CONCHO US 87 (0070-05-037)

Items: 140

County: CONCHO
Length: N/A
Highway: US 87
District: SAN ANGELO
Control Number: 0070-05-037
DBE Goal: N/A
Project: NH 1902(151)
Guaranty: N/A
Time: 299 WORKING DAYS
Engineer's Estimate: $13,126,208.02
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: CONSTRUCT PASSING LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$13,126,208.02
$13,599,407.74
Over/Under Est: 3.6% $473,199.72
$15,376,235.37
Over/Under Est: 17.14% $2,250,027.35
Amt Left: 13.07% $1,776,827.63

Bid Items & Bid Tabulations

140 Total 0 of 140
CONCHO  |  US 87  |  SAN ANGELO  |  0070-05-037  |  07/09/2019  |  $13,126,208.02  |  NH 1902(151)  |  CONSTRUCT PASSING LANES  |  299 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALLEN KELLER COMPANY
REECE ALBERT, INC.
PREPARING ROW
STA 746.030 $700.000 $150.000 $386.930
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 14.000 $520.000 $1,500.000 $1,870.820
PREP ROW (TREE)(24"-30"DIA)
EA 2.000 $500.000 $4,000.000 $1,870.820
PREP ROW (TREE) (18"-36" DIA.)
EA 5.000 $1,220.000 $3,600.000 $1,870.820
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 32,855.000 $5.000 $2.100 $2.730
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 681.000 $5.000 $4.900 $3.230
EXCAVATION (ROADWAY)
CY 21,220.000 $12.000 $19.500 $12.410
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 19,276.000 $20.000 $7.000 $16.630
BACKFILL (TY A OR B)
STA 385.000 $120.000 $100.000 $354.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 123,516.000 $0.110 $0.190 $0.180
DRILL SEEDING (TEMP) (WARM)
SY 61,764.000 $0.110 $0.150 $0.160
DRILL SEEDING (TEMP) (COOL)
SY 61,764.000 $0.110 $0.150 $0.160
PROOF ROLLING
HR 166.000 $90.000 $190.000 $77.270
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 32,796.000 $50.000 $45.000 $49.330
PRIME COAT(MC-30 OR AE-P)
GAL 15,557.000 $5.000 $5.500 $4.900
EMULS ASPH (EROSN CONT)(SS-1)
GAL 3,991.000 $3.500 $4.500 $5.130
ASPH (MULTI OPTION)
GAL 213,554.000 $3.000 $4.200 $3.940
AGGR(TY-PB GR-3 SAC-B)
CY 5,345.000 $120.000 $108.000 $130.200
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 46,716.000 $74.000 $96.000 $117.880
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 3,210.000 $4.000 $3.300 $6.370
CEM STABIL BKFL
CY 439.000 $200.000 $190.000 $192.750
CUT & RESTORING PAV
SY 81.000 $160.000 $170.000 $170.070
TEMPORARY SPL SHORING
SF 782.000 $50.000 $5.500 $5.670
CL C CONC (HEADWALL)
CY 5.000 $1,120.000 $730.000 $736.990
CL C CONC (RAIL FOUNDATION)
CY 8.000 $500.000 $730.000 $736.990
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 851.000 $200.000 $140.000 $141.730
RIPRAP (CONC)(5 IN)
CY 1,500.000 $420.000 $500.000 $510.220
RIPRAP (STONE PROTECTION)(12 IN)
CY 11.000 $125.000 $275.000 $761.960
RIPRAP (MOW STRIP)(4 IN)
CY 16.000 $450.000 $490.000 $493.220
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 356.000 $150.000 $140.000 $141.730
CONC BOX CULV (3 FT X 2 FT)
LF 29.000 $250.000 $430.000 $425.190
CONC BOX CULV (6 FT X 3 FT)
LF 27.000 $400.000 $500.000 $510.220
CONC BOX CULV (6 FT X 4 FT)
LF 45.000 $500.000 $530.000 $538.570
CONC BOX CULV (7 FT X 7 FT)
LF 78.000 $600.000 $1,100.000 $1,133.830
CONC BOX CULV (8 FT X 6 FT)
LF 11.000 $520.000 $900.000 $907.070
CONC BOX CULV (12 FT X 10 FT)
LF 13.000 $1,100.000 $1,000.000 $1,020.450
CONC BOX CULV (8 FT X 3 FT)
LF 11.000 $400.000 $725.000 $736.990
CONC BOX CULV (8 FT X 2 FT)
LF 41.000 $520.000 $750.000 $765.340
CONC BOX CULV (10 FT X 3 FT)(EXTEND)
LF 10.000 $1,000.000 $780.000 $793.680
RC PIPE (CL III)(24 IN)
LF 904.000 $80.000 $95.000 $96.380
RC PIPE (CL III)(30 IN)
LF 74.000 $85.000 $125.000 $124.720
RC PIPE (CL III)(36 IN)
LF 30.000 $130.000 $225.000 $226.770
WINGWALL (PW - 1) (HW=13 FT)
EA 2.000 $75,000.000 $55,000.000 $53,857.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $10,000.000 $10,650.000 $10,771.400
