
|
STATELINE CONSTRUCTION, LLC
($1,452,727)
|
|
|
0910-08-080
|
ANDERSON
|
TYLER
|
$1,057,250
|
VA
|
C 910-8-80
|
02/01/2023
|
11/15/2023
|
STATE PARK IMPRVS
|
BAKER & COMPANY CONSTRUCTION, LLC
($958,749)
|
|
|
0910-08-081
|
ANDERSON
|
TYLER
|
$748,230
|
VA
|
STP 2022(533)HES
|
05/04/2022
|
08/31/2024
|
HAZARD ELIM & SAFETY
|
MARCOM'S MOWING SERVICE, LLC
($757,095)
|
|
|
1928-01-005
|
ANDERSON
|
TYLER
|
$2,383,206
|
FM 1990
|
STP 2025(993)HES
|
07/01/2025
|
05/14/2025
|
HAZARD ELIM & SAFETY
|
THK CONSTRUCTION LLC
($1,639,418)
|
|
|
3199-01-008
|
ANDERSON
|
TYLER
|
$2,849,016
|
FM 2054
|
SSW 3199-1-8
|
07/11/2018
|
11/15/2023
|
GR, BS, OCST, ACP SURF, STRS, PV MK
|
A. L. HELMCAMP, INC.
($2,573,742)
|
|
|
6307-35-001
|
ANDERSON
|
TYLER
|
$106,535
|
FM0315
|
RMC - 630735001
|
09/06/2016
|
11/15/2023
|
TREE TRIM
|
TERRY ENTERPRISES
($138,031)
|
|
|
6318-11-001
|
ANDERSON
|
TYLER
|
$146,502
|
SH0019
|
BPM - 631811001
|
02/06/2018
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
L.C. JORDAN & SON
($129,538)
|
|
|
6321-14-001
|
ANDERSON
|
TYLER
|
$126,675
|
US0287
|
RMC - 632114001
|
10/10/2017
|
11/15/2023
|
TREE TRIM
|
TERRY ENTERPRISES
($111,944)
|
|
|
6323-60-001
|
ANDERSON
|
TYLER
|
$220,464
|
SH0019
|
RMC - 632360001
|
11/07/2017
|
11/15/2023
|
TREE RMVL
|
THOMAS 11 DEVELOPMENT LLC
($217,630)
|
|
|
6323-60-001
|
ANDERSON
|
TYLER
|
$358,250
|
SH0019
|
RMC - 632360001
|
02/01/2018
|
11/15/2023
|
TREE RMVL
|
CROSS PLUS CONSTRUCTION, LLC
($335,000)
|
|
|
6326-87-001
|
ANDERSON
|
TYLER
|
$226,575
|
US0287
|
RMC - 632687001
|
02/06/2018
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
RED BARON BUILDING COMPANY, L.L.C.
($232,133)
|
|
|
6336-97-001
|
ANDERSON
|
TYLER
|
$245,483
|
US0287
|
RMC - 633697001
|
12/11/2018
|
11/15/2023
|
ROW MOW
|
LAWRENCE W. SIMS
($237,949)
|
|
|
6339-56-001
|
ANDERSON
|
TYLER
|
$850,485
|
US0079
|
RMC - 633956001
|
01/08/2019
|
11/15/2023
|
UPGRADE OF SIGNS & ASSEMBLIES
|
CHAMPION INFRASTRUCTURE, LLC
($745,420)
|
|
|
6343-46-001
|
ANDERSON
|
TYLER
|
$208,275
|
US0175
|
RMC - 634346001
|
11/12/2019
|
11/15/2023
|
DRAINAGE STRUCT
|
BAKER & COMPANY CONSTRUCTION, LLC
($167,162)
|
|
|
6349-65-001
|
ANDERSON
|
TYLER
|
$151,725
|
FM0323
|
RMC - 634965001
|
11/12/2019
|
11/15/2023
|
TREE TRIM
|
TERRY ENTERPRISES
($145,190)
|
|
|
6353-98-001
|
ANDERSON
|
TYLER
|
$253,759
|
SH0155
|
RMC - 635398001
|
01/07/2020
|
11/15/2023
|
ROW MOW
|
LAWRENCE W. SIMS
($242,054)
|
|
|
6354-35-001
|
ANDERSON
|
TYLER
|
$298,175
|
US0079
|
MMC - 635435001
|
02/11/2020
|
09/26/2024
|
HOT MIX MATERIALS
|
TEXAS MATERIALS GROUP, INC.
