ANDREWS US 385 (0228-05-066)

Items: 119

County: ANDREWS
Length: N/A
Highway: US 385
District: ODESSA
Control Number: 0228-05-066
DBE Goal: N/A
Project: NH 2020(571)
Guaranty: N/A
Time: 440 WORKING DAYS
Engineer's Estimate: $43,930,130.82
Date: 02/06/2020 (6 years ago)
Contract Number: N/A
Type: ROADWAY RECONSTRUCTION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$43,930,130.82
$49,841,452.88
Over/Under Est: 13.46% $5,911,322.06
Over/Under Est: 23.45% $10,302,601.61
Amt Left: 8.81% $4,391,279.55
$60,665,655.72
Over/Under Est: 38.1% $16,735,524.90
Amt Left: 21.72% $10,824,202.84
Delta: -11.86% -$6,432,923.29
$61,908,144.18
Over/Under Est: 40.92% $17,978,013.36
Amt Left: 24.21% $12,066,691.30
Delta: -2.05% -$1,242,488.46

Bid Items & Bid Tabulations

119 Total 0 of 119
ANDREWS  |  US 385  |  ODESSA  |  0228-05-066  |  02/06/2020  |  $43,930,130.82  |  NH 2020(571)  |  ROADWAY RECON  |  440 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNF CONSTRUCTION, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
RK HALL, LLC
A. L. HELMCAMP, INC.
REMOVING CONC (CURB AND GUTTER)
LF 1,332.000 $9.500 $15.000 $10.000 $19.220 $12.000
REMOVING CONC (MISC)
SY 48.000 $16.500 $39.000 $11.000 $142.830 $50.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 53.000 $20.000 $35.000 $11.000 $188.690 $50.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 5,849.000 $6.750 $5.000 $3.000 $7.640 $8.000
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 10,911.000 $5.500 $9.000 $5.000 $9.500 $10.000
EXCAVATION (ROADWAY)
CY 119,273.000 $7.500 $9.000 $10.000 $11.070 $19.000
EXCAVATION (SPECIAL)
CY 167.000 $20.000 $9.000 $12.000 $77.570 $35.000
SUBGRADE WIDENING (DENS CONT)
STA 757.000 $820.000 $1,000.000 $450.000 $1,421.520 $575.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 28,019.000 $7.000 $10.500 $5.000 $15.470 $19.000
BACKFILL (TY B)
STA 962.000 $140.000 $200.000 $200.000 $140.140 $320.000
BLADING
HR 221.000 $275.000 $200.000 $300.000 $167.740 $160.000
PROOF ROLLING
HR 551.000 $140.000 $110.000 $80.000 $139.050 $90.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 36,647.000 $12.500 $11.000 $13.000 $13.010 $14.000
FL BS (CMP IN PLC)(TY A GR 4)(10")
SY 176,226.000 $15.000 $15.500 $20.000 $14.630 $26.000
REWRKING BS MATL (TY C)(10")(ORD COMP)
SY 31,027.000 $2.350 $1.250 $4.070 $2.950 $2.700
PRIME COAT (CSS-1H)
GAL 173,274.000 $5.000 $3.250 $3.000 $3.600 $3.300
EMULS ASPH (BS OR SUBGR TRT)(AE-P)
GAL 828,258.000 $4.000 $0.500 $4.000 $5.820 $3.700
FOG SEAL (CSS-1H)
GAL 219.000 $5.000 $5.000 $4.000 $32.860 $35.000
ASPH (AC-20-5TR)
GAL 357,721.000 $3.500 $3.250 $5.000 $4.270 $3.900
ASPH (RC-250)
GAL 415,955.000 $5.000 $4.100 $5.000 $5.030 $4.200
AGGR(TY-B GR-4 SAC-A)
CY 8,320.000 $80.000 $88.000 $150.000 $217.630 $110.000
AGGR(TY-B GR-5 SAC-A)
CY 8,320.000 $60.000 $88.000 $150.000 $244.330 $110.000
AGGR(TY-PB GR-4 SAC-A)
CY 7,234.000 $75.000 $112.000 $150.000 $258.920 $120.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 76,574.000 $115.000 $120.000 $130.000 $166.870 $165.000
CEM STABIL BKFL
CY 1,620.000 $111.000 $188.000 $75.000 $224.000 $215.000
CUT & RESTORING PAV
SY 2,614.000 $70.000 $130.000 $80.000 $111.820 $60.000
TRENCH EXCAVATION PROTECTION
LF 670.000 $6.000 $19.000 $1.000 $16.800 $16.000
CL A CONC (MISC)
CY 2.000 $700.000 $700.000 $1,200.000 $3,360.000 $3,200.000
RIPRAP (CONC)(5 IN)
CY 213.000 $430.000 $770.000 $485.000 $644.000 $620.000
CONC BOX CULV (3 FT X 2 FT)
LF 3,586.000 $235.000 $280.000 $350.000 $268.800 $260.000
CONC BOX CULV (4 FT X 2 FT)
LF 2,014.000 $250.000 $320.000 $400.000 $308.000 $300.000
RC PIPE (CL III)(18 IN)
LF 2,812.000 $60.000 $120.000 $95.000 $72.800 $70.000
RC PIPE (CL III)(24 IN)
