|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
1,332.000
|
$9.500
|
$15.000
|
$10.000
|
$19.220
|
$12.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
48.000
|
$16.500
|
$39.000
|
$11.000
|
$142.830
|
$50.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
53.000
|
$20.000
|
$35.000
|
$11.000
|
$188.690
|
$50.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
5,849.000
|
$6.750
|
$5.000
|
$3.000
|
$7.640
|
$8.000
|
|
|
REMOVING STAB BASE & ASPH PAV (10"-12")
|
SY
|
10,911.000
|
$5.500
|
$9.000
|
$5.000
|
$9.500
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
119,273.000
|
$7.500
|
$9.000
|
$10.000
|
$11.070
|
$19.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
167.000
|
$20.000
|
$9.000
|
$12.000
|
$77.570
|
$35.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
757.000
|
$820.000
|
$1,000.000
|
$450.000
|
$1,421.520
|
$575.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
28,019.000
|
$7.000
|
$10.500
|
$5.000
|
$15.470
|
$19.000
|
|
|
BACKFILL (TY B)
|
STA
|
962.000
|
$140.000
|
$200.000
|
$200.000
|
$140.140
|
$320.000
|
|
|
BLADING
|
HR
|
221.000
|
$275.000
|
$200.000
|
$300.000
|
$167.740
|
$160.000
|
|
|
PROOF ROLLING
|
HR
|
551.000
|
$140.000
|
$110.000
|
$80.000
|
$139.050
|
$90.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
36,647.000
|
$12.500
|
$11.000
|
$13.000
|
$13.010
|
$14.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(10")
|
SY
|
176,226.000
|
$15.000
|
$15.500
|
$20.000
|
$14.630
|
$26.000
|
|
|
REWRKING BS MATL (TY C)(10")(ORD COMP)
|
SY
|
31,027.000
|
$2.350
|
$1.250
|
$4.070
|
$2.950
|
$2.700
|
|
|
PRIME COAT (CSS-1H)
|
GAL
|
173,274.000
|
$5.000
|
$3.250
|
$3.000
|
$3.600
|
$3.300
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(AE-P)
|
GAL
|
828,258.000
|
$4.000
|
$0.500
|
$4.000
|
$5.820
|
$3.700
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
219.000
|
$5.000
|
$5.000
|
$4.000
|
$32.860
|
$35.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
357,721.000
|
$3.500
|
$3.250
|
$5.000
|
$4.270
|
$3.900
|
|
|
ASPH (RC-250)
|
GAL
|
415,955.000
|
$5.000
|
$4.100
|
$5.000
|
$5.030
|
$4.200
|
|
|
AGGR(TY-B GR-4 SAC-A)
|
CY
|
8,320.000
|
$80.000
|
$88.000
|
$150.000
|
$217.630
|
$110.000
|
|
|
AGGR(TY-B GR-5 SAC-A)
|
CY
|
8,320.000
|
$60.000
|
$88.000
|
$150.000
|
$244.330
|
$110.000
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
7,234.000
|
$75.000
|
$112.000
|
$150.000
|
$258.920
|
$120.000
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
76,574.000
|
$115.000
|
$120.000
|
$130.000
|
$166.870
|
$165.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,620.000
|
$111.000
|
$188.000
|
$75.000
|
$224.000
|
$215.000
|
|
|
CUT & RESTORING PAV
|
SY
|
2,614.000
|
$70.000
|
$130.000
|
$80.000
|
$111.820
|
$60.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
670.000
|
$6.000
|
$19.000
|
$1.000
|
$16.800
|
$16.000
|
|
|
CL A CONC (MISC)
|
CY
|
2.000
|
$700.000
|
$700.000
|
$1,200.000
|
$3,360.000
|
$3,200.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
213.000
|
$430.000
|
$770.000
|
$485.000
|
$644.000
|
$620.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
3,586.000
|
$235.000
|
$280.000
|
$350.000
|
$268.800
|
$260.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
2,014.000
|
$250.000
|
$320.000
|
$400.000
|
$308.000
|
$300.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,812.000
|
$60.000
|
$120.000
|
$95.000
|
$72.800
|
$70.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
496.000
|
$65.000
|
$170.000
|
$100.000
|
$95.200
|
$91.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$4,230.000
|
$5,400.000
|
$2,500.000
|
$5,040.000
|
$4,800.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$8,500.000
|
$13,500.000
|
$1,875.000
|
$14,000.000
|
$14,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
4.000
|
$5,000.000
|
$3,800.000
|
$2,500.000
|
$5,223.400
|
$3,800.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
2.000
|
$6,000.000
|
$7,800.000
|
$2,600.000
|
$3,808.000
|
$3,700.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
42.000
|
$7,170.000
|
$4,000.000
|
$2,700.000
|
$4,480.000
|
$4,300.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$5,090.000
|
$4,200.000
|
$3,200.000
|
$4,032.000
|
$3,900.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
26.000
|
$5,500.000
|
$4,200.000
|
$3,500.000
