PREPARING ROW
|
STA
|
287.200
|
$1,600.000
|
$5,000.000
|
$10,600.000
|
$10,400.000
|
$10,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
923.000
|
$12.000
|
$15.000
|
$22.000
|
$10.000
|
$15.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
790.000
|
$17.000
|
$25.000
|
$32.000
|
$12.000
|
$20.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
2,197.000
|
$8.500
|
$10.000
|
$14.000
|
$7.000
|
$10.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
19.000
|
$45.000
|
$75.000
|
$30.000
|
$55.000
|
$40.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
125,792.000
|
$3.500
|
$5.000
|
$7.000
|
$7.500
|
$5.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
433,689.000
|
$8.000
|
$8.000
|
$8.000
|
$7.750
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
265,951.000
|
$8.500
|
$6.000
|
$5.000
|
$9.000
|
$14.000
|
|
|
BLADING
|
HR
|
150.000
|
$100.000
|
$150.000
|
$128.000
|
$150.000
|
$155.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
469,157.000
|
$1.400
|
$1.000
|
$0.700
|
$1.000
|
$1.600
|
|
|
EROSION CONTROL COMPOST (2")
|
SY
|
464,601.000
|
$0.750
|
$2.000
|
$0.500
|
$1.550
|
$1.650
|
|
|
BLOCK SODDING
|
SY
|
4,556.000
|
$4.500
|
$7.000
|
$5.300
|
$5.500
|
$5.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
464,601.000
|
$0.150
|
$0.100
|
$0.080
|
$0.150
|
$0.150
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
464,601.000
|
$0.800
|
$0.700
|
$0.710
|
$0.700
|
$0.720
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
234,581.000
|
$0.800
|
$0.680
|
$0.710
|
$0.670
|
$0.690
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
234,581.000
|
$0.800
|
$0.680
|
$0.710
|
$0.650
|
$0.690
|
|
|
VEGETATIVE WATERING
|
MG
|
22,520.000
|
$8.000
|
$8.000
|
$5.000
|
$7.000
|
$22.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
10,000.000
|
$2.750
|
$1.500
|
$1.100
|
$1.000
|
$0.830
|
|
|
WILDFLOWER SEEDING
|
AC
|
24.000
|
$1,500.000
|
$1,200.000
|
$1,200.000
|
$1,000.000
|
$990.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
|
SY
|
150,108.000
|
$23.000
|
$25.000
|
$33.500
|
$34.000
|
$33.500
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
2,181.000
|
$176.000
|
$300.000
|
$200.000
|
$320.000
|
$350.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
121,143.000
|
$3.500
|
$1.500
|
$2.000
|
$3.500
|
$2.150
|
|
|
CEMENT
|
TON
|
2,181.000
|
$195.000
|
$250.000
|
$240.000
|
$240.000
|
$270.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
121,143.000
|
$2.500
|
$2.500
|
$3.600
|
$2.500
|
$2.100
|
|
|
PRIME COAT (MC-30)
|
GAL
|
45,608.000
|
$4.700
|
$5.000
|
$5.000
|
$5.500
|
$5.750
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
188,775.000
|
$3.500
|
$5.000
|
$4.700
|
$3.550
|
$5.750
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
4,496.000
|
$120.000
|
$120.000
|
$145.000
|
$120.000
|
$149.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,300.000
|
$55.000
|
$60.000
|
$86.000
|
$70.000
|
$90.000
|
|
|
CEM STABIL BKFL
|
CY
|
752.000
|
$100.000
|
$175.000
|
$280.000
|
$250.000
|
$240.000
|
|
|
CUT & RESTORING PAV
|
SY
|
794.000
|
$90.000
|
$80.000
|
$100.000
|
$125.000
|
$185.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
3,374.000
|
$120.000
|
$185.000
|
$260.000
|
$250.000
|
$220.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
2,999.000
|
$5.000
|
$10.000
|
$12.000
|
$5.000
|
$10.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
8,519.000
|
$20.000
|
$35.000
|
$70.000
|
$38.000
|
$50.000
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
4.000
|
$20,000.000
|
$60,000.000
|
$50,000.000
|
$20,000.000
|
$22,000.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
382.000
|
$100.000
|
$185.000
|
$200.000
|
$200.000
|