($322,600)
|
|
|
6355-65-001
|
ANDERSON
|
TYLER
|
$113,750
|
US0079
|
MMC - 635565001
|
05/12/2020
|
11/15/2023
|
LIQUID ASPH-MATERIALS ONLY
|
MARTIN RESOURCE MANAGEMENT CORPORATION
($65,950)
|
|
|
6355-73-001
|
ANDERSON
|
TYLER
|
$59,800
|
SH0155
|
MMC - 635573001
|
06/09/2020
|
11/15/2023
|
CONC MATERIALS ONLY
|
BIG CREEK CONSTRUCTION, LTD.
($61,400)
|
|
|
6364-68-001
|
ANDERSON
|
TYLER
|
$237,500
|
US0079
|
MMC - 636468001
|
09/08/2020
|
11/15/2023
|
LIQUID ASPH MATERIALS ONLY
|
MARTIN RESOURCE MANAGEMENT CORPORATION
($237,500)
|
|
|
6370-20-001
|
ANDERSON
|
TYLER
|
$91,502
|
FM0321
|
RMC - 637020001
|
10/06/2020
|
11/15/2023
|
TREE TRIM
|
L & M MOWING CONTRACTORS, LLC
($56,030)
|
|
|
6377-25-001
|
ANDERSON
|
TYLER
|
$276,000
|
US0175
|
MMC - 637725001
|
03/16/2021
|
11/15/2023
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($303,000)
|
|
|
6378-11-001
|
ANDERSON
|
TYLER
|
$172,000
|
US0175
|
MMC - 637811001
|
04/13/2021
|
11/15/2023
|
ROCK/RIPRAP
|
A. L. HELMCAMP, INC.
($101,516)
|
|
|
6378-25-001
|
ANDERSON
|
TYLER
|
$61,400
|
US0079
|
MMC - 637825001
|
04/13/2021
|
11/15/2023
|
MATERIALS ONLY: HYDRAULIC CEMENT CO...
|
DIGG COMMERCIAL, LLC
($58,200)
|
|
|
6387-82-001
|
ANDERSON
|
TYLER
|
$193,326
|
FM0019
|
RMC - 638782001
|
10/12/2021
|
11/15/2023
|
TREE TRIM AND BRUSH RMVL
|
TERRY ENTERPRISES
($144,913)
|
|
|
6390-00-001
|
ANDERSON
|
TYLER
|
$240,600
|
US0079
|
MMC - 639000001
|
11/10/2021
|
11/15/2023
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($210,600)
|
|
|
6391-15-001
|
ANDERSON
|
TYLER
|
$550,483
|
FM0320
|
BPM - 639115001
|
02/03/2022
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
SHALOM SERVICES CORPORATION
($555,213)
|
|
|
6392-52-001
|
ANDERSON
|
TYLER
|
$524,481
|
US0079
|
RMC - 639252001
|
12/01/2021
|
11/15/2023
|
MOW HWY RIGHT OF WAY
|
S G COMPANY, LLC
($604,287)
|
|
|
6394-42-001
|
ANDERSON
|
TYLER
|
$238,505
|
US0287
|
RMC - 639442001
|
03/08/2022
|
11/15/2023
|
CULVERT
|
BAKER & COMPANY CONSTRUCTION, LLC
($229,446)
|
|
|
6396-67-001
|
ANDERSON
|
TYLER
|
$376,600
|
SH0019
|
RMC - 639667001
|
03/04/2022
|
11/15/2023
|
TREE RMVL
|
ROAD SOLUTIONS L.L.C.
($352,983)
|
|
|
6412-19-001
|
ANDERSON
|
TYLER
|
$4,708,983
|
US0287
|
RMC - 641219001
|
09/07/2022
|
11/15/2023
|
MILL AND INLAY
|
BIG CREEK CONSTRUCTION, LTD.
($4,990,503)
|
|
|
6415-74-001
|
ANDERSON
|
TYLER
|
$201,063
|
US0287
|
RMC - 641574001
|
10/11/2022
|
11/15/2023
|
TREE TRIM AND BRUSH RMVL
|
RDA VEGETATION MANAGEMENT LLC
($186,648)
|
|
|
6422-20-001
|
ANDERSON
|
TYLER
|
$1,564,350
|
US0079
|
MMC - 642220001
|
10/06/2022
|
11/15/2023
|
HOT MIX
|
TEXAS MATERIALS GROUP, INC.
