Show Job Controls
Bid Cobra

ANDREWS SH 176 (0548-01-034)

Items: 124

County: ANDREWS
Length: N/A
Highway: SH 176
District: ODESSA
Control Number: 0548-01-034
DBE Goal: N/A
Project: STP 2019(944)HES
Guaranty: N/A
Time: 292 WORKING DAYS
Engineer's Estimate: $10,643,350.79
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: GR,STR,BASE,SURF,SIGN,&ILL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$10,643,350.79
Over/Under Est: 34.7% $3,693,670.08
$15,455,801.94
Over/Under Est: 45.22% $4,812,451.15
Amt Left: 7.8% $1,118,781.07
$17,692,730.92
Over/Under Est: 66.23% $7,049,380.13
Amt Left: 23.41% $3,355,710.05
Delta: -14.47% -$2,236,928.98
Over/Under Est: 142.53% $15,170,150.89
Amt Left: 80.05% $11,476,480.81
Delta: -45.90% -$8,120,770.76

Bid Items & Bid Tabulations

124 Total 0 of 124
ANDREWS  |  SH 176  |  ODESSA  |  0548-01-034  |  07/09/2019  |  $10,643,350.79  |  STP 2019(944)HES  |  GR,STR,BASE,SURF,SIGN,&ILL  |  292 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
DELHUR INDUSTRIES, INC.
FNF CONSTRUCTION, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
AC 53.260 $700.000 $7,025.000 $600.000 $575.000 $2,840.740
REMOVING STAB BASE & ASPH PAV (4" - 6")
SY 29,970.000 $6.000 $3.220 $2.400 $4.000 $6.690
OBLITERATING ABANDONED ROAD
SY 19,786.000 $5.000 $4.500 $5.050 $1.000 $15.390
EXCAVATION (ROADWAY)
CY 7,477.000 $7.750 $5.750 $2.800 $2.600 $10.380
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 350,794.000 $7.250 $12.200 $14.460 $15.250 $28.590
BLADING
HR 60.000 $140.000 $375.000 $180.000 $750.000 $252.820
FURNISHING AND PLACING TOPSOIL (4")
SY 179,843.000 $0.750 $1.500 $1.500 $1.000 $4.220
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 179,843.000 $0.150 $0.120 $0.170 $0.110 $0.140
PROOF ROLLING
HR 60.000 $82.000 $150.000 $120.000 $93.000 $138.340
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 292.000 $14.000 $60.000 $10.150 $22.000 $37.910
FL BS (CMP IN PLC)(TY A GR 4)(10.5")
SY 97,556.000 $11.000 $12.200 $10.150 $15.000 $20.960
PRIME COAT (MC-30)
GAL 17,947.000 $4.000 $5.270 $5.780 $6.000 $5.680
FOG SEAL (CSS-1H)
GAL 45.000 $4.000 $232.100 $8.250 $8.000 $53.520
SUPERPAVE MIXTURES SP-B PG70-22
TON 20,846.000 $70.000 $93.500 $105.620 $128.000 $148.930
SUPERPAVE MIXTURES SP-C SAC-A PG64-22
TON 5,913.000 $80.000 $115.000 $123.020 $134.000 $223.650
TOM-C (AGGREGATE) SAC-A
TON 4,712.000 $95.000 $60.000 $96.730 $111.000 $174.450
TOM (ASPHALT) PG 70-22
TON 371.000 $560.000 $728.200 $819.680 $900.000 $925.780
CEM STABIL BKFL
CY 404.000 $63.000 $307.110 $182.000 $176.000 $157.470
TRENCH EXCAVATION PROTECTION
LF 1,973.000 $2.250 $23.970 $8.400 $3.000 $8.070
TEMPORARY SPL SHORING
SF 5,630.000 $13.000 $43.750 $15.550 $20.000 $46.570
DRILL SHAFT (30 IN)
LF 152.000 $120.000 $349.380 $347.750 $450.000 $253.310
DRILL SHAFT (36 IN)
LF 543.000 $160.000 $280.580 $279.270 $320.000 $291.480
DRILL SHAFT (48 IN)
LF 21.000 $378.900 $645.000 $642.000 $800.000 $689.830
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 22.000 $115.000 $139.750 $139.100 $180.000 $141.140