$205.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,788.000
|
$225.000
|
$310.000
|
$300.000
|
$285.000
|
$345.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
133.600
|
$1,000.000
|
$1,200.000
|
$1,100.000
|
$1,200.000
|
$1,100.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
410.400
|
$1,000.000
|
$1,200.000
|
$1,300.000
|
$1,200.000
|
$1,130.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
179.200
|
$1,000.000
|
$1,200.000
|
$1,300.000
|
$1,400.000
|
$1,260.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
2.000
|
$1,000.000
|
$1,500.000
|
$2,000.000
|
$1,500.000
|
$1,350.000
|
|
|
CL C CONC (MISC)
|
CY
|
24.000
|
$1,000.000
|
$1,500.000
|
$800.000
|
$1,200.000
|
$830.000
|
|
|
CL E CONC (SEAL SLAB)
|
CY
|
119.000
|
$650.000
|
$725.000
|
$550.000
|
$300.000
|
$610.000
|
|
|
REINF CONC SLAB
|
SF
|
130,000.000
|
$18.000
|
$20.000
|
$26.000
|
$26.000
|
$24.500
|
|
|
APPROACH SLAB
|
CY
|
122.000
|
$500.000
|
$900.000
|
$750.000
|
$750.000
|
$850.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
16,185.000
|
$165.000
|
$220.000
|
$235.000
|
$220.000
|
$220.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
165.000
|
$550.000
|
$600.000
|
$640.000
|
$650.000
|
$650.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
16.000
|
$100.000
|
$425.000
|
$190.000
|
$190.000
|
$210.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
392.000
|
$200.000
|
$145.000
|
$190.000
|
$190.000
|
$180.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
1,862.000
|
$150.000
|
$155.000
|
$150.000
|
$190.000
|
$180.000
|
|
|
RIPRAP (STONE PROTECTION)(30 IN)
|
CY
|
99.000
|
$180.000
|
$190.000
|
$190.000
|
$190.000
|
$185.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
168.000
|
$495.000
|
$575.000
|
$580.000
|
$650.000
|
$675.000
|
|
|
RAIL (TY SSTR)
|
LF
|
6,644.000
|
$50.000
|
$75.000
|
$75.000
|
$115.000
|
$60.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
468.000
|
$150.000
|
$190.000
|
$185.000
|
$180.000
|
$215.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
38.000
|
$200.000
|
$270.000
|
$310.000
|
$600.000
|
$370.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
228.000
|
$450.000
|
$515.000
|
$450.000
|
$800.000
|
$570.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
96.000
|
$530.000
|
$650.000
|
$730.000
|
$950.000
|
$750.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
82.000
|
$600.000
|
$525.000
|
$360.000
|
$800.000
|
$395.000
|
|
|
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
|
LF
|
85.000
|
$1,600.000
|
$2,000.000
|
$1,300.000
|
$1,200.000
|
$995.000
|
|
|
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
|
LF
|
150.000
|
$1,800.000
|
$2,100.000
|
$1,300.000
|
$1,500.000
|
$1,925.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
54.000
|
$2,000.000
|
$2,200.000
|
$1,600.000
|
$1,600.000
|
$1,300.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
7,751.000
|
$65.000
|
$60.000
|
$66.000
|
$55.000
|
$50.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
851.000
|
$80.000
|
$80.000
|
$82.000
|
$75.000
|
$70.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
592.000
|
$120.000
|
$110.000
|
$101.000
|
$100.000
|
$95.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
659.000
|
$150.000
|
$145.000
|
$135.000
|
$140.000
|
$135.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
193.000
|
$180.000
|
$225.000
|
$180.000
|
$200.000
|
$175.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
429.000
|
$250.000
|
$235.000
|
$230.000
|
$285.000
|
$220.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$5,500.000
|
$4,800.000
|
$5,700.000
|
$6,000.000
|
$7,880.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
16.000
|
$5,000.000
|
$7,600.000
|
$6,100.000
|
