PREPARING ROW
|
STA
|
689.840
|
$500.000
|
$325.000
|
$1,100.000
|
$1,100.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
1,604.000
|
$14.000
|
$11.750
|
$20.000
|
$9.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
797.000
|
$18.000
|
$13.500
|
$30.000
|
$9.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
625.000
|
$5.000
|
$3.000
|
$15.000
|
$5.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
3,086.000
|
$6.000
|
$15.500
|
$6.000
|
$9.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0"-10")
|
SY
|
1,612.000
|
$6.000
|
$11.000
|
$15.000
|
$9.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,836.000
|
$12.000
|
$11.500
|
$10.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
35,724.000
|
$18.000
|
$27.500
|
$13.000
|
$15.000
|
|
|
BACKFILL (TY C)
|
STA
|
656.740
|
$14.000
|
$205.000
|
$100.000
|
$200.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
95,855.000
|
$1.000
|
$1.500
|
$0.900
|
$2.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
72,274.000
|
$0.220
|
$0.260
|
$0.300
|
$0.400
|
|
|
STRAW/HAY MLCH SEED(TEMP)(WARM)
|
SY
|
36,137.000
|
$0.400
|
$0.260
|
$0.300
|
$0.400
|
|
|
STRAW/HAY MLCH SEED(TEMP)(COOL)
|
SY
|
36,137.000
|
$0.400
|
$0.240
|
$0.300
|
$0.800
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
23,581.000
|
$0.900
|
$0.770
|
$0.820
|
$0.800
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
11,790.000
|
$0.700
|
$0.690
|
$0.820
|
$0.800
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
11,790.000
|
$0.700
|
$0.670
|
$0.820
|
$0.800
|
|
|
VEGETATIVE WATERING
|
MG
|
2,110.000
|
$10.000
|
$10.000
|
$12.000
|
$7.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
23,581.000
|
$1.000
|
$1.260
|
$1.300
|
$1.500
|
|
|
LIME (HYDRATED LIME (DRY))
|
TON
|
409.000
|
$170.000
|
$149.910
|
$150.000
|
$200.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
24,715.500
|
$3.000
|
$5.500
|
$2.500
|
$4.000
|
|
|
CEMENT
|
TON
|
409.000
|
$145.000
|
$141.200
|
$165.000
|
$160.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
24,715.500
|
$3.000
|
$4.500
|
$2.800
|
$3.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
5,944.000
|
$2.750
|
$3.250
|
$5.000
|
$5.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
144,371.000
|
$3.250
|
$3.170
|
$3.300
|
$4.250
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
3,438.000
|
$110.000
|
$129.500
|
$120.000
|
$135.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
712.000
|
$155.000
|
$175.000
|
$160.000
|
$200.000
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
1,514.000
|
$145.000
|
$135.000
|
$126.000
|
$135.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
23,701.000
|
$105.000
|
$135.000
|
$126.000
|
$135.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
24,386.000
|
$90.000
|
$92.020
|
$94.000
|
$95.000
|
|
|
SUPERPAVE MIXTURES SP-D PG64-22
|
TON
|
472.000
|
$105.000
|
$175.000
|
$110.000
|
$125.000
|
|
|
SUPERPAVE MIXTURES SP-D PG64-22(LEV-UP)
|
TON
|
17,539.000
|
$100.000
|
$98.000
|
$110.000
|
$115.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,000.000
|
$75.000
|
$50.000
|
$60.000
|
$50.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
116,525.000
|
$1.500
|
$0.850
|
$1.000
|
$2.500
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
16,752.000
|
$1.200
|
$2.500
|
$1.500
|
$2.500
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
315.000
|
$30.000
|
$36.000
|
$15.000
|
$45.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,108.000
|
$15.000
|
$28.000
|
$30.000
|
$30.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
24.000
|
$1,400.000
|
$1,000.000
|
$1,200.000
|
$700.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
150.000
|
$425.000
|
$455.000
|
$480.000
|
$450.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
279.000
|
$145.000
|
$150.000
|
$165.000
|
$160.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
311.000
|
$400.000
|
$500.000
|
$550.000
|
$425.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
467.000
|
$12.000
|
$34.000
|
$30.000
|
$45.000
|
|
|
CLEANING AND SEALING JOINTS (CL 3)
|
LF
|
173.000
|
$35.000
|
$14.000
|
$30.000
|
$25.000
|
|
|
RAIL (TY T552)
|
LF
|
69.500
|
$50.000
|
$400.000
|
$225.000
|
$300.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
31.000
|
$190.000
|
$375.000
|
$450.000
|
$300.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
30.000
|
$845.000
|
$1,630.000
|
$1,200.000
|
$700.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,476.000
|
$50.000
|
$40.000
|
$46.000
|
$40.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,168.000
|
$70.000
|
$54.000
|
$85.000
|
$55.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
128.000
|
$85.000
|
$76.000
|
$125.000
|