DRILL SHAFT (SIGN MTS) (24 IN)
LF 66.000 $160.000 $268.750 $267.500 $340.000 $198.590
CL C CONC (ABUT)
CY 63.600 $800.000 $1,053.500 $1,048.600 $1,800.000 $1,724.560
CL C CONC (CAP)
CY 39.800 $1,050.000 $1,069.630 $1,064.650 $2,100.000 $2,723.760
CL C CONC (COLUMN)
CY 41.000 $1,000.000 $1,095.430 $1,090.330 $1,900.000 $2,470.180
REINF CONC SLAB
SF 9,660.000 $17.250 $23.220 $23.110 $34.000 $31.780
APPROACH SLAB
CY 84.200 $400.000 $579.430 $576.730 $960.000 $911.130
PRESTR CONC GIRDER (TX54)
LF 1,251.000 $170.000 $222.530 $221.490 $300.000 $266.690
RIPRAP (CONC)(4 IN)
CY 1,344.650 $500.000 $560.080 $557.470 $530.000 $640.030
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 6.000 $475.000 $900.850 $1,070.000 $980.000 $1,541.240
RAIL (TY SSTR)
LF 468.000 $55.000 $127.930 $127.330 $134.000 $200.160
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 90.000 $100.000 $139.750 $139.100 $216.000 $212.160
RC PIPE (CL III)(18 IN)
LF 540.000 $50.000 $97.830 $59.480 $95.000 $98.830
RC PIPE (CL III)(24 IN)
LF 414.000 $70.000 $129.000 $76.800 $115.000 $98.290
RC PIPE (CL IV)(18 IN)
LF 333.000 $70.000 $163.400 $61.950 $160.000 $94.170
RC PIPE (CL V)(18 IN)
LF 642.000 $75.000 $106.430 $65.250 $105.000 $99.950
RC PIPE (CL V)(24 IN)
LF 718.000 $80.000 $151.580 $91.650 $140.000 $102.430
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 3.000 $3,550.000 $5,278.250 $4,028.960 $4,500.000 $12,175.510
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $4,400.000 $9,524.500 $4,429.500 $5,000.000 $13,239.510
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 3.000 $765.000 $1,505.000 $1,388.400 $1,700.000 $1,528.380
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 3.000 $875.000 $1,806.000 $1,470.900 $2,200.000 $1,561.630
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 13.000 $1,200.000 $2,408.000 $1,590.530 $2,300.000 $1,478.040
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $1,200.000 $2,408.000 $1,590.530 $2,300.000 $1,661.380
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,200.000 $2,408.000 $1,669.730 $2,400.000 $1,727.880
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 6.000 $1,500.000 $3,010.000 $2,343.750 $2,500.000 $1,794.380
REMOV STR (SET)
EA 2.000 $525.000 $322.500 $600.000 $800.000 $616.810
REMOV STR (PIPE)
LF 58.000 $28.000 $65.580 $18.000 $26.000 $21.270
MOBILIZATION
LS 1.000 $1,135,440.470 $900,000.000 $1,511,589.000 $1,762,800.000 $2,332,140.870
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $10,000.000 $5,000.000 $16,110.920 $24,777.690 $5,643.100
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 860.000 $7.000 $16.600 $8.200 $9.000 $12.300
BIODEG EROSN CONT LOGS (REMOVE)
LF 860.000 $1.500 $2.660 $2.400 $2.400 $2.570
CONC CURB & GUTTER (TY II)
LF 583.000 $15.000 $46.230 $30.680 $28.000 $28.110
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 19,870.000 $0.150 $0.160 $0.350 $0.400 $0.390
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 7,030.000 $0.200 $0.270 $0.410 $0.700 $0.680
MTL W-BEAM GD FEN (STEEL POST)
