Show Job Controls
Bid Cobra

ANGELINA FM 324 (0176-08-026)

Items: 148

County: ANGELINA
Length: 3.5670 MILES
Highway: FM 324
District: LUFKIN
Control Number: 0176-08-026
DBE Goal: 8.0%
Project: BR 2025(393)
Guaranty: $100,000.00
Time: 403 WORKING DAYS
Engineer's Estimate: $30,366,663.25
Date: 04/03/2025 (1 year ago)
Contract Number: 4253003
Type: BRIDGE REPLACEMENT
Project ID: A00064155
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JESSE SISCO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$30,366,663.25
$27,229,475.48
Over/Under Est: -10.33% -$3,137,187.77
$27,998,348.79
Over/Under Est: -7.8% -$2,368,314.46
Amt Left: 2.82% $768,873.31
Over/Under Est: -3.47% -$1,054,723.85
Amt Left: 7.65% $2,082,463.92
Delta: -4.69% -$1,313,590.61
Over/Under Est: -2.46% -$747,847.25
Amt Left: 8.77% $2,389,340.52
Delta: -1.05% -$306,876.60
Over/Under Est: -0.12% -$36,258.76
Amt Left: 11.39% $3,100,929.01
Delta: -2.40% -$711,588.49
$30,433,669.89
Over/Under Est: 0.22% $67,006.64
Amt Left: 11.77% $3,204,194.41
Delta: -0.34% -$103,265.40
Subcontractor Percentage Amount
A R BROTHERS CONSTRUCTION SERVICES, INC. 2.18% $597,539.87
JB PINNACLE GROUP, LLC 1.43% $391,964.22
HERMANOS STEEL, LLC 0.63% $172,683.54
COLD CREEK CONSTRUCTION, LTD 0.57% $156,237.49
CEN TEX HYDROSEED, INC. 0.53% $145,273.45
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.52% $142,532.45
CREACOM, INC. 0.48% $131,568.41
BATTERSON, LLP 0.30% $82,230.26
PANOLA SIGN & BARRICADE, INC. 0.15% $41,115.13
PRIMATE CONSTRUCTION, LP 0.10% $27,410.09
SURFACE PREPARATION TECHNOLOGIES, LLC 0.04% $10,964.03
Total: 6.93% $1,899,518.94

Bid Items & Bid Tabulations

148 Total 0 of 148
ANGELINA  |  FM 324  |  LUFKIN  |  0176-08-026  |  04/03/2025  |  $30,366,663.25  |  BR 2025(393)  |  BRIDGE REPL  |  403 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
ALTUS CONSTRUCTION LLC
LONGVIEW BRIDGE AND ROAD, LTD.
JAMES CONSTRUCTION GROUP, LLC
RAGLE CONSTRUCTION, INC.
ISI CONTRACTING, INC.
PREPARING ROW
STA 161.000 $3,000.000 $2,500.000 $17,221.270 $6,000.000 $17,000.000 $2,950.000 $6,211.000
DISPOSAL OF WATER WELL
EA 2.000 $6,000.000 $7,500.000 $10,618.190 $3,100.000 $7,500.000 $1,500.000 $5,500.000
REMOV CONC (DRIVEWAYS)
SY 1,088.000 $45.000 $32.000 $19.910 $42.000 $31.400 $15.000 $77.000
RMV (11") TRT/UNTRT BASE & ASPH PAV
SY 7,221.000 $20.000 $5.750 $3.450 $6.500 $7.860 $8.000 $6.000
EXCAV (ROADWAY)
CY 9,185.000 $25.000 $12.000 $14.170 $16.000 $27.070 $30.000 $16.000
EXCAV (CHANNEL)
CY 389.000 $70.000 $12.000 $22.780 $40.000 $36.500 $20.000 $28.000
EXCAV (SPECIAL)
CY 4,009.000 $15.000 $12.000 $24.750 $28.000 $24.530 $20.000 $7.110
EMBANK (FNL)(OC)(TY B)
CY 1,952.000 $35.000 $19.000 $26.550 $35.500 $68.190 $25.000 $54.000
EMBANK (FNL)(DC)(TY C)
CY 15,410.000 $25.000 $40.000 $19.470 $20.000 $32.780 $10.000 $48.000
EMBANK (VEH)(OC)(TY B)
CY 167.000 $125.000 $12.000 $53.090 $52.000 $68.180 $30.000 $62.000
BLADING
