WASHINGTON FM 1155 (0315-12-016)

Items: 90

County: WASHINGTON
Length: N/A
Highway: FM 1155
District: BRYAN
Control Number: 0315-12-016
DBE Goal: N/A
Project: STP 1902(115)
Guaranty: N/A
Time: 84 WORKING DAYS
Engineer's Estimate: $1,271,589.96
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: WIDEN NON-FREEWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$1,271,589.96
$1,296,208.43
Over/Under Est: 1.94% $24,618.47

Bid Items & Bid Tabulations

90 Total 0 of 90
WASHINGTON  |  FM 1155  |  BRYAN  |  0315-12-016  |  07/09/2019  |  $1,271,589.96  |  STP 1902(115)  |  WIDEN NON-FREEWAY  |  84 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
PREPARING ROW
STA 67.900 $400.000 $445.000
REMOVING CONCRETE(MOW STRIP)
LF 940.000 $12.000 $5.700
EXCAVATION (ROADWAY)
CY 500.000 $10.000 $16.000
SUBGRADE WIDENING (ORD COMP)
STA 67.900 $605.000 $645.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 20.000 $10.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 152.000 $15.000 $25.500
FURNISHING AND PLACING TOPSOIL (4")
SY 16,194.000 $0.560 $0.500
BLOCK SODDING
SY 128.000 $4.300 $5.260
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 16,194.000 $0.130 $0.160
BROADCAST SEED (TEMP) (WARM)
SY 8,097.000 $0.130 $0.160
BROADCAST SEED (TEMP) (COOL)
SY 8,097.000 $0.130 $0.160
VEGETATIVE WATERING
MG 161.900 $18.000 $18.000
FLBS (CMP IN PLC)(TY D GR 1-2 OR 5)(8")
SY 18,636.000 $14.000 $14.900
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 15,973.000 $2.760 $1.100
CEMENT
TON 319.000 $150.000 $147.000
CEMENT TREAT (EXIST MATL)(DC)(10")
SY 22,629.000 $2.700 $0.960
CM TRT(PT MX)(CL M)(TYD)(GR1-2)(FN POS)
CY 765.000 $110.000 $80.000
ASPH (AC-20-5TR)
GAL 16,888.000 $3.250 $3.100
ASPH (RC-250)
GAL 6,413.000 $3.800 $4.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 190.000 $100.000 $176.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 356.000 $100.000 $164.000
CUT & RESTORING PAV
SY 46.000 $65.000 $150.000
FLOWABLE BACKFILL
CY 2.000 $100.000 $890.000
TRENCH EXCAVATION PROTECTION
LF 111.000 $10.000 $15.750
RIPRAP (CONC)(5 IN)
CY 14.200 $500.000 $526.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 45.000 $120.000 $237.000
RIPRAP (MOW STRIP)(4 IN)
CY 41.700 $415.000 $579.000
RC PIPE (CL III)(36 IN)
LF 84.000 $131.000 $150.000
SET (TY I)(S=10 FT)(HW=5FT)(4:1)(C)
EA 4.000 $16,000.000 $15,800.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 28.000 $920.000 $840.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,245.000 $840.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,190.000 $1,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,240.000 $2,700.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 2.000 $1,950.000 $3,160.000
SET (TY II) (36 IN) (RCP) (4: 1) (P)
EA 2.000 $3,600.000 $3,700.000
REMOV STR (WINGWALL)
EA 2.000 $1,995.000 $1,400.000
REMOV STR (PIPE)
EA 19.000 $400.000 $800.000
REMOVING ROCK RIPRAP
LF 40.000 $20.000 $264.000
MOBILIZATION
LS 1.000 $94,500.000 $103,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,500.000 $1,300.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 560.000 $28.000 $29.450
ROCK FILTER DAMS (REMOVE)
LF 560.000 $7.500 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,160.000 $2.500 $2.630
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,160.000 $0.500 $0.700
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 394.000 $4.000 $4.210
BIODEG EROSN CONT LOGS (REMOVE)
LF 394.000 $1.200 $0.500
DRIVEWAYS (ACP)
SY 356.000 $45.000 $29.500
DRIVEWAYS (SURF TREAT)
SY 1,235.000 $35.000 $55.700
TURNOUTS (SURF TREAT)
SY 151.000 $70.000 $136.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $20.000 $23.680
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,952.000 $1,873.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $2.600 $2.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $158.000 $400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,600.000 $2,770.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $242.000 $265.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 6.000 $225.000 $237.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $270.000 $270.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $576.000 $580.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $625.000 $384.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $495.000 $500.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $670.000 $900.000
REMOVE SM RD SN SUP&AM
EA 39.000 $85.000 $68.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 12.000 $24.000 $21.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 10.000 $60.000 $50.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 10.000 $20.000 $25.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 490.000 $0.220 $0.350
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 14,300.000 $0.220 $0.350
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8.000 $0.750 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 185.000 $0.400 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 150.000 $0.800 $1.050
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 54.000 $6.500 $10.530
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $91.000 $315.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $215.000 $370.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 26.000 $8.000 $10.530
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 14,740.000 $0.500 $0.810
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 490.000 $0.500 $1.050
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 14,300.000 $0.500 $0.850
REFL PAV MRKR TY I-C
EA 9.000 $3.500 $6.320
REFL PAV MRKR TY II-A-A
EA 158.000 $3.500 $6.320
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,000.000 $2,700.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 40.000 $5.000 $15.800
TMA (STATIONARY)
EA 2.000 $8,500.000 $6,500.000
TMA (MOBILE OPERATION)
DAY 4.000 $325.000 $500.000
1
CEM STABIL BKFL
CY 44.000 $70.000 $131.500
1
RC PIPE (CL III)(18 IN)
LF 338.000 $50.000 $59.000
1
RC PIPE (CL III)(24 IN)
LF 144.000 $76.000 $105.000
1A
CEM STABIL BKFL
CY 83.200 $70.000 $0.000
1A
RC PIPE (CL III)(18 IN)
LF 262.000 $50.000 $0.000
1A
RC PIPE (CL III)(24 IN)
LF 120.000 $76.000 $0.000
1A
THERMOPLASTIC PIPE (SIZE)(PP)
LF 100.000 $28.800 $0.000
Totals: $1,302,513.960 $1,296,208.430