$6,000.000
|
$7,650.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
1.000
|
$5,500.000
|
$9,900.000
|
$6,600.000
|
$6,000.000
|
$8,575.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
7.000
|
$5,750.000
|
$12,200.000
|
$7,000.000
|
$6,000.000
|
$9,500.000
|
|
|
INLET (COMPL)(PSL)(SL)(5FTX5FT)
|
EA
|
2.000
|
$9,100.000
|
$9,200.000
|
$6,600.000
|
$11,000.000
|
$9,500.000
|
|
|
INLET (COMPL)(PSL)(SL)(6FTX6FT)
|
EA
|
1.000
|
$9,500.000
|
$14,000.000
|
$11,000.000
|
$16,000.000
|
$15,935.000
|
|
|
INLET (COMPL)(PSL)(SL)(8FTX8FT)
|
EA
|
3.000
|
$10,000.000
|
$16,000.000
|
$20,000.000
|
$20,000.000
|
$20,620.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
6.000
|
$5,000.000
|
$6,700.000
|
$4,100.000
|
$7,000.000
|
$4,310.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$6,800.000
|
$15,000.000
|
$10,000.000
|
$16,000.000
|
$16,725.000
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
2.000
|
$11,700.000
|
$13,500.000
|
$6,500.000
|
$12,000.000
|
$13,260.000
|
|
|
INLET (COMPL)(PSL)(FG)(6FTX6FT-3FTX3FT)
|
EA
|
2.000
|
$7,800.000
|
$14,000.000
|
$7,500.000
|
$12,000.000
|
$13,100.000
|
|
|
INLET (COMPL)(PSL)(FG)(8FTX8FT-3FTX3FT)
|
EA
|
1.000
|
$12,000.000
|
$19,000.000
|
$25,000.000
|
$21,000.000
|
$21,810.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
1.000
|
$8,800.000
|
$16,000.000
|
$18,000.000
|
$15,000.000
|
$6,545.000
|
|
|
WINGWALL (FW - S) (HW=10 FT)
|
EA
|
1.000
|
$37,000.000
|
$42,000.000
|
$46,000.000
|
$30,000.000
|
$28,650.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
3.000
|
$46,300.000
|
$87,000.000
|
$90,000.000
|
$65,000.000
|
$52,960.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
2.000
|
$50,000.000
|
$129,000.000
|
$100,000.000
|
$95,000.000
|
$79,200.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$16,800.000
|
$24,000.000
|
$20,000.000
|
$20,000.000
|
$17,100.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$21,200.000
|
$25,000.000
|
$22,000.000
|
$15,000.000
|
$17,590.000
|
|
|
WINGWALL (SW - 0) (HW=7 FT)
|
EA
|
1.000
|
$25,000.000
|
$26,000.000
|
$22,000.000
|
$18,000.000
|
$17,590.000
|
|
|
HEADWALL (CH - PW - 0)(DIA=36 IN)(MOD)
|
EA
|
1.000
|
$7,400.000
|
$95,000.000
|
$85,000.000
|
$67,000.000
|
$66,890.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
1.000
|
$7,500.000
|
$9,200.000
|
$9,100.000
|
$10,000.000
|
$10,100.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
108.000
|
$1,000.000
|
$900.000
|
$750.000
|
$700.000
|
$686.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$1,400.000
|
$2,300.000
|
$900.000
|
$900.000
|
$1,121.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
$2,000.000
|
$2,600.000
|
$1,100.000
|
$1,100.000
|
$1,232.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
12.000
|
$3,000.000
|
$3,200.000
|
$2,100.000
|
$2,000.000
|
$2,057.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$3,500.000
|
$4,100.000
|
$3,600.000
|
$2,500.000
|
$4,015.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
5.000
|
$4,000.000
|
$5,000.000
|
$2,700.000
|
$3,300.000
|
$5,145.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$6,050.000
|
$7,200.000
|
$5,900.000
|
$6,000.000
|
$5,920.000
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$7,000.000
|
$7,500.000
|
$6,700.000
|
$7,000.000
|
$6,840.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$10,700.000
|
$9,800.000
|
$8,200.000
|
$10,000.000
|
$8,675.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
2.000
|
$4,000.000
|
$7,500.000
|
$2,500.000
|
$8,000.000
|
$8,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$590.000
|
$500.000
|
$1,000.000
|
$4,500.000
|
$725.000
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$285,000.000
|
$349,000.000
|