STA 137.000 $275.000 $115.000 $278.730 $190.000 $927.820 $185.000 $1,510.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 33.000 $175.000 $155.000 $318.550 $250.000 $564.070 $135.000 $749.000
BLOCK SODDING
SY 869.000 $10.000 $6.500 $6.450 $6.250 $5.000 $12.000 $11.920
BROADCAST SEED (TEMP_WARM)
SY 9,471.000 $0.500 $0.350 $0.800 $0.150 $0.150 $0.130 $0.320
BROADCAST SEED (TEMP_COOL)
SY 11,586.000 $0.500 $0.350 $0.800 $0.200 $0.200 $0.150 $0.270
BOND FBR MTRX SEED (PERM)(RURAL)(CLAY)
SY 18,941.000 $1.000 $0.950 $0.900 $0.650 $0.800 $0.560 $1.440
VEGETATIVE WATERING
TGL 397.300 $25.000 $15.000 $29.130 $52.000 $42.040 $40.000 $60.000
FL BS (RDWY DEL) (TY A GR 3)
TON 9,631.000 $50.000 $72.000 $46.610 $64.000 $58.800 $60.000 $75.000
CEMENT
TON 968.000 $260.000 $225.000 $219.000 $365.000 $292.140 $300.000 $232.640
CEMENT TRT (EXIST MATL & NEW BASE)(12")
SY 45,830.000 $6.500 $2.750 $7.140 $4.500 $6.510 $4.300 $6.250
CEMENT TRT (NEW BASE)(12")
SY 7,275.000 $10.000 $2.750 $1.990 $4.500 $10.420 $3.800 $4.050
CEMENT TRT (SUBGRADE)(12")
SY 1,234.000 $6.000 $2.750 $4.580 $7.000 $6.670 $6.000 $8.670
ASPH (RC-250)
TON 109.000 $1,250.000 $1,050.000 $1,914.320 $1,250.000 $550.000 $1,250.000 $13.430
ASPH (AC-15P OR CRS-2P)
TON 98.800 $1,250.000 $1,050.000 $983.910 $1,250.000 $550.000 $1,250.000 $16.780
AGGR (TY E OR L, GR-5)
CY 708.000 $225.000 $175.000 $269.540 $175.000 $320.000 $150.000 $1,007.000
AGGR (TY E OR L, PE OR PL GR 4)
CY 409.000 $225.000 $200.000 $181.770 $250.000 $198.000 $200.000 $403.000
SP MIXES SP-B PG64-22
TON 815.000 $180.000 $175.000 $201.580 $190.000 $141.000 $205.000 $210.000
SP MIXES SP-C PG70-22
TON 5,592.000 $180.000 $165.000 $197.420 $186.000 $172.000 $205.000 $206.000
SP MIXES SP-C SAC-A PG70-22
TON 5,614.000 $180.000 $170.000 $190.800 $180.000 $173.000 $210.000 $199.000
SP MIXES SP-C SAC-A PG70-22 (EXEMPT)
TON 56.000 $200.000 $500.000 $557.450 $525.000 $250.000 $210.000 $582.000
PLANE ASPH CONC PAV(2")
SY 834.000 $10.000 $5.000 $10.090 $8.000 $10.400 $12.000 $19.270
CEM STABIL BKFL
CY 331.000 $350.000 $185.000 $260.890 $300.000 $197.340 $115.000 $391.740
TEMPORARY SPL SHORING
SF 1,335.000 $65.000 $61.000 $31.850 $60.000 $72.540 $45.000 $29.940
DRILL SHAFT (18 IN)
LF 180.000 $250.000 $260.000 $373.560 $315.000 $59.800 $80.000 $281.000
DRILL SHAFT (36 IN)
LF 3,870.000 $350.000 $290.000 $168.020 $450.000 $220.180 $240.000 $388.000
DRILL SHAFT (42 IN)
LF 420.000 $650.000 $365.000 $319.320 $550.000 $300.310 $320.000 $570.000
DRILL SHAFT (48 IN)
LF 800.000 $1,000.000 $660.000 $409.800 $515.000 $390.670 $425.000 $633.000
CL C CONC (ABUT)
CY 79.400 $1,800.000 $1,300.000 $1,125.630 $1,100.000 $1,074.150 $1,200.000 $2,705.660
CL C CONC (CAP)
CY 485.700 $2,000.000 $1,500.000 $1,113.890 $1,250.000 $1,587.950 $1,700.000 $2,279.000
CL C CONC (COLUMN)
CY 429.200 $2,200.000 $1,350.000 $1,034.770 $1,350.000 $1,565.870 $1,600.000 $2,364.000
CL C CONC (CRASHWALL)
CY 215.400 $2,000.000 $1,050.000 $566.910 $565.000 $831.960 $1,400.000 $1,750.000
CL C CONC (COLLAR)