$72.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
108.000
|
$100.000
|
$93.000
|
$130.000
|
$115.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
76.000
|
$160.000
|
$153.000
|
$220.000
|
$250.000
|
|
|
RC PIPE (CL III)(72 IN)
|
LF
|
32.000
|
$190.000
|
$450.000
|
$380.000
|
$600.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$3,500.000
|
$3,800.000
|
$4,000.000
|
$5,000.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$25,000.000
|
$33,000.000
|
$50,000.000
|
$35,000.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
1.000
|
$26,000.000
|
$31,000.000
|
$51,000.000
|
$35,000.000
|
|
|
WINGWALL (PW - 2) (HW=12 FT)
|
EA
|
1.000
|
$34,000.000
|
$38,900.000
|
$52,000.000
|
$38,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
184.000
|
$858.000
|
$650.000
|
$700.000
|
$575.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
7.000
|
$1,200.000
|
$1,000.000
|
$750.000
|
$600.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
9.000
|
$875.000
|
$1,100.000
|
$800.000
|
$700.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
54.000
|
$950.000
|
$1,250.000
|
$850.000
|
$900.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$1,400.000
|
$1,200.000
|
$900.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,500.000
|
$1,500.000
|
$1,400.000
|
$1,100.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,675.000
|
$2,600.000
|
$1,800.000
|
$1,600.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,800.000
|
$2,050.000
|
$1,800.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,900.000
|
$2,600.000
|
$2,000.000
|
$3,300.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$4,000.000
|
$4,200.000
|
$3,600.000
|
$5,500.000
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$4,200.000
|
$3,450.000
|
$3,600.000
|
$5,000.000
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$4,400.000
|
$5,100.000
|
$3,800.000
|
$5,500.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$5,500.000
|
$8,300.000
|
$6,000.000
|
$9,000.000
|
|
|
SET (TY II) (72 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$6,500.000
|
$35,500.000
|
$20,000.000
|
$15,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,000.000
|
$200.000
|
$1,000.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
80.000
|
$32.000
|
$5.000
|
$25.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,233,000.000
|
$905,000.000
|
$950,000.000
|
$800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$5,000.000
|
$2,800.000
|
$6,000.000
|
$8,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,240.000
|
$30.000
|
$35.000
|
$30.000
|
$40.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
250.000
|
$50.000
|
$60.000
|
$90.000
|
$65.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,490.000
|
$8.000
|
$12.000
|
$4.000
|
$12.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
780.000
|
$25.000
|
$28.000
|
$15.000
|
$33.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
780.000
|
$15.000
|
$14.000
|
$3.000
|
$14.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
2,000.000
|
$25.000
|
$10.000
|
$22.000
|
$15.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
200.000
|
$65.000
|
$75.000
|
$65.000
|
$125.000
|
|
|
BLADING WORK (EROSION & SEDMT CONT)
|
HR
|
200.000
|
$120.000
|
$100.000
|
$125.000
|
$150.000
|
|
|
BULLDOZER WORK (EROSION & SEDMT CONT)
|
HR
|
200.000
|
$120.000
|
$100.000
|
$125.000
|
$150.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
14,177.000
|
$3.000
|
$2.500
|
$2.500
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
14,177.000
|
$1.000
|
$1.100
|
$0.600
|
$1.100
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
200.000
|
$120.000
|
$110.000
|
$100.000
|
$175.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
330.000
|
$75.000
|
$80.000
|
$90.000
|
$90.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
330.000
|
$15.000
|
$31.000
|
$30.000
|
$20.000
|
|
|
CONC CURB (TY I)
|
LF
|
220.000
|
$20.000
|
$15.000
|
$35.000
|
$25.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,769.000
|
$40.000
|
$31.800
|
$55.000
|
$30.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,723.000
|
$30.000
|
$31.800
|
$26.000
|
$30.000
|
|
|
TURNOUTS (ACP)
|
SY
|
241.000
|
$35.000
|
$31.800
|
$26.000
|
$30.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
751.000
|
$90.000
|
$108.000
|
$110.000
|
$110.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
123,782.000
|
$0.350
|
$0.155
|
$0.130
|
$0.400
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
62,416.000
|
$0.350
|
$0.190
|
$0.150
|
$0.500
|
|
|
CONC MEDIAN
|
SY
|
689.000
|
$60.000
|
$46.000
|
$70.000
|
$110.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,125.000
|
$25.000
|
$20.000
|
$20.000