$670,000.000
|
$275,000.000
|
$550,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
67.000
|
$400.000
|
$450.000
|
$660.000
|
$1,000.000
|
$1,515.000
|
|
|
REMOVING ROCK RIPRAP
|
LF
|
92.000
|
$1,900.000
|
$75.000
|
$30.000
|
$40.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,367,000.000
|
$5,400,000.000
|
$6,100,000.000
|
$5,600,000.000
|
$4,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
30.000
|
$8,000.000
|
$7,500.000
|
$15,000.000
|
$15,000.000
|
$5,200.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
815.000
|
$30.000
|
$35.000
|
$31.000
|
$33.000
|
$31.900
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
1,500.000
|
$50.000
|
$60.000
|
$42.000
|
$48.000
|
$49.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,315.000
|
$10.000
|
$7.000
|
$11.000
|
$8.000
|
$12.100
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
3,500.000
|
$30.000
|
$20.000
|
$15.000
|
$25.000
|
$28.600
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
3,500.000
|
$10.000
|
$5.000
|
$3.000
|
$8.000
|
$9.900
|
|
|
EXCAV (EROSN & SEDMT CONT, IN VEH)
|
CY
|
5,000.000
|
$15.000
|
$20.000
|
$14.000
|
$10.000
|
$15.000
|
|
|
EMBANK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
5,000.000
|
$15.000
|
$20.000
|
$21.000
|
$10.000
|
$17.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
1,500.000
|
$70.000
|
$80.000
|
$66.000
|
$30.000
|
$71.250
|
|
|
FRNT END LOADER WORK (ERSN & SEDM CONT)
|
HR
|
1,200.000
|
$105.000
|
$80.000
|
$100.000
|
$30.000
|
$71.250
|
|
|
BULLDOZER WORK (EROSION & SEDMT CONT)
|
HR
|
1,200.000
|
$70.000
|
$80.000
|
$110.000
|
$30.000
|
$54.200
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
21,290.000
|
$2.850
|
$3.500
|
$2.500
|
$3.500
|
$3.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
21,290.000
|
$0.700
|
$0.500
|
$0.900
|
$0.650
|
$0.330
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
590.000
|
$6.000
|
$7.000
|
$4.300
|
$8.000
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
590.000
|
$1.500
|
$1.000
|
$1.100
|
$1.000
|
$1.100
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
1,400.000
|
$70.000
|
$80.000
|
$85.000
|
$60.000
|
$176.650
|
|
|
CONSTRUCTING DETOURS
|
SY
|
6,176.000
|
$58.000
|
$130.000
|
$105.000
|
$127.000
|
$195.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
280.000
|
$75.000
|
$85.000
|
$85.000
|
$75.000
|
$95.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
7,500.000
|
$22.000
|
$12.000
|
$25.000
|
$16.000
|
$6.150
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
1,100.000
|
$14.000
|
$22.000
|
$35.000
|
$15.000
|
$5.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
9,960.000
|
$10.000
|
$7.000
|
$16.000
|
$7.000
|
$4.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
440.000
|
$8.000
|
$19.000
|
$30.000
|
$7.000
|
$3.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$8.000
|
$19.000
|
$30.000
|
$7.000
|
$3.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
7,500.000
|
$12.000
|
$10.000
|
$22.000
|
$9.000
|
$6.150
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
1,100.000
|
$10.000
|
$16.000
|
$26.000
|
$9.000
|
$5.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
280.000
|
$10.000
|
$16.000
|
$26.000
|
$9.000
|
$5.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
6,043.000
|
$28.000
|
$24.000
|
$42.000
|
$50.000
|
$40.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
7,189.000
|
$40.000
|
$40.000
|
$42.000
|
$50.000
|
$56.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
831.000
|
$105.000
|
$95.000
|
$140.000
|
$150.000
|
$128.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
71,254.000
|
$0.200
|
$0.300
|
$0.240
|
$0.350
|
$0.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,475.000