EA 1.000 $1,700.000 $6,000.000 $5,309.090 $3,250.000 $3,689.850 $1,525.000 $4,503.000
REINF CONC SLAB
SF 118,680.000 $30.000 $32.000 $26.550 $30.000 $27.100 $22.000 $20.000
APPROACH SLAB
CY 92.900 $1,000.000 $900.000 $1,075.430 $910.000 $673.840 $580.000 $1,423.000
PRESTR CONC GIRDER (TX34)
LF 2,027.880 $200.000 $200.000 $221.570 $235.000 $249.160 $230.000 $238.000
PRESTR CONC GIRDER (TX54)
LF 9,378.310 $225.000 $220.000 $228.610 $250.000 $265.270 $260.000 $236.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 141.000 $450.000 $350.000 $424.730 $380.000 $356.000 $330.000 $168.000
RIPRAP (STONE COMMON)(GROUT)(18 IN)
CY 54.000 $300.000 $375.000 $530.910 $377.000 $351.400 $360.000 $195.000
RIPRAP (STONE PROTECTION)(27 IN)
CY 1,273.000 $275.000 $325.000 $160.520 $400.000 $231.080 $170.000 $166.000
ELASTOMERIC BEARING (E7)
EA 6.000 $4,700.000 $5,000.000 $7,831.980 $4,700.000 $5,365.840 $4,000.000 $1,731.000
ELASTOMERIC BEARING (F7)
EA 6.000 $5,000.000 $5,000.000 $7,517.680 $4,800.000 $5,365.840 $4,000.000 $1,731.000
SLIDING ELASTOMERIC BEARING (ES 7)
EA 12.000 $4,500.000 $5,500.000 $1,083.060 $4,550.000 $5,393.350 $4,000.000 $2,423.000
STR STEEL (PLATE GIRDER)
LB 2,666,932.000 $2.500 $2.300 $2.450 $2.750 $2.750 $2.000 $2.000
RAIL (TY SSTR)
LF 5,228.000 $135.000 $85.000 $61.900 $71.000 $59.620 $60.000 $160.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 329.000 $280.000 $240.000 $179.890 $270.000 $220.780 $190.000 $177.000
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 90.000 $320.000 $300.000 $195.020 $307.000 $224.060 $190.000 $177.000
CONC BOX CULV (4 FT X 2 FT)
LF 4.000 $1,000.000 $990.000 $350.400 $2,100.000 $2,126.000 $1,200.000 $5,724.000
RC PIPE (CL III)(18 IN)
LF 640.000 $100.000 $99.000 $58.710 $79.500 $88.440 $90.000 $202.000
RC PIPE (CL III)(24 IN)
LF 164.000 $160.000 $121.000 $90.040 $98.000 $110.820 $125.000 $342.000
RC PIPE (CL V)(18 IN)
LF 235.000 $150.000 $127.000 $87.060 $92.000 $129.240 $95.000 $265.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $9,500.000 $9,900.000 $7,555.500 $4,200.000 $13,483.930 $9,665.000 $23,416.000
WINGWALL (PW - 1) (HW=3 FT)
EA 1.000 $13,000.000 $17,700.000 $13,140.010 $10,700.000 $14,268.330 $8,850.000 $44,609.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $1,500.000 $1,300.000 $1,066.490 $1,800.000 $941.540 $1,475.000 $4,477.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 56.000 $1,500.000 $1,300.000 $1,066.490 $1,230.000 $941.540 $1,335.000 $3,422.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $2,000.000 $2,100.000 $1,777.480 $1,650.000 $1,501.520 $2,150.000 $4,266.000
REMOV STR (SET)
EA 1.000 $500.000 $550.000 $623.150 $1,300.000 $540.370 $630.000 $6,500.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $125,000.000 $60,000.000 $100,872.780 $56,000.000 $70,000.000 $4,500,000.000 $163,152.000
REMOV STR (PIPE)
EA 1.000 $1,500.000 $550.000 $995.460 $1,300.000 $874.400 $1,500.000 $808.600
REMOVE STR (DRIVEWAY CULVERT)