LF 496.000 $65.000 $170.000 $100.000 $95.200 $91.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $4,230.000 $5,400.000 $2,500.000 $5,040.000 $4,800.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $8,500.000 $13,500.000 $1,875.000 $14,000.000 $14,000.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 4.000 $5,000.000 $3,800.000 $2,500.000 $5,223.400 $3,800.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $6,000.000 $7,800.000 $2,600.000 $3,808.000 $3,700.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 42.000 $7,170.000 $4,000.000 $2,700.000 $4,480.000 $4,300.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $5,090.000 $4,200.000 $3,200.000 $4,032.000 $3,900.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
EA 26.000 $5,500.000 $4,200.000 $3,500.000 $5,376.000 $5,200.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 72.000 $900.000 $2,300.000 $2,000.000 $1,064.000 $1,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $1,420.000 $2,600.000 $1,750.000 $1,344.000 $1,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 11.000 $1,800.000 $2,600.000 $2,200.000 $1,344.000 $1,300.000
REMOV STR (INLET)
EA 10.000 $650.000 $470.000 $1,100.000 $560.000 $540.000
REMOV STR (SET)
EA 6.000 $500.000 $800.000 $1,200.000 $560.000 $540.000
REMOV STR (PIPE)
LF 4,401.000 $15.000 $10.000 $25.000 $11.200 $11.000
MOBILIZATION
LS 1.000 $3,247,378.320 $4,900,000.000 $5,215,401.890 $3,453,648.670 $6,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 37.000 $10,000.000 $21,250.000 $10,500.000 $23,363.060 $30,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,640.000 $5.000 $5.000 $5.000 $5.350 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,640.000 $2.000 $1.250 $1.000 $1.650 $1.000
CONSTRUCTING DETOURS
SY 10,755.000 $85.000 $37.000 $50.000 $64.310 $74.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 6,880.000 $30.000 $80.000 $65.000 $82.250 $100.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 1,080.000 $45.000 $90.000 $65.000 $110.040 $110.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 6,880.000 $10.000 $11.000 $10.000 $8.120 $25.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 1,080.000 $11.000 $12.000 $10.000 $16.530 $25.000
CONC CURB & GUTTER (TY II)
LF 1,854.000 $28.000 $26.000 $25.000 $39.200 $38.000
INTERSECTIONS (ACP)
SY 8,678.000 $45.000 $71.000 $65.000 $90.830 $75.000
DRIVEWAYS (CONC)
SY 77.000 $100.000 $88.000 $80.000 $242.990 $140.000
DRIVEWAYS (ACP)
SY 12,878.000 $65.000 $77.000 $35.000 $58.070 $50.000
TURNOUTS (ACP)
SY 6,876.000 $45.000 $82.000 $35.000 $63.090 $75.000
CONC SIDEWALKS (6")
SY 58.000 $100.000 $109.000 $40.000 $100.800 $100.000
CURB RAMPS (TY 1)
EA 2.000 $1,500.000 $2,000.000 $750.000 $2,240.000 $2,200.000
CONCRETE SIDEWALK (STEPS)
SY 41.000 $185.000 $232.000 $100.000 $235.200 $220.000
RUMBLE STRIPS (SHOULDER)
LF 317,071.000 $0.300 $0.160 $0.150 $0.130 $0.140
MTL W-BEAM GD FEN (STEEL POST)
LF 163.000 $28.500 $43.000 $27.000 $46.760 $45.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,385.000 $2,100.000 $1,500.000 $2,240.000 $2,200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,085.000 $3,400.000 $2,800.000 $3,752.000 $3,600.000
CONDT (PVC) (SCH 40) (1")
LF 10.000 $15.000 $11.000 $20.000 $11.200 $11.000
ELEC CONDR (NO.8) BARE
LF 10.000 $1.000 $4.000 $20.000 $4.480 $5.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 30.000 $2.000 $6.000 $20.000 $6.720 $6.500
GROUND BOX TY BATTERY (162915)W/APRON
EA 1.000 $2,300.000 $3,600.000 $2,500.000 $3,920.000 $3,800.000
ALUMINUM SIGNS (TY A)
SF 6.000 $35.000 $51.000 $30.000 $56.000 $27.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 190.000 $520.000 $843.000 $500.000 $728.000 $810.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 16.000 $650.000 $1,210.000 $500.000 $682.860 $890.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 33.000 $610.000 $890.000 $700.000 $672.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 18.000 $710.000 $1,310.000 $1,100.000 $1,064.000 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $790.000 $1,850.000 $800.000 $1,335.990 $1,300.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $950.000 $1,890.000 $900.000 $1,511.900 $1,400.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 4.000 $870.000 $1,370.000 $900.000 $1,065.360 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $1,150.000 $1,340.000 $1,000.000 $1,058.110 $1,300.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,600.000 $1,670.000 $1,400.000 $1,884.850 $1,700.000