LF 890.000 $27.000 $29.030 $29.700 $31.000 $30.420
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,365.000 $2,420.000 $2,500.000 $2,581.090
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,200.000 $1,612.500 $1,650.000 $1,700.000 $1,730.540
GDRAIL END TRT(INST)(WOOD POST)(TY II)
EA 6.000 $2,650.000 $3,225.000 $3,300.000 $3,400.000 $3,326.850
GATE (REMOVE)
EA 8.000 $500.000 $900.000 $600.000 $490.000 $130.140
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 4.000 $1,125.000 $1,612.500 $1,605.000 $1,600.000 $2,471.090
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 19.000 $4,050.000 $4,783.750 $4,761.500 $4,600.000 $4,488.910
CONDT (PVC) (SCH 40) (2")
LF 5,232.000 $8.000 $8.600 $8.560 $9.000 $8.770
CONDT (PVC) (SCH 40) (2") (BORE)
LF 911.000 $22.750 $37.630 $37.450 $36.000 $55.350
CONDT (RM) (1")
LF 270.000 $20.500 $32.250 $32.100 $31.000 $30.160
ELEC CONDR (NO.10) BARE
LF 275.000 $1.250 $3.230 $3.210 $3.100 $2.790
ELEC CONDR (NO.10) INSULATED
LF 550.000 $1.250 $3.230 $3.210 $3.200 $3.590
ELEC CONDR (NO.8) BARE
LF 5,919.000 $1.250 $1.080 $1.070 $1.100 $1.760
ELEC CONDR (NO.8) INSULATED
LF 12,594.000 $1.250 $1.400 $1.390 $1.400 $1.750
ELEC CONDR (NO.6) BARE
LF 369.000 $1.500 $1.610 $1.610 $1.600 $2.800
ELEC CONDR (NO.6) INSULATED
LF 738.000 $1.700 $1.880 $1.870 $1.800 $3.460
GROUND BOX TY A (122311)W/APRON
EA 15.000 $1,010.000 $1,397.500 $1,391.000 $1,400.000 $1,527.960
REMOVE ELECTRICAL SERVICES
EA 1.000 $550.000 $537.500 $535.000 $510.000 $656.090
ELC SRV TY A 240/480 060(NS)AL(E)SP(U)
EA 1.000 $5,000.000 $8,868.750 $8,827.500 $8,400.000 $8,411.090
ELC SRV TY D 120/240 060(NS)GS(N)SP(U)
EA 1.000 $5,755.000 $7,525.000 $7,490.000 $7,200.000 $5,386.090
ALUMINUM SIGNS (TY G)
SF 1,175.500 $35.000 $38.700 $38.520 $37.000 $32.450
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 29.000 $825.000 $704.130 $720.500 $670.000 $951.660
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 18.000 $875.000 $897.630 $918.500 $850.000 $1,145.400
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 4.000 $1,015.000 $1,182.500 $1,210.000 $1,200.000 $1,446.110
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,675.000 $1,128.750 $1,155.000 $1,100.000 $1,363.610
REMOVE SM RD SN SUP&AM
EA 35.000 $120.000 $125.000 $90.000 $80.000 $155.910
INSTALL LRSS (STRUCT STEEL)
LB 4,801.220 $8.930 $6.990 $7.150 $7.000 $6.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 46.000 $110.000 $88.150 $90.200 $84.000 $166.010
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 32.000 $158.000 $88.150 $302.500 $84.000 $163.600
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $21.000 $21.500 $291.500 $25.000 $38.110
INSTL OM ASSM (OM-3R)(FLX)SRF
EA 4.000 $225.000 $284.880 $291.500 $380.000 $373.610
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 63,170.000 $0.510 $0.590 $0.350 $0.350 $0.360
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 38,630.000 $0.210 $0.190 $0.180 $0.200 $0.180
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 11,870.000 $1.250 $1.670 $1.760 $1.700 $1.790