($1,451,700)
|
|
|
6444-56-001
|
ANDERSON
|
TYLER
|
$2,269,976
|
US0079
|
RMC - 644456001
|
11/02/2023
|
11/15/2023
|
MILL AND INLAY
|
MADDEN CONTRACTING COMPANY, LLC.
($2,220,152)
|
|
|
6451-01-001
|
ANDERSON
|
TYLER
|
$243,588
|
US0287
|
RMC - 645101001
|
09/12/2023
|
11/15/2023
|
TREE TRIM AND BRUSH RMVL
|
S FOWLER SERVICES LLC
($194,976)
|
|
|
6457-46-001
|
ANDERSON
|
TYLER
|
$1,407,000
|
US0079
|
MMC - 645746001
|
11/02/2023
|
11/15/2023
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,341,800)
|
|
|
6472-09-001
|
ANDERSON
|
TYLER
|
$229,040
|
US0079
|
RMC - 647209001
|
10/08/2024
|
09/13/2024
|
TREE TRIM AND BRUSH RMVL
|
MARLANE CONSTRUCTION, LLC
($177,331)
|
|
|
6478-11-001
|
ANDERSON
|
TYLER
|
$514,000
|
US0079
|
RMC - A00213202
|
01/21/2025
|
01/05/2025
|
TREE RMVL
|
L & M MOWING CONTRACTORS, LLC
($436,408)
|
|
|
6482-15-001
|
ANDERSON
|
TYLER
|
$928,000
|
US0079
|
MMC - A00214676
|
04/15/2025
|
03/12/2025
|
ROCK/RIPRAP
|
KNIFE RIVER CORPORATION - SOUTH
($883,890)
|
|
|
6485-91-001
|
ANDERSON
|
TYLER
|
$393,729
|
US0079
|
BPM - A00216166
|
10/21/2025
|
07/22/2025
|
BRIDGE PREVENT MAINT
|
BECK-REIT & SONS, LTD.
($322,159)
|
|
|
6491-57-001
|
ANDERSON
|
TYLER
|
$1,573,500
|
US0079
|
MMC - A00217882
|
11/05/2025
|
09/25/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,572,500)
|
|
|
6492-40-001
|
ANDERSON
|
TYLER
|
$708,581
|
US0079
|
RMC - A00218097
|
12/09/2025
|
10/01/2025
|
MOW HWY RIGHT OF WAY
|
S G COMPANY, LLC
($699,935)
|
|
|
6498-38-001
|
ANDERSON
|
TYLER
|
$200,000
|
US0287
|
RMC - A00220004
|
08/11/2026
|
06/01/2026
|
TREE TRIM AND BRUSH RMVL
|
|
|
|
6500-34-001
|
ANDERSON
|
TYLER
|
$700,000
|
SH0155
|
BPM - A00220736
|
07/21/2026
|
05/01/2026
|
BRIDGE PREVENT MAINT
|
|
|
|
0228-04-043
|
ANDREWS
|
ODESSA
|
$40,055,499
|
US 385
|
C 228-4-43
|
01/07/2022
|
11/15/2023
|
ROADWAY REHAB
|
REECE ALBERT, INC.
($37,642,802)
|
|
|
0228-05-066
|
ANDREWS
|
ODESSA
|
$43,930,131
|
US 385
|
NH 2020(571)
|
02/06/2020
|
11/15/2023
|
ROADWAY RECON
|
FNF CONSTRUCTION, INC.
($49,841,453)
|
|
|
0228-05-068
|
ANDREWS
|
ODESSA
|
$492,940
|
US 385
|
STP 1902(013)HES
|
06/04/2019
|
11/15/2023
|
INTERS BEACON WARN SIG
|
WILLIS ELECTRIC CO., LP
($598,519)
|
|
|
0354-06-030
|
ANDREWS
|
ODESSA
|
$29,597,172
|
SH 115
|
STP 2022(582)HES
|
08/04/2022
|
11/15/2023
|
CONSTRUCT BRIDGE
|
FNF CONSTRUCTION, INC.
($36,740,467)
|
|
|
0354-06-031
|
ANDREWS
|
ODESSA
|
$1,302,733
|
SH 115
|
STP 2B20(119)HES
|
11/04/2020
|
11/15/2023
|
SAFETY LIGHTING AT INTERS
|
VACA UNDERGROUND UTILITIES INC
($1,156,358)
|
|
|
0548-01-034
|
ANDREWS
|
ODESSA
|
$10,643,351
|
SH 176
|
STP 2019(944)HES
|
07/09/2019
|
09/27/2024
|
GR,STR,BASE,SURF,SIGN,&ILL
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($14,337,021)
|
|
|
0548-05-049
|
ANDREWS
|
ODESSA
|
$13,655,435
|
SH 176
|
STP 2018(680)
|
02/01/2018
|
11/15/2023
|
RECON AND WIDEN
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($11,368,798)
|
|
|
1127-01-012
|
ANDREWS
|
ODESSA
|
$44,538,506
|
SH 128
|
F 2B22(010)
|
01/05/2023
|
11/15/2023
|
HWY IMPRV
|
CI CONSTRUCTORS, INC.