EA 31.000 $1,700.000 $550.000 $1,743.240 $1,225.000 $1,017.330 $370.000 $2,000.000
MOBILIZATION
LS 1.000 $3,000,000.000 $2,700,000.000 $2,786,627.490 $2,000,000.000 $1,912,840.210 $3,000,000.000 $3,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 34.000 $3,000.000 $15,000.000 $19,909.100 $15,100.000 $8,738.110 $20,000.000 $14,549.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $7,500.000 $7,654.760 $20,200.000 $17,818.410 $25,000.000 $6,856.000
TMA (STATIONARY)
DAY 200.000 $250.000 $400.000 $265.450 $500.000 $820.160 $300.000 $329.000
TMA (MOBILE OPERATION)
DAY 50.000 $250.000 $500.000 $265.450 $500.000 $1,252.840 $825.000 $827.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 204.000 $35.000 $50.000 $31.850 $38.000 $50.000 $34.000 $82.000
ROCK FILTER DAMS (REMOVE)
LF 204.000 $10.000 $17.000 $13.560 $12.000 $10.000 $11.000 $25.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 476.000 $45.000 $38.000 $27.080 $39.000 $25.000 $35.000 $70.000
CONSTRUCTION EXITS (REMOVE)
SY 476.000 $15.000 $17.000 $10.080 $12.000 $10.000 $11.000 $16.000
CONSTRUCTION PERIMETER FENCE
LF 1,684.000 $15.000 $5.000 $4.540 $11.000 $6.000 $6.000 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 12,686.000 $5.000 $4.750 $3.640 $3.500 $3.990 $3.250 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 12,686.000 $1.000 $1.400 $1.100 $1.000 $1.000 $0.700 $3.000
ROCK FILTER DAMS (INSTALL) (TY 2) 6:1
LF 60.000 $50.000 $110.000 $67.690 $41.000 $50.000 $37.000 $227.620
CONSTRUCTING DETOURS
SY 540.000 $150.000 $165.000 $183.930 $210.000 $173.490 $150.000 $525.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,540.000 $450.000 $60.000 $39.820 $105.000 $82.020 $105.000 $91.770
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 120.000 $300.000 $80.000 $69.200 $136.000 $82.020 $105.000 $100.620
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,540.000 $60.000 $13.000 $15.930 $10.000 $7.540 $14.000 $16.070
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 120.000 $80.000 $40.000 $16.190 $35.000 $17.630 $14.000 $64.450
DRIVEWAYS (CONC)
SY 1,209.000 $145.000 $209.000 $95.820 $187.000 $179.900 $105.000 $334.680
DRIVEWAYS (ACP)
SY 3,440.000 $65.000 $91.000 $26.400 $86.000 $83.590 $105.000 $85.790
DRIVEWAYS (BASE)
SY 169.000 $45.000 $64.000 $71.670 $50.000 $51.970 $75.000 $150.000
TURNOUTS (ACP)
SY 290.000 $75.000 $60.000 $102.320 $142.000 $242.260 $170.000 $126.380
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 750.000 $1.000 $18.000 $8.100 $13.000 $9.600 $8.000 $13.900
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $35.000 $28.000 $22.850 $27.500 $26.750 $26.750 $50.710
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,500.000 $1,950.000 $1,990.910 $2,100.000 $1,750.000 $1,750.000 $1,865.060
REMOVE METAL BEAM GUARD FENCE
LF 325.000 $8.000 $4.500 $2.560 $4.500 $2.000 $2.000 $17.230
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $270.000 $440.000 $219.000 $450.000 $150.000 $150.000 $1,413.670