|
$28.000
|
$30.000
|
$24.000
|
$25.000
|
$24.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,000.000
|
$2,200.000
|
$1,800.000
|
$2,100.000
|
$1,892.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,600.000
|
$1,500.000
|
$1,400.000
|
$1,400.000
|
$1,397.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
875.000
|
$2.200
|
$3.000
|
$2.200
|
$3.000
|
$2.200
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$4,000.000
|
$3,500.000
|
$3,200.000
|
$3,300.000
|
$3,327.500
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$270.000
|
$250.000
|
$220.000
|
$250.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
38.000
|
$1,200.000
|
$2,500.000
|
$1,000.000
|
$3,000.000
|
$3,025.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
18.000
|
$870.000
|
$1,250.000
|
$700.000
|
$1,500.000
|
$1,320.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
18.000
|
$11,800.000
|
$9,000.000
|
$8,800.000
|
$11,000.000
|
$11,000.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
1,000.000
|
$20.000
|
$42.000
|
$46.000
|
$48.000
|
$47.500
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
14.000
|
$270.000
|
$300.000
|
$270.000
|
$325.000
|
$317.900
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$310.000
|
$500.000
|
$425.000
|
$340.000
|
$355.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
75.000
|
$560.000
|
$750.000
|
$710.000
|
$750.000
|
$772.200
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
$680.000
|
$900.000
|
$850.000
|
$900.000
|
$942.700
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$800.000
|
$1,200.000
|
$1,000.000
|
$1,100.000
|
$1,096.700
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
3.000
|
$875.000
|
$1,100.000
|
$1,000.000
|
$1,100.000
|
$1,051.600
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
2.000
|
$1,000.000
|
$1,500.000
|
$1,400.000
|
$1,500.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
2.000
|
$1,500.000
|
$2,500.000
|
$2,000.000
|
$2,300.000
|
$2,285.800
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
1.000
|
$3,000.000
|
$10,000.000
|
$1,600.000
|
$8,000.000
|
$7,298.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
67.000
|
$90.000
|
$125.000
|
$30.000
|
$105.000
|
$103.400
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
40.000
|
$20.000
|
$40.000
|
$20.000
|
$35.000
|
$26.400
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
40.000
|
$20.000
|
$30.000
|
$20.000
|
$35.000
|
$26.400
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
28.000
|
$30.000
|
$40.000
|
$45.000
|
$55.000
|
$37.400
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
14.000
|
$30.000
|
$40.000
|
$45.000
|
$55.000
|
$37.400
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
54.000
|
$80.000
|
$90.000
|
$110.000
|
$85.000
|
$85.800
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
54,027.000
|
$0.200
|
$0.550
|
$0.530
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
160.000
|
$4.000
|
$6.000
|
$4.240
|
$5.000
|
$4.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,108.000
|
$0.250
|
$0.550
|
$0.530
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
56,654.000
|
$0.200
|
$0.550
|
$0.530
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
|
LF
|
1,476.000
|
$3.750
|
$3.000
|
$2.650
|
$2.700
|
$2.750
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
2,115.000
|
$3.750
|
$4.000
|
$3.500
|
$3.600
|
$3.630
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,472.000
|
$4.000
|
$4.000
|
$3.500
|
$3.600
|
$3.630
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
6,337.000
|
$3.000
|
$4.000
|
$3.180
|
$3.300
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
7,424.000
|
$3.000
|
$4.000
|
$3.180
|
$3.300