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $25,000.000 $22,500.000 $22,676.630
WINGWALL (PW - 1) (HW=8 FT)
EA 3.000 $25,000.000 $25,000.000 $24,944.300
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $29,000.000 $36,000.000 $36,282.610
SET (TY I)(S=10 FT)(HW=4FT)(3:1)(C)
EA 2.000 $12,000.000 $7,550.000 $7,653.370
SET (TY I)(S=10 FT)(HW=8FT)(3:1)(C)
EA 1.000 $20,000.000 $9,250.000 $9,354.110
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 3.000 $6,000.000 $4,500.000 $4,535.330
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $8,000.000 $5,000.000 $5,102.240
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $7,000.000 $5,000.000 $5,102.240
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
EA 4.000 $6,500.000 $5,300.000 $5,385.700
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 1.000 $6,500.000 $6,800.000 $6,519.530
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
EA 3.000 $7,000.000 $6,800.000 $6,236.070
SET (TY I)(S= 8 FT)(HW= 3 FT)(3:1) (C)
EA 5.000 $10,000.000 $6,700.000 $6,802.990
SET (TY I)(S= 8 FT)(HW= 4 FT)(3:1) (C)
EA 1.000 $7,800.000 $7,000.000 $7,086.450
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 56.000 $1,130.000 $1,350.000 $1,360.600
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $2,150.000 $2,250.000 $2,267.660
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $3,800.000 $4,750.000 $4,818.790
CLEAN EXIST CULVERTS
EA 18.000 $2,400.000 $2,000.000 $2,012.550
REMOV STR (BOX CULVERT)
EA 1.000 $5,000.000 $5,600.000 $5,669.160
MOBILIZATION
LS 1.000 $1,060,000.000 $997,000.000 $1,305,213.160
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $8,000.000 $15,000.000 $9,577.840
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 2,063.000 $35.000 $36.000 $36.610
ROCK FILTER DAMS (REMOVE)
LF 2,063.000 $12.000 $12.000 $12.270
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 664.000 $30.000 $38.000 $38.690
CONSTRUCTION EXITS (REMOVE)
SY 664.000 $10.000 $11.000 $11.220
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $3.000 $6.500 $6.660
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.000 $2.500 $2.630
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 40,000.000 $6.000 $4.300 $4.340
BIODEG EROSN CONT LOGS (REMOVE)
LF 40,000.000 $1.000 $0.500 $0.570
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 1.000 $4,000.000 $13,000.000 $5,703.160
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 340.000 $6.000 $17.000 $17.010
PTB (FUR & INST)(STEEL)
LF 1,080.000 $60.000 $180.000 $181.410
PTB (MOVE)(STEEL)
LF 2,520.000 $6.000 $9.000 $9.070
PTB (STKPL)(STEEL)
LF 1,080.000 $15.000 $11.300 $11.340
DRIVEWAYS (ACP)
SY 1,631.000 $30.000 $44.000 $37.870
RUMBLE STRIPS (SHOULDER)
LF 140,856.000 $0.150 $0.200 $0.190
RUMBLE STRIPS (CENTERLINE)
LF 71,921.000 $0.200 $0.250 $0.260
MTL W-BEAM GD FEN (STEEL POST)
LF 14,850.000 $25.000 $29.000 $29.480
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 16.000 $2,000.000 $2,500.000 $2,522.780
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 100.000 $80.000 $53.000 $53.290
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 6.000 $1,200.000 $1,450.000 $1,473.980
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $2.500 $3.400 $3.400
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $240.000 $225.000 $226.770
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $290.000 $225.000 $226.770
GUARDRAIL END TREATMENT (INSTALL)
EA 74.000 $2,700.000 $2,800.000 $2,834.580
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $280.000 $225.000 $226.770
CRASH CUSH ATTEN (MOVE & RESET)
EA 12.000 $1,300.000 $1,690.000 $1,700.750
CRASH CUSH ATTEN (STKPL)
EA 5.000 $900.000 $1,690.000 $1,700.750