($35,996,695)
|
|
|
6319-44-001
|
ANDREWS
|
ODESSA
|
$44,000
|
US0385
|
RMC - 631944001
|
08/15/2017
|
11/15/2023
|
LANDSCAPE MAINT
|
A & F, LLC
($33,200)
|
|
|
6319-44-001
|
ANDREWS
|
ODESSA
|
$44,000
|
US0385
|
RMC - 631944001
|
10/24/2017
|
11/15/2023
|
LANDSCAPE MAINT
|
CM COMPANY
($59,200)
|
|
|
6324-74-001
|
ANDREWS
|
ODESSA
|
$129,480
|
US0385
|
RMC - 632474001
|
01/09/2018
|
11/15/2023
|
ROADSIDE MOW
|
DOUBLE A CONTRACTING, L.P.
($181,272)
|
|
|
6347-57-001
|
ANDREWS
|
ODESSA
|
$124,800
|
FM1788
|
RMC - 634757001
|
08/13/2019
|
11/15/2023
|
CLEANING AND SEALING CRACKS
|
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY
($72,719)
|
|
|
6355-29-001
|
ANDREWS
|
ODESSA
|
$1,995,857
|
SH0115
|
RMC - 635529001
|
03/05/2020
|
11/15/2023
|
MILL AND INLAY
|
FNH CONSTRUCTION, LLC
($3,006,934)
|
|
|
6355-29-001
|
ANDREWS
|
ODESSA
|
$1,987,011
|
SH0115
|
RMC - 635529001
|
09/04/2020
|
11/15/2023
|
MILL AND INLAY
|
RK HALL, LLC
($2,138,496)
|
|
|
6363-10-001
|
ANDREWS
|
ODESSA
|
$247,053
|
SH0176
|
RMC - 636310001
|
07/28/2020
|
09/26/2024
|
CLEANING AND SEALING CRACKS
|
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY
($182,259)
|
|
|
6383-52-001
|
ANDREWS
|
ODESSA
|
$261,840
|
US0385
|
RMC - 638352001
|
12/14/2021
|
11/15/2023
|
MOW HWY RIGHT OF WAY
|
DOUBLE A CONTRACTING, L.P.
($298,825)
|
|
|
6383-89-001
|
ANDREWS
|
ODESSA
|
$258,379
|
US0385
|
RMC - 638389001
|
09/14/2021
|
09/24/2024
|
CLEANING AND SEALING CRACKS
|
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY
($238,464)
|
|
|
6388-86-001
|
ANDREWS
|
ODESSA
|
$64,000
|
SH0176
|
RMC - 638886001
|
10/12/2021
|
11/15/2023
|
LANDSCAPE MAINT
|
CM COMPANY
($51,200)
|
|
|
6485-94-001
|
ANDREWS
|
ODESSA
|
$325,300
|
US0385
|
RMC - A00216171
|
08/12/2025
|
05/20/2025
|
CRACK SEAL
|
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY
($274,434)
|
|
|
6493-84-001
|
ANDREWS
|
ODESSA
|
$335,370
|
US0385
|
RMC - A00218406
|
02/10/2026
|
10/22/2025
|
MOW HWY RIGHT OF WAY
|
L&L COMPANY
($261,399)
|
|
|
0176-02-118
|
ANGELINA
|
LUFKIN
|
$48,176,388
|
US 59
|
F 2021(440)
|
06/02/2022
|
09/03/2024
|
HWY IMPRV
|
LONGVIEW BRIDGE AND ROAD, LTD.