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 8,820.000 $0.700 $0.810 $0.880 $1.000 $0.920
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 28,640.000 $0.750 $1.190 $2.200 $1.800 $1.210
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 15,510.000 $0.700 $1.200 $2.200 $1.800 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,990.000 $0.810 $0.910 $0.900 $1.000 $0.960
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 28.000 $5.860 $15.050 $6.600 $6.000 $12.350
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 18.000 $113.660 $161.250 $143.000 $140.000 $178.800
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 10.000 $141.000 $236.500 $198.000 $190.000 $214.110
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 40.000 $40.400 $19.350 $33.000 $31.000 $37.030
PAVEMENT SEALER 4"
LF 52,545.000 $0.200 $0.220 $0.280 $0.300 $0.310
PAVEMENT SEALER 8"
LF 2,990.000 $0.300 $0.560 $0.550 $0.600 $0.600
PAVEMENT SEALER 24"
LF 28.000 $1.400 $5.380 $1.650 $1.600 $7.400
PAVEMENT SEALER (ARROW)
EA 18.000 $22.000 $53.750 $22.000 $21.000 $30.950
PAVEMENT SEALER (WORD)
EA 10.000 $28.000 $53.750 $27.500 $26.000 $43.610
PAVEMENT SEALER (YLD TRI)
EA 40.000 $10.250 $10.750 $5.500 $5.500 $9.530
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,100.000 $0.460 $0.450 $0.450 $0.500 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 28,680.000 $0.480 $0.410 $0.450 $0.500 $0.460
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 20,765.000 $0.520 $0.410 $0.450 $0.500 $0.470
REFL PAV MRKR TY II-A-A
EA 213.000 $3.250 $5.380 $3.850 $3.600 $4.610
REFL PAV MRKR TY II-C-R
EA 261.000 $3.250 $5.380 $3.850 $3.600 $4.470
ELIM EXT PAV MRK & MRKS (4")
LF 18,534.000 $0.430 $0.590 $0.870 $0.900 $0.880
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 480.000 $0.250 $5.380 $3.300 $3.100 $3.640
CARBON FIBER REINF POLYMER PROTECTION
SF 354.000 $45.000 $96.750 $99.000 $126.000 $136.010
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $16,000.000 $20,900.000 $20,350.000 $20,000.000 $20,566.330
CCTV FIELD EQUIPMENT (DIGITAL)
EA 1.000 $8,250.000 $16,770.000 $16,692.000 $16,000.000 $10,446.090
CCTV FIELD CONTROLLER
EA 1.000 $2,160.000 $3,332.500 $3,317.000 $3,200.000 $4,671.090
TMSP RADAR SPEED CONTROL MONITOR
EA 4.000 $12,000.000 $10,120.000 $11,000.000 $5,500.000 $15,119.110
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 480.000 $3.390 $26.880 $33.000 $31.000 $33.670
ITS POLE (60 FT)(90 MPH)
EA 1.000 $15,875.400 $27,036.250 $26,910.000 $26,000.000 $8,500.000
ITS POLE MNT CAB (TY 1)(CONF 2)
EA 1.000 $5,900.000 $11,986.250 $11,930.500 $11,400.000 $10,831.090
TMA (STATIONARY)
EA 4.000 $12,000.000 $21,600.000 $24,000.000 $46,000.000 $29,080.510
TMA (MOBILE OPERATION)
HR 240.000 $40.000 $35.000 $110.000 $65.000 $161.980
INSTALL OF FIELD HARD ETHERNET SWITCH
EA 1.000 $2,500.000 $3,440.000 $3,424.000 $3,300.000 $3,736.090
INSTALL OF CELLULAR MODEM
EA 1.000 $3,225.000 $3,440.000 $3,424.000 $3,300.000 $3,736.090
Totals: $10,643,350.795 $14,337,020.890 $15,455,801.954 $17,692,730.920 $25,813,501.717