Show Job Controls
Bid Cobra

ANGELINA US 59 (0176-03-142)

Items: 29

County: ANGELINA
Length: 0.0000 MILES
Highway: US 59
District: LUFKIN
Control Number: 0176-03-142
DBE Goal: 0.0%
Project: BR 2025(670)
Guaranty: $16,000.00
Time: 143 WORKING DAYS
Engineer's Estimate: $760,848.00
Date: 04/03/2025 (1 year ago)
Contract Number: 4253231
Type: BRIDGE MAINTENANCE
Project ID: A00201408
Contract Type: Federal
Project Description: CONCRETE REPAIR, JOINT REPAIR, AND EROSION REPAIR - BMIP
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JESSE SISCO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$760,848.00
$570,968.80
Over/Under Est: -24.96% -$189,879.20
Over/Under Est: 0.83% $6,318.09
Amt Left: 34.36% $196,197.29
Over/Under Est: 3.47% $26,417.00
Amt Left: 37.88% $216,296.20
Delta: -2.62% -$20,098.91
Over/Under Est: 20.42% $155,380.17
Amt Left: 60.47% $345,259.37
Delta: -16.38% -$128,963.17
Over/Under Est: 32.69% $248,749.69
Amt Left: 76.82% $438,628.89
Delta: -10.19% -$93,369.52
$1,038,780.23
Over/Under Est: 36.53% $277,932.23
Amt Left: 81.93% $467,811.43
Delta: -2.89% -$29,182.54
Over/Under Est: 36.77% $279,786.60
Amt Left: 82.26% $469,665.80
Delta: -0.18% -$1,854.37
Subcontractor Percentage Amount
JOSEY'S CONTRACTING LLC 4.79% $35,285.48
Total: 4.79% $35,285.48

Bid Items & Bid Tabulations

29 Total 0 of 29
ANGELINA  |  US 59  |  LUFKIN  |  0176-03-142  |  04/03/2025  |  $760,848.00  |  BR 2025(670)  |  BRIDGE MAINT  |  143 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PREMIER CONTRACTORS LLC
BLACKSMITH VENTURES LLC
GARRET SHIELDS INFRASTRUCTURE
MB WESTERN INDUSTRIAL CONTRACTING CO.
SCOUT 5 CONSTRUCTION LLC
THK CONSTRUCTION LLC
SCR CIVIL CONSTRUCTION, LLC
PREPARING ROW
AC 0.500 $4,500.000 $20,000.000 $5,000.000 $20,000.000 $20,000.000 $25,000.000 $147,000.000 $21,000.000
REMOV CONC (CURB)
LF 13.000 $18.000 $100.000 $100.000 $50.000 $25.000 $225.000 $21.000 $20.000
EMBANK (VEH)(OC)(TY B)
CY 100.000 $50.000 $100.000 $100.000 $50.000 $75.000 $125.000 $26.250 $100.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 80.000 $175.000 $100.000 $150.000 $100.000 $100.000 $250.000 $52.500 $260.000
BROADCAST SEED (TEMP_WARM)
SY 3,372.000 $0.500 $1.300 $1.000 $0.500 $0.620 $0.010 $0.580 $2.750
BROADCAST SEED (TEMP_COOL)
SY 3,372.000 $0.500 $1.300 $1.000 $0.500 $0.650 $0.010 $0.580 $0.500
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 3,372.000 $1.000 $1.300 $1.000 $1.500 $1.700 $0.010 $1.590 $2.300
VEGETATIVE WATERING
TGL 252.000 $25.000 $100.000 $1.000 $50.000 $55.000 $0.010 $10.500 $80.000
FLOWABLE BACKFILL
CY 12.000 $460.000 $350.000 $1,500.000 $600.000 $500.000 $400.000 $840.000 $1,260.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 130.500 $280.000 $300.000 $200.000 $200.000 $246.000 $250.000 $157.500 $348.000
RIPRAP (CONC)(FLUME)
CY 16.000 $700.000 $800.000 $500.000 $1,000.000 $650.000 $500.000 $840.000 $4,200.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 238.000 $215.000 $250.000 $225.000 $300.000 $200.000 $400.000 $210.000 $280.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 463.000 $75.000 $65.000 $60.000 $50.000 $48.710 $40.000 $43.700 $69.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 558.000 $75.000 $65.000 $60.000 $50.000 $79.700 $40.000 $62.100 $85.000
CLEAN & PAINT EXIST STR (SYSTEM II)
LS 1.000 $50,000.000 $100,000.000 $224,400.000 $250,000.000 $295,000.000 $200,000.000 $258,060.000 $265,000.000
HEADER TYPE EXPANSION JOINT
CF 61.000 $240.000 $500.000 $400.000 $500.000 $1,000.000 $7.500 $782.000 $500.000
ADJUST STL SHOES
EA 12.000 $15,000.000 $2,000.000 $10,000.000 $8,000.000 $10,455.000 $11,000.000 $21,000.000 $4,000.000
MOBILIZATION
LS 1.000 $80,000.000 $55,000.000 $50,000.000 $50,000.000 $65,000.000 $300,000.000 $73,500.000 $103,800.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $3,500.000 $1.000 $2,000.000 $5,000.000 $5,000.000 $0.010 $6,634.010 $12,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $1.000 $15,000.000 $1,000.000 $5,000.000 $30,000.000 $21,000.000 $11,000.000
TMA (STATIONARY)
DAY 143.000 $350.000 $1.000 $400.000 $300.000 $250.000 $0.010 $262.500 $225.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 624.000 $35.000 $50.000 $10.000 $10.000 $40.000 $45.000 $10.500 $46.000
CONSTRUCTION EXITS (REMOVE)
SY 624.000 $15.000 $50.000 $2.000 $5.000 $10.000 $10.000 $5.250 $30.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 850.000 $5.000 $5.000 $10.000 $6.000 $5.000 $3.500 $5.250 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 850.000 $1.000 $2.000 $1.000 $2.000 $2.000 $1.500 $2.100 $3.000
CONC CURB (TY II)
LF 13.000 $75.000 $100.000 $100.000 $50.000 $55.000 $400.000 $105.000 $150.000
DRIFTWOOD REMOVAL
CY 25.000 $800.000 $100.000 $200.000 $125.000 $100.000 $175.000 $31.500 $230.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 250.000 $175.000 $150.000 $75.000 $150.000 $119.300 $150.000 $52.500 $100.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $800.000 $1,000.000 $100.000 $1,000.000 $500.000 $1,000.000 $1,050.000 $600.000
Totals: $760,848.000 $570,968.800 $767,166.000 $787,265.000 $916,228.170 $1,009,597.690 $1,038,780.230 $1,040,634.600
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $34,250.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,500.00
Total: $37,250.00