($63,145,676)
|
|
|
0176-02-120
|
ANGELINA
|
LUFKIN
|
$3,117,155
|
US 59
|
NH 2017(826)
|
03/08/2017
|
11/15/2023
|
HMA LEVEL UP, OCST AND PFC SURF
|
MOORE BROTHERS CONSTRUCTION COMPANY
($2,865,624)
|
|
|
0176-02-124
|
ANGELINA
|
LUFKIN
|
$979,564
|
BU 59-G
|
F 2021(825)
|
08/04/2021
|
11/15/2023
|
CONSTRUCT PEDESTRIAN INFRASTRUCT
|
DBI SERVICES, LLC
($934,763)
|
|
|
0176-02-125
|
ANGELINA
|
LUFKIN
|
$1,116,133
|
BU 59-G
|
F 2022(895)
|
08/04/2022
|
11/15/2023
|
BICYCLE AND PEDESTRIAN IMPRVS
|
ENCINO LANDSCAPE, INC.
($1,363,054)
|
|
|
0176-02-127
|
ANGELINA
|
LUFKIN
|
$255,810
|
US 59
|
BR 2022(514)
|
03/03/2022
|
11/15/2023
|
BRIDGE MAINT
|
SJ&J CONSTRUCTION, LLC
($281,620)
|
|
|
0176-02-128
|
ANGELINA
|
LUFKIN
|
$5,356,774
|
BU 59G
|
F 2B25(040)
|
09/05/2025
|
07/01/2025
|
RESURF ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($4,646,844)
|
|
|
0176-03-097
|
ANGELINA
|
LUFKIN
|
$141,599,693
|
US 59
|
NH 2013(218)
|
12/04/2019
|
11/15/2023
|
HWY IMPRV
|
SACYR CONSTRUCTION USA LLC
($140,865,929)
|
|
|
0176-03-131
|
ANGELINA
|
LUFKIN
|
$1,671,568
|
US 59
|
STP 1802(326)HES
|
07/11/2018
|
11/15/2023
|
IMPROVE GUARDRAIL TO DES STANDARDS
|
B & E CONSTRUCTION INC
($1,620,249)
|
|
|
0176-03-135
|
ANGELINA
|
LUFKIN
|
$8,387,938
|
US 59
|
NH 2018(772)
|
04/04/2018
|
11/15/2023
|
PLANE, HMA LEVEL-UP, OCST, PFC
|
MOORE BROTHERS CONSTRUCTION COMPANY
($8,332,375)
|
|
|
0176-03-142
|
ANGELINA
|
LUFKIN
|
$760,848
|
US 59
|
BR 2025(670)
|
04/03/2025
|
02/02/2025
|
BRIDGE MAINT
|
PREMIER CONTRACTORS LLC
($570,969)
|
|
|
0176-08-024
|
ANGELINA
|
LUFKIN
|
$563,358
|
FM 324
|
STP 1802(328)HES
|
07/10/2018
|
11/15/2023
|
IMPROVE GUARDRAIL AND SAFETY TREAT
|
A R BROTHERS CONSTRUCTION SERVICES, INC.
($533,772)
|
|
|
0176-08-026
|
ANGELINA
|
LUFKIN
|
$30,366,663
|
FM 324
|
BR 2025(393)
|
04/03/2025
|
02/02/2025
|
BRIDGE REPL
|
A. L. HELMCAMP, INC.
($27,229,475)
|
|
|
0200-01-083
|
ANGELINA
|
LUFKIN
|
$1,593,129
|
US 69
|
NH 2016(424)
|
12/06/2017
|
11/15/2023
|
RESURF WITH THIN OVERLAY MIXTURE
|
MOORE BROTHERS CONSTRUCTION COMPANY
($1,576,982)
|
|
|
0200-01-089
|
ANGELINA
|
LUFKIN
|
$159,645
|
US 69
|
STP 2018(520)HES
|
02/02/2018
|
11/15/2023
|
INSTL TRAF SIGNAL
|
THIRD COAST SERVICES LLC
($164,665)
|
|
|
0200-01-090
|
ANGELINA
|
LUFKIN
|
$238,190
|
BU 69-J
|
STP 2017(642)HES
|
02/02/2017
|
11/15/2023
|
IMPROVE TRAF SIG
|
SIGNAL SERVICES GROUP INC.
($255,255)
|
|
|
0200-01-091
|
ANGELINA
|
LUFKIN
|
$120,361
|
US 69
|
C 200-1-91
|
03/05/2019
|
11/15/2023
|
INSTL TRAF SIGNAL
|
TEXAS TRAFFIC CONTROL SYSTEMS, INC.
($114,857)
|
|
|
0200-02-031
|
ANGELINA
|
LUFKIN
|
$10,535,967
|
US 69
|
NH 2013(513)
|
06/06/2017
|
11/15/2023
|
WIDEN FROM 2 LANES TO 4 LANE DIVIDED...
|
PINTO CONSTRUCTION CO., INC.
($9,969,131)
|