REMOVE SM RD SN SUP&AM
EA 244.000 $80.000 $80.000 $100.000 $141.510 $110.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 44.000 $70.000 $117.000 $75.000 $154.000 $75.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 62.000 $80.000 $117.000 $85.000 $154.000 $86.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 89.000 $80.000 $117.000 $95.000 $154.000 $88.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 44,580.000 $0.200 $0.170 $0.250 $0.180 $0.170
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 227.000 $7.000 $8.250 $1.650 $8.960 $9.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 20,149.000 $0.200 $0.170 $0.250 $0.180 $0.170
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 18,045.000 $0.400 $0.800 $0.650 $0.840 $0.800
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 121.000 $14.000 $16.250 $10.000 $17.920 $17.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 43,242.000 $0.400 $0.800 $0.750 $0.840 $0.800
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 2,473.000 $1.000 $0.920 $1.350 $1.010 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 71,419.000 $0.900 $0.670 $0.850 $0.730 $0.700
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 41,872.000 $1.000 $0.400 $0.350 $0.390 $0.370
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 214,117.000 $0.300 $0.350 $0.350 $0.360 $0.340
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 5,965.000 $0.300 $0.400 $0.350 $0.390 $0.370
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 179,521.000 $0.300 $0.350 $0.350 $0.360 $0.340
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 1,239.000 $15.000 $12.250 $13.000 $13.440 $13.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 117.000 $220.000 $225.000 $225.000 $246.400 $240.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 30.000 $350.000 $305.000 $225.000 $336.000 $320.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 40.000 $570.000 $380.000 $500.000 $414.400 $400.000
PREFAB PAV MRK TY C (W) (WORD)
EA 147.000 $280.000 $255.000 $275.000 $280.000 $270.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 202.000 $30.000 $25.000 $45.000 $25.760 $25.000
PRE PM TY C(ACC PRK)(BL&WH)(W/BORDR)LG
EA 2.000 $250.000 $508.000 $20.000 $560.000 $540.000
REFL PAV MRKR TY I-C
EA 121.000 $4.000 $5.250 $3.500 $5.600 $5.400
REFL PAV MRKR TY II-A-A
EA 647.000 $4.000 $3.250 $3.000 $3.360 $3.300
REFL PAV MRKR TY II-C-R
EA 7,673.000 $4.000 $3.000 $3.500 $3.080 $3.000
VEH SIG SEC (12")LED(YEL)
EA 2.000 $230.000 $407.000 $250.000 $448.000 $430.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 15.000 $2.000 $4.250 $10.000 $4.480 $4.500
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $9,500.000 $13,800.000 $8,000.000 $15,120.000 $15,000.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $850.000 $1,100.000 $1,000.000 $1,120.000 $1,100.000
EMULSION
GAL 3,081,706.000 $2.150 $3.000 $3.250 $3.270 $3.000
CEMENT
TON 421.000 $180.000 $300.000 $165.000 $235.140 $230.000
EMUL TRTMNT (MX EXST MTRL)10"
SY 655,682.000 $3.000 $5.000 $3.000 $2.710 $5.600
SP MIXES SP-B SAC-B PG70-22
TON 22,371.000 $90.000 $118.000 $115.000 $123.130 $136.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $2,900.000 $25,000.000 $10,000.000 $16,980.040 $25,000.000
DEAD END ROADWAY BARRICADE
LF 64.000 $50.000 $90.000 $75.000 $560.000 $65.000
TMA (STATIONARY)
DAY 72.000 $200.000 $250.000 $250.000 $384.270 $500.000
TMA (MOBILE OPERATION)
DAY 68.000 $200.000 $1,000.000 $275.000 $496.710 $100.000
Totals: $43,930,130.820 $49,841,452.880 $54,232,732.430 $60,665,655.720 $61,908,144.180