|
$5,376.000
|
$5,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
72.000
|
$900.000
|
$2,300.000
|
$2,000.000
|
$1,064.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,420.000
|
$2,600.000
|
$1,750.000
|
$1,344.000
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
11.000
|
$1,800.000
|
$2,600.000
|
$2,200.000
|
$1,344.000
|
$1,300.000
|
|
|
REMOV STR (INLET)
|
EA
|
10.000
|
$650.000
|
$470.000
|
$1,100.000
|
$560.000
|
$540.000
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$500.000
|
$800.000
|
$1,200.000
|
$560.000
|
$540.000
|
|
|
REMOV STR (PIPE)
|
LF
|
4,401.000
|
$15.000
|
$10.000
|
$25.000
|
$11.200
|
$11.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,247,378.320
|
$4,900,000.000
|
$5,215,401.890
|
$3,453,648.670
|
$6,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
37.000
|
$10,000.000
|
$21,250.000
|
$10,500.000
|
$23,363.060
|
$30,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,640.000
|
$5.000
|
$5.000
|
$5.000
|
$5.350
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,640.000
|
$2.000
|
$1.250
|
$1.000
|
$1.650
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
10,755.000
|
$85.000
|
$37.000
|
$50.000
|
$64.310
|
$74.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
6,880.000
|
$30.000
|
$80.000
|
$65.000
|
$82.250
|
$100.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
1,080.000
|
$45.000
|
$90.000
|
$65.000
|
$110.040
|
$110.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
6,880.000
|
$10.000
|
$11.000
|
$10.000
|
$8.120
|
$25.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
1,080.000
|
$11.000
|
$12.000
|
$10.000
|
$16.530
|
$25.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,854.000
|
$28.000
|
$26.000
|
$25.000
|
$39.200
|
$38.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
8,678.000
|
$45.000
|
$71.000
|
$65.000
|
$90.830
|
$75.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
77.000
|
$100.000
|
$88.000
|
$80.000
|
$242.990
|
$140.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
12,878.000
|
$65.000
|
$77.000
|
$35.000
|
$58.070
|
$50.000
|
|
|
TURNOUTS (ACP)
|
SY
|
6,876.000
|
$45.000
|
$82.000
|
$35.000
|
$63.090
|
$75.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
58.000
|
$100.000
|
$109.000
|
$40.000
|
$100.800
|
$100.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$1,500.000
|
$2,000.000
|
$750.000
|
$2,240.000
|
$2,200.000
|
|
|
CONCRETE SIDEWALK (STEPS)
|
SY
|
41.000
|
$185.000
|
$232.000
|
$100.000
|
$235.200
|
$220.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
317,071.000
|
$0.300
|
$0.160
|
$0.150
|
$0.130
|
$0.140
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
163.000
|
$28.500
|
$43.000
|
$27.000
|
$46.760
|
$45.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,385.000
|
$2,100.000
|
$1,500.000
|
$2,240.000
|
$2,200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,085.000
|
$3,400.000
|
$2,800.000
|
$3,752.000
|
$3,600.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
10.000
|
$15.000
|
$11.000
|
$20.000
|
$11.200
|
$11.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
10.000
|
$1.000
|
$4.000
|
$20.000
|
$4.480
|
$5.000
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
30.000
|
$2.000
|
$6.000
|
$20.000
|
$6.720
|
$6.500
|
|
|
GROUND BOX TY BATTERY (162915)W/APRON
|
EA
|
1.000
|
$2,300.000
|
$3,600.000
|
$2,500.000
|
$3,920.000
|
$3,800.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
6.000
|
$35.000
|
$51.000
|
$30.000
|
$56.000
|
$27.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
190.000
|
$520.000
|
$843.000
|
$500.000
|
$728.000
|
$810.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
16.000
|
$650.000
|
$1,210.000
|
$500.000
|
$682.860
|
$890.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
33.000
|
$610.000
|
$890.000
|
$700.000
|
$672.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
18.000
|
$710.000
|
$1,310.000
|
$1,100.000
|
$1,064.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$790.000
|
$1,850.000
|
$800.000
|
$1,335.990
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$950.000
|
$1,890.000
|
$900.000
|
$1,511.900
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$870.000
|
$1,370.000
|
$900.000
|
$1,065.360
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
1.000
|
$1,150.000
|
$1,340.000
|
$1,000.000