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $8,800.000 $9,500.000 $9,637.570
WIRE FENCE (TY C)
LF 578.000 $15.000 $17.000 $17.010
WIRE FENCE (TY D)
LF 50.000 $17.000 $20.000 $20.410
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 5.000 $300.000 $400.000 $396.840
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $750.000 $640.000 $646.280
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $700.000 $840.000 $850.370
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 7.000 $800.000 $950.000 $958.090
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $1,000.000 $1,100.000 $1,111.150
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 44.000 $600.000 $665.000 $672.360
REMOVE SM RD SN SUP&AM
EA 7.000 $150.000 $200.000 $86.260
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 56.000 $98.000 $90.000 $92.970
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 15.000 $24.000 $45.000 $45.350
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 3.000 $65.000 $92.000 $92.970
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 26.000 $100.000 $95.000 $96.380
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 223.000 $24.000 $47.000 $47.620
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 13,041.000 $0.250 $0.400 $0.400
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 2,336.000 $0.500 $0.500 $0.510
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 70,901.000 $0.250 $0.300 $0.310
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 612.000 $0.250 $0.300 $0.310
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 88.000 $3.000 $4.500 $4.540
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,492.000 $0.500 $1.100 $1.130
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 34.000 $9.000 $11.250 $11.340
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,480.000 $0.500 $1.100 $1.130
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 2,650.000 $0.800 $0.750 $0.790
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 3,801.000 $0.650 $1.000 $0.960
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 123.000 $10.000 $12.300 $12.470
REFL PAV MRK TY II (W) 4" (BRK)
LF 14,720.000 $0.110 $0.150 $0.140
REFL PAV MRK TY II (W) 4" (DOT)
LF 2,650.000 $0.800 $0.250 $0.200
REFL PAV MRK TY II (W) 4" (SLD)
LF 148,908.000 $0.110 $0.150 $0.140
REFL PAV MRK TY II (W) 8" (SLD)
LF 3,801.000 $0.300 $0.300 $0.320
REFL PAV MRK TY II (W) 24" (SLD)
LF 123.000 $2.800 $2.350 $2.380
REFL PAV MRK TY II (Y) 4" (BRK)
LF 8,360.000 $0.110 $0.150 $0.140
REFL PAV MRK TY II (Y) 4" (SLD)
LF 88,390.000 $0.110 $0.150 $0.140
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 14,720.000 $0.350 $0.350 $0.360
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 148,908.000 $0.300 $0.300 $0.310
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 8,360.000 $0.300 $0.350 $0.360
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 88,390.000 $0.300 $0.300 $0.340
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $225.000 $260.000 $266.450
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 14.000 $500.000 $600.000 $634.950
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $300.000 $325.000 $328.810
REFL PAV MRKR TY I-C
EA 928.000 $3.500 $4.500 $4.540
REFL PAV MRKR TY II-A-A
EA 2,117.000 $3.500 $4.500 $4.540
ELIM EXT PAV MRK & MRKS (4")
LF 77,217.000 $0.750 $0.500 $0.500
TREE TRIMMING
MI 0.400 $15,000.000 $32,000.000 $62,133.980
CNC CRACK REPAIR (FLOOD)(GRAVITY)(ROUT)
SF 8.000 $300.000 $325.000 $340.150
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 51.000 $8,000.000 $120.000 $335.480
TMA (STATIONARY)
DAY 367.000 $200.000 $240.000 $244.930
TMA (MOBILE OPERATION)
DAY 5.000 $700.000 $570.000 $827.520
TEMP SPEED MONITOR SYS
EA 2.000 $8,000.000 $22,500.000 $7,902.760
Totals: $13,126,208.020 $13,599,407.740 $15,376,235.380