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,300.000 $2,653.120 $3,300.000 $3,050.000 $3,050.000 $4,067.720
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $700.000 $440.000 $254.840 $440.000 $200.000 $200.000 $1,413.670
CHAIN LINK FENCE (INSTALL) (8')
LF 570.000 $75.000 $66.000 $31.850 $47.000 $94.590 $75.000 $109.660
WIRE FENCE (TY C)
LF 200.000 $25.000 $55.000 $23.890 $28.000 $23.890 $25.000 $31.050
WIRE FENCE (REMOVE)
LF 200.000 $5.000 $21.000 $3.880 $12.000 $7.000 $10.000 $18.210
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $650.000 $596.000 $334.470 $770.000 $542.000 $628.000 $606.400
MAILBOX INSTALL-S (WC-POST) TY 3
EA 17.000 $300.000 $253.000 $249.530 $193.000 $230.000 $252.000 $257.330
MAILBOX INSTALL-D (WC-POST) TY 3
EA 2.000 $350.000 $270.000 $292.000 $250.000 $245.000 $297.000 $274.120
RELOCATE EXISTING MAILBOX
EA 3.000 $225.000 $130.000 $132.730 $310.000 $118.000 $159.000 $132.020
IN RD IL (U/P) (TY 1) (250W EQ) LED
EA 8.000 $1,300.000 $2,750.000 $1,934.770 $6,600.000 $1,500.000 $1,250.000 $1,973.710
IN RD IL (U/P) (TY 2) (250W EQ) LED
EA 12.000 $825.000 $2,750.000 $1,858.710 $7,700.000 $1,500.000 $1,500.000 $2,091.020
CONDT (PVC) (SCH 40) (2")
LF 1,545.000 $24.000 $16.500 $12.740 $6.600 $20.000 $20.000 $35.090
CONDT (RM) (1")
LF 958.000 $27.000 $33.000 $51.100 $33.000 $25.000 $35.000 $25.670
ELEC CONDR (NO.12) INSULATED
LF 3,594.000 $2.000 $1.650 $1.190 $1.650 $2.000 $1.750 $2.180
ELEC CONDR (NO.6) INSULATED
LF 5,175.000 $2.500 $2.750 $2.190 $2.200 $2.500 $2.250 $3.510
GROUND BOX TY C (162911)W/APRON
EA 2.000 $3,200.000 $2,420.000 $1,059.160 $1,100.000 $500.000 $1,500.000 $1,458.330
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 1.000 $8,500.000 $6,600.000 $4,778.180 $7,150.000 $10,000.000 $9,000.000 $11,695.640
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $875.000 $845.000 $865.380 $985.000 $768.000 $777.000 $834.160
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 6.000 $1,125.000 $1,079.000 $1,056.510 $1,250.000 $981.000 $965.000 $1,065.520
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,250.000 $4,181.000 $976.870 $1,250.000 $3,801.000 $1,042.000 $4,128.460
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 3.000 $1,500.000 $1,387.000 $1,438.760 $1,450.000 $1,261.000 $1,245.000 $1,369.640
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 26.000 $600.000 $471.000 $621.160 $550.000 $428.000 $448.000 $464.870
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 15.000 $725.000 $581.000 $695.490 $726.000 $528.000 $541.000 $573.490
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $625.000 $560.000 $589.310 $705.000 $509.000 $554.000 $552.850
RELOCATE SM RD SN SUP&AM TY TWT
EA 1.000 $600.000 $275.000 $499.050 $550.000 $250.000 $400.000 $271.540
REMOVE SM RD SN SUP&AM
EA 63.000 $185.000 $130.000 $91.580 $100.000 $118.000 $99.000 $128.170
IN SRSS & AM (RAIL)(90 MPH)(P MOUNT)
EA 3.000 $5,000.000 $5,500.000 $3,056.450 $3,600.000 $7,741.000 $5,480.000 $8,407.900