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,300.000
|
$0.600
|
$1.500
|
$1.060
|
$1.100
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
3,300.000
|
$1.000
|
$1.500
|
$1.060
|
$1.100
|
$1.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,212.000
|
$1.000
|
$1.500
|
$2.000
|
$2.000
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
920.000
|
$1.000
|
$1.500
|
$2.000
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
7,278.000
|
$0.900
|
$1.250
|
$1.060
|
$1.100
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
160.000
|
$3.000
|
$4.500
|
$4.240
|
$5.000
|
$4.400
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
262.000
|
$6.000
|
$7.000
|
$6.360
|
$7.000
|
$6.600
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
104.000
|
$35.000
|
$40.000
|
$37.100
|
$40.000
|
$38.500
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
1,220.000
|
$5.500
|
$6.000
|
$5.830
|
$6.000
|
$6.050
|
|
|
PAVEMENT SEALER 4"
|
LF
|
7,520.000
|
$0.100
|
$0.550
|
$0.530
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
12,440.000
|
$0.400
|
$0.550
|
$0.530
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
48,113.000
|
$0.400
|
$0.550
|
$0.530
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,440.000
|
$0.400
|
$0.550
|
$0.530
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
57,168.000
|
$0.400
|
$0.550
|
$0.530
|
$0.550
|
$0.550
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
45.000
|
$200.000
|
$250.000
|
$212.000
|
$220.000
|
$220.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
21.000
|
$270.000
|
$300.000
|
$259.700
|
$260.000
|
$269.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
191.000
|
$4.000
|
$5.000
|
$3.920
|
$4.000
|
$4.070
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
661.000
|
$3.500
|
$5.000
|
$3.920
|
$4.000
|
$4.070
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
767.000
|
$3.500
|
$5.000
|
$3.920
|
$4.000
|
$4.070
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
30,884.000
|
$0.500
|
$0.500
|
$0.420
|
$0.440
|
$0.440
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
7,520.000
|
$0.050
|
$0.400
|
$0.530
|
$0.550
|
$0.550
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
35,995.000
|
$95.000
|
$102.000
|
$130.000
|
$133.000
|
$123.400
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
65,829.000
|
$90.000
|
$107.000
|
$130.000
|
$137.000
|
$126.790
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
8,717.000
|
$110.000
|
$122.000
|
$143.000
|
$145.000
|
$134.550
|
|
|
SP MIXES SP-D PG64-22 (LEVEL-UP)
|
TON
|
7,686.000
|
$120.000
|
$117.000
|
$143.000
|
$138.000
|
$128.820
|
|
|
PFC-C (PG76 MIX) SAC-A
|
TON
|
11,042.000
|
$180.000
|
$160.000
|
$160.000
|
$175.000
|
$173.250
|
|
|
TACK COAT
|
GAL
|
14,724.000
|
$4.000
|
$4.500
|
$4.500
|
$4.000
|
$4.500
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
6.000
|
$4,500.000
|
$4,000.000
|
$7,500.000
|
$5,000.000
|
$3,500.000
|
|
|
ASBESTOS ABATEMENT (OTHER)
|
SF
|
400.000
|
$88.000
|
$60.000
|
$58.000
|
$50.000
|
$140.000
|
|
|
INSTALL FTB
|
LF
|
1,800.000
|
$45.000
|
$60.000
|
$37.000
|
$65.000
|
$55.000
|
|
|
REMOVE FTB
|
LF
|
1,800.000
|
$5.000
|
$15.000
|
$15.000
|
$15.000
|
$13.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
400.000
|
$72.000
|
$150.000
|
$100.000
|
$100.000
|
$132.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$10,000.000
|
$15,000.000
|
$40,000.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
945.000
|
$160.000
|
$200.000
|
$80.000
|
$100.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
80.000
|
$160.000
|
$500.000
|
$100.000
|
$100.000
|
$250.000
|
|
Totals: |
$48,036,548.550
|
$55,487,305.160
|
$62,792,646.110
|
$63,868,868.680
|
$64,909,504.080
|