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$1,600.000
|
$1,375.000
|
$1,500.000
|
$1,800.000
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
4.000
|
$1,200.000
|
$900.000
|
$820.000
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,850.000
|
$3.000
|
$2.500
|
$3.000
|
$3.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$500.000
|
$150.000
|
$185.000
|
$200.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$200.000
|
$100.000
|
$130.000
|
$150.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
24.000
|
$2,500.000
|
$2,575.000
|
$2,700.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
16.000
|
$350.000
|
$200.000
|
$300.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,760.000
|
$1,000.000
|
$750.000
|
$1,100.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$11,000.000
|
$9,000.000
|
$9,500.000
|
$10,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
73.000
|
$215.000
|
$236.170
|
$230.000
|
$250.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
8.000
|
$300.000
|
$275.940
|
$270.000
|
$300.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$450.000
|
$385.270
|
$390.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$475.000
|
$516.250
|
$520.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$525.000
|
$658.050
|
$650.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
11.000
|
$630.000
|
$804.210
|
$820.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
6.000
|
$775.000
|
$900.760
|
$920.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$700.000
|
$752.100
|
$750.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
103.000
|
$340.000
|
$376.810
|
$350.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$500.000
|
$497.230
|
$475.000
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
121.000
|
$75.000
|
$105.190
|
$100.000
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
14.000
|
$30.000
|
$15.000
|
$20.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
16.000
|
$60.000
|
$45.000
|
$60.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
54.000
|
$30.000
|
$25.000
|
$35.000
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
11,374.000
|
$0.200
|
$0.120
|
$0.130
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
138,495.000
|
$0.250
|
$0.120
|
$0.130
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
31,382.000
|
$0.200
|
$0.120
|
$0.130
|
$0.140
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
11,374.000
|
$0.750
|
$1.500
|
$0.700
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
31,382.000
|
$0.600
|
$1.500
|
$0.700
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
6,899.000
|
$0.750
|
$1.500
|
$0.600
|
$2.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,251.000
|
$0.350
|
$0.800
|
$0.900
|
$0.880
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
740.000
|
$2.000
|
$1.000
|
$1.100
|
$1.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
600.000
|
$3.000
|
$5.500
|
$5.800
|
$6.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,425.000
|
$0.150
|
$1.000
|
$1.100
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
12,070.000
|
$0.350
|
$0.480
|
$0.500
|
$0.520
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
137,521.000
|
$0.350
|
$0.400
|
$0.420
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,250.000
|
$0.350
|
$0.480
|
$0.500
|
$0.520
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
135,968.000
|
$0.350
|
$0.400
|
$0.420
|
$0.440
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
11.000
|
$200.000
|
$185.000
|
$195.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
3.000
|
$255.000
|
$250.000
|
$265.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
6.000
|
$35.000
|
$75.000
|
$80.000
|
$100.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
132.000
|
$2.500
|
$3.300
|
$3.500
|
$4.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
697.000
|
$2.500
|
$3.300
|
$3.500
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,144.000
|
$2.500
|
$3.300
|
$3.500
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,305.000
|
$0.400
|
$0.500
|
$1.000
|
$0.550
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,425.000
|
$0.200
|
$0.250
|
$0.270
|
$0.300
|
|
|
FLOATING TURBIDITY BARRIER(FUR & INST)
|
LF
|
600.000
|
$30.000
|
$38.750
|
$30.000
|
$45.000
|
|
|
FLOATING TURBIDITY BARRIER (REMOVE)
|
LF
|
600.000
|
$3.000
|
$6.950
|
$12.000
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
200.000
|
$125.000
|
$100.000
|
$180.000
|
$200.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$16,800.000
|
$10,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$10,000.000
|
$1.000
|
$10,000.000
|
$40,000.000
|
|
Totals: |
$13,463,239.240
|
$14,425,842.220
|
$14,461,865.190
|
$15,586,667.880
|