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 50.000 $25.000 $26.000 $13.270 $27.000 $12.500 $20.000 $24.800
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $32.000 $32.000 $16.460 $32.000 $15.500 $25.000 $24.800
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 36.000 $150.000 $88.000 $132.730 $83.000 $125.000 $153.000 $24.800
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 1,820.000 $4.500 $6.750 $5.310 $4.500 $6.000 $3.000 $6.520
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 1,820.000 $4.500 $6.750 $5.310 $4.500 $6.000 $3.000 $6.520
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 38.000 $0.750 $4.850 $5.310 $11.000 $4.400 $7.550 $4.780
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 68.000 $2.500 $2.550 $2.650 $11.000 $2.330 $7.550 $2.530
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 44.000 $15.000 $8.800 $8.490 $27.500 $8.000 $20.000 $8.690
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 113.000 $2.000 $1.050 $0.500 $2.250 $2.000 $1.620 $2.160
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,700.000 $2.000 $1.050 $0.520 $2.250 $2.000 $1.680 $2.160
REFL PAV MRK TY I (W)8"(BRK)(090MIL)
LF 150.000 $1.000 $1.100 $2.650 $2.500 $1.000 $3.950 $1.090
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 600.000 $1.000 $1.100 $1.590 $1.100 $1.000 $3.950 $1.090
RE PM TY II (W) 6" (SLD)
LF 5,260.000 $0.500 $0.330 $0.740 $0.600 $0.300 $1.500 $0.330
RE PM TY II (Y) 6" (SLD)
LF 5,260.000 $0.500 $0.330 $0.740 $0.600 $0.300 $1.500 $0.330
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 36,369.000 $1.500 $0.720 $0.740 $0.900 $0.650 $0.980 $0.710
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 750.000 $2.000 $0.660 $0.800 $1.100 $0.600 $0.980 $0.650
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 6,281.000 $1.500 $0.720 $0.800 $1.100 $0.650 $0.980 $0.710
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 28,863.000 $1.500 $0.660 $0.740 $0.900 $0.600 $0.980 $0.650
PREFAB PM TY B (W)(ARROW)
EA 2.000 $210.000 $688.000 $265.450 $275.000 $625.000 $1,125.000 $678.850
PREFAB PM TY B (W)(WORD)
EA 2.000 $250.000 $770.000 $292.000 $385.000 $700.000 $1,125.000 $760.310
PREFAB PM TY C (W)(24")(SLD)
LF 77.000 $18.000 $22.500 $13.270 $15.000 $20.500 $40.000 $22.270
REFL PAV MRKR TY I-C
EA 91.000 $7.000 $8.000 $5.310 $505.000 $7.250 $6.850 $7.870
REFL PAV MRKR TY II-A-A
EA 590.000 $7.000 $8.000 $5.310 $5.500 $7.250 $6.850 $7.870
ELIM EXT PM & MRKS (4")
LF 3,130.000 $4.000 $0.700 $0.580 $1.100 $0.600 $0.550 $0.650
BONDING COURSE
GAL 5,082.000 $6.000 $4.650 $6.900 $7.500 $7.500 $7.500 $7.000
Totals: $30,366,663.250 $27,229,475.480 $27,998,348.798 $29,311,939.400 $29,618,816.006 $30,330,404.490 $30,433,669.898
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,500.00
RAILROAD FORCE ACCOUNT WORK (PART) $64,800.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,500.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,500.00
Total: $70,300.00