|
$1,058.110
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$1,600.000
|
$1,670.000
|
$1,400.000
|
$1,884.850
|
$1,700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
244.000
|
$80.000
|
$80.000
|
$100.000
|
$141.510
|
$110.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
44.000
|
$70.000
|
$117.000
|
$75.000
|
$154.000
|
$75.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
62.000
|
$80.000
|
$117.000
|
$85.000
|
$154.000
|
$86.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
89.000
|
$80.000
|
$117.000
|
$95.000
|
$154.000
|
$88.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
44,580.000
|
$0.200
|
$0.170
|
$0.250
|
$0.180
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
227.000
|
$7.000
|
$8.250
|
$1.650
|
$8.960
|
$9.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
20,149.000
|
$0.200
|
$0.170
|
$0.250
|
$0.180
|
$0.170
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
18,045.000
|
$0.400
|
$0.800
|
$0.650
|
$0.840
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
121.000
|
$14.000
|
$16.250
|
$10.000
|
$17.920
|
$17.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
43,242.000
|
$0.400
|
$0.800
|
$0.750
|
$0.840
|
$0.800
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
2,473.000
|
$1.000
|
$0.920
|
$1.350
|
$1.010
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
71,419.000
|
$0.900
|
$0.670
|
$0.850
|
$0.730
|
$0.700
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
41,872.000
|
$1.000
|
$0.400
|
$0.350
|
$0.390
|
$0.370
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
214,117.000
|
$0.300
|
$0.350
|
$0.350
|
$0.360
|
$0.340
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
5,965.000
|
$0.300
|
$0.400
|
$0.350
|
$0.390
|
$0.370
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
179,521.000
|
$0.300
|
$0.350
|
$0.350
|
$0.360
|
$0.340
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
1,239.000
|
$15.000
|
$12.250
|
$13.000
|
$13.440
|
$13.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
117.000
|
$220.000
|
$225.000
|
$225.000
|
$246.400
|
$240.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
30.000
|
$350.000
|
$305.000
|
$225.000
|
$336.000
|
$320.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
40.000
|
$570.000
|
$380.000
|
$500.000
|
$414.400
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
147.000
|
$280.000
|
$255.000
|
$275.000
|
$280.000
|
$270.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
202.000
|
$30.000
|
$25.000
|
$45.000
|
$25.760
|
$25.000
|
|
PRE PM TY C(ACC PRK)(BL&WH)(W/BORDR)LG
|
EA
|
2.000
|
$250.000
|
$508.000
|
$20.000
|
$560.000
|
$540.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
121.000
|
$4.000
|
$5.250
|
$3.500
|
$5.600
|
$5.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
647.000
|
$4.000
|
$3.250
|
$3.000
|
$3.360
|
$3.300
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
7,673.000
|
$4.000
|
$3.000
|
$3.500
|
$3.080
|
$3.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
2.000
|
$230.000
|
$407.000
|
$250.000
|
$448.000
|
$430.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
15.000
|
$2.000
|
$4.250
|
$10.000
|
$4.480
|
$4.500
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
1.000
|
$9,500.000
|
$13,800.000
|
$8,000.000
|
$15,120.000
|
$15,000.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$850.000
|
$1,100.000
|
$1,000.000
|
$1,120.000
|
$1,100.000
|
|
|
EMULSION
|
GAL
|
3,081,706.000
|
$2.150
|
$3.000
|
$3.250
|
$3.270
|
$3.000
|
|
|
CEMENT
|
TON
|
421.000
|
$180.000
|
$300.000
|
$165.000
|
$235.140
|
$230.000
|
|
|
EMUL TRTMNT (MX EXST MTRL)10"
|
SY
|
655,682.000
|
$3.000
|
$5.000
|
$3.000
|
$2.710
|
$5.600
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
22,371.000
|
$90.000
|
$118.000
|
$115.000
|
$123.130
|
$136.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$2,900.000
|
$25,000.000
|
$10,000.000
|
$16,980.040
|
$25,000.000
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
64.000
|
$50.000
|
$90.000
|
$75.000
|
$560.000
|
$65.000
|
|
|
TMA (STATIONARY)
|
DAY
|
72.000
|
$200.000
|
$250.000
|
$250.000
|
$384.270
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
68.000
|
$200.000
|
$1,000.000
|
$275.000
|
$496.710
|
$100.000
|
|
Totals: |
$43,930,130.820
|
$49,841,452.880
|
$54,232,732.430
|
$60,665,655.720
|
$61